This is an asbestos-containing building materials (ACBM) survey report prepared by RPF Environmental, Inc. for the New Hampshire Department of Environmental Services (NH DES) Waste Water Treatment Plant located at 528 River Street in Franklin, New Hampshire. The survey was conducted on December 5, 2018, and encompassed exterior roofing and door caulking assessments across seven buildings: Headwork, Primary, Secondary, Plant Water, Gas, Digestion, and Septic Receiving facilities. The scope of work was limited to accessible areas only, excluding interior spaces and concealed materials. RPF Environmental extracted and analyzed 89 bulk samples using polarized light microscopy (PLM) in accordance with EPA sampling protocols and identified asbestos-containing materials in 18 homogeneous groups of suspect building material.
The survey identified non-friable asbestos-containing building materials classified as EPA Category I, with asbestos content ranging from 2% to 30% chrysotile in various built-up roofing felts, flashing compounds, and penetration compounds. The report concludes that ACBM found to be impacted or disturbed by renovation or demolition activities must be removed by qualified, licensed contractors in accordance with State and federal regulations, while materials that will not be impacted may remain in place if managed properly under an asbestos management plan and operations and maintenance program. The report emphasizes that a certified abatement project designer must prepare a work plan prior to any abatement activity, and notification to NH Air Resources is required 10 days before interior abatement work or demolition begins. RPF Environmental makes no guarantees or warranties regarding the property condition beyond the scope of the limited survey performed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| attachment_2_RFP DES 2026-06.pdf | ||
| attachment_1_RFP DES 2026-06.pdf | ||
| RFP DES 2026-06.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
January 11, 2019
Sharon McMillin
State of NH Dept. of Environmental Services
Administrator
528 River St.
PO Box 68
Franklin, NH 03235
Re: Franklin Waste Water Treatment Plant
Roof and Door Survey Findings
RPF File No. 188931
Dear Mr. McMillin, On December 5, 2018, RPF Environmental, Inc. (RPF) conducted roofing and door surveys at the
Waste Water Treatment Plant located at 528 River Street in Franklin, New Hampshire. The surveys were performed on the exterior roofing of the Headwork, Primary, Secondary, Plant Water, Gas, Digestion, Septic Receiving Buildings and door sampling at the Headwork, Primary, Secondary, Septic Receiving and Operations and Garage Buildings as designated by you or your site representative for accessible asbestos building material as indicated herein. Below is a summary of findings, discussion of the results and preliminary recommendations for proper management of the identified asbestos building material. Attached to this report are the survey data tables, laboratory results, survey methodologies and limitations.
This report is not intended to be used as an abatement specification or work plan. To proceed with abatement work, the following important steps are necessary:
1. A work plan or project design documents must be prepared prior to abatement by a certified abatement project designer.
2. The abatement specification or work plan should then be used to solicit bids from qualified abatement contractors. Only properly licensed contractors should be used for asbestos abatement and disposal.
3. A qualified industrial hygiene/testing consultant should conduct sufficient testing and inspections of the work, independent of the abatement contractor. The consultant should also prepare final abatement reports for the work.
Summary of Findings
The scope of the survey included accessible asbestos-containing building material in accordance with the initial asbestos inspection requirements prior to renovation or demolition work as stated in the State regulations and applicable federal regulations.
NH DES Waste Water Treatment Facility
Building Survey Findings Page 2
Several types of suspect asbestos-containing building material (ACBM) were observed by
RPF, including friable and nonfriable suspect material. Based on the testing performed by
RPF, asbestos was detected in the following materials:
• Various Built-up roofing felts
• Various Flashing Compound
• Various Penetration
Compound
The scope of work was limited to the exterior roofing and doors of the buildings listed on page 1 of this report. Full exterior sampling was not performed, and interior sampling was not included as part of the scope of work. Except for the door caulking sampling and roof sampling performed as listed in the above buildings, no interior sampling was performed.
No interior sampling was performed on the buildings. Window caulking and exterior portions of the building were inventoried only.
Depending on the extent of renovation and final construction plans, proper abatement and/or management of the materials will be required in accordance with applicable State and federal regulations. Renovation and demolition plans should be reviewed by a certified industrial hygienist and a project designer for possible asbestos impact issues. Based on the impact assessment and planned usage, technical specifications should be prepared for abatement, as applicable. A management plan should also be prepared to address any asbestos or other hazardous material scheduled to remain after construction.
Discussion of Findings
Asbestos is the name for a group of naturally occurring minerals that separate into strong, very fine fibers. The adverse health effects associated with asbestos exposure have been extensively studied for many years. Results of these studies and epidemiological investigations have demonstrated that inhalation of asbestos fibers may lead to increased risk of developing one or more diseases. In all cases, extreme care must be used not to disturb asbestos-containing materials or to create fiber release episodes.
In the accessible locations surveyed, RPF identified thirty-seven (37) homogeneous groups of accessible suspect asbestos-containing building material. Suspect materials were identified based on current industry standards, EPA, and other guideline listings of potential suspect ACBM.
The following is a summary list of the suspect ACBM identified and sampled during this survey:
• Various Built-up roofing felts
• Various Flashing Compound
• Various Penetration Compound
• Various Roof Filler Insulation
• Various Fiberboard
• Various Interior Door Caulk
• Various Exterior Door Caulk
Building Survey Findings Page 3
A total of eighty-nine (89) samples were extracted from the different groups of suspect material in accordance with EPA sampling protocols. Of the samples collected by RPF, asbestos was detected in eighteen (18) groups of suspect ACBM.
Table 1 of Appendix A includes a list of ACBM and accessible asbestos identified in the building, EPA category listings, and asbestos content. A listing of the different homogenous groups of suspect material identified, samples collected, and analytical results is included in Appendix A.
The ACBM identified during this survey consists of nonfriable material. The nonfriable ACBM was observed to be in good to fair condition and, left undisturbed and properly managed, is unlikely to cause any major fiber release episodes.
Suspect materials encountered at the site subsequent to this survey, which are not included on the enclosed listings of suspect material sampled, should be assumed to be ACBM until proper testing proves otherwise (for example prior to any disturbance due to maintenance, renovation or demolition activity). Please notify RPF in this event to arrange for proper testing and assessments.
Please reference the attached methodology and limitations.
Conclusions
Based on the survey findings, the buildings were found to have non-friable ACBM roofing.
In accordance with current regulatory requirements, ACBM that may be impacted or disturbed
(such that asbestos fiber release occurs) by renovation, demolition or other such activity must be removed by qualified, licensed firms. Although regulations for removal of nonfriable ACBM are somewhat less stringent than the requirements for friable ACBM, it should be noted that nonfriable
ACBM that is subjected to grinding, abrasion, and other forces, could be rendered friable. In this event, the nonfriable ACBM would be re-categorized friable ACBM.
ACBM that will not be impacted by renovation or demolition activity may be left in place if managed properly and if the materials are maintained in good condition. ACBM to remain in the building should be included in an asbestos management plan and operations and maintenance
(O&M) program detailing the measures to be used to safely occupy the building until the ACBM is fully removed. An accredited Management Planner should prepare the O&M Program in accordance with the guidelines set forth in 40 CFR Part 763 (AHERA).
Work impacting LP, fluorescent light bulbs, mercury (and potential PCB ballasts) must be performed in accordance with current State and federal standards, including but not limited safe work practices, engineering controls, proper waste packaging, and proper disposal. Work involving LP may require notification of tenants, if rented or leased space, prior to start of work.
Sufficiently in advance of the start of renovation and/or remediation work, abatement project design should be completed. As part the initial design steps any planned renovation and demolition activity should be reviewed for potential impact on ACBM. Asbestos removal is highly regulated at the State and federal level, and in some cases, at the local level also. Notification to NH Air
Building Survey Findings Page 4
Resources is required 10-days prior to the start of interior abatement work and demolition. Only qualified, trained, and licensed firms, as applicable, should be engaged to complete asbestos removal or other abatement activity. Asbestos abatement work must be designed (abatement specifications or work plan prepared) by accredited personnel.
All employees and contractors that may access or otherwise disturb areas with suspect ACBM present should be notified of the presence of ACBM and possible hidden ACBM, and the need to use caution when proceeding with work. Appropriate notifications, labeling and other hazard communications should be completed to all employees, contractors and others in accordance with
US OSHA regulations and other applicable requirements (including asbestos labeling in accordance with 29 CFR Part 1926). The scope of RPF services for this survey did not include labeling of ACBM or hazard communications to other employees, building occupants, contractors, or subcontractors.
Documentation of current ACBM conditions and in-depth hazard assessment is beyond the scope-of-work for this initial survey. With the exception of the specific testing and analysis detailed herein, no other samples of materials, oil, water, ground water, air, or other suspect hazardous materials were collected in the course of this inspection that supports or denies these conclusions.
No additional services beyond those explicitly stated herein were performed and none should be inferred or implied. The summary and conclusions are based on reasonably ascertainable information as described in this report. RPF Environmental, Inc. makes no guarantees, warranties, or references regarding this property or the condition of the property after the period of this report.
If you have any questions at this time, or if you would like to discuss the remediation process, please call our office.
Sincerely, RPF ENVIRONMENTAL, INC.
Kara Forsythe, SMS
Sr. EH&S Consultant
Enclosures:
Appendix A: Data and Analytical Tables
Appendix B: Example Pictures
Appendix C: Summary of Methodology and Limitations
188931 Franklin WWTP 121318 Rpt
APPENDIX A
TABLE 1
NH DEPARTMENT OF ENVIROMENTAL SERVICES
Waste Water Treatment Plant
528 River Street, Franklin
SUMMARY OF EXTERIOR ROOFING ACBM IDENTIFIED
Building Material
Location Approximate
Quantity
EPA Category Asbestos
Results
Head Work Building
Built Up Roofing Felts Exterior Roof 808 sq. ft Category I
Nonfriable
5% Chrysotile
Edge Flashing
Compound
Exterior Roof 130 lf. Category I
Nonfriable
10%
Chrysotile
Penetration Flashing
Compound
Exterior Roof 10 sq. ft. Category I
Nonfriable
5% Chrysotile
Primary Building
Built-up roofing felts Exterior Roof 413 sq. ft. Category I
Nonfriable
5% Chrysotile
Penetration Flashing
Compound
Exterior Roof 5 sq. ft. Category I
Nonfriable
30%
Chrysotile
Edge Flashing
Compound
Exterior Roof 75 lf. Category I
Nonfriable
10%
Chrysotile
Secondary Building
Built-up roofing felts Exterior Roof 502 sq. ft. Category I
Nonfriable
10%
Chrysotile
Edge Flashing
Compound
Exterior Roof 85 lf. Category I
Nonfriable
10%
Chrysotile
Penetration Flashing
Compound
Exterior Roof 5 lf. Category I
Nonfriable
15%
Chrysotile
Plant Water Building
Edge Flashing
Compound
Exterior Roof 90 lf. Category I
Nonfriable
10%
Chrysotile
Digestion
Edge Flashing
Compound
Exterior Roof 35 lf. Category I
Nonfriable
15%
Chrysotile
Built-up Roofing Felts Exterior Roof 191 sq. ft. Category I
Nonfriable
10%
Chrysotile
Penetration Compound Exterior Roof 3 sq. ft. Category I
Nonfriable
15% Chrysotile
Notes:
• Table 1 does not include a listing of all ACBM and suspect ACBM present at the site, only the materials found to be
ACBM during the limited testing of this limited survey. Full testing and inspections are required to further identify the types, locations and quantities of ACBM present at this site.
• Please note that Category 1 and Category 2 nonfriable ACM are recategorized as friable and/or RACM under certain conditions. Current State asbestos regulations are more strict and comprehensive than the EPA NESHAPs requirements.
• All quantities are approximate only and should be confirmed during abatement project design and abatement bidding.
• It is possible that some concealed or inaccessible ACBM is present. Care should be used when renovating/demolishing inaccessible building space. Further explorative survey work may be necessary during design and/or in conjunction with demolition.
Gas Roof
Edge Flashing
Compound
Exterior Roof 30 lf. Category I
Nonfriable
2% Chrysotile
Penetration Compound Exterior Roof 8 sq. ft. Category I
Nonfriable
15% Chrysotile
Septic Receiving
Edge Flashing
Compound
Exterior Roof 80 lf. Category I
Nonfriable
8% Chrysotile
Built-up roofing felts Exterior Roof 168 sq. ft. Category I
Nonfriable
20% Chrysotile
Penetration Compound Exterior Roof 4 sq. ft. Category I
Nonfriable
10% Chrysotile
TABLE 2
WWTP Headwork Building
Exterior Roofing and Door Caulking Survey
Polarized Light Microscopy – EPA 600/R-93/116 Method
Samples Collected: December 05, 2018
• SFP Means analysis was terminated because asbestos was detected on a previous homogenous sample during the survey work.
Please reference the "HG" group number.
• Please reference the full report for discussions and additional information and limitations pertaining to these results.
Sample ID Description
Asbestos
Content
Asbestos
Components
Fibrous
Components
Non Fibrous
Components
120518 HG01 Door caulk, white, dry side None Detected -- 100% Other
120518 HG01a Door caulk, white, dry side None Detected -- 100% Other
120518 HG02 door caulk, black, wet side None Detected -- 100% Other
120518 HG02b door caulk, black, wet side None Detected -- 100% Other
120518 HG03
Built up roofing, exterior, top layer, south side Positive 5% Chrysotile
5% Fiber Glass
40% Cellulose 50% Other
120518 HG03b
Built up roofing, exterior, top layer, north side *SFP -- --
120518 HG03c
Built up roofing, exterior, top layer, center of room *SFP -- --
120518 HG04a
Insulation filler, tan, middle layer, south side None Detected --
30% Vermiculite
70% Other
120518 HG04b
Insulation filler, tan, middle layer, north side None Detected --
30% Vermiculite
70% Other
120518 HG04c
Insulation filler, tan, middle layer, center of roof None Detected --
30% Vermiculite
70% Other
120518 HG05
Flashing compound, black, roof edge, south side at metal Positive 10% Chrysotile -- 90% Other
120518 HG05b
Flashing compound, black, roof edge, north side at metal *SFP -- --
120518 HG06
Abutment flashing, black, at north end exhaust vent Positive 5% Chrysotile
15% Synthetic
Fibers 80% Other
120518 HG06b
Abutment flashing, black, at south end exhaust vent *SFP -- -- 188931
WWTP Primary Building
Roofing and Door Caulk Survey
• SFP Means analysis was terminated because asbestos was detected on a previous homogenous sample during the survey work.
• Please reference the full report for discussions and additional information and limitations pertaining to these results.
Content
Asbestos
Components
Fibrous
Components
Non Fibrous
Components
120518 HG100
Door caulk, white, west door, interior None Detected -- 100% Other
120518 HG100b
Door caulk, white, west door, interior None Detected -- 100% Other
120518 HG101
Door caulk, grey, north door, exterior None Detected -- 100% Other
120518 HG101b
Door caulk, grey, north door, exterior None Detected -- 100% Other
120518 HG102 Built up roofing, black, west side Positive 5% Chrysotile
20% Synthetic
Fibers
30% Cellulose 45% Other
120518 HG102b
Built up roofing felts, black, east side *SFP -- --
120518 HG103
Roofing filler insulation, tan, west side None Detected --
30% Vermiculite
70% Other
120518 HG103b
Roofing filler insulation, tan, east side None Detected --
30% Vermiculite
70% Other
120518 HG104
Roof penetration compound, black, west edge Positive 30% Chrysotile 30% Cellulose 40% Other
120518 HG104b
Roof penetration compound, black, west edge *SFP -- --
120518 HG105
Edge flashing, black, west roof edge Positive 10% Chrysotile -- 90% Other
120518 HG105b
Edge flashing, black, east roof edge *SFP -- --
120518 HG106 vent caulk, white, furnace vent None Detected -- 100% Other
120518 HG106b vent caulk, white, furnace vent None Detected -- 100% Other
120518 HG107 Vent flashing, black, furnace vent None Detected 10% Cellulose 90% Other
120518 HG107b Vent flashing, black, furnace vent None Detected -- 100% Other
WWTP- Secondary Building
Roof and Door Caulk Survey
• SFP Means analysis was terminated because asbestos was detected on a previous homogenous sample during the survey work.
• Please reference the full report for discussions and additional information and limitations pertaining to these results.
Content
Asbestos
Components
Fibrous
Components
Non Fibrous
Components
120518 HG200 Door caulk, white, south door, interior None Detected -- 100% Other
120518 HG200b Door caulk, white, south door, interior None Detected -- 100% Other
120518 HG201 Door caulk, grey, south door, exterior None Detected -- 100% Other
120518 HG201b Door caulk, grey, east door, exterior None Detected -- 100% Other
120518 HG202
Edge flashing compound, black, south roof edge Positive 10% Chrysotile 10% Cellulose 80% Other
120518 HG202b
Edge flashing compound, black, south roof edge *SFP -- --
120518 HG203 Built up roofing felts, black, north edge Positive 10% Chrysotile 30% Cellulose 60% Other
120518 HG203b Built up roofing felts, black, south edge *SFP -- --
120518 HG204 Roof filler insulation, tan, north edge None Detected -- 100% Other
120518 HG204b Roof filler insulation, tan, south edge None Detected -- 100% Other
120518 HG205
Roof penetration compound, black, south east vent flashing Positive 15% Chrysotile -- 85% Other
120518 HG205b
Roof penetration compound, black, south east vent flashing *SFP -- --
WWTP-Plant Water Roof
Roofing Survey Only
• SFP Means analysis was terminated because asbestos was detected on a previous homogenous sample during the survey work.
• Please reference the full report for discussions and additional information and limitations pertaining to these results.
Content
Asbestos
Components
Fibrous
Components
Non Fibrous
Components
120518 HG 300
Built up roofing felts, black, north side of roof None Detected
30% Synthetic
Fibers 70% Other
120518 HG 300b
Built up roofing felts, black, east side of roof None Detected
30% Synthetic
Fibers 70% Other
120518 HG 301-A
Fiberboard, brown, with black paper, north side of roof None Detected 95% Cellulose 5% Other
120518 HG 301-B Tar, black, north side of roof None Detected -- 100% Other
120518 HG 301b-
A
Fiberboard, brown, with black paper, east side of roof None Detected 95% Cellulose 5% Other
120518 HG 301b-
B
Tar, black, with black paper, east side of roof None Detected -- 100% Other
120518 HG 302-A Foam, yellow, north side of roof None Detected -- 100% Other
120518 HG 302-B Felt, black, north side of roof None Detected 70% Cellulose 30% Other
120518 HG 302b Foam only, yellow, east side of roof None Detected -- 100% Other
120518 HG 303 Flashing Compound, Black, east edge Positive 10% Chrysotile -- 90% Other
120518 HG 303b Flashing Compound, Black, south edge *SFP -- --
120518 HG 304
Penetration roll roofing, grey and black, north west side of roof around vent None Detected 30% Cellulose 70% Other
120518 HG 304b
Penetration roll roofing, grey and black, north west side of roof around vent None Detected 30% Cellulose 70% Other
WWTP Digestion Building
Roof Survey Only
• SFP Means analysis was terminated because asbestos was detected on a previous homogenous sample during the survey work.
• Please reference the full report for discussions and additional information and limitations pertaining to these results.
Content
Asbestos
Components
Fibrous
Components
Non Fibrous
Components
120518HG400
Edge flashing compound, black, south edge Positive 15% Chrysotile -- 85% Other
120518HG400b
Edge flashing compound, black, north edge *SFP -- --
120518HG401 Built up roofing felts, black, north None Detected 30% Cellulose 70% Other
120518HG401b Built up roofing felts, black, south Positive 10% Chrysotile 30% Cellulose 60% Other
120518HG402 Roof filler insulation, tan, north None Detected -- 100% Other
120518HG402b Roof filler insulation, tan, south None Detected -- 100% Other
120518HG403 Penetration flashing compound, black Positive 15% Chrysotile -- 85% Other
120518HG403b Penetration flashing compound, black *SFP -- --
Gas Building
Roof Survey Only
• SFP Means analysis was terminated because asbestos was detected on a previous homogenous sample during the survey work.
• Please reference the full report for discussions and additional information and limitations pertaining to these results.
Content
Asbestos
Components
Fibrous
Components
Non Fibrous
Components
120518 HG 500
Flashing compound, edge, black, exterior south end None Detected -- 100% Other
120518 HG 500b
Flashing compound, edge, black, exterior south end Positive 2% Chrysotile -- 98% Other
120518 HG 501
Built up roofing felts, black, east side None Detected 30% Cellulose 70% Other
120518 HG 501b
Built- up roofing felts, black, west side None Detected
10% Fiber Glass
20% Cellulose 70% Other
120518 HG 502 Roof filler insulation, tan, east side None Detected -- 100% Other
120518 HG 502b
Roof filler insulation, tan, north side None Detected -- 100% Other
1205018 HG 503
Penetration compound, black, around vent Positive 15% Chrysotile -- 85% Other
120518 HG 503b
Penetration compound, black, around vent *SFP -- --
WWTP-Septic Receiving Building
Roof and Door Survey Only
• SFP Means analysis was terminated because asbestos was detected on a previous homogenous sample during the survey work.
• Please reference the full report for discussions and additional information and limitations pertaining to these results.
Content
Asbestos
Components
Fibrous
Components
Non Fibrous
Components
120518 HG 600
Edge flashing compound, black, north edge Positive 8% Chrysotile 2% Cellulose 90% Other
120518 HG 600b
Edge flashing compound, black, south edge *SFP -- --
120518 HG 601
Built-up roofing felts, black, exterior north east side Positive 20% Chrysotile 30% Cellulose 50% Other
120518 HG 601b
Built-up roofing felts, black, exterior, east side *SFP --
120518 HG 602
Roof filler insulation, tan, exterior north east side None Detected -- 100% Other
120518 HG 602b
Roof filler insulation, tan, exterior, south edge None Detected -- 100% Other
120518 HG 603
Penetration flashing compound, black, south side Positive 10% Chrysotile -- 90% Other
120518 HG 603b
Penetration flashing compound, black, south side *SFP --
120518 HG 604 Door caulk, grey, interior, north door None Detected -- 100% Other
120518 HG 604b Door caulk, grey, interior, north door None Detected -- 100% Other
120518 HG 605
Door caulk, grey, exterior, grey, north door None Detected -- 100% Other
120518 HG 605b
Door caulk, grey, exterior, grey, north door None Detected -- 100% Other
WWTP-Operations Building Garage
Limited Door Caulking Survey Only
• SFP Means analysis was terminated because asbestos was detected on a previous homogenous sample during the survey work.
• Please reference the full report for discussions and additional information and limitations pertaining to these results.
Content
Asbestos
Components
Fibrous
Components
Non Fibrous
Components
120518 HG 700
Door caulk grey exterior operations building garage Door #3 None Detected -- 100%Other
120518 HG 700b
Door caulk grey exterior operations building garage Door #3 None Detected -- 100%Other
120518 HG 701
Door caulk grey interior operations building garage door #3 None Detected -- 100%Other
120518 HG 701b
Door caulk grey interior operations building garage door #3 None Detected -- 100%Other
120518 HG 702
Door caulk tan interior operations building wash bay door None Detected -- 100%Other
120518 HG 702b
Door caulk tan interior operations building wash bay door None Detected -- 100%Other
APPENDIX B
EXAMPLE PICTURES
Site Address: NH DES WWTP, Franklin, NH www.airpf.com
888-SAFE AIR
File No. 188931
1. View of Headwork Building
2. Headwork Building, ACBM built-up roofing felts, edge flashing and penetration flashing
3. View of Primary Building Primary Building ACBM built-up roofing felts, edge flashing and penetration flashing
4. View of Secondary Building
5. Secondary Building ACBM flashing compound, penetration compound and built-up roofing felts
EXAMPLE PICTURES
Site Address: NH DES WWTP, Franklin, NH www.airpf.com
888-SAFE AIR
File No. 188931
6. View of Plant Water Building 7. Plant Water Building ACBM Flashing Compound
8. View Digestion Building
9. ACBM built up roofing felts, flashing compound and penetration compound
V
10. View of Gas Building, ACBM edge and penetration compound
11. View of Septic Receiving Building ACBM built up roofing, edge and penetration compound
APPENDIX C
Summary of Methodology: Asbestos-Containing Building Materials Survey
EPA accredited inspector(s) surveyed accessible space in the building or site areas included within the
RPF Scope of Work (SOW) to identify suspect asbestos-containing building material (ACBM). Suspect
ACBM was inventoried and categorized into homogeneous groups of materials. To the extent indicated in the report, samples were then extracted from the different groups of homogeneous materials in accordance with applicable State and federal rules and regulations. For surveys in which the SOW included full inspections of the affect space, sampling methodologies were based on the requirements set forth in 40 CFR Part 763 (EPA) and 29 CFR Part 1926.1101 (OSHA). For preliminary or limited surveys, findings apply to only the affected material or space as indicated in the RPF SOW and Report and additional inspection and testing will be required to satisfy regulatory obligations associated with renovation, demolition, maintenance and other occupational safety and health requirements.
Collected samples were individually placed into sealed containers, labeled, and submitted with proper chain of custody forms to the RPF NVLAP-accredited vendor laboratory. Sample containers and tools were cleaned after each sample was collected. Samples were analyzed for asbestos content using polarized light microscopy (PLM). Although PLM is the method currently recognized in State and federal regulations for asbestos identification in bulk samples, PLM may not be sensitive enough to detect all of the asbestos fibers in certain types of materials, such as floor tile and other nonfriable ACBM. In the event that more definitive results are requested in cases of with negative or trace results of asbestos are detected, RPF recommends that confirmation testing be completed using transmission electron microscopy.
For each homogeneous group of suspect material, a “stop at first positive” (SFP) method may have been employed during the analysis. The SFP method is based on current EPA sampling protocols and means that if one sample within a homogeneous group of suspect material is found to contain >1% asbestos, then further analysis of that specific homogenous group samples is terminated and the entire homogeneous group of material is considered to be ACBM regardless of the other sample results. This is based on the potential for inconsistent mix of asbestos in the product yielding varying findings across the different individual samples collected from the same homogeneous group. Unless otherwise noted in the report, sample groups found to have 1% to <10% asbestos content are assumed to be ACBM; to rebut this assumption further analysis with point count methods are required.
Inaccessible and hidden areas, including but not limited to wall/floor/ceiling cavity space, space with obstructed access (such as fiberglass insulation above suspended ceilings), sub floors, interiors of mechanical and process equipment, and similar spaces were not included in the inspection and care should be used when accessing these areas in the future. Unless otherwise noted in the RPF Report, destructive survey techniques were not employed during this survey.
In the event that additional suspect materials are encountered that are not addressed in this report, the materials should be properly tested by an accredited inspector. For example, during renovation and demolition it is likely that additional suspect material will be encountered and such suspect materials should be assumed to be hazardous until proper inspection and testing occurs.
RPF followed applicable industry standards; however, various assumptions and limitations of the methods can result in missed materials or misidentification of materials due several factors including but not limited to: inaccessible space due to physical or safety constraints, space that is difficult to reach to fully inspection, assumptions regarding the determination of homogenous groups of suspect material, assumptions regarding attempts to conduct representative sampling, and potential for varying mixtures and layers of material sampled not being representative of all areas of similar material. Also reference the
Limitations document attached to the report.
LIMITATIONS
1. The observations and conclusions presented in the Report were based solely upon the services described herein, and not on scientific tasks or procedures beyond the RPF Environmental, Inc. Scope of Work
(SOW) as discussed in the proposal and/or agreement. The conclusions and recommendations are based on visual observations and testing, limited as indicated in the Report, and were arrived at in accordance with generally accepted standards of industrial hygiene practice and asbestos professionals. The nature of this survey or monitoring service was limited as indicated herein and in the report or letter of findings.
Further testing, survey, and analysis is required to provide more definitive results and findings.
2. For site survey work, observations were made of the designated accessible areas of the site as indicated in the Report. While it was the intent of RPF to conduct a survey to the degree indicated, it is important to note that not all suspect ACBM material in the designated areas were specifically assessed and visibility was limited, as indicated, due to the presence of furnishings, equipment, solid walls and solid or suspended ceilings throughout the facility and/or other site conditions. Asbestos or hazardous material may have been used and may be present in areas where detection and assessment is difficult until renovation and/or demolition proceeds. Access and observations relating to electrical and mechanical systems within the building were restricted or not feasible to prevent damage to the systems and minimize safety hazards to the survey team.
3. Although assumptions may have been stated regarding the potential presence of inaccessible or concealed asbestos and other hazardous material, full inspection findings for all asbestos and other hazardous material requires the use of full destructive survey methods to identify possible inaccessible suspect material and this level of survey was not included in the SOW for this project. For preliminary survey work, sampling and analysis as applicable was limited and a full survey throughout the site was not performed. Only the specific areas and /or materials indicated in the report were included in the SOW.
This inspection did not include a full hazard assessment survey, full testing or bulk material, or testing to determine current dust concentrations of asbestos in and around the building. Inspection results should not be used for compliance with current EPA and State asbestos in renovation/demolition requirements unless specifically stated as intended for this use in the RPF report and considering the limitations as stated therein and within this limitations document.
4. Where access to portions of the surveyed area was unavailable or limited, RPF renders no opinion of the condition and assessment of these areas. The survey results only apply to areas specifically accessed by
RPF during the survey. Interiors of mechanical equipment and other building or process equipment may also have asbestos and other hazardous material present and were not included in this inspection. For renovation and demolition work, further inspection by qualified personnel will be required during the course of construction activity to identify suspect material not previously documented at the site or in this survey report. Bordering properties were not investigated and comprehensive file review and research was not performed.
5. For lead in paint, observations were made of the designated accessible areas of the site as indicated in the
Report. Limited testing may have been performed to the extent indicated in the text of the report. In order to conduct thorough hazard assessments for lead exposures, representative surface dust testing, air monitoring and other related testing throughout the building, should be completed. This type of in depth testing and analysis was beyond the scope of services for the initial inspection. For lead surveys with
XRF readings, it is recommended that surfaces found to have LBP or trace amount of lead detected with readings of less than 4 mg/cm2 be confirmed using laboratory analysis if more definitive results are required. Substrate corrections involving destructive sampling or damage to existing surfaces (to minimize XRF read-through) were not completed. In some instances, destructive testing may be required for more accurate results. In addition, depending on the specific thickness of the paint films on different areas of a building component, differing amounts of wear, and other factors, XRF readings can vary slightly, even on the same building component. Unless otherwise specifically stated in the scope of services and final report, lead testing performed is not intended to comply with other state and federal regulations pertaining to childhood lead poisoning regulations.
RPF Service Limitations (cont.)
6. Air testing is to be considered a “snap shot” of conditions present on the day of the survey with the understanding that conditions may differ at other times or dates or operational conditions for the facility.
Results are also limited based on the specific analytical methods utilized. For phase contrast microscopy
(PCM) total airborne fiber testing, more sensitive asbestos-specific analysis using transmission electron microscopy (TEM) can be performed upon request.
7. For asbestos bulk and dust testing, although polarize light microscopy (PLM) is the method currently recognized in State and federal regulations for asbestos identification in bulk samples, some industry studies have found that PLM may not be sensitive enough to detect all of the asbestos fibers in certain nonfriable material, vermiculate type insulation, soils, surface dust, and other materials requiring more sensitive analysis to identify possible asbestos fibers. In the event that more definitive results are requested, RPF recommends that confirmation testing be completed using TEM methods or other analytical methods as may be applicable to the material. Detection of possible asbestos fibers may be made more difficult by the presence of other non-asbestos fibrous components such as cellulose, fiber glass, etc., by binder/matrix materials which may mask or obscure fibrous components, and/or by exposure to conditions capable of altering or transforming asbestos. PLM can show significant bias leading to false negatives and false positives for certain types of materials. PLM is limited by the visibility of the asbestos fibers. In some samples the fibers may be reduced to a diameter so small or masked by coatings to such an extent that they cannot be reliably observed or identified using PLM.
8. For hazardous building material inspection or survey work, RPF followed applicable industry standards;
however, RPF does not warrant or certify that all asbestos or other hazardous materials in or on the building has been identified and included in this report. Various assumptions and limitations of the methods can result in missed materials or misidentification of materials due to several factors including but not limited to: inaccessible space due to physical or safety constraints, space that is difficult to reach to fully inspect, assumptions regarding the determination of homogenous groups of suspect material, assumptions regarding attempts to conduct representative sampling, and potential for varying mixtures and layers of material sampled not being representative of all areas of similar material.
9. Full assessments often requires multiple rounds of sampling over a period of time for air, bulk material, surface dust and water. Such comprehensive testing was beyond the scope of RPF services. In addition clearance testing for abatement, as applicable, was based on the visual observations and limited ambient area air testing as indicated in the report and in accordance with applicable state and federal regulations.
The potential exists that microscopic surface dust remains with contaminant present even in the event that the clearance testing meets the state and federal requirements. Likewise for building surveys, visual observations are not sufficient alone to detect possible contaminant in settled dust. Unless otherwise specifically indicated in the report, surface dust testing was not included in the scope of the RPF services.
10. For abatement or remediation monitoring services: RPF is not responsible for observations and test for specific periods of work that RPF did not perform full shift monitoring of construction, abatement or remediation activity. In the event that problems occurred or concerns arouse regarding contamination, safety or health hazards during periods RPF was not onsite, RPF is not responsible to provide documentation or assurances regarding conditions, safety, air testing results and other compliance issues.
RPF may have provided recommendations to the Client, as needed, pertaining to the Client’s Contractor compliance with the technical specifications, schedules, and other project related issues as agreed and based on results of RPF monitoring work. However, actual enforcement, or waiving of, contract provisions and requirements as well as regulatory liabilities shall be the responsibility of Client and
Client’s Contractor(s). Off-site abatement activities, such as waste transportation and disposal, were not monitored or inspected by RPF.
11. For services limited to clearance testing following abatement or remediation work by other parties: The testing was limited to clearance testing only and as indicated in the report and a site assessment for possible environmental health and safety hazards was not performed as part of the scope of this testing.
Client, or Client’s abatement contractor as applicable, was responsible for performing visual inspections
RPF Service Limitations (cont.)
of the work area to determine completeness of work prior to air clearance testing by RPF.
12. For site work, including but not limited to air clearance testing services, in which RPF did not provide full site safety and health oversight, abatement design, full shift monitoring of all site activity, RPF expresses no warranties, guarantees or certifications of the abatement work conducted by the Client or other employers at the job site(s), conditions during the work, or regulatory compliance, with the exception of the specific airborne concentrations as indicated by the air clearance test performed by RPF during the conditions present for the clearance testing. Unless otherwise specifically noted in the RPF Report, visual inspections and air clearance testing results apply only to the specific work area and conditions present during the testing. RPF did not perform visual inspections of surfaces not accessible in the work area due to the presence of containment barriers or other obstructions. In these instances, some contamination may be present following RPF clearance testing and such contamination may be exposed during and after removal of the containment barriers or other obstructions following RPF testing services. Client or
Client’s Contractor is responsible for using appropriate care and inspection to identify potential hazards and to remediate such hazards as necessary to ensure compliance and a safe environment.
13. The survey was limited to the material and/or areas as specifically designated in the report and a site assessment for other possible environmental health and safety hazards or subsurface pollution was not performed as part of the scope of this site inspection. Typically, hazardous building materials such as asbestos, lead paint, PCBs, mercury, refrigerants, hydraulic fluids and other hazardous product and materials may be present in buildings. The survey performed by RPF only addresses the specific items as indicated in the Report.
14. For mold and moisture survey services, RPF services did not include design or remediation of moisture intrusion. Some level of mold will remain at the site regardless of RPF testing and Contractor or Client cleaning efforts. RPF testing associated with mold remediation and assessments is limited and may or may not be representative of other surfaces and locations at the site. Mold growth will occur if moisture intrusion deficiencies have not been fully remedied and if the site or work areas are not maintained in a sufficiently dry state. Porous surfaces in mold contaminated areas which are not removed and disposed of will likely result in future spore release, allergen sources, or mold contamination.
15. Existing reports, drawings, and analytical results provided by the Client to RPF, as applicable, were not verified and, as such, RPF has relied upon the data provided as indicated, and has not conducted an independent evaluation of the reliability of these data.
16. Where sample analyses were conducted by an outside laboratory, RPF has relied upon the data provided, and has not conducted an independent evaluation of the reliability of this data.
17. All hazard communication and notification requirements, as required by U.S. OSHA regulation 29 CFR
Part 1926, 29 CFR Part 1910, and other applicable rules and regulations, by and between the Client, general contractors, subcontractors, building occupants, employees and other affected persons were the responsibility of the Client and are not part of the RPF SOW.
18. The applicability of the observations and recommendations presented in this report to other portions of the site was not determined. Many accidents, injuries and exposures and environmental conditions are a result of individual employee/employer actions and behaviors, which will vary from day to day, and with operations being conducted. Changes to the site and work conditions that occur subsequent to the RPF inspection may result in conditions which differ from those present during the survey and presented in the findings of the report.
| 188931 Franklin WWTP 121318 rpt |
| Appendix A |
| 188931 120518 Asb - Bulk PLM Tbl2- WWTP Headwork |
| 188931 120518 Asb - Bulk PLM Tbl2a- Primary |
| 188931 120518 Asb - Bulk PLM Tbl2b- WWTP Secondary |
| 188931 120518 Asb - Bulk PLM Tbl2c-Plant Water Roof |
| 188931 120518 Asb - Bulk PLM Tbl2d- WWTP Digestion |
| 188931 120518 Asb - Bulk PLM Tbl2eGas Building |
| 188931 120518 Asb - Bulk PLM Tbl2f Septic |
| 188931 120518 Asb - Bulk PLM Tbl2g- Operations Blg |
| Appendix B |
| 188931 example pictures |
| Appendix C |
| A - Methods Asb + HazMat Surveylh |
| RPF followed applicable industry standards; however, various assumptions and limitations of the methods can result in missed materials or misidentification of materials due several factors including but not limited to: inaccessible space due to physic... |
| RPF followed applicable industry standards for construction related identification in nonresidential settings; however, RPF does not warrant or certify that all lead or other hazardous materials in or on the building has been identified and included i... |
| RPF followed applicable industry standards; however, RPF does not warrant or certify that all hazardous material in or on the building has been identified and included in this report. Various assumptions and limitations of the methods can result in m... |
| A - Limitations 1211 lh |
| 1. The observations and conclusions presented in the Report were based solely upon the services described herein, and not on scientific tasks or procedures beyond the RPF Environmental, Inc. Scope of Work (SOW) as discussed in the proposal and/or agre... |
| 2. For site survey work, observations were made of the designated accessible areas of the site as indicated in the Report. While it was the intent of RPF to conduct a survey to the degree indicated, it is important to note that not all suspect ACBM m... |
| 3. Although assumptions may have been stated regarding the potential presence of inaccessible or concealed asbestos and other hazardous material, full inspection findings for all asbestos and other hazardous material requires the use of full destructi... |
| 4. Where access to portions of the surveyed area was unavailable or limited, RPF renders no opinion of the condition and assessment of these areas. The survey results only apply to areas specifically accessed by RPF during the survey. Interiors of m... |
| 5. For lead in paint, observations were made of the designated accessible areas of the site as indicated in the Report. Limited testing may have been performed to the extent indicated in the text of the report. In order to conduct thorough hazard ass... |
| 6. Air testing is to be considered a “snap shot” of conditions present on the day of the survey with the understanding that conditions may differ at other times or dates or operational conditions for the facility. Results are also limited based on th... |
| 7. For asbestos bulk and dust testing, although polarize light microscopy (PLM) is the method currently recognized in State and federal regulations for asbestos identification in bulk samples, some industry studies have found that PLM may not be sensi... |
| 8. For hazardous building material inspection or survey work, RPF followed applicable industry standards; however, RPF does not warrant or certify that all asbestos or other hazardous materials in or on the building has been identified and included in... |
| 9. Full assessments often requires multiple rounds of sampling over a period of time for air, bulk material, surface dust and water. Such comprehensive testing was beyond the scope of RPF services. In addition clearance testing for abatement, as app... |
| 10. For abatement or remediation monitoring services: RPF is not responsible for observations and test for specific periods of work that RPF did not perform full shift monitoring of construction, abatement or remediation activity. In the event that p... |
| 11. For services limited to clearance testing following abatement or remediation work by other parties: The testing was limited to clearance testing only and as indicated in the report and a site assessment for possible environmental health and safety... |
| 12. For site work, including but not limited to air clearance testing services, in which RPF did not provide full site safety and health oversight, abatement design, full shift monitoring of all site activity, RPF expresses no warranties, guarantees o... |
| 13. The survey was limited to the material and/or areas as specifically designated in the report and a site assessment for other possible environmental health and safety hazards or subsurface pollution was not performed as part of the scope of this si... |
| 14. For mold and moisture survey services, RPF services did not include design or remediation of moisture intrusion. Some level of mold will remain at the site regardless of RPF testing and Contractor or Client cleaning efforts. RPF testing associat... |
| 15. Existing reports, drawings, and analytical results provided by the Client to RPF, as applicable, were not verified and, as such, RPF has relied upon the data provided as indicated, and has not conducted an independent evaluation of the reliability... |
| 16. Where sample analyses were conducted by an outside laboratory, RPF has relied upon the data provided, and has not conducted an independent evaluation of the reliability of this data. |
| 17. All hazard communication and notification requirements, as required by U.S. OSHA regulation 29 CFR Part 1926, 29 CFR Part 1910, and other applicable rules and regulations, by and between the Client, general contractors, subcontractors, building oc... |
| 18. The applicability of the observations and recommendations presented in this report to other portions of the site was not determined. Many accidents, injuries and exposures and environmental conditions are a result of individual employee/employer ... |