Attachment 3 Pricing Workbook W56HZV-23-R-L102.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Recreation Site Pavilion Roof Repair
Solicitation number
W56HZV-23-R-L102
Issued by

About this file

This document contains a pricing workbook template for solicitation number W56HZV-23-R-L102 to repair the roof of a recreation site pavilion. The workbook instructions specify that offerors must complete all yellow highlighted cells with pricing information for various construction categories including general requirements, bonds, concrete work, masonry, metals, wood and plastics work, and other related construction categories. The total proposed price should be included at the bottom. The solicitation is for the Department of the Army Materiel Command TACOM Life Cycle Management Command to repair the roof of an unspecified recreation site pavilion. Offerors must submit completed pricing workbooks in Excel format in response to solicitation number W56HZV-23-R-L102.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Solicitation: W56HZV-23-R-L102
Attachment 0003 - Pricing Workbook
Instructions
1. All cells highlighted in green may require inputs and must be completed.
2. Do not adjust formulas or otherwise manipulate any of the non-green highlighted cells.
3. Do not alter or make changes to this attachment except for inputting values into these cells highlighted in
yellow. Do not print to Adobe PDF, this spreadsheet is to be completed and submitted as an excel attachment.
4. Avoid proposing partial cents, i.e. amount beyond a penny ($0.01). Round to the nearest penny for every yellow highlighted cell
requiring input. All dollar values will be displayed to the nearest $0.01. avoid proposing a formula in any yellow highlighted cells,
instead use amounts.

Estimate Sheet

Project Title: JSMC Pavilion Repair W56HZV-23-R-L102
Contractor:Date:
Pricing BreakdownCOST
REQ'DTYPERATEINCREASE
YGen. RequirementsERROR:#VALUE!
01General Requirements$0.00NBondsERROR:#VALUE!
02Existing Conditions$0.00YEscalation, Area, SizeERROR:#VALUE!
03Concrete$0.00YOverheadERROR:#VALUE!
04Masonry$0.00YProfitERROR:#VALUE!
05Metals$0.00NDesignERROR:#VALUE!
06Wood, Plastics, & Composites$0.00
07Thermal & Moisture Protection$0.00SUB-TOTAL(S):ERROR:#VALUE!
08Openings$0.00
09Finishes$0.00
10Specialities$0.00GRAND TOTAL:ERROR:#VALUE!
11Equipment$0.00
12Furnishings$0.00
13Special Construction$0.00
14Conveying Equipment$0.00
21Fire Suppression$0.00
22Plumbing$0.00
23Heating, Ventilating, & Air Conditioning$0.00
25Integrated Automation$0.00
26Electrical$0.00
27Communications$0.00
28Electronic Safety & Security$0.00
31Earthwork$0.00
32Exterior Improvements$0.00
33Utilities$0.00
34Transportation$0.00
35Waterway & Marine$0.00
40Process Integration$0.00
41Material Processing & Handling Equipment$0.00
42Process Heating, Cooling, and Drying Equipment$0.00
43Process Gas and Liquid Handling, Purif., and Storage Equip$0.00
44Pollution Control Equipment$0.00
45Industry-Specific Manufacturing Equipment$0.00
48Electrical Power Generation$0.00

TOTAL: $ -

File details come from the government source that posted it. Updated .