Attachment 3 Quote Breakdown Sheet.xlsx

XLSX spreadsheet 137 KB Posted

Attached to
Occupational Safety & Health Surveys and Safety & Health Risk Management Surveys at Multiple GSA Region 5 Locations
Solicitation number
47PF0024Q0126
Issued by

About this file

This document appears to be an Excel spreadsheet detailing the locations, square footage, and pricing information for Occupational Safety & Health (OSH) Surveys and Safety & Health Risk Management Surveys (RMS) at 65 federal government buildings and facilities across 5 states - Illinois, Indiana, Michigan, Ohio, and Wisconsin.

The spreadsheet provides a breakdown of the specific locations, including the building name, address, gross square footage, and whether the survey required is for OSH or RMS. For each location, the spreadsheet lists the number of hours and associated labor costs for the Fire Protection Engineer and Safety and Health Specialist to perform the required survey work. Travel and other expenses are also included. The total pricing for all 65 locations is $0.00, indicating this is likely a pricing template or worksheet rather than a final proposed cost.

View the file

Other files

File Type Posted
Solicitation Amendment 47PF0024Q0126_0001.pdf PDF
RFQ_FY25 Health and Safety Surveys Final.pdf PDF
47PF0024Q0126 SF18 Form.pdf PDF
Attachment 1 OSH Template.xlsx XLSX spreadsheet
Attachment 2 Safety and Health RMS Template.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Breakdown Sheet

FY25 - "OWNED" 35 OSH and 30 Safety & Health (S&H) Risk Managemnet Surveys (RMS) With 10 being combined S&H RMS and Annual OSH surveys (65 locations)ABC
Sq. Ft.
Location1= IL0069ES- MELVIN PRICE FEDERAL COURTHOUSE 750 MISSOURI AVENUE EAST SAINT LOUIS IL 62201-2954- Location 1 - (GSF = 58537 SqFt and GSA RSF = 56120 SqFt) - Safety & Health Risk Management Survey (RMS) Only.58537 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 11TOTAL$0.00$0.00$0.00$0.00
Location2= IL0209CF- FEDERAL ARCHIVES RECORDS CTR. 7358 S PULASKI RD CHICAGO IL 60629-5834- Location 2 - (GSF = 184721 SqFt and GSA RSF = 184671 SqFt) - Safety & Health Risk Management Survey (RMS) Only.184721 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 22TOTAL$0.00$0.00$0.00$0.00
Location3= IL0220ZZ- EAST SAINT LOUIS FEDERAL BUILDING 650 MISSOURI AVE EAST SAINT LOUIS IL 62201-2955- Location 3 - (GSF = 32795 SqFt and GSA RSF = 31990 SqFt) - Safety & Health Risk Management Survey (RMS) Only.32795 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 33TOTAL$0.00$0.00$0.00$0.00
Location4= IL0222ZZ- MOUNT VERNON FEDERAL BUILDING 105 S 6TH ST MOUNT VERNON IL 62864-4127- Location 4 - (GSF = 19187 SqFt and GSA RSF = 18267 SqFt) - Safety & Health Risk Management Survey (RMS) Only.19187 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 44TOTAL$0.00$0.00$0.00$0.00
Location5= IN0057ZZ- CHARLES A HALLECK FEDERAL BLDG 230 N 4TH ST LAFAYETTE IN 47901-1339- Location 5 - (GSF = 60062 SqFt and GSA RSF = 45470 SqFt) - Safety & Health Risk Management Survey (RMS) Only.60062 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 55TOTAL$0.00$0.00$0.00$0.00
Location6= MI0401CI- CARGO INSPECTION 2810 W FORT ST DETROIT MI 48216-2061 - Location 6 - (GSF = 44933 SqFt and GSA RSF = 44933 SqFt) - Safety & Health Risk Management Survey (RMS) Only.44933 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 66TOTAL$0.00$0.00$0.00$0.00
Location7= MI0403CI- CARGO INSPECTION: VACIS 2810 WEST FORT STREET DETROIT MI 48226-2069- Location 7 - (GSF = 6608 SqFt and GSA RSF = 6608 SqFt) - Safety & Health Risk Management Survey (RMS) Only.6608 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 77TOTAL$0.00$0.00$0.00$0.00
Location8= MI0404CI- CARGO INSPECTION: BROKER BLDG 2810 W FORT ST DETROIT MI 48216-2069- Location 8 - (GSF = 26651 SqFt and GSA RSF = 26643 SqFt) - Safety & Health Risk Management Survey (RMS) Only.26651 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 88TOTAL$0.00$0.00$0.00$0.00
Location9= MI0405CI- CARGO INSPECTION: CANOPY 2810 W FORT ST DETROIT MI 48216-2069 - Location 9 - (GSF = 2725 SqFt and GSA RSF = 2725 SqFt) - Safety & Health Risk Management Survey (RMS) Only.2725 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 99TOTAL$0.00$0.00$0.00$0.00
Location10= MI0407CI- CARGO INSPECTION: NON-INTRUSIVE INSPECTION GANTRY BUILDING 2810 W FORT ST DETROIT MI 48216-2061 - Location 10 - (GSF = 5577 SqFt and GSA RSF = 5577 SqFt) - Safety & Health Risk Management Survey (RMS) Only.5577 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 1010TOTAL$0.00$0.00$0.00$0.00
Location11= MI0501BC- BUILDING 1 (HDIFC BLDG 01) 50 WASHINGTON AVE N BATTLE CREEK MI 49037-3001 - Location 11 - (GSF = 243628 SqFt and GSA RSF = 222366 SqFt) - Safety & Health Risk Management Survey (RMS) Only.243628 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 1111TOTAL$0.00$0.00$0.00$0.00
Location12= MI0502BC- BUILDING 1A (HDIFC BLDG 01A) 50 WASHINGTON AVE N BATTLE CREEK MI 49037-3001 - Location 12 - (GSF = 109125 SqFt and GSA RSF = 104252 SqFt) - Safety & Health Risk Management Survey (RMS) Only.109125 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 1212TOTAL$0.00$0.00$0.00$0.00
Location13= MI0504BC- BUILDING 2A (HDIFC BLDG 02A) 74 N WASHINGTON AVE BATTLE CREEK MI 49037-3085 - Location 13 - (GSF = 36507 SqFt and GSA RSF = 35590 SqFt) - Safety & Health Risk Management Survey (RMS) Only.36507 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 1313TOTAL$0.00$0.00$0.00$0.00
Location14= MI0505BC- BUILDING 2B (HDIFC BLDG 02B) 74 WASHINGTON AVE N BATTLE CREEK MI 49037-3028 - Location 14 - (GSF = 24539 SqFt and GSA RSF = 19841 SqFt) - Safety & Health Risk Management Survey (RMS) Only.24539 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 1414TOTAL$0.00$0.00$0.00$0.00
Location15= MI0506BC- BUILDING 2C (HDIFC BLDG 02C) 74 N WASHINGTON AVE BATTLE CREEK MI 49037-3085 - Location 15 - (GSF = 37662 SqFt and GSA RSF = 36538 SqFt) - Safety & Health Risk Management Survey (RMS) Only.37662 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 1515TOTAL$0.00$0.00$0.00$0.00
Location16= OH0100ZZ- DONALD J. PEASE FEDERAL BLDG 143 W LIBERTY ST MEDINA OH 44256-2215 - Location 16 - (GSF = 8201 SqFt and GSA RSF = 8201 SqFt) - Safety & Health Risk Management Survey (RMS) Only.8201 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 1616TOTAL$0.00$0.00$0.00$0.00
Location17= OH0215ZZ- THOMAS D LAMBROS FEDERAL BUILDING 125 MARKET ST YOUNGSTOWN OH 44503-1780 - Location 17 - (GSF = 42846 SqFt and GSA RSF = 33331 SqFt) - Safety & Health Risk Management Survey (RMS) Only.42846 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 1717TOTAL$0.00$0.00$0.00$0.00
Location18= OH0302ZZ- NATHANIEL R JONES FEDERAL BUILDING & COURTHOUSE 10 E COMMERCE ST YOUNGSTOWN OH 44503-1621 - Location 18 - (GSF = 49977 SqFt and GSA RSF = 43586 SqFt) - Safety & Health Risk Management Survey (RMS) Only.49977 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 1818TOTAL$0.00$0.00$0.00$0.00
Location19= OH0305ZZ- TOLEDO COURTHOUSE (NEW) INTERSECTION OF MICHIGAN AND CHERRY TOLEDO OH 43624-0000 - Location 19 - (GSF = 0 SqFt and GSA RSF = 0 SqFt) - Safety & Health Risk Management Survey (RMS) Only.UNKNOWN
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 1919TOTAL$0.00$0.00$0.00$0.00
Location20= OH0514DD- WAREHOUSE 4 3150 SPRINGBORO RD DAYTON OH 45439-0000 - Location 20 - (GSF = 49977 SqFt and GSA RSF = 43586 SqFt) - Safety & Health Risk Management Survey (RMS) Only.49977 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 2020TOTAL$0.00$0.00$0.00$0.00
Location21= IL0032ZZ- US CUSTOMHOUSE 610 S CANAL ST CHICAGO IL 60607-4523 - Location 21 - (GSF = 267945 SqFt and GSA RSF = 246471 SqFt) - Annual OSH Survey Only.267945 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 2121TOTAL$0.00$0.00$0.00$0.00
Location22= IL0054ZZ- CHICAGO FEDERAL BUILDING - 536 S CLARK STREET 536 S CLARK ST CHICAGO IL 60605-1509 - Location 22 - (GSF = 620087 SqFt and GSA RSF = 569050 SqFt) - Annual OSH Survey Only.620087 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 2222TOTAL$0.00$0.00$0.00$0.00
Location23= IL0205ZZ- EVERETT M. DIRKSEN COURTHOUSE 219 S DEARBORN ST CHICAGO IL 60604-1702 - Location 23 - (GSF = 1450322 SqFt and GSA RSF = 1212678 SqFt) - Annual OSH Survey Only.1450322 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 2323TOTAL$0.00$0.00$0.00$0.00
Location24= IL0236FC- JOHN C. KLUCZYNSKI FED. BLDG. 230 S DEARBORN ST CHICAGO IL 60604-1505 - Location 24 - (GSF = 1417138 SqFt and GSA RSF = 1140231 SqFt) - Annual OSH Survey Only.1417138 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 2424TOTAL$0.00$0.00$0.00$0.00
Location25= IL0303ZZ- METCALFE BUILDING 77 W JACKSON BLVD CHICAGO IL 60604-3511 - Location 25 - (GSF = 840102 SqFt and GSA RSF = 734885 SqFt) - Annual OSH Survey Only.840102 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 2525TOTAL$0.00$0.00$0.00$0.00
Location26= IL2225ZZ-(Lease) COOK HOUSE 508 S 8TH ST SPRINGFIELD IL 62703-1607 - Location 26 - (GSF = 3860 SqFt and GSA RSF = 3860 SqFt) - Annual OSH Survey Only.3860 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 2626TOTAL$0.00$0.00$0.00$0.00
Location27= IL2628ZZ-(Lease) WILLIAMSBURG CENTER 4 1734 CORPORATE XING O'FALLON IL 62269-3745 - Location 27 - (GSF = 4599 SqFt and GSA RSF = 4599 SqFt) - Annual OSH Survey Only.4599 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 2727TOTAL$0.00$0.00$0.00$0.00
Location28= IL2643ZZ-(Lease) IVANHOE WOODS CORPORATE CENTER 505 WARRENVILLE RD LISLE IL 60532-1668 - Location 28 - (GSF = 1520 SqFt and GSA RSF = 1520 SqFt) - Annual OSH Survey Only.1520 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 2828TOTAL$0.00$0.00$0.00$0.00
Location29= IN0048ZZ- BIRCH BAYH FEDERAL BUILDING & COURTHOUSE 46 E OHIO ST INDIANAPOLIS IN 46204-1903 - Location 29 - (GSF = 480681 SqFt and GSA RSF = 362829 SqFt) - Annual OSH Survey Only.480681 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 2929TOTAL$0.00$0.00$0.00$0.00
Location30= IN0096ZZ- ROBERT GRANT FEDERAL BUILDING & COURTHOUSE 204 S MAIN ST SOUTH BEND IN 46601-2122 - Location 30 - (GSF = 108252 SqFt and GSA RSF = 92770 SqFt) - Annual OSH Survey Only.108252 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 3030TOTAL$0.00$0.00$0.00$0.00
Location31= IN0133ZZ- MINTON-CAPEHART FEDERAL BUILDING 575 N PENNSYLVANIA ST INDIANAPOLIS IN 46204-1563 - Location 31 - (GSF = 613097 SqFt and GSA RSF = 399507 SqFt) - Annual OSH Survey Only.613097 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 3131TOTAL$0.00$0.00$0.00$0.00
Location32= IN0300ZZ- HAMMOND COURTHOUSE 5400 FEDERAL PLZ HAMMOND IN 46320-1839 - Location 32 - (GSF = 270508 SqFt and GSA RSF = 233069 SqFt) - Annual OSH Survey Only.270508 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 3232TOTAL$0.00$0.00$0.00$0.00
Location33= IN1703ZZ- MAJOR GENERAL EMMETT J. BEAN 8899 E 56TH ST INDIANAPOLIS IN 46216-1000 - Location 33 - (GSF = 1654579 SqFt and GSA RSF = 1594186 SqFt) - Annual OSH Survey Only.1654579 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 3333TOTAL$0.00$0.00$0.00$0.00
Location34= MI0118ZZ- ANN ARBOR FEDERAL BUILDING 200 E LIBERTY ST ANN ARBOR MI 48104-2129 - Location 34 - (GSF = 104731 SqFt and GSA RSF = 71365 SqFt) - Annual OSH Survey Only.104731 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 3434TOTAL$0.00$0.00$0.00$0.00
Location35= MI0131MC- PATRICK V MCNAMARA FED BLDG 477 MICHIGAN AVE DETROIT MI 48226-2523 - Location 35 - (GSF = 1048497 SqFt and GSA RSF = 947859 SqFt) - Annual OSH Survey Only.1048497 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 3535TOTAL$0.00$0.00$0.00$0.00
Location36= MI1999ZZ-(Lease) LAUREL OFFICE PARK LTD. PARTNE 17177 N LAUREL PARK DR LIVONIA MI 48152-2651 - Location 36 - (GSF = 3446 SqFt and GSA RSF = 3446 SqFt) - Annual OSH Survey Only.3446 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 3636TOTAL$0.00$0.00$0.00$0.00
Location37= OH0033ZZ- METZENBAUM COURTHOUSE 201 SUPERIOR AVE E CLEVELAND OH 44114-1203 - Location 37 - (GSF = 211882 SqFt and GSA RSF = 183178 SqFt) - Annual OSH Survey Only.211882 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 3737TOTAL$0.00$0.00$0.00$0.00
Location38= OH0192ZZ- A J CELEBREZZE FEDERAL BUILDING 1240 E 9TH ST CLEVELAND OH 44114-2001 - Location 38 - (GSF = 1459380 SqFt and GSA RSF = 1194675 SqFt) - Annual OSH Survey Only.1459380 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 3838TOTAL$0.00$0.00$0.00$0.00
Location39= OH0194ZZ- JOHN F SEIBERLING FEDERAL BUILDING & COURTHOUSE 2 S MAIN ST AKRON OH 44308-1818 - Location 39 - (GSF = 412753 SqFt and GSA RSF = 174225 SqFt) - Annual OSH Survey Only.412753 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 3939TOTAL$0.00$0.00$0.00$0.00
Location40= OH0301ZZ- CARL B STOKES COURTHOUSE 801 W SUPERIOR AVE CLEVELAND OH 44113-1829 - Location 40 - (GSF = 728560 SqFt and GSA RSF = 592843 SqFt) - Annual OSH Survey Only.728560 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 4040TOTAL$0.00$0.00$0.00$0.00
Location41= OH2098ZZ-(Lease) 2600 PARAMOUNT PLACE 2600 PARAMOUNT PL FAIRBORN OH 45324-6763 - Location 41 - (GSF = 2983 SqFt and GSA RSF = 2983 SqFt) - Annual OSH Survey Only.2983 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 4141TOTAL$0.00$0.00$0.00$0.00
Location42= OH2469ZZ-(Lease) MILFORD CORPORATE CENTER 77 MILFORD DR HUDSON OH 44236-2779 - Location 42 - (GSF = 132 SqFt and GSA RSF = 132 SqFt) - Annual OSH Survey Only.132 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 4242TOTAL$0.00$0.00$0.00$0.00
Location43= WI0044ZZ- MILWAUKEE FEDERAL BUILDING & COURTHOUSE 517 E WISCONSIN AVE MILWAUKEE WI 53202-4500 - Location 43 - (GSF = 463271 SqFt and GSA RSF = 428881 SqFt) - Annual OSH Survey Only.463271 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 4343TOTAL$0.00$0.00$0.00$0.00
Location44= WI0350ZZ- R.W. KASTENMEIER COURTHOUSE 120 N HENRY ST MADISON WI 53703-2559 - Location 44 - (GSF = 73243 SqFt and GSA RSF = 68470 SqFt) - Annual OSH Survey Only.73243 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 4444TOTAL$0.00$0.00$0.00$0.00
Location45= WI1789-(Lease) 2448 S. 102ND STREET 2448 S 102ND ST WEST ALLIS WI 53227-2141 - Location 45 - (GSF = 1212 SqFt and GSA RSF = 1212 SqFt) - Annual OSH Survey Only.1212 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 4545TOTAL$0.00$0.00$0.00$0.00
Location46= IL0154ZZ- PEORIA FEDERAL BUILDING & COURTHOUSE 100 NE MONROE ST PEORIA IL 61602-1022 - Location 46 - (GSF = 109987 SqFt and GSA RSF = 105658 SqFt) - Annual OSH Survey and See Item 47 below for the Risk Management Survey (RMS) for this same property.109987 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 4646TOTAL$0.00$0.00$0.00$0.00
Location47= IL0154ZZ- PEORIA FEDERAL BUILDING & COURTHOUSE 100 NE MONROE ST PEORIA IL 61602-1022 - Location 47 - (GSF = 109987 SqFt and GSA RSF = 105658 SqFt) - Risk Management Survey (RMS) with Annual OSH Survey in item 46.109987 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 4747TOTAL$0.00$0.00$0.00$0.00
Location48= IL0173ZZ- PAUL FINDLEY BUILDING 600 E MONROE ST SPRINGFIELD IL 62701-1626 - Location 48 - (GSF = 154285 SqFt and GSA RSF = 123627 SqFt) - Annual OSH Survey and See Item 49 below for the Risk Management Survey (RMS) for this same property.154285 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 4848TOTAL$0.00$0.00$0.00$0.00
Location49= IL0173ZZ- PAUL FINDLEY BUILDING 600 E MONROE ST SPRINGFIELD IL 62701-1626 - Location 49 - (GSF = 154285 SqFt and GSA RSF = 123627 SqFt) - Risk Management Survey (RMS) with Annual OSH Survey in item 48.154285 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 4949TOTAL$0.00$0.00$0.00$0.00
Location50= IL0206ZZ- WILLIAM L. BEATTY FEDERAL BUILDING & COURTHOUSE 501 BELLE ST ALTON IL 62002-6169 - Location 50 - (GSF = 30357 SqFt and GSA RSF = 29194 SqFt) - Annual OSH Survey and See Item 51 below for the Risk Management Survey (RMS) for this same property.30357 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 5050TOTAL$0.00$0.00$0.00$0.00
Location51= IL0206ZZ- WILLIAM L. BEATTY FEDERAL BUILDING & COURTHOUSE 501 BELLE ST ALTON IL 62002-6169 - Location 51 - (GSF = 30357 SqFt and GSA RSF = 29194 SqFt) - Risk Management Survey (RMS) with Annual OSH Survey in item 50.30357 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 5151TOTAL$0.00$0.00$0.00$0.00
Location52= IL0301ES- MELVIN PRICE FEDERAL BUILDING 750 MISSOURI AVENUE EAST SAINT LOUIS IL 62201-2954 - Location 52 - (GSF = 74732 SqFt and GSA RSF = 62860 SqFt) - Annual OSH Survey and See Item 53 below for the Risk Management Survey (RMS) for this same property.74732 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 5252TOTAL$0.00$0.00$0.00$0.00
Location53= IL0301ES- MELVIN PRICE FEDERAL BUILDING 750 MISSOURI AVENUE EAST SAINT LOUIS IL 62201-2954 - Location 53 - (GSF = 74732 SqFt and GSA RSF = 62860 SqFt) - Risk Management Survey (RMS) with Annual OSH Survey in item 52.74732 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 5353TOTAL$0.00$0.00$0.00$0.00
Location54= IL0311ZZ- STANLEY J. ROSZKOWSKI COURTHOUSE 327 S CHURCH ST ROCKFORD IL 61101-1316 - Location 54 - (GSF = 206128 SqFt and GSA RSF = 172716 SqFt) - Annual OSH Survey and See Item 54 below for the Risk Management Survey (RMS) for this same property.206128 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 5454TOTAL$0.00$0.00$0.00$0.00
Location55= IL0311ZZ- STANLEY J. ROSZKOWSKI COURTHOUSE 327 S CHURCH ST ROCKFORD IL 61101-1316 - Location 55 - (GSF = 206128 SqFt and GSA RSF = 172716 SqFt) - Risk Management Survey (RMS) with Annual OSH Survey in item 54.206128 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 5555TOTAL$0.00$0.00$0.00$0.00
Location56= IN0031ZZ- E. ROSS ADAIR FEDERAL BUILDING & COURTHOUSE 1300 S HARRISON ST FORT WAYNE IN 46802-3495 - Location 56 - (GSF = 124638 SqFt and GSA RSF = 104155 SqFt) - Annual OSH Survey and See Item 57 below for the Risk Management Survey (RMS) for this same property.124638 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 5656TOTAL$0.00$0.00$0.00$0.00
Location57= IN0031ZZ- E. ROSS ADAIR FEDERAL BUILDING & COURTHOUSE 1300 S HARRISON ST FORT WAYNE IN 46802-3495 - Location 57 - (GSF = 124638 SqFt and GSA RSF = 104155 SqFt) - Risk Management Survey (RMS) with Annual OSH Survey in item 56.124638 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 5757TOTAL$0.00$0.00$0.00$0.00
Location58= IN0126ZZ- LEE H HAMILTON FEDERAL BUILDING & COURTHOUSE 121 W SPRING ST NEW ALBANY IN 47150-3645 - Location 58 - (GSF = 37223 SqFt and GSA RSF = 35355 SqFt) - Annual OSH Survey and See Item 59 below for the Risk Management Survey (RMS) for this same property.37223 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 5858TOTAL$0.00$0.00$0.00$0.00
Location59= IN0126ZZ- LEE H HAMILTON FEDERAL BUILDING & COURTHOUSE 121 W SPRING ST NEW ALBANY IN 47150-3645 - Location 58 - (GSF = 37223 SqFt and GSA RSF = 35355 SqFt) - Risk Management Survey (RMS) with Annual OSH Survey in item 58.37223 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 5959TOTAL$0.00$0.00$0.00$0.00
Location60= MI0503BC- BUILDING 2 (HDIFC BLDG 02) 74 WASHINGTON AVE N BATTLE CREEK MI 49037-3085 - Location 60 - (GSF = 226670 SqFt and GSA RSF = 215252 SqFt) - Annual OSH Survey and See Item 61 below for the Risk Management Survey (RMS) for this same property.226670 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 6060TOTAL$0.00$0.00$0.00$0.00
Location61= MI0503BC- BUILDING 2 (HDIFC BLDG 02) 74 WASHINGTON AVE N BATTLE CREEK MI 49037-3085 - Location 61 - (GSF = 226670 SqFt and GSA RSF = 215252 SqFt) - Risk Management Survey (RMS) with Annual OSH Survey in item 60.226670 Sq.Ft.
Cost per HourNumber of Hours PreparationNumber of Hours On-SiteNumber of Hours ReportSUBTOTAL
Fire Protection Engineer (FPE)x(+)(+)$0.00
Safety and Health Specialistx(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
x(+)(+)$0.00
LABOR SUBTOTAL000$0.00$0.00$0.00$0.00

SUBTOTAL

LAB SUBTOTAL

Per PersonNumber of PeopleNumber of DaysSUBTOTAL
Travel Expenses;11$0.00
Lodging & Per diem;11$0.00
Other11$0.00
EXPENSES SUBTOTAL$0.00
LOCATION 6161TOTAL$0.00$0.00$0.00$0.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .