Attachment 3_Schedule of Services.docx
DOCX document 25 KB Posted
- Solicitation number
- W91ZLK-23-R-0016
About this file
This document contains a schedule of services for the annual maintenance and repair of water systems for three test facilities. The contractor will provide monthly water treatment, including labor, equipment, and materials, for the evaporative cooling tower systems and associated subsystems of the Army Contracting Command's Roadway Simulator, Drivetrain Durability Simulator, and Heavy Vehicle Durability Simulator facilities. The base year and two option year periods are included, with estimated quantities and blank cost amounts per hour and total for the contractor to provide. The related federal contract opportunity is solicitation number W91ZLK-23-R-0016 issued by the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground for the annual maintenance and repair of the water systems at the Roadway Simulator Test Facility and Drivetrain Simulator Facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1_Combined SynopsisAndSolicitation Description_W91ZLK-23-R-0016.docx | DOCX document | |
| Attachment 4_Provisions and Clauses.docx | DOCX document | |
| Attachment 2_Performance Work Statement.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF SERVICES
| Item No. |
| Description |
| Estimated Quantity |
| Amount |
(Per Hour & Total)
Base Year
| 0001 |
| Labor, equipment, and materials necessary to accomplish proper water treatment of the evaporative cooling tower systems, and associated subsystems of the ATC Roadway Simulator (RWS), Drivetrain Durability Simulator (DDS), and Heavy Vehicle Durability Simulator (HVDS) facilities. Services, water treatment and reports to be provided monthly. |
| 1 Job |
| Total: |
Option Year One
| 1001 |
| Labor, equipment, and materials necessary to accomplish proper water treatment of the evaporative cooling tower systems, and associated subsystems of the ATC Roadway Simulator (RWS), Drivetrain Durability Simulator (DDS), and Heavy Vehicle Durability Simulator (HVDS) facilities. Services, water treatment and reports to be provided monthly. |
| 1 Job |
| Total: |
Option Year Two
| 2001 |
| Labor, equipment, and materials necessary to accomplish proper water treatment of the evaporative cooling tower systems, and associated subsystems of the ATC Roadway Simulator (RWS), Drivetrain Durability Simulator (DDS), and Heavy Vehicle Durability Simulator (HVDS) facilities. Services, water treatment and reports to be provided monthly. |
| 1 Job |
| Total: |
File details come from the government source that posted it. Updated .