Attachment 3 - Repair Ploesti Dr Sinkholes MSS.xls
XLS spreadsheet 56 KB Posted
- Attached to
- Repair Ploesti Dr Sink Holes
- Solicitation number
- FA301021R0015
About this file
This solicitation package outlines requirements for a construction contract to repair sinkholes on Ploesti Drive at Keesler Air Force Base in Mississippi. The work includes milling and overlaying road surfaces, replacing storm drainage, and repairing road sections. The acquisition is set aside for Service-Disabled Veteran-Owned Small Businesses and will use a Performance Price Trade-Off evaluation approach. The North American Industry Classification System Code is 237310 for heavy and civil engineering construction, and the size standard is $39.5 million. The Product Service Code is Z2LB. The estimated value is between $500,000 and $1 million. The performance period is 180 days from notice to proceed. Interested parties must register in the System for Award Management to be eligible for award. The point of contact for questions is the contracting specialist and officer listed.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| MAHG 20-1154 | Project Title: | ||
| Repair Sinkholes Ploesti Drive | Solicitation / Contract Number: |
[ enter here ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||
| Number of Copies Required | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||
| Notified | Contractor Resubmittal | Final Approval | ||||||||||||||||||||
| Approved | Disapproved | |||||||||||||||||||||
| 1 | CIP Concrete Manholes (2) | X | 2 WK PRIOR | |||||||||||||||||||
| 2 | Reinforced Concrete Pipe | X | X | X | 2 WK PRIOR | |||||||||||||||||
| 3 | Asphalt Surface Course | X | X | X | 2 WK PRIOR | |||||||||||||||||
| 4 | Asphalt Binder Course | X | X | X | 2 WK PRIOR | |||||||||||||||||
| 5 | Concrete Mix Design | X | X | X | 2 WK PRIOR | |||||||||||||||||
| 6 | Size 610 Limestone Base | X | X | X | 2 WK PRIOR | |||||||||||||||||
| 7 | "Track-Lite" Running Track Surface | X | X | X | 2 WK PRIOR | |||||||||||||||||
| 8 | HAZMAT Questionaire | X | X | 5 DAYS PRIOR | ||||||||||||||||||
| 9 | HAZMAT MSDS | X | 5 DAYS PRIOR | |||||||||||||||||||
| 10 | HAZMAT Reporting Entry Form | X | X | 5 DAYS PRIOR | ||||||||||||||||||
| 11 | HAZMAT Reporting Entry Form | X | X | END OF CONTRACT | ||||||||||||||||||
| 12 | Recycling and Landfill Report | X | X | END OF CONTRACT | ||||||||||||||||||
| 13 | Warranty (Manufacturer's) | X | END OF CONTRACT | |||||||||||||||||||
| 14 | 1-Year Warranty (Contractor's) | X | END OF CONTRACT | |||||||||||||||||||
| 15 | ||||||||||||||||||||||
| 16 | ||||||||||||||||||||||
| 17 | ||||||||||||||||||||||
| 18 | ||||||||||||||||||||||
| 19 | ||||||||||||||||||||||
| 20 | ||||||||||||||||||||||
| 21 | ||||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 | ||||||||||||||||||||||
| 25 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
File details come from the government source that posted it. Updated .