This document contains a request for proposal for a federal contract opportunity along with responses to questions from an interested vendor. The Air Force is soliciting proposals for the acquisition of an additive metal 3D printer to be delivered and installed at Wright Patterson Air Force Base in Ohio. Proposals are due by March 11, 2022 and the contract is to be awarded on a firm-fixed price basis. The printer must be able to print with tungsten and molybdenum alloys in a build area no larger than 6 inches by 6 inches by 10 inches. The selected vendor will be responsible for delivery, setup, and installation activities which must be completed within three months of award. Evaluation will consider both price and technical factors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 7 - Q and A - 8 March 22 - CO Signed.pdf | ||
| Attachment 6 - Q and A - 4 March 22 - CO Signed.pdf | ||
| Attachment 5 - Q and A - 28 FEB 2022_signed.pdf | ||
| Attachment 4 - Q and A - 14 FEB 2022 - CO Signed.pdf | ||
| Attachment 2 - FAR 52.204-24.pdf | ||
| Attachment 1 - Metal Printer Minimum Requirements.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Updated: 17 November 21
Attachment 3: RFI Responses
1. The solicitation calls for one 500 watt laser and one 1000 watt laser. Is there a preference to have two different laser wattages or can both lasers be 1000 watts?
a. No preference, both lasers may be 1000 Watts and they may deliver a 500 Watt & 1000
Watt pair.
2. Regarding the dual laser configuration, can you clarify how you would like the two lasers to operate? For example, two lasers building the same part or two lasers building two separate parts. Or one laser for testing?
a. Both lasers should be able to build the same part or act independently building different parts.
3. What types of material are you looking to print with?
a. Tungsten and molybdenum alloys
4. Offloading the machine from the delivery truck and setting the machine into place – Contractor Responsibility or Wright Patterson Responsibility?
a. Contractor Responsibility.
5. Creating the properly fused electrical connections to the machine – Contractor Responsibility or
Wright Patterson Responsibility?
a. Fused electrical connections are available in the room and the room is set-up with electrical connections for multiple metal 3D printers. Contractor would be responsible for making final connection from electrical boxes to machines
6. Any sort of gas connections (nitrogen or argon) – Contractor Responsibility or Wright Patterson Responsibility?
a. Argon and nitrogen gas connections are available at the wall near where the printer will sit. Contractor will be responsible for making final connection from wall to printer.
7. What metals will the end user utilize in the technology they plan to acquire?
a. Metals: Nickel super alloys, steels, and refractory metals.
8. What are the dimensions of the largest part the end user will need to fabricate with the metal 3D
Printer?
Updated: 17 November 21
a. The Government does not have estimated dimensions. The max size of the build chamber, as stated in the minimum requirements document, should be no greater than 6 inch x 6 inch x 10 inch.