Attachment 3 Quote Sheet.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 12FPC326Q0056
About this file
This is a Quote Sheet for the Assunpink Dam No. 8 Dam Rehabilitation project, serving as the pricing template for the Request for Quotation (RFQ) Solicitation Number 12FPC326Q0056 issued by the U.S. Department of Agriculture, Natural Resources Conservation Service (NRCS) for the New Jersey office. The quote sheet itemizes 36 primary line items and 5 optional line items covering comprehensive dam rehabilitation work, including clearing and grubbing (0.4 acres), structure removal, embankment excavation (1,200 cubic yards), common excavation for auxiliary spillway (9,100 cubic yards), earthfill (10,300 cubic yards), roller compacted concrete (2,000 cubic yards), drainage piping (620 linear feet for toe drain and 690 linear feet for cutoff wall), rock riprap (1,000 cubic yards), bituminous concrete work, geotechnical instrumentation, and various supporting services such as construction surveys, mobilization/demobilization, traffic control, and construction quality control. All unit prices on the sheet are currently set at $0.00, requiring vendors to complete pricing for each line item.
This Total Small Business Set-Aside acquisition is restricted to small business concerns with a size standard of $40 million under NAICS code 237990. The project objectives are to rehabilitate the dam to meet state and federal dam safety criteria while maintaining current flood protection levels. The quote sheet includes optional line items for concrete spall repair, acid-producing soil stockpiling, lime-treated earthfill, lime supply, and limestone check dams, which will be awarded by modification if determined necessary. Vendors must provide unit prices for lump sum items, linear feet, cubic yards, square yards, tons, and each (EA) quantities to enable evaluation of total project cost.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| Quote Sheet | ||||||
| Assunpink Dam No. 8 Dam Rehabilitation | ||||||
| Item | Item Description | Spec. Section | Estimated Quantity | Unit | Unit Price | Cost |
| 1 | Clearing and Grubbing | CS 2 | 0.4 | AC | $0.00 | |
| 2 | Structure Removal | CS 3 | Job | LS | ||
| 3 | Toe Drain Abandonment | CS 3 | Job | LS | ||
| 4 | Pollution Control | CS 5 | Job | LS | ||
| 5 | Permanent Seeding and Mulching | CS 6 | 3.4 | AC | $0.00 | |
| 6 | Turf Reinforcement Mat | CS 6 | 5,600.0 | SY | $0.00 | |
| 7 | Construction Surveys | CS 7 | Job | LS | ||
| 8 | Mobilization and Demobilization | CS 8 | Job | LS | ||
| 9 | Traffic Control | CS 9 | Job | LS | ||
| 10 | Reservoir Dewatering and Stream Diversion | CS 11 | Job | LS | ||
| 11 | Embankment Excavation Dewatering | CS 11 | Job | LS | ||
| 12 | Auxiliary Spillway Excavation Dewatering | CS 11 | Job | LS | ||
| 13 | Common Excavation, Embankment and Toe Drain | CS 21 | 1,200.0 | CY | $0.00 | |
| 14 | Common Excavation, Auxiliary Spillway | CS 21 | 9,100.0 | CY | $0.00 | |
| 15 | Earthfill | CS 23 | 10,300.0 | CY | $0.00 | |
| 16 | Fine Drainfill | CS 24 | 1,600.0 | CY | $0.00 | |
| 17 | Coarse Drainfill | CS 24 | 900.0 | CY | $0.00 | |
| 18 | Topsoiling | CS 26 | 7,654.0 | SY | $0.00 | |
| 19 | Cast-In-Place, Auxiliary Spillway Reinforced Concrete Starter W | CS 31 | 110.0 | CY | $0.00 | |
| 20 | Precast 8" Pipe Straight Headwall | CS 31 | 2.0 | EA | $0.00 | |
| 21 | Impact Basin and Riser Concrete Preventative Coating | CS 35 | Job | LS | ||
| 22 | Concrete Leak Repair - Chemical Grouting | CS 35 | Job | LS | ||
| 23 | Roller Compacted Concrete (RCC) | CS 36 | 2,000.0 | CY | $0.00 | |
| 24 | Cement for RCC | CS 36 | 250.0 | TONS | $0.00 | |
| 25 | Fly Ash for RCC | CS 36 | 250.0 | TONS | $0.00 | |
| 26 | RCC Test Section | CS 36 | Job | LS | ||
| 27 | Drainage Piping, 8-inch Toe Drain | CS 45 | 620.0 | LF | $0.00 | |
| 28 | Drainage Piping, 6-inch ASW Cutoff Wall | CS 45 | 690.0 | LF | $0.00 | |
| 29 | Rock Riprap | CS 61 | 1,000.0 | CY | $0.00 | |
| 30 | Stainless Steel Metalwork for Baffles | CS 81 | Job | LS | ||
| 31 | Chain Link Fence | CS 91 | 46.0 | LF | $0.00 | |
| 32 | Construction Quality Control | CS 94 | Job | LS | ||
| 33 | Field Office | CS 96 | Job | LS | ||
| 34 | Bituminous Concrete | CS 400 | 355.1 | TON | $0.00 | |
| 35 | Bituminous Concrete Removal | CS 400 | 2,400.0 | SY | $0.00 | |
| 36 | Geotechnical Instrumentation | CS 401 | Job | LS | ||
| TOTAL = | $0.00 |
| 200 | 1Optional Line Item - Concrete Spall Repair: Impact Basin |
| 201 | 1Optional Line Item - Stockpiling Acid-Producing Soils |
| 202 | 1Optional Line Item - Lime-Treated Earthfill |
| 203 | 1Optional Line Item - Lime |
| 204 | 1Optional Line Item - Limestone Check Dams |
| TOTAL IF OPTIONAL LINE ITEM 200 IS USED = |
TOTAL IF OPTIONAL LINE ITEMS 201-203 IS USED =
TOTAL IF OPTIONAL LINE ITEMS 200- 204 IS USED =
| UNIT DEFINITIONS: LS=Lump Sum, LF=Linear Feet, CF = Cubic Feet, SF=Square Feet, CY=Cubic Yards, SY = Square Yards, EA = Each, MO = Month, TN = Ton, AC = Acre |
| 1Optional Line Items will be awarded by modification if determined to be needed. |