This file is a Price Schedule for Material Handling Equipment (MHE) Maintenance for DLA Disposition Services at Grafenwoehr, Germany. The solicitation (SP451025Q1034) covers preventive maintenance and repair services for various material handling equipment including forklifts (electric and diesel, ranging from 2K to 59K capacity), street sweepers, front end loaders, container handlers, utility task vehicles, and warehouse tractors. The contract is structured with a base year and two option years, each covering 12 months from 7/8/2025 to 7/7/2028, with a total estimated value of $22,800 for the Grafenwoehr location.

The pricing schedule includes detailed line items for quarterly and annual preventive maintenance for each equipment type, with a standard unit rate per service. Additional cost components include repair/replacement parts (40,000 units at $1 each) and labor for unscheduled repairs (70-150 hours). The price schedule indicates an escalation factor of 2.5% using the U.S. Department of Labor CPI Index, with prices incrementally increasing across the base and option years. The procurement is classified under NAICS 811310 with a size standard of $12.5 million, and is being conducted as a full and open competition for commercial items prepared under FAR 12 and 13 guidelines.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price

Price Schedule for Grafenwoehr MHE Maintenance
*The Parts Reimbursable CLIN reimburses parts at actual cost, see Performance Work Statement (PWS). Offerors are not to change this line on the price scheduled. This line will be evaluated the same for all offerors.
CLINBASE Period - (12 Months) (7/8/2025 to 7/7/2026)Unit of IssueAmountPriceExtended Price
0001Preventive Maintenance on 15K Diesal ForkliftEA4$0.00
0002Preventive Maintenance on 2K Electric ForkliftEA4$0.00
0003Preventive Maintenance on 4K Electric ForkliftEA4$0.00
0004Preventive Maintenance on 6K Diesel ForkliftEA8$0.00
0005Preventive Maintenance on Electric SweeperEA8$0.00
0006Preventive Maintenance on Diesel Street SweeperEA4$0.00
0007Preventive Maintenance on Front End LoaderEA8$0.00
0008Repair/Replacement PartsROM - UN7600$1.00$7,600.00
0009Trip FeeROM-EA50$0.00
0010Labor for Unscheduled RepairsROM - HR70$0.00
Base Year Total$7,600.00
CLINOPTION 1 - (12 Months) (7/8/2026 to 7/7/2027)Unit of IssueAmountPriceExtended Price
1001Preventive Maintenance on 15K Diesal ForkliftEA4$0.00
1002Preventive Maintenance on 2K Electric ForkliftEA4$0.00
1003Preventive Maintenance on 4K Electric ForkliftEA4$0.00
1004Preventive Maintenance on 6K Diesel ForkliftEA8$0.00
1005Preventive Maintenance on Electric SweeperEA8$0.00
1006Preventive Maintenance on Diesel Street SweeperEA4$0.00
1007Preventive Maintenance on Front End LoaderEA8$0.00
1008Repair/Replacement PartsROM - UN7600$1.00$7,600.00
1009Trip FeeROM-EA50$0.00
1010Labor for Unscheduled RepairsROM - HR70$0.00
Option 1 Total$7,600.00
CLINOPTION 2 - (12 Months) (7/8/2027 to 7/7/2028)Unit of IssueAmountPriceExtended Price
2001Preventive Maintenance on 15K Diesal ForkliftEA4$0.00
2002Preventive Maintenance on 2K Electric ForkliftEA4$0.00
2003Preventive Maintenance on 4K Electric ForkliftEA4$0.00
2004Preventive Maintenance on 6K Diesel ForkliftEA8$0.00
2005Preventive Maintenance on Electric SweeperEA8$0.00
2006Preventive Maintenance on Diesel Street SweeperEA4$0.00
2007Preventive Maintenance on Front End LoaderEA8$0.00
2008Repair/Replacement PartsROM - UN7600$1.00$7,600.00
2009Trip FeeROM-EA50$0.00
2010Labor for Unscheduled RepairsROM - HR70$0.00
Option 2 Total$7,600.00

TOTAL ALL OPTIONS $22,800.00

&"-,Bold"&14FOR OFFICIAL USE ONLY&"-,Regular"&11

PROCUREMENT SENSITIVE - SOURCE SELECTION INFORMATION

IGE (2)

***CUI***

IGE for Warner Robins MHE Maintenance
Developed by Michael McCarthy 10.10.24
CLINBASE Period - (12 Months)Unit of IssueAmountPriceupdatedExtended Price
0001Quarterly Preventive Maintenance: Electric Forklift, 3-4kEA18$591.37$606.15$10,910.78
0002Annual Preventive Maintenance: Electric Forklift, 3-4kEA6$591.37$606.15$3,636.93
0003Quarterly Preventive Maintenance: Diesel Forklift, 3-4kEA6$591.37$606.15$3,636.93
0004Annual Preventive Maintenance: Diesel Forklift, 3-4kEA2$591.37$606.15$1,212.31
0005Quarterly Preventative Maintenance: Diesel Forklift, 6kEA12$715.76$733.65$8,803.85
0006Annual Preventative Maintenance: Diesel Forklift, 6kEA4$715.76$733.65$2,934.62
0007Quarterly Preventive Maintenance: Diesel Forklift, 12-19kEA6$715.76$733.65$4,401.92
0008Annual Preventive Maintenance: Diesel Forklift, 12-19kEA2$715.76$733.65$1,467.31
0009Quarterly Preventive Maintenance: Forklift, 20-29kEA1$888.78$911.00$911.00
0010Annual Preventive Maintenance: Forklift, 20-29kEA1$888.78$911.00$911.00
0011Quarterly Preventive Maintenance: Forklift, 30-39kEA3$1,026.50$1,052.16$3,156.49
0012Annual Preventive Maintenance: Forklift, 30-39kEA1$1,026.50$1,052.16$1,052.16
0013Quarterly Preventive Maintenance: Forklift, 50-59kEA3$1,420.32$1,455.83$4,367.48
0014Annual Preventive Maintenance: Forklift, 50-59kEA1$1,420.32$1,455.83$1,455.83
0015Quarterly Preventive Maintenance: Container HandlerEA3$1,420.32$1,455.83$4,367.48
0016Annual Preventive Maintenance: Container HandlerEA1$1,420.32$1,455.83$1,455.83
0017Quarterly Preventive Maintenance: Front End LoaderEA6$1,678.56$1,720.52$10,323.14
0018Annual Preventive Maintenance: Front End LoaderEA2$1,678.56$1,720.52$3,441.05
0019Quarterly Preventive Maintenance: Tractor, WarehouseEA6$1,420.32$1,455.83$8,734.97
0020Annual Preventive Maintenance: Tractor, WarehouseEA2$1,420.32$1,455.83$2,911.66
0021Quarterly Preventive Maintenance: Utility Task VehicleEA3$473.87$485.72$1,457.15
0022Annual Preventive Maintenance: Utility Task VehicleEA1$473.87$485.72$485.72
0023Quarterly Preventive Maintenance: Street SweeperEA3$320.11$328.11$984.34
0024Annual Preventive Maintenance: Street SweeperEA1$320.11$328.11$328.11
0025Quarterly Preventive Maintenance: Warehouse SweeperEA6$320.11$328.11$1,968.68
0026Annual Preventive Maintenance: Warehouse SweeperEA2$320.11$328.11$656.23
0027Quarterly Preventive Maintenance: Utility Task VehicleEA3$473.87$485.72$1,457.15
0028Annual Preventive Maintenance: Utility Task VehicleEA1$473.87$485.72$485.72
0029Repair/Replacement PartsROM - UN40000$1.00$1.00$40,000.00
0030Labor for Unscheduled RepairsROM - HR150$153.50$157.34$23,600.63
Base Year Total$151,516.43
CLINOPTION 1 - (12 Months)Unit of IssueAmountPriceupdatedExtended Price
1001Quarterly Preventive Maintenance: Electric Forklift, 3-4kEA18$606.15$621.31$10,910.78
1002Annual Preventive Maintenance: Electric Forklift, 3-4kEA6$606.15$621.31$3,636.93
1003Quarterly Preventive Maintenance: Diesel Forklift, 3-4kEA6$606.15$621.31$3,636.93
1004Annual Preventive Maintenance: Diesel Forklift, 3-4kEA2$606.15$621.31$1,212.31
1005Quarterly Preventative Maintenance: Diesel Forklift, 6kEA12$733.65$752.00$8,803.85
1006Annual Preventative Maintenance: Diesel Forklift, 6kEA4$733.65$752.00$2,934.62
1007Quarterly Preventive Maintenance: Diesel Forklift, 12-19kEA6$733.65$752.00$4,401.92
1008Annual Preventive Maintenance: Diesel Forklift, 12-19kEA2$733.65$752.00$1,467.31
1009Quarterly Preventive Maintenance: Forklift, 20-29kEA1$911.00$933.77$911.00
1010Annual Preventive Maintenance: Forklift, 20-29kEA1$911.00$933.77$911.00
1011Quarterly Preventive Maintenance: Forklift, 30-39kEA3$1,052.16$1,078.47$3,156.49
1012Annual Preventive Maintenance: Forklift, 30-39kEA1$1,052.16$1,078.47$1,052.16
1013Quarterly Preventive Maintenance: Forklift, 50-59kEA3$1,455.83$1,492.22$4,367.48
1014Annual Preventive Maintenance: Forklift, 50-59kEA1$1,455.83$1,492.22$1,455.83
1015Quarterly Preventive Maintenance: Container HandlerEA3$1,455.83$1,492.22$4,367.48
1016Annual Preventive Maintenance: Container HandlerEA1$1,455.83$1,492.22$1,455.83
1017Quarterly Preventive Maintenance: Front End LoaderEA6$1,720.52$1,763.54$10,323.14
1018Annual Preventive Maintenance: Front End LoaderEA2$1,720.52$1,763.54$3,441.05
1019Quarterly Preventive Maintenance: Tractor, WarehouseEA6$1,455.83$1,492.22$8,734.97
1020Annual Preventive Maintenance: Tractor, WarehouseEA2$1,455.83$1,492.22$2,911.66
1021Quarterly Preventive Maintenance: Utility Task VehicleEA3$485.72$497.86$1,457.15
1022Annual Preventive Maintenance: Utility Task VehicleEA1$485.72$497.86$485.72
1023Quarterly Preventive Maintenance: Street SweeperEA3$328.11$336.32$984.34
1024Annual Preventive Maintenance: Street SweeperEA1$328.11$336.32$328.11
1025Quarterly Preventive Maintenance: Warehouse SweeperEA6$328.11$336.32$1,968.68
1026Annual Preventive Maintenance: Warehouse SweeperEA2$328.11$336.32$656.23
1027Quarterly Preventive Maintenance: Utility Task VehicleEA3$485.72$497.86$1,457.15
1028Annual Preventive Maintenance: Utility Task VehicleEA1$485.72$497.86$485.72
1029Repair/Replacement PartsROM - UN40000$1.00$1.00$40,000.00
1030Labor for Unscheduled RepairsROM - HR150$157.34$161.27$23,600.63
Base Year Total$151,516.43
CLINOPTION 2 - (12 Months)Unit of IssueAmountPriceupdatedExtended Price
2001Quarterly Preventive Maintenance: Electric Forklift, 3-4kEA18$621.31$636.84$11,183.55
2002Annual Preventive Maintenance: Electric Forklift, 3-4kEA6$621.31$636.84$3,727.85
2003Quarterly Preventive Maintenance: Diesel Forklift, 3-4kEA6$621.31$636.84$3,727.85
2004Annual Preventive Maintenance: Diesel Forklift, 3-4kEA2$621.31$636.84$1,242.62
2005Quarterly Preventative Maintenance: Diesel Forklift, 6kEA12$752.00$770.80$9,023.94
2006Annual Preventative Maintenance: Diesel Forklift, 6kEA4$752.00$770.80$3,007.98
2007Quarterly Preventive Maintenance: Diesel Forklift, 12-19kEA6$752.00$770.80$4,511.97
2008Annual Preventive Maintenance: Diesel Forklift, 12-19kEA2$752.00$770.80$1,503.99
2009Quarterly Preventive Maintenance: Forklift, 20-29kEA1$933.77$957.12$933.77
2010Annual Preventive Maintenance: Forklift, 20-29kEA1$933.77$957.12$933.77
2011Quarterly Preventive Maintenance: Forklift, 30-39kEA3$1,078.47$1,105.43$3,235.40
2012Annual Preventive Maintenance: Forklift, 30-39kEA1$1,078.47$1,105.43$1,078.47
2013Quarterly Preventive Maintenance: Forklift, 50-59kEA3$1,492.22$1,529.53$4,476.67
2014Annual Preventive Maintenance: Forklift, 50-59kEA1$1,492.22$1,529.53$1,492.22
2015Quarterly Preventive Maintenance: Container HandlerEA3$1,492.22$1,529.53$4,476.67
2016Annual Preventive Maintenance: Container HandlerEA1$1,492.22$1,529.53$1,492.22
2017Quarterly Preventive Maintenance: Front End LoaderEA6$1,763.54$1,807.63$10,581.22
2018Annual Preventive Maintenance: Front End LoaderEA2$1,763.54$1,807.63$3,527.07
2019Quarterly Preventive Maintenance: Tractor, WarehouseEA6$1,492.22$1,529.53$8,953.34
2020Annual Preventive Maintenance: Tractor, WarehouseEA2$1,492.22$1,529.53$2,984.45
2021Quarterly Preventive Maintenance: Utility Task VehicleEA3$497.86$510.31$1,493.58
2022Annual Preventive Maintenance: Utility Task VehicleEA1$497.86$510.31$497.86
2023Quarterly Preventive Maintenance: Street SweeperEA3$336.32$344.72$1,008.95
2024Annual Preventive Maintenance: Street SweeperEA1$336.32$344.72$336.32
2025Quarterly Preventive Maintenance: Warehouse SweeperEA6$336.32$344.72$2,017.89
2026Annual Preventive Maintenance: Warehouse SweeperEA2$336.32$344.72$672.63
2027Quarterly Preventive Maintenance: Utility Task VehicleEA3$497.86$510.31$1,493.58
2028Annual Preventive Maintenance: Utility Task VehicleEA1$497.86$510.31$497.86
2029Repair/Replacement PartsROM - UN40000$1.00$1.00$40,000.00
2030Labor for Unscheduled RepairsROM - HR150$161.27$165.30$24,190.64
Base Year Total$154,304.34
Second Option Year TotalERROR:#REF!
TOTAL ALL OPTIONSERROR:#REF!
Notes:
Estimate for CLINs 0001-0030 derived from contract SP451023D0014. Price provided estimates the inspection, lube and up to 1 hour of travel included. Escalation factor was applied using U.S. Department of Labor CPI Index from August, 2024 at 2.5% for All Items.
Controlled by: DLA Disposition Services
Controlled by: DLA Disposition Services (PS)
CUI Category: SSEL
Distribution/Dissemination Control: FEDONLY
POC: Michael McCarthy, (269) 986-8727, michael.mccarthy@dla.mil
***CUI***

&"-,Bold"&14FOR OFFICIAL USE ONLY&"-,Regular"&11

PROCUREMENT SENSITIVE - SOURCE SELECTION INFORMATION

File details come from the government source that posted it. Updated .