CLINS

Source Selection Sensitive FAR 2.101

Schedule of Services SP3300-21-Q-0110

POC Carl Devitz, 717-770-2891, carl.devitz@dla.mil

CLINSPROJECTUnit of MeasueQTYPrice Each
CLIN 0001Inspect the control room boards and fuel pump station control board to ensure the control boards are functioning properly. As part of this inspection, ensure all lights and gauges are functioning properly (3.1.1.)JB1
CLIN 0002Install a high-level alarm check button/s on the fuel pump station control board. Alarm check button/s should be for all tanks in the tank farm. Verify the fuel pump station control board is functioning properly including that all annunciators and lights are functioning properly (3.1.2.)JB1
CLIN 0003Replace up to 18 light bulbs (i.e., OX IDEC AC 115/120V LSTD-H2) on the control room boards and fuel pump station control board in case blown bulbs are discovered during 3.1.1 or 3.1.2 above (3.1.3.)JB1
CLIN 0004Install fire protective wrapping around fiberglass reinforced piping to comply with NFPA 30 27.4.4, PA 25.245.526 (b) if manufacturer determines piping is acceptable in current condition (3.1.4.)JB1
or
CLIN 0005Replace fiberglass reinforced piping to comply with NFPA 30 27.4.4, PA 25.245.526 (b) if manufacturer determines piping is unacceptable in current condition (3.1.4)JB1
CLIN 0006Inspect the tank farm secondary containment for gaps/cracks, certify the containment as meeting regulatory requirements, and provide documentation required by DEP (3.1.5.)JB1
CLIN 0007Label piping according to NFPA 30 27.10 (3.1.6.)JB1
CLIN 0008Install an antisiphon device on product line leaving the containment structure, (3.1.7.)JB1
and/or
CLIN 0009Install a solenoid valve on product line leaving the containment structure.Installing a solenoid valve would require installation of conduit and wiring. Contractor must supply and install the conduit & wiring required for the solenoid valve (3.1.7.)JB1
CLIN 0010Unseal the interstitial port/s on the underground DW FRP fuel piping of the supply and return lines to allow leaks from the main lines to drain into the tank containment (3.1.8.)JB1
CLIN 0011Conduct a secondary type of nondestructive shell testing for tanks 10A and 14A (3.1.9.)JB1
CLIN 0012Install a check valve on the return line (3.1.10.)
CLIN 0013Inspect exposed fuel line at pump station for serviceability and operability (3.1.11.)JB1
CLIN 0014Install a check valve for the exposed fuel line at the pump station (3.1.12.)JB1
CLIN 0015Attach a printer to the 6,000-gallon heating oil AST tank monitor at Building 83 so monthly tank monitoring can be performed and printed out such as but not limited to the status of the interstitial area, if any alarms sound, etc. The housing for the printer must be watertight because the monitor is located outside adjacent to the tank. Also, confirm the monitor and tank have a high-level alarm with an automatic high-level cutoff device and a method of leak detection for the tank and piping. The tank is manufactured by Highland Tank & MFG. CO. and the monitor currently on the tank is a Pneumercator TMS 3000. The manufacturer has a stock printer that can be added to the monitor. Installing the tank monitor may require installing conduit and wiring. The Contractor will supply and install conduit & wiring required for the tank monitor (3.2.1.)JB1
or
CLIN 0016Install a printer in a nearby facility connected to the existing monitoring of the 6,000-gallon heating oil AST at Building 83 so monthly tank monitoring can be performed and printed out such as but not limited to the status of the interstitial area, if any alarms sound, etc. Also, confirm there is a high-level alarm device with an automatic high-level cutoff device and a method of leak detection for the tank and piping. The tank is manufactured by Highland Tank & MFG. CO. and the monitor currently on the tank is a Pneumercator TMS 3000. The manufacturer has a stock printer that can be added to the monitor. Installing the tank monitor may require installing conduit and wiring. The Contractor will supply and install conduit & wiring required for the tank monitor (3.2.1.)JB1
CLIN 0017Change fill port connection to a connection for delivery under pressure for two 2,000-gallon USTs at Building 54 and prepare a brief written report of any additional changes required for the USTs to remain compliant with all applicable Federal, State, and local laws, regulations, codes, and standards resulting from the project (3.2.2.)JB1
CLIN 0018Inspect one 300-gallon diesel and one 300-gallon gasoline AST at Building 300 to ensure compliance with all applicable Federal, State, and local laws, regulations, codes, and standards (3.2.3.)JB1
CLIN 0019Inspect one 4,000-gallon heating oil AST and one INCON TS-1001 Tank Sentinel monitor at Building 89 to ensure compliance with all applicable Federal, State, and local laws, regulations, codes, and standards and determine how to access regular and emergency vents, to ensure high level alarm is set correctly, and interstitial monitor is working correctly, etc. (3.2.4)JB1
CLIN 0020Inspect one 2,000-gallon heating oil AST at Building 57 to ensure compliance with all applicable Federal, State, and local laws, regulations, codes, and standards (3.2.5.)JB1
CLIN 0021Inspect one 500-gallon kerosene AST located at Building 749 to ensure compliance with all applicable Federal, State, and local laws, regulations, codes, and standards (3.2.6.)JB1

GRAND TOTAL 0.00

Vendor to only fill in Column highliighted in Yellow. The total will self populate

CLIN 0004 and 0005 is an either or. The vendor shall quote the most cost effective solution in compliance with regulatory requirements
CLIN 0008 and 0009 is an either or, or an and. The vendor shall quote the most cost effective solution in compliance with regulatory requirements
CLIN 0015 and 0016 is an either or. The vendor shall quote the most cost effective solution in compliance with regulatory requirements