Attachment 3 - Product Version Configurations.pdf

PDF 13 MB Posted

Attached to
Streetlight Replacement Project
Solicitation number
61899
Issued by
Fairfax County, Falls Church City, Virginia

About this file

This document is an attachment related to a streetlight replacement project in the City of Fairfax, Virginia. The City of Fairfax, located in Fairfax County, has a multi-year project to replace the existing gas-powered streetlights with new LED streetlights. The second phase of the project will replace 45 streetlights on North Street, Chain Bridge Road, University Drive, Blenhiem Boulevard, Main Street, and East Street. The City will not guarantee any specific amount of business to the awarded contractor after the initial phase.

The document does not provide pricing terms, set-asides, information on incumbents, funding requirements, or other salient details. The focus is on the project overview, locations, and quantities for the second phase of the streetlight replacement initiative in the City of Fairfax.

View the file

Other files

File Type Posted
Attachment 1 - Bid Submission Form.docx DOCX document
Attachment 2 - Price Document 3.18.24.xlsx XLSX spreadsheet
IFB 61899 - Streetlight Replacement Project.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF FAIRFAX - North St Phase

PLAN FOR BID SOLICITATION

1of 5

NTS

12/12/23

R&A R&A

(Not For Construction)

NOTIFY "MISS UTILITY" AT 1-800-552-7001

72 HOURS IN ADVANCE OF ANY

CONSTRUCTION IN THESE LOCATIONS

15865 Crabbs Branch Way Rockville, MD 20855

PROJECT MANAGEMENT

UTILITY ENGINEERING &

(301) 548-7475 (Office)

(301) 548-7478 (Fax)

Gas Lamp-to-LED Streetlight Conversions

Poles and Conduit Alignment and Design

HISTORIC DISTRICT STREETLIGHT LAMP/POLE CONFIGURATIONS

CONCRETE FOUNDATIONS - "VERSION A" & "VERSION B"

City of Fairfax - Gas Lamp Conversions

North St / Phase 2 - Streetlight Configurations

Streetlight

Version

Label

A

B

C

PTUE3

Historic

LED Lamp

X

X

X

12-foot pole concrete base

X

X

X

12-foot pole

Direct-Bury

Banner

Accessories

X

X

X

CF-19

19-in diameter

12-foot pole concrete base

CF-16

16-in diameter

DB

WFCL3

Cutoff Acorn

LED Lamp

ARDCL

Cutoff Colnl

LED Lamp

D

E

X

X

X X

X

LED STREETLIGHT INFRASTRUCTURE LEGEND

NEW: 1way, 2-inch PVC for new streetlight connections (Phase 2)

NEW: 12' x 12' Electric Splice Box (Phase 2)

NEW: Electric circuit feed path (Phase 2)

EXISTING: 1way, 2-inch PVC for streetlight connections (Phase 1)

EXISTING: Electric circuit feed path (Phase 1)

Transition Residential

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text No.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

CITY

AutoCAD SHX Text

STLT

NTS12/12/23

R&A R&A

(Not For Construction)

NOTIFY "MISS UTILITY" AT 1-800-552-7001

72 HOURS IN ADVANCE OF ANY

CONSTRUCTION IN THESE LOCATIONS

15865 Crabbs Branch Way Rockville, MD 20855

PROJECT MANAGEMENT

UTILITY ENGINEERING &

(301) 548-7475 (Office)

(301) 548-7478 (Fax)

Gas Lamp-to-LED Streetlight Conversions

Poles and Conduit Alignment and Design

HISTORIC DISTRICT STREETLIGHT LAMP/POLE CONFIGURATIONS

DIRECT BURY FOUNDATIONS - "VERSION C"

City of Fairfax - Gas Lamp Conversions

North St / Phase 2 - Streetlight Configurations

Streetlight

Version

Label

A

B

C

PTUE3

Historic

LED Lamp

X

X

X

12-foot pole concrete base

X

X

X

12-foot pole

Direct-Bury

Banner

Accessories

X

X

X

CF-19

19-in diameter

12-foot pole concrete base

CF-16

16-in diameter

DB

WFCL3

Cutoff Acorn

LED Lamp

ARDCL

Cutoff Colnl

LED Lamp

D

E

X

X

X X

X

LED STREETLIGHT INFRASTRUCTURE LEGEND

NEW: 1way, 2-inch PVC for new streetlight connections (Phase 2)

NEW: 12' x 12' Electric Splice Box (Phase 2)

NEW: Electric circuit feed path (Phase 2)

EXISTING: 1way, 2-inch PVC for streetlight connections (Phase 1)

EXISTING: Electric circuit feed path (Phase 1)

Transition Residential

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text No.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

CITY

NTS

12/12/23

R&A R&A

(Not For Construction)

NOTIFY "MISS UTILITY" AT 1-800-552-7001

72 HOURS IN ADVANCE OF ANY

CONSTRUCTION IN THESE LOCATIONS

15865 Crabbs Branch Way Rockville, MD 20855

PROJECT MANAGEMENT

UTILITY ENGINEERING &

(301) 548-7475 (Office)

(301) 548-7478 (Fax)

Gas Lamp-to-LED Streetlight Conversions

Poles and Conduit Alignment and Design

PRIMARY ROAD CUTOFF ACORN STREETLIGHT LAMP/POLE CONFIGURATION

CONCRETE FOUNDATION - "VERSION D"

City of Fairfax - Gas Lamp Conversions

North St / Phase 2 - Streetlight Configurations

Streetlight

Version

Label

A

B

C

PTUE3

Historic

LED Lamp

X

X

X

12-foot pole concrete base

X

X

X

12-foot pole

Direct-Bury

Banner

Accessories

X

X

X

CF-19

19-in diameter

12-foot pole concrete base

CF-16

16-in diameter

DB

WFCL3

Cutoff Acorn

LED Lamp

ARDCL

Cutoff Colnl

LED Lamp

D

E

X

X

X X

X

LED STREETLIGHT INFRASTRUCTURE LEGEND

NEW: 1way, 2-inch PVC for new streetlight connections (Phase 2)

NEW: 12' x 12' Electric Splice Box (Phase 2)

NEW: Electric circuit feed path (Phase 2)

EXISTING: 1way, 2-inch PVC for streetlight connections (Phase 1)

EXISTING: Electric circuit feed path (Phase 1)

Transition Residential

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text No.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

CITY

NTS12/12/23

R&A R&A

(Not For Construction)

NOTIFY "MISS UTILITY" AT 1-800-552-7001

72 HOURS IN ADVANCE OF ANY

CONSTRUCTION IN THESE LOCATIONS

15865 Crabbs Branch Way Rockville, MD 20855

PROJECT MANAGEMENT

UTILITY ENGINEERING &

(301) 548-7475 (Office)

(301) 548-7478 (Fax)

Gas Lamp-to-LED Streetlight Conversions

Poles and Conduit Alignment and Design

RESIDENTIAL CUTOFF COLONIAL STREETLIGHT LAMP/POLE CONFIGURATION

DIRECT BURY FOUNDATION - "VERSION E"

City of Fairfax - Gas Lamp Conversions

North St / Phase 2 - Streetlight Configurations

Streetlight

Version

Label

A

B

C

PTUE3

Historic

LED Lamp

X

X

X

12-foot pole concrete base

X

X

X

12-foot pole

Direct-Bury

Banner

Accessories

X

X

X

CF-19

19-in diameter

12-foot pole concrete base

CF-16

16-in diameter

DB

WFCL3

Cutoff Acorn

LED Lamp

ARDCL

Cutoff Colnl

LED Lamp

D

E

X

X

X X

X

LED STREETLIGHT INFRASTRUCTURE LEGEND

NEW: 1way, 2-inch PVC for new streetlight connections (Phase 2)

NEW: 12' x 12' Electric Splice Box (Phase 2)

NEW: Electric circuit feed path (Phase 2)

EXISTING: 1way, 2-inch PVC for streetlight connections (Phase 1)

EXISTING: Electric circuit feed path (Phase 1)

Transition Residential

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text No.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

CITY

Sheets and Views
GAS-LED North - S1
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S2.pdf
Sheets and Views
GAS-LED North - S2
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S3.pdf
Sheets and Views
GAS-LED North - S3
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S4.pdf
Sheets and Views
GAS-LED North - S4
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S5.pdf
Sheets and Views
GAS-LED North - S5
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S6.pdf
Sheets and Views
GAS-LED North - S6
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S7.pdf
Sheets and Views
North - Hist CF Specs - S7
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S8.pdf
Sheets and Views
North Hist - DB Specs - S8
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S9.pdf
Sheets and Views
Cutoff Acorn CF Specs - S9
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S10.pdf
Sheets and Views
Cutoff Colonial DB Specs-S10
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S11 foundation.pdf
Sheets and Views
GAS-LED North - S1
COF - Gas Lamp-LED Plan - 2023 10 12 North St Phase - PRELIM REVIEW - S2.pdf
Sheets and Views
GAS-LED North - S2
COF - Gas Lamp-LED Plan - 2023 10 12 North St Phase - PRELIM REVIEW - S3.pdf
Sheets and Views
GAS-LED North - S3
COF - Gas Lamp-LED Plan - 2023 10 12 North St Phase - PRELIM REVIEW - S4.pdf
Sheets and Views
GAS-LED North - S4
COF - Gas Lamp-LED Plan - 2023 10 12 North St Phase - PRELIM REVIEW - S5.pdf
Sheets and Views
GAS-LED North - S5
COF - Gas Lamp-LED Plan - 2023 10 12 North St Phase - PRELIM REVIEW - S6.pdf
Sheets and Views
GAS-LED North - S6
COF - Gas Lamp-LED Plan - 2023 10 12 North St Phase - PRELIM REVIEW - S7.pdf
Sheets and Views
North - Hist CF Specs - S7
COF - Gas Lamp-LED Plan - 2023 10 12 North St Phase - PRELIM REVIEW - S8.pdf
Sheets and Views
North Hist - DB Specs - S8
COF - Gas Lamp-LED Plan - 2023 10 12 North St Phase - PRELIM REVIEW - S9.pdf
Sheets and Views
Cutoff Acorn CF Specs - S9
COF - Gas Lamp-LED Plan - 2023 10 12 North St Phase - PRELIM REVIEW - S10.pdf
Sheets and Views
Cutoff Colonial DB Specs-S10
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S6.pdf
Sheets and Views
GAS-LED North - S6
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S4.pdf
Sheets and Views
GAS-LED North - S4
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S1 A.pdf
Sheets and Views
GAS-LED North - S1
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S2 A.pdf
Sheets and Views
GAS-LED North - S2
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S3 A.pdf
Sheets and Views
GAS-LED North - S3
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S4 A.pdf
Sheets and Views
GAS-LED North - S4
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S5 A.pdf
Sheets and Views
GAS-LED North - S5
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S6 A.pdf
Sheets and Views
GAS-LED North - S6
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S9 A.pdf
Sheets and Views
Cutoff Acorn CF Specs - S9
COF - Gas Lamp-LED Plan - 2023 12 12 North St Phase 2 - ISSUE FOR IFB - S10 A.pdf
Sheets and Views
Cutoff Colonial DB Specs-S10

File details come from the government source that posted it. Updated .