Attachment 3 RFQ Required CLIN COST Structure Breakdown.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- W911RX-24-Q-0072
About this file
This document appears to be an Attachment 3 - RFQ Required CLIN COST Structure Breakdown for a federal contract opportunity. It provides a detailed cost breakdown for various line items, including annual maintenance services, quarterly maintenance services, 5-year inspections, and unscheduled/emergency repairs for fire department equipment at Fort Johnson, Louisiana.
The related federal contract opportunity is a solicitation (Solicitation Number W911RX-24-Q-0072) for Fire Department Equipment Service Testing at Fort Johnson, Louisiana. It is a 100% small business set-aside for the maintenance and servicing of fire department equipment, including self-contained breathing apparatus (SCBA) units, confined space equipment, breathing air compressors, fire hoses, and ladders. The contract is for a base year with four option years, and the services must be performed at regular intervals as outlined in NFPA standards to support the mission of the Fire & Emergency Services at USAG Fort Johnson.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fire EQ Test
| CLIN | Description | Est Qty | Unit | Base Year Unit Price | Base Year CLIN Price | Base Year Total Price | Option Year 1 Unit Price | Option Year 1 CLIN Price | Option Year 1 Total Price | Option Year 2 Unit Price | Option Year 2 CLIN Price | Option Year 2 Total Price | Option Year 3 Unit Price | Option Year 3 CLIN Price | Option Year 3 Total Price | Option Year 4 Unit Price | Option Year 4 CLIN Price | Option Year 4 Total Price | Base and All Option Total |
| 0001 | Annual Maintenance Services | ||||||||||||||||||
| Annual Services (w/Flow Test) of Complete SCBA Units (PWS 5.3) | |||||||||||||||||||
| Complete SCBA Assemblies | 60 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SCBA Masks | 60 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Confined Space Escape Packs | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Annual Visual Inspections of Cylinders (PWS 5.4) | 0 | ||||||||||||||||||
| Carbon SCBA Cylinders (10, 30, 45, 60 minute) | 135 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Annual Confined Space Inspection/Testing/Maint/Repair/ ( PWS 5.6) | $ - 0 | ||||||||||||||||||
| Confined Space Rescue (CSR) Air Source Cart | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Confined Space Rescue (CSR) Air Hoses (Feet) 200’ | 4 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Annual PM and servicing of Breathing Air Compressors (PWS 5.7) | |||||||||||||||||||
| Bauer Breathing Air Compressor | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Mako Breathing Air Compressor | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Annual Testing Structural Fire Hose (PWS 5.10) | $ - 0 | ||||||||||||||||||
| Feet (Supply and Attack) | 22,000 | FT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Annual Testing Fire Hose Nozzles (PWS 5.11) | $ - 0 | ||||||||||||||||||
| Hose Nozzles | 35 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Annual Ladder Testing/Inspection/Certification (PWS 5.9) | $ - 0 | ||||||||||||||||||
| Ground Ladders | 30 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Aerial Ladder Testing (2001 E-One 110’ w/ waterway) | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 0002 | Quarterly Maintenance Services (PWS 5.8) | ||||||||||||||||||
| Air Sampling/Testing kits/service for (3) units (quarterly) | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0003 | 5 Year Inspections (PWS 5.5 & 5.9) | ||||||||||||||||||
| Hydrostatic Testing of Cylinders (5 year cycle) | 27 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Aerial Ladder Non-destructive testing (2001 E-One 110’ w/ waterway) Inspected in base Year Only | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| 0004 | Unregularly Scheduled/Emergency Repairs (PWS 5.4) | ||||||||||||||||||
| HP Valve Kits for SCBA Cylinders (30, 45, 60 minute) | 135 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Valve Rebuild | 135 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| ALL | TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
File details come from the government source that posted it. Updated .