This document is a Quality Assurance Surveillance Plan (QASP) for cage washer maintenance and repair at Aberdeen Proving Ground. The contract is a firm fixed-price agreement requiring the contractor to perform quarterly on-site preventive maintenance visits to inspect two Lancer SAS Cage and Rack Washers, with four total visits scheduled annually. Each maintenance visit must include a full inspection, adjustments, and repairs to ensure optimal machine performance, with a detailed report submitted within 7 calendar days of the visit.

Key requirements include providing unlimited technical support, responding to emergency calls with repair estimates within 8 hours and service within 24 hours, and offering a minimum 30-day warranty on repairs and parts. The contract will be administered by the Defense Health Agency, with the Contracting Officer's Representative (COR) monitoring technical aspects and performance. The surveillance plan outlines a comprehensive method for tracking contractor performance, including potential Contract Discrepancy Reports for non-conforming work, with performance levels categorized into minor, major, and critical classifications.

View the file

Other files

File Type Posted
Combined Solicitation - HT942525QE027.docx DOCX document
Attachment 2 - Equipment List.xlsx XLSX spreadsheet
Attachment 1 - Performance Work Statement.docx DOCX document
Attachment 4 - Past Performance Information Sheet (PPIS).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan

For

Cage Washer Maintenance and Repair

28 April 2025

Insert Contracting Officer InfoInsert COR Info
NAMERebecca Kilby
Contracting OfficerContracting Officer’s Representative
Contracting AgencyAberdeen Proving Ground

TABLE OF CONTENTS

Subject Page Number

1. Overview

2. Description of Services

3. Roles and Responsibilities

4. Contract Quality Requirements

5. Government Surveillance

6. Non-Conforming Performance

7. Deduct Plan

8. Data Analysis

9. Acceptance of Services

10. COR Status Report

11. Contractor Manpower Reporting Application (CMRA)

12. Contractor Performance Assessment Reporting System (CPARS)

13. Combating Trafficking In Persons

14. COR/Quality Assurance Surveillance Files

15. QASP Changes

1. Overview.

1.1. Purpose. The purpose of this Quality Assurance Surveillance Plan (QASP) is to identify the methods and procedures the Government will use to ensure it receives the services under this contract as identified in the Performance Work Statement (PWS).

1.2. Intent. The intent of this QASP is to: 1) ensure Contractor performance meets or exceeds contract terms, conditions and specifications; 2) hold the Contractor accountable for quality control; and 3) encourage the Contractor to take appropriate steps to control and improve quality. Accordingly, the Government will perform surveillance on the contract in accordance with this QASP but reserves the right to monitor the contract in any manner necessary, at any times necessary, and at all places necessary to ensure that the rendered services conform to contract requirements. The Government also reserves the right to perform quality assurance at the subcontractor level and perform quality assurance at the Contractor's place of business, if applicable. Resolution of non-conforming services discovered at the subcontractor level will be addressed with the prime Contractor.

2. Description of Services.

2.1. Scope of Work. The Contractor shall conduct quarterly on-site preventive maintenance visits to thoroughly inspect the cage washers. These visits will be completed in October, January, April, and July. and will total 4 visits in all. The first visit will occur no greater than 30 days following the award of the contract. Each of the preventive maintenance visits will include a full inspection of the cage washers and will include adjustments and repairs to keep the machine operating at full performance. After every maintenance visit, the Contractor will provide a detailed report of the condition of the cage washer within 7 calendar days of the preventive maintenance visits. This report will include a list of faulty, defective, or worn parts that are required to bring the cage washer into a properly maintained condition and/or at optimal operation. This report will include a summary of what was performed on the cage wash at the time of the visit. No work will be performed at any additional costs to the Government without first receiving authorization from the Government’s Contracting Officer (CO).

2.2. Type of Contract. Firm Fixed Price

3. Roles and Responsibilities

3.1. Government.

3.1.1. Contracting Officer (CO). The CO is the only person with the authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

3.1.2. Contracting Officer’s Representative (COR). The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the CO and Contractor of any deficiencies; coordinate availability of Government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially regarding changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

4. Contract Quality Requirements.

4.1. Contractor’s Quality Control Program. The Contractor’s quality control program (in accordance with FAR Part 46 and applicable 52.246-(Clause(s))) is how the Contractor assures that work complies with the requirement of the contract. The Contractor shall ensure services are performed in accordance with this PWS. The Contractor shall identify, prevent, and ensure non-recurrence of defective services.

4.2. Government Quality Assurance. The Government shall evaluate the Contractor’s performance under this contract in accordance with this QASP. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance and minimum acceptable defect rate(s).

5. Government Surveillance.

5.1. Methods of Surveillance. The following Methods of Surveillance will be utilized in monitoring the Contractors’ performance:

5.1.3. Periodic Inspection. A performance requirements summary (PRS) is attached.

5.1.4. Customer Feedback. The DA Form 5477, Customer Complaint Record, Attachment 2, will be used to document/record all complaints. The following procedures will be followed when a complaint is received.

· The COR will investigate and determine the validity of the complaint.

· If the complaint is determined to be invalid, the COR will inform the person who submitted the complaint of the reason(s) as soon as practical.

· For validated complaints that are true contractual non-conformances, the procedures in paragraph 6 below will be followed.

5.2. Surveillance Schedule. A Surveillance Schedule will be created for each month of Contractor performance utilizing the DA 5475, COR Surveillance Schedule, Attachment 3. The schedule is “FOR OFFICIAL USE ONLY” and is not releasable to anyone other than authorized Government personnel. A copy of the Surveillance Schedule will be filed in the Wide Area WorkFlow e-Business Suite, JAM/SPM, https://wawf.eb.mil/ (Either as an Attachment to the Monthly COR Status Reports or uploaded separately in the Miscellaneous Documents Section of the COR’s Online File.). Comment by Vandevander, Nicholas A CIV DHA DHA CONTRACTING ACT (USA): CORT has been replaced with JAM/SPM. Please reference this accordingly. Comment by Kilby, Rebecca L CIV DHA DHA PUB HEALTH - A (USA): Fixed

5.3. Surveillance Instructions/Checklists. Surveillance Checklists, Attachment 4, will be utilized and completed when surveillances are conducted.

5.4. Surveillance Documentation. No later than the 15th of each month surveillance documentation for the preceding month will be uploaded in the Wide Area WorkFlow e-Business Suite, JAM/SPM, https://wawf.eb.mil/. Monthly surveillance documentation includes the Monthly Status Report, the Surveillance Schedule and all completed Surveillance Checklist(s) for the preceding month. Surveillance Schedules and completed Surveillance Checklists may be uploaded in CORT Tool either as Attachments to Monthly Status Reports or uploaded separately in the Miscellaneous Documents Section of the COR’s Online File. Comment by Vandevander, Nicholas A CIV DHA DHA CONTRACTING ACT (USA): See prior comment Comment by Kilby, Rebecca L CIV DHA DHA PUB HEALTH - A (USA): Fixed

6. Non-Conforming Performance. Non-conformance occurs when a Contractor fails to meet Contract or Task Order terms, conditions and/or specifications. All instances of non-conformance will be documented, and the Contractor will be notified. Resolution of non-conformance discovered at the subcontractor level will be addressed with the prime Contractor. Non-conformance is classified as either: Level I (Minor); Level II (Major); or Level III (Critical).

6.1. Level I (Minor). Level I non-conformance is not likely to materially reduce the usability of services for their intended purpose or is a departure from established standards having little bearing on completing the contract requirement. Minor non-conformances can usually be corrected on the spot and can be issued to the Contractor through either a verbal or written Contract Discrepancy Report (CDR). However, the Government is still required to document verbal Level I CDRs. The COR may issue verbal Level I CDRs directly to the appropriate level of Contractor management. The COR will notify the CO as soon as practical when a verbal Level I CDR is issued and document them in their Monthly Reports. If the non-conformance cannot be corrected on the spot, the Contractor shall be given a suspense date to correct the deficiency. The CO will issue, and sign written Level I CDRs, Attachment 5.

6.2. Level II (Major). Level II non-conformance is likely to result in failure of the services to meet contract requirements. Also, repeated discrepancies, many documented Level I CDRs and trends indicating failure of the Contractor’s quality control program can be classified as Level II CDRs. The CO issues all Level II CDRs in writing, Attachment 5. The COR will notify the CO as soon as practical when a major non-conformance is identified.

6.3. Level III (Critical). Level III non-conformances result in hazardous or unsafe conditions due to the manner in which the services are performed; prevent or impact a vital agency mission as a result of performance; or are for repeated or uncorrected Level II CDRs. The Contracting Office Director or Deputy Director issues written Level III CDRs. The COR is responsible for notifying the CO immediately upon discovery of a critical non-conformance.

6.4. Documenting CDRs. Documentation, as a minimum, will include: the Contract or Task Order number; reference to the specific contract requirement; the specific discrepancy to the requirement; where it was discovered; the date and time it was discovered; Contractor representative who was notified; and the suspense date for Contractor response/corrective action.

6.5. Tracking and Resolving CDRs. All CDRs, verbal and written, regardless of issuer will be included in the COR’s Monthly Report. The COR and CO shall track CDRs to ensure the Contractor identifies and takes appropriate corrective action to the root cause and the specific non-conformance is corrected within the required timeline. The CO will make a final written determination of the Government’s remedies if the non-conformance is not corrected by the Contractor after receiving notice and a reasonable opportunity to correct the work.

7. Deduct Plan. This acquisition does not include a Deduct Plan.

8. Data Analysis. Data Analysis will be performed to identify trends in cost, schedule and/or performance risks. The results of Data Analysis will be documented in COR Status Reports and may be used to adjust the surveillance schedules, increase or decrease surveillance, if deemed appropriate. Negative trends noted using Government data/observations could result in issuing the Contractor a Contract Discrepancy Report. Trends noted using Contractor data will not result in a CDR unless the Contractor is not addressing the negative trend.

9. Acceptance of Services. When all services have been deemed acceptable and there is documented objective quality evidence to support acceptable performance the COR will accept the services provided and authorize payment of the Contractor. This is accomplished by approving the Contractor’s Receiving Reports in Wide Area WorkFlow, e-Business Suite, https://wawf.eb.mil/.

10. COR Status Report. COR Status Reports will be submitted on a Monthly basis, no later than the 15th of each month for the preceding month, to the Contracting Officer via the Wide Area WorkFlow e-Business Suite, CORT Tool. COR Status Reports will provide a synopsis of the Contractors performance for the inclusive dates of the report. The synopsis will contain a summary of: surveillances performed; Customer Feedback, if any; CDRs, if any; an analysis of the Contractors performance; recommended adjustments to surveillance schedules; and any other pertinent contract information. Completed Surveillance Checklists and CDRs, if any, will be included as attachments to COR Status Reports or uploaded separately in the Miscellaneous Documents Section of the COR’s Online file.

11. Contractor Manpower Reporting Application (CMRA). In accordance with Office of the Secretary of Defense Memorandum, Enterprise-wide CMRA, dated 28 Nov 2012, the Contractor must report contractor manpower to the Contractor Manpower Reporting website at https://cmra.army.mil. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. The COR shall verify that the Contactor has complied with the required contractor manpower reporting annually and document the results in the Wide Area WorkFlow, e-Business Suite, CORT Tool File, Miscellaneous Documents Section https://wawf.eb.mil/.

12. Combating Trafficking In Persons (CTIP). In accordance with PGI 222.17 and FAR 52.222-50, the CO will be notified immediately of any information from any source that alleges a Contractor employee, subcontractor and/or subcontractor employee has engaged in conduct that violates the United States Government “zero” tolerance policy regarding trafficking in persons.

13. COR/Quality Assurance Surveillance Files. The official COR/Quality Assurance Surveillance File will be maintained in the Wide Area WorkFlow, e-Business Suite, CORT Tool, https://wawf.eb.mil/, IAW DoDI 5000.72, DoD Standard for COR Certification.

14. QASP Changes. This QASP is a living document and, as such, may be changed as needed based on Data Analysis (trends), contract modifications, etc. The COR will send any recommended changes to the CO for approval and the CO must approve all changes.

Rebecca Kilby, COR

Contracting Officer’s Signature Block

Attachments:

1. PRS

2. Customer Complaint Record, DA Form 5477

3. Surveillance Schedule, DA Form 5475

4. Surveillance Checklist(s)

5. Contract Discrepancy Report, DA Form 5479

Attachment 1

Performance Requirements Summary (PRS) Comment by Vandevander, Nicholas A CIV DHA DHA CONTRACTING ACT (USA): Please see comments on PWS and change this to reflect them accordingly. Comment by Kilby, Rebecca L CIV DHA DHA PUB HEALTH - A (USA): Sent an email to get clarification but did not receive a response.

PERFORMANCE OBJECTIVE
STANDARD
PERFORMANCE THRESHOLD ACCEPTABLE QUALITY LEVELS (AQLs)
METHOD OF SURVEILLANCE

PRS#1 - PWS para (5.1.3) The contractor shall give a detailed report on condition of cage wash after maintenance visit.

Within 7 business days.

Reports are received within the required days without deviation from standard.
Periodic Inspection

PRS#2 - PWS para (5.2.1) Repairs and repair parts shall have a 30 day warranty.

At least 30 days.
At least 30-day warranty received without deviation from standard.
Periodic Inspection

PRS#3 - PWS para ( 5.2.2)

The contractor shall accept phone calls for technical support.

Unlimited
Unlimited calls without deviation from standard.
Periodic Inspection

PRS#4 - PWS para ( 5.2.3)

The contractor shall respond to emergency calls and services.

Calls-repair estimate within 8 hours.

Service-24 hours after notification of problem.

Estimate received within 8 hours and service within 24 hours without deviation from standard.
Periodic Inspection

PRS#5 (5.1.1)

The contractor shall perform required maintenance required by the original equipment manufacturer (OEM)

Completed at scheduled visit
Maintenance required by the

original equipment manufacturer (OEM) is completed at scheduled visit Periodic Inspection

PRS#6 (5.1.2)

The contractor shall perform a full inspection of the cage wash

Completed at scheduled visit
Included in service report.
Periodic Inspection

Attachment 2

Customer Complaint Record, DA Form 5477

Attachment 3

Surveillance Schedule, DA Form 5475

Attachment 4

Surveillance Checklist(s)

COR Inspection Checklist & Data Report (Fixed Firm Price Contract)
Meeting Contract Requirements

Contractor:

Contract Number:

Service Provided:

COR Name:

Date:
YES
No
N/A

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments summary, to include, positive trends, negative trends, concerns, customer comments, and any additional COR comments:

Attachment 5

Contract Discrepancy Report, DA Form 5479 image1.emf

DATE OF COMPLAINT TIME OF COMPLAINT

NATURE OF COMPLAINT

CONTRACT REFERENCE

VALIDATION

DATE CONTRACTOR INFORMED COMPLAINT TIME CONTRACTOR INFORMED OF COMPLAINT

ACTION TAKEN BY CONTRACTOR (Responsible officer)

RECEIVED AND VALIDATED BY

ORGANIZATION

INDIVIDUAL

NOTE: ( ) Used for in-house operation.

CUSTOMER COMPLAINT RECORD

For use of this form, see DA PAM 5-20; the proponent agency is ACSIM.

SOURCE OF COMPLAINT

(Responsible officer) (Responsible officer)

DA FORM 5477, MAR 2008 PREVIOUS EDITIONS ARE OBSOLETE. APD PE v1.01ES initiator:ralph.gaines@us.army.mil;wfState:distributed;wfType:email;workflowId:b71742b09d8a4c49a6eb59ab36d6e236

DATE OF COMPLAINT:

TIME OF COMPLAINT:

ORGANIZATION INDIVIDUAL SOURCE OF COMPLAINT:

NATURE OF COMPLAINT:

CONTRACT REFERENCE:

VALIDATION:

DATE CONTRACTOR INFORMED COMPLAINT Responsible officer:

TIME CONTRACTOR INFORMED OF COMPLAINT Responsible officer:

ACTION TAKEN BY CONTRACTOR Responsible officer:

RECEIVED AND VALIDATED BY:

NOTE Used for inhouse operation:

undefined: Off

Text2:

SubmitButton1:

image2.emf

DA FORM 5477

DATE OF COMPLAINT TIME OF COMPLAINT

NATURE OF COMPLAINT

CONTRACT REFERENCE

VALIDATION

DATE CONTRACTOR INFORMED COMPLAINT TIME CONTRACTOR INFORMED OF COMPLAINT

ACTION TAKEN BY CONTRACTOR (Responsible officer)

RECEIVED AND VALIDATED BY

ORGANIZATION

INDIVIDUAL

NOTE: ( ) Used for in-house operation.

CUSTOMER COMPLAINT RECORD

SOURCE OF COMPLAINT

(Responsible officer) (Responsible officer)

DA FORM 5477, MAR 2008 PREVIOUS EDITIONS ARE OBSOLETE. APD PE v1.01ES initiator:ralph.gaines@us.army.mil;wfState:distributed;wfType:email;workflowId:b71742b09d8a4c49a6eb59ab36d6e236

DATE OF COMPLAINT:

TIME OF COMPLAINT:

ORGANIZATION INDIVIDUAL SOURCE OF COMPLAINT:

NATURE OF COMPLAINT:

CONTRACT REFERENCE:

VALIDATION:

DATE CONTRACTOR INFORMED COMPLAINT Responsible officer:

TIME CONTRACTOR INFORMED OF COMPLAINT Responsible officer:

ACTION TAKEN BY CONTRACTOR Responsible officer:

RECEIVED AND VALIDATED BY:

NOTE Used for inhouse operation:

undefined: Off

Text2:

SubmitButton1:

image3.emf

DATE

COR/QAE SURVEILLANCE SCHEDULE

When completed stamp "FOR OFFICIAL USE ONLY"

DA FORM 5475, MAR 2008 APD PE v1.00

SERVICE

PREVIOUS EDITIONS ARE OBSOLETE.

image4.emf

DA FORM 5479

6.

2. 3.

PREPARED ORAL NOTIFICATION RETURNED BY CONTRACTOR ACTION COMPLETE

4. DISCREPANCY OR PROBLEM (Describe in Detail: Include reference in PWS / Directive: Attach continuation sheet if necessary.)

5. SIGNATURE OF CONTRACTING OFFICER

7.

8. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE. ATTACH

1. CONTRACT NUMBER

9. SIGNATURE OF CONTRACTOR REPRESENTATIVE 10. DATE

11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, rejection: attach continuation sheet if necessary)

12. GOVERNMENT ACTIONS (Payment deduction, cure notice, show cause, other.)

CONTRACT DISCREPANCY REPORT

TO: (Contractor and Manager Name)

DATES

CLOSE OUT

CONTRACTOR

NOTIFIED

NAME AND TITLE SIGNATURE DATE

QAE

CONTRACTING

OFFICER

CONTINUATION SHEET IF NECESSARY. (Cite applicable Q.A. program procedures or new A.W. procedures.)

DA FORM 5479, MAR 2008 APD PE v1.01ES

FROM: (Name of QAE)

TO: (Contracting Officer) FROM: (Contractor) image5.emf

6.

2. 3.

PREPARED ORAL NOTIFICATION RETURNED BY CONTRACTOR ACTION COMPLETE

4. DISCREPANCY OR PROBLEM (Describe in Detail: Include reference in PWS / Directive: Attach continuation sheet if necessary.)

5. SIGNATURE OF CONTRACTING OFFICER

7.

8. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE. ATTACH

1. CONTRACT NUMBER

9. SIGNATURE OF CONTRACTOR REPRESENTATIVE 10. DATE

11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, rejection: attach continuation sheet if necessary)

12. GOVERNMENT ACTIONS (Payment deduction, cure notice, show cause, other.)

CONTRACT DISCREPANCY REPORT

TO: (Contractor and Manager Name)

DATES

CLOSE OUT

CONTRACTOR

NOTIFIED

NAME AND TITLE SIGNATURE DATE

QAE

CONTRACTING

OFFICER

CONTINUATION SHEET IF NECESSARY. (Cite applicable Q.A. program procedures or new A.W. procedures.)

DA FORM 5479, MAR 2008 APD PE v1.01ES

FROM: (Name of QAE)

TO: (Contracting Officer) FROM: (Contractor) image6.emf

DA FORM 5475

COR/QAE SURVEILLANCE SCHEDULE

When completed stamp "FOR OFFICIAL USE ONLY"

DA FORM 5475, MAR 2008 APD PE v1.00

SERVICE

File details come from the government source that posted it. Updated .