This is a price schedule template for an AI Ambient Scribe pilot program for the Department of Veterans Affairs. The schedule breaks down costs across a base period and four option years, including non-severable pilot costs, per-site implementation costs, and recurring license fees.

The template includes line items for deliverables, VA system configuration, EHR integration (both VistA and Cerner), site customization for up to 165 sites, monthly user licenses ($600 per user per month), and specialty service configurations. Key personnel rates are provided for Project Manager, Technical Developer, Program Manager, and Technical Writer roles. The implementation timeline shows a phased rollout starting with 5 initial sites and expanding to additional locations over time. The schedule accounts for overhead costs like meetings, documentation, training development, and travel expenses for on-site support (estimated at $9,180 per site visit for a 6-person team over 3 days).

View the file

Other files

File Type Posted
Attachment 1 - RFI Questions_REVISED.docx DOCX document
Attachment 1 - RFI Questions.docx DOCX document
Attachment 2 - PWS Ambient Scribe.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Sheet

PROJECT TITLEAI Ambient Scribe Pilot Per Solution Costs
Pilot Non-Severable Costs
Overhead
1Deliverables (meetings, document prep, document production, training document development)$ - 0
2Configuration to VA system needs (including deployment to VAEC & ATO)$ - 0
3Configuration for Primary CareIncluded in License cost
4EHR Integration Costs (VistA)$ - 0
4Coding Integration Support$ - 0
Per Site Costs
6Document ShippingIncluded in cost
7Site Customization$ - 0
8Licenses$ - 0
Pilot Non-Severable Tasks Total Cost Per Vendor$ - 0
Optional Tasks - Base Period
9Additional Site Customization and Support (up to 20 sites during base period)$ - 0
10Ambient Scribe Licenses - Billed Monthly for Active Users$ - 0
11Integration to Cerner$ - 0
11Confifiguration of Additional Capabilities$ - 0
10Additional License Costs for Capabilities$ - 0
12Additional Specialty Service Configuration (2)$ - 0
13Additional Year Pilot Support Deliverables (meetings, document prep, document production, training document development)$ - 0
Total Cost Optional Tasks$ - 0
Option Year 1 Tasks
1Deliverables (meetings, document prep, document production, training document development)$ - 0
9Additional Site Customization (remaining 145)$ - 0
10Ambient Scribe Licenses - Billed Monthly for Active Users$ - 0
10Additional License Costs for Coding, After-Visit Summaries, Order Capture, Care Plans$ - 0
12Additional Specialty Service Configuration (4)$ - 0
Total Cost Option Year 1$ - 0
Option Year 2 Tasks
1Deliverables (meetings, document prep, document production, training document development)$ - 0
10Ambient Scribe Licenses - Billed Monthly for Active Users$ - 0
10Additional License Costs for Capabilities$ - 0
12Additional Specialty Service Configuration (4)$ - 0
Total Cost Option Year 2$ - 0
Option Year 3 Tasks
1Deliverables (meetings, document prep, document production, training document development)$ - 0
10Ambient Scribe Licenses - Billed Monthly for Active Users$ - 0
10Additional License Costs for Capabilities$ - 0
12Additional Specialty Service Configuration (4)$ - 0
Total Cost Option Year 3$ - 0
Option Year 4 Tasks
1Deliverables (meetings, document prep, document production, training document development)$ - 0
10Ambient Scribe Licenses - Billed Monthly for Active Users$ - 0
10Additional License Costs for Capabilities$ - 0
12Additional Specialty Service Configuration (4)$ - 0
Total Cost Option Year 4$ - 0
Pilot Non-Severable Tasks$ - 0
Optional Tasks in Base Period$ - 0
Base Period Total Cost$ - 0
Option Year 1 Total Cost$ - 0
Option Year 2 Total Cost$ - 0
Option Year 3 Total Cost$ - 0
Option Year 4 Total Cost$ - 0

Base Period and Optional Tasks

PROJECT TITLE
Pilot Non-Severable Costs
Overhead
1Deliverables (meetings, document prep, document production, training document development)$ - 0
2Configuration to VA system needs (including deployment to VAEC & ATO)$ - 0
RoleRateHoursTotal
Project Manager$ - 0$ - 0
Technical Developer$ - 0$ - 0
Program Manager$ - 0$ - 0
Technical Writer$ - 0$ - 0
$ - 0
3Configuration for Primary CareIncluded in License cost
4EHR Integration Costs (VistA)$ - 0
RoleRateHoursTotal
Project Manager$ - 0$ - 0
Technical Developer$ - 0$ - 0
Program Manager$ - 0$ - 0
Technical Writer$ - 0$ - 0
$ - 0
5Coding Integration Support
RoleRateHoursTotal
Project Manager$ - 0$ - 0
Technical Developer$ - 0$ - 0
Program Manager$ - 0$ - 0
Technical Writer$ - 0$ - 0
$ - 0
Per Site Costs
6Document ShippingIncluded in cost
7Site Customization$ - 0
RoleRateHoursTotal
Project Manager$ - 0$ - 0
Technical Developer$ - 0$ - 0
Program Manager$ - 0$ - 0
Technical Writer$ - 0$ - 0
Cost per site$ - 0
Number of Sites5
Total Site-Specfic costs$ - 0
8Licenses
Cost per user per month$ - 0
Users100
Months12
Total Cost Per Month$ - 0
Non-Severable Tasks Total Cost$ - 0
Optional Tasks - Base Period
9Additional Site Customization
RoleRateHoursTotal
Project Manager$ - 0$ - 0
Technical Developer$ - 0$ - 0
Program Manager$ - 0$ - 0
Technical Writer$ - 0$ - 0
Total cost per site$ - 0
Sites20
Site specfic costs$ - 0
10Ambient Scribe Licenses - Billed Monthly for Active Users
Total cost per site$ - 0
Sites20
Site specfic costs$ - 0
11Integration to Cerner
RoleRateHoursTotal
Project Manager$ - 0$ - 0
Technical Developer$ - 0$ - 0
Program Manager$ - 0$ - 0
Technical Writer$ - 0$ - 0
$ - 0
12Confifiguration of Additional Capabilities
CapabilityImplementation Cost
After VIsit Summary$ - 0
Order Capture & Drafting$ - 0
Care Plan Generation$ - 0
$ - 0
13Additional License Costs for Capabilities
Cost per user per month$ - 0
Total User Months- 0
Total Cost$ - 0
14Additional Specialty Service Configuration
RoleRateHoursTotal
Project Manager$ - 050$ - 0
Technical Developer$ - 050$ - 0
Program Manager$ - 0280$ - 0
Technical Writer$ - 0120$ - 0
$ - 0
New Specialties2.00
Specialties Cost$ - 0
15Additional Year Pilot Support Deliverables (meetings, document prep, document production, training document development)$ - 0
Cost of Optional Tasks$ - 0
Cost of Base Period$ - 0
Cost of Optional Tasks$ - 0
Non-Severable Tasks$ - 0
Optional Tasks$ - 0
Total Value Base Period$ - 0
Option Period 1 Total Cost$ - 0
Option Period 2 Total Cost$ - 0
Option Period 3 Total Cost$ - 0
Option Period 4 Total Cost$ - 0

Total Contract Value Base + All Option Period $ - 0

OY1

PROJECT TITLEAI Ambient Scribe Pilot
Option Year Tasks
1Deliverables (meetings, document prep, document production, training document development)$ - 0
Data Repatriation, Customer Success, Implementation
9Additional Site Customization
RoleRateHoursTotal
Project Manager$ - 0100$ - 0
Technical Developer$ - 0100$ - 0
Program Manager$ - 0560$ - 0
Technical Writer$ - 0120$ - 0
Travel to support Site$ - 0
Total cost per site$ - 0
Sites145
Site specfic costs$ - 0
10Ambient Scribe Licenses - Billed Monthly for Active Users
Cost per user per month$ - 0
Total User Months150,000.00
Total Cost$ - 0
10Additional License Costs for Capabilities
Cost per user per month$ - 0
Total User Months120,000.00
Total Cost$ - 0
12Additional Specialty Service Configuration
RoleRateHoursTotal
Project Manager$ - 050$ - 0
Technical Developer$ - 050$ - 0
Program Manager$ - 0280$ - 0
Technical Writer$ - 0120$ - 0
Total Cost$ - 0
New Specialties4.00
Specialties Cost$ - 0
Option Year 1 Total Cost$ - 0

OY2

PROJECT TITLEAI Ambient Scribe Pilot
Option Year Tasks
1Deliverables (meetings, document prep, document production, training document development)$ - 0
Data Repatriation, Customer Success, Implementation
9Additional Site Customization
RoleRateHoursTotal
Project Manager$ - 0100$ - 0
Technical Developer$ - 0100$ - 0
Program Manager$ - 0560$ - 0
Technical Writer$ - 0120$ - 0
Travel to support Site$ - 0
Total cost per site$ - 0
Sites145
Site specfic costs$ - 0
10Ambient Scribe Licenses - Billed Monthly for Active Users
Cost per user per month$ - 0
Total User Months150,000.00
Total Cost$ - 0
10Additional License Costs for Capabilities
Cost per user per month$ - 0
Total User Months120,000.00
Total Cost$ - 0
12Additional Specialty Service Configuration
RoleRateHoursTotal
Project Manager$ - 050$ - 0
Technical Developer$ - 050$ - 0
Program Manager$ - 0280$ - 0
Technical Writer$ - 0120$ - 0
Total Cost$ - 0
New Specialties4.00
Specialties Cost$ - 0
Option Year 2 Total Cost$ - 0

OY3

PROJECT TITLEAI Ambient Scribe Pilot
Option Year Tasks
1Deliverables (meetings, document prep, document production, training document development)$ - 0
Data Repatriation, Customer Success, Implementation
9Additional Site Customization
RoleRateHoursTotal
Project Manager$ - 0100$ - 0
Technical Developer$ - 0100$ - 0
Program Manager$ - 0560$ - 0
Technical Writer$ - 0120$ - 0
Travel to support Site$ - 0
Total cost per site$ - 0
Sites145
Site specfic costs$ - 0
10Ambient Scribe Licenses - Billed Monthly for Active Users
Cost per user per month$ - 0
Total User Months150,000.00
Total Cost$ - 0
10Additional License Costs for Capabilities
Cost per user per month$ - 0
Total User Months120,000.00
Total Cost$ - 0
12Additional Specialty Service Configuration
RoleRateHoursTotal
Project Manager$ - 050$ - 0
Technical Developer$ - 050$ - 0
Program Manager$ - 0280$ - 0
Technical Writer$ - 0120$ - 0
Total Cost$ - 0
New Specialties4.00
Specialties Cost$ - 0
Option Year 3 Total Cost$ - 0

OY4

PROJECT TITLEAI Ambient Scribe Pilot
Option Year Tasks
1Deliverables (meetings, document prep, document production, training document development)$ - 0
Data Repatriation, Customer Success, Implementation
9Additional Site Customization
RoleRateHoursTotal
Project Manager$ - 0100$ - 0
Technical Developer$ - 0100$ - 0
Program Manager$ - 0560$ - 0
Technical Writer$ - 0120$ - 0
Travel to support Site$ - 0
Total cost per site$ - 0
Sites145
Site specfic costs$ - 0
10Ambient Scribe Licenses - Billed Monthly for Active Users
Cost per user per month$ - 0
Total User Months150,000.00
Total Cost$ - 0
10Additional License Costs for Capabilities
Cost per user per month$ - 0
Total User Months120,000.00
Total Cost$ - 0
12Additional Specialty Service Configuration
RoleRateHoursTotal
Project Manager$ - 050$ - 0
Technical Developer$ - 050$ - 0
Program Manager$ - 0280$ - 0
Technical Writer$ - 0120$ - 0
Total Cost$ - 0
New Specialties4.00
Specialties Cost$ - 0
Option Year 4 Total Cost$ - 0

Phased IGCE with Timeline (OLD)

IDEPENDENT GOVERNMENT COST ESTIMATE (IGCE)Target Submission6/28/24
Date Submitted7/5/24
1 PROJECT TITLEWeeks Delayed1
2. PROJECT MANAGERPeriod of PerformanceWeeks to Award4
FromTo
8/2/248/1/27Timeline: Awarded8/2/24
Pilot Non-Severable Costs
Overhead costs
1Deliverables (meetings, document prep, document production, training document development)$ 175,000.00
Data Repatriation, Customer Success, Implementation
2Configuration to VA system needs (including deployment to VAEC & ATO)
RoleRateHoursTotal
Project Manager$ 120.85600$ 72,510.00
Technical Developer$ 139.30600$ 83,580.00
Program Manager$ 139.302800$ 390,040.00
Technical Writer$ 74.25480$ 35,640.00
$ 581,770.00

3 Configuration for Primary Care Included in License cost

4EHR Integration Costs (VistA)
RoleRateHoursTotal
Project Manager$ 120.85240$ 29,004.00
Technical Developer$ 139.30240$ 33,432.00
Program Manager$ 139.301000$ 139,300.00
Technical Writer$ 74.25200$ 14,850.00
$ 216,586.00
Per site costs
5Travel
People6
Days3
Air (per person)$ 450.00
Lodging (per person per day)$ 300.00
Per Diem (per person per day)$ 60.00
Travel per site$ 9,180.00
6Document ShippingIncluded
7Site Customization
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
Total cost per site$ 70,101.50
Sites1San Francisco / KCVA
Site specfic costs$ 70,101.50
Licenses
8Cost per user per month$ 600.00Weeks to ATO (Contingent on FedRAMP Situation/VAEC willingness)16
Users20Timeline ATO Complete & Deployed11/22/24
Months6
$ 72,000.00
Weeks to Provision & Train1
Base Period Total cost$ 1,115,457.50Timeline: Pilot Active at First Sites(2 of 11)11/29/24
$ 2,230,915.00
Optional Tasks
First Expansion @ 90 Days After ATO & Go LiveExecute Optional Task2/6/25
9Site Customization
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
Total cost per site$ 60,921.50
Sites1Prescott / Loma Linda
Site specfic costs$ 60,921.50
Licenses
10Cost per user per month$ 600.00
Users20
Months3Period (3 months to catchup to initial task order)
$ 36,000.00
Cost of Additional Tasks$ 96,921.50
New Contract Ceiling$ 1,212,379.00Timeline: Expansion to Cohort 2 (4 of 11)2/27/25
Second Expansion @ 60 Days After First ExpansionExecute Optional Task4/7/25
11Site Customization
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
Total cost per site$ 60,921.50
Sites1Tampa / Ft. Harrison
Site specfic costs$ 60,921.50
Licenses
12Cost per user per month$ 600.00
Users20
Months1Period 1 month to catch up to existing renewals
$ 12,000.00
Cost of Additional Tasks$ 72,921.50
New Contract Ceiling$ 1,285,300.50Timeline: Expansion to Cohort 3 (6 of 11)4/28/25
Licenses - Renewals Existing Sites - Pilot Months 7-9Execute Optional Task5/7/25
13Cost per user per month$ 600.00
Users60All above
Months3
$ 108,000.00
Third Expansion @ 30 Days After Second Expansion
9Site Customization
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
Total cost per site$ 60,921.50
Sites1Dallas / Eerie
Site specfic costs$ 60,921.50
Licenses
14Cost per user per month$ 600.00
Users20
Months3
$ 36,000.00
Cost of Additional Tasks$ 204,921.50License Renewals, 2 New Site Customizations, 40 new licenses for new sites
New Contract Ceiling$ 1,490,222.00Timeline: Expand to cohort 4 (8 of 11)5/28/25
4th Expansion @ 30 Days After Last ExpansionExecute Optional Task6/6/25
15Site Customization
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
Total cost per site$ 60,921.50
Sites1Ann Arbor / Wilmington
Site specfic costs$ 60,921.50
Licenses
16Cost per user per month$ 600.00
Users20
Months2
$ 24,000.00
Cost of Additional Tasks$ 84,921.50
New Contract Ceiling$ 1,575,143.50Timeline: Expand to cohort 5 (10 of 11)6/27/25
Fifth Expansion (30 Days after last)Execute Optional Task7/6/25
17Site Customization
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
Total cost per site$ 60,921.50
Sites1Marion
Site specfic costs$ 60,921.50
Licenses
18Cost per user per month$ 600.00
Users20
Months1
$ 12,000.00
Cost of Additional Tasks$ 72,921.50
New Contract Ceiling$ 1,648,065.00Timeline: Expand to final cohort (11 of 11)7/27/25
Licenses - Renewals Existing Sites - Pilot Months 10-12Execute Optional Task8/5/25
19Cost per user per month$ 600.00
Users120All 11 Sites
Months3
$ 216,000.00
Cost of Additional Tasks$ 216,000.00
New Contract Ceiling$ 1,864,065.00Total Single Contract Needs in FY25$ 3,726,339.00(Ceiling - Base Period)
$ 7,452,678.00
Additional Tasks in Scope of Pilot - Year 2 (Expansion to Other Specialties, Cerner, Continued Pilot Support)$ 9,952,678.00
20Integration to CernerAvailable Out of BoxExecute Task Order11/29/25
RoleRateHoursTotal
Project Manager$ 120.85600$ 72,510.00
Technical Developer$ 139.30600$ 83,580.00
Program Manager$ 139.303400$ 473,620.00
Technical Writer$ 74.251200$ 89,100.00Weeks for Cerner Integration8
$ 718,810.00TimeLine: Cerner Integration within 8 weeks of Task Order1/24/26
21Additional Specialty Service Configuration
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
New Specialties1.00Wait for New Specialties in Weeks8
Specialties Cost$ 60,921.50Timeline: New Specialty Care Templates Available1/24/26
22Year 2 Pilot Deliverables (meetings, document prep, document production, training document development)$ 350,000.00Priced @ $175K per 5 sites supported includes travel
Data Repatriation, Customer Success, Implementation
Cost of Additional Tasks$ 1,129,731.50
New Contract Ceiling$ 2,993,796.50
23Licenses - Renewals Existing Sites - Pilot Months 12-24 (FY26 Money)
Cost per user per month$ 600.00
Sites22.00Optional Tasks to keep ongoing
Users Per Site20.00
Users (Qtr 1)440.00Execute Optional Task11/3/25Welcome to FY26
Cost$ 264,000.00

Specialty Care Users Per Site 20.00 Goes Live 1/17/2024 Approximately

Users (Qtr 1)880.00Execute Optional Task2/1/26
Cost$ 528,000.00
Users (Qtr 1)880.00Execute Optional Task5/2/26
Cost$ 528,000.00
Users (Qtr 1)880.00Execute Optional Task7/31/26
Cost$ 528,000.00
Cost of Additional Tasks$ 1,848,000.00
New Contract Ceiling$ 4,841,796.50Timeline: Period of Performance Planned End11/28/26
Cost of Base Period$ 1,115,457.50$ 2,230,915.00$ 9,952,678.00$ 12,183,593.00
Total Contract Ceiling$ 4,841,796.50
Cost of licenses$ 2,292,000.00
User Months$ 3,820.00

Phased Implementation Schedule

IDEPENDENT GOVERNMENT COST ESTIMATE (IGCE)Target Submission6/28/24
Date Submitted6/28/24
1 PROJECT TITLEWeeks Delayed
2. PROJECT MANAGERPeriod of PerformanceWeeks to Award8
FromTo
9/27/249/26/27Timeline: Awarded9/27/24
Pilot Non-Severable Costs
Overhead costs
1Deliverables (meetings, document prep, document production, training document development)$ 175,000.00
Data Repatriation, Customer Success, Implementation
2Configuration to VA system needs (including deployment to VAEC & ATO)
RoleRateHoursTotal
Project Manager$ 120.85600$ 72,510.00
Technical Developer$ 139.30600$ 83,580.00
Program Manager$ 139.302800$ 390,040.00
Technical Writer$ 74.25480$ 35,640.00
$ 581,770.00

3 Configuration for Primary Care Included in License cost

4EHR Integration Costs (VistA)
RoleRateHoursTotal
Project Manager$ 120.85240$ 29,004.00
Technical Developer$ 139.30240$ 33,432.00
Program Manager$ 139.301000$ 139,300.00
Technical Writer$ 74.25200$ 14,850.00
$ 216,586.00
Overhead total$ 200,000.00
Per site costs
5Travel
People6
Days3
Air (per person)$ 450.00
Lodging (per person per day)$ 300.00
Per Diem (per person per day)$ 60.00
Travel per site$ 9,180.00
6Document ShippingIncluded
7Site Customization
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
Total cost per site$ 70,101.50
Sites2KCVA & Loma Linda
Site specfic costs$ 158,563.00
Licenses
8Cost per user per month$ 600.00Weeks to ATO16
Users40Timeline ATO Complete & Deployed1/17/25
Months6
$ 144,000.00
Weeks to Provision & Train1
Base Period Total cost$ 1,275,919.00Timeline: Pilot Active at First Sites(2 of 11)1/24/25
Optional Tasks
First Expansion @ 90 Days After ATO & Go LiveExecute Optional Task4/3/25
9Site Customization
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
Total cost per site$ 60,921.50
Sites9San Francisco, Ft. Harrison
Site specfic costs$ 548,293.50
Licenses
10Cost per user per month$ 600.00
Users180
Months3Period (3 months to catchup to initial task order)
$ 324,000.00
Cost of Additional Tasks$ 872,293.50
New Contract Ceiling$ 2,148,212.50Timeline: Expansion to Cohort 2 (4 of 11)4/24/25
Second Expansion @ 60 Days After First ExpansionExecute Optional Task6/2/25
11Site Customization
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
Total cost per site$ 60,921.50
Sites2Marion & Prescott
Site specfic costs$ 121,843.00
Licenses
12Cost per user per month$ 600.00
Users40
Months1Period 1 month to catch up to existing renewals
$ 24,000.00
Cost of Additional Tasks$ 145,843.00
New Contract Ceiling$ 2,294,055.50Timeline: Expansion to Cohort 3 (6 of 11)6/23/25
Licenses - Renewals Existing Sites - Pilot Months 7-9Execute Optional Task7/2/25
13Cost per user per month$ 600.00
Users260KCVA, Loma Linda, San Francisco, Ft. Harrison, Marion, & Prescott
Months3
$ 468,000.00
Third Expansion @ 30 Days After Second Expansion
9Site Customization
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
Total cost per site$ 60,921.50
Sites2Tampa & Eerie
Site specfic costs$ 121,843.00
Licenses
14Cost per user per month$ 600.00
Users40
Months3
$ 72,000.00
Cost of Additional Tasks$ 661,843.00License Renewals, 2 New Site Customizations, 40 new licenses for new sites
New Contract Ceiling$ 2,955,898.50Timeline: Expand to cohort 4 (8 of 11)7/23/25
4th Expansion @ 30 Days After Last ExpansionExecute Optional Task8/1/25
15Site Customization
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
Total cost per site$ 60,921.50
Sites2Dallas, Wilmington
Site specfic costs$ 121,843.00
Licenses
16Cost per user per month$ 600.00
Users40
Months2
$ 48,000.00
Cost of Additional Tasks$ 169,843.00
New Contract Ceiling$ 3,125,741.50Timeline: Expand to cohort 5 (10 of 11)8/22/25
Fifth Expansion (30 Days after last)Execute Optional Task8/31/25
17Site Customization
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
Total cost per site$ 60,921.50
Sites1Ann Arbor
Site specfic costs$ 60,921.50
Licenses
18Cost per user per month$ 600.00
Users20
Months1
$ 12,000.00
Cost of Additional Tasks$ 72,921.50
New Contract Ceiling$ 3,198,663.00Timeline: Expand to final cohort (11 of 11)9/21/25
Licenses - Renewals Existing Sites - Pilot Months 9-12Execute Optional Task9/30/25
19Cost per user per month$ 600.00
Users360All 11 Sites
Months3
$ 648,000.00
Cost of Additional Tasks$ 648,000.00
New Contract Ceiling$ 3,846,663.00Total Single Contract Needs in FY25$ 4,944,318.50(Ceiling - Base Period)
Additional Tasks in Scope of Pilot - Year 2 (Expansion to Other Specialties, Cerner, Continued Pilot Support)
20Integration to CernerAvailable Out of BoxExecute Task Order1/24/26
RoleRateHoursTotal
Project Manager$ 120.85600$ 72,510.00
Technical Developer$ 139.30600$ 83,580.00
Program Manager$ 139.303400$ 473,620.00
Technical Writer$ 74.251200$ 89,100.00Weeks for Cerner Integration8
$ 718,810.00TimeLine: Cerner Integration within 8 weeks of Task Order3/21/26
21Additional Specialty Service Configuration
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
New Specialties3.00Wait for New Specialties in Weeks8
Specialties Cost$ 182,764.50Timeline: New Specialty Care Templates Available3/21/26
22Year 2 Pilot Deliverables (meetings, document prep, document production, training document development)$ 350,000.00Priced @ $175K per 5 sites supported includes travel
Data Repatriation, Customer Success, Implementation
Cost of Additional Tasks$ 1,251,574.50
New Contract Ceiling$ 5,098,237.50
23Licenses - Renewals Existing Sites - Pilot Months 12-24 (FY26 Money)
Cost per user per month$ 600.00
Sites11.00
Users Per Site20.00
Users (Qtr 1)220.00Execute Optional Task12/29/25Welcome to FY26
Cost$ 132,000.00

Specialty Care Users Per Site 30.00 Goes Live 1/17/2024 Approximately

Users (Qtr 1)550.00Execute Optional Task3/29/26
Cost$ 330,000.00
Users (Qtr 1)550.00Execute Optional Task6/27/26
Cost$ 330,000.00
Users (Qtr 1)550.00Execute Optional Task9/25/26
Cost$ 330,000.00
Cost of Additional Tasks$ 1,122,000.00
New Contract Ceiling$ 6,220,237.50Timeline: Period of Performance Planned End1/23/27
Cost of Base Period$ 1,275,919.00$ 2,551,838.00848
Total Contract Ceiling$ 6,220,237.50121.1428571429
2.3232876712

Base Period with Optional

IDEPENDENT GOVERNMENT COST ESTIMATE (IGCE)Target Submission6/28/24
Date Submitted6/28/24
1 PROJECT TITLEWeeks Delayed0
2. PROJECT MANAGERPeriod of Performance
FromTo
7/26/247/25/27Timeline: Awarded7/26/24
Pilot Non-Severable Costs
Overhead costs
1Deliverables (meetings, document prep, document production, training document development)Included in license cost
Data Repatriation
2Configuration to VA system needs (including deployment to VAEC & ATO)
RoleRateHoursTotal
Project Manager$ 120.85600$ 72,510.00
Technical Developer$ 139.30600$ 83,580.00
Program Manager$ 139.302800$ 390,040.00
Technical Writer$ 74.25480$ 35,640.00
$ 581,770.00

3 Configuration for Primary Care Included in License cost

3EHR Integration Costs (VistA)
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50

Overhead total $ 60,921.50

Per site costs
5Travel
People6
Days3
Air (per person)$ 450.00
Lodging (per person per day)$ 300.00
Per Diem (per person per day)$ 60.00
Travel per site$ 9,180.00
6Document ShippingIncluded
7Site Customization
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
Total cost per site$ 70,101.50
Sites5
Site specfic costs$ 350,507.50Weeks to ATO8
Timeline ATO Complete & Deployed9/20/24
Licenses
8Cost per user per month$ 600.00
Users100
Months6
$ 360,000.00
Weeks to Provision & Train2
Base Period Total cost$ 1,353,199.00End Base Task10/4/24

Optional Tasks

9 Integration to Cerner Available Out of Box

10Additional Specialty Service Configuration
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
New Specialties- 0
Specialties Cost$ - 0
11Additional Site Customization
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
Per Site New Cost$ 60,921.50
New Sites- 0
12Travel for Additional Site Support
People6
Days3
Air (per person)$450
Lodging (per person per day)$300
Per Diem (per person per day)$60
Travel per site$9,180
13Additional Licenses (In 3 Month Increments)
Cost per user per month$ 600.00
Users$ 100.00
Months24
License Costs$ 1,440,000.00
Cost of Additional Tasks$ 1,440,000.00
Cost of Base Period$ 1,353,199.00
Total Contract Ceiling$ 2,793,199.00

Base Period with Optional Tasks

IDEPENDENT GOVERNMENT COST ESTIMATE (IGCE)
1 PROJECT TITLE
2. PROJECT MANAGERPeriod of Performance
FromTo
8/1/247/31/27
Pilot Non-Severable Costs
Overhead costs
1Deliverables (meetings, document prep, document production, training document development)Included in license cost
2Configuration to VA system needsIncluded in License cost
3Configuration for Primary CareIncluded in License cost
3EHR Integration Costs (VistA)
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50

Overhead total $ 60,921.50

Per site costs
5Travel
People6
Days3
Air (per person)$ 450.00
Lodging (per person per day)$ 300.00
Per Diem (per person per day)$ 60.00
Travel per site$ 9,180.00
6Document ShippingIncluded
7Site Customization
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
Total cost per site$ 70,101.50
Sites5
Site specfic costs$ 350,507.50
Licenses
8Cost per user per month$ 600.00
Users100
Months12
$ 720,000.00

Base Period Total cost $1,131,429.00

Optional Tasks

9 Integration to Cerner Available Out of Box

10Additional Specialty Service Configuration
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
New Specialties- 0
Specialties Cost$ - 0
11Additional Site Customization
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
Per Site New Cost$ 60,921.50
New Sites- 0
12Travel for Additional Site Support
People6
Days3
Air (per person)$450
Lodging (per person per day)$300
Per Diem (per person per day)$60
Travel per site$9,180
13Additional Licenses (In 3 Month Increments)
Cost per user per month$ 600.00
Users$ 100.00
Months24
License Costs$ 1,440,000.00
Cost of Additional Tasks$ 1,440,000.00
Cost of Base Period$ 1,131,429.00
Total Contract Ceiling$ 2,571,429.00

Base Year

IDEPENDENT GOVERNMENT COST ESTIMATE (IGCE)Implementation Sites5
Users Per Site20
1 PROJECT TITLE
2. PROJECT MANAGERPeriod of Performance
FromTo
8/1/247/31/25
Overhead costs
1Deliverables (meetings, document prep, document production, training document development)Included in license cost
2Configuration to VA system needsIncluded in License cost
3Configuration for Primary CareIncluded in License cost
3EHR Integration Costs (VistA)
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50

Overhead total $ 60,921.50

Per site costs
1Travel
People6
Days3
Air (per person)$450
Lodging (per person per day)$300
Per Diem (per person per day)$60
Travel per site$9,180
2Document ShippingIncluded
3Site Customization
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
Total cost per site$ 70,101.50
Sites5
Site specfic costs$ 350,507.50
Liscenes
1Cost per user per month$600
Users100
Months12
$720,000

Total cost $1,131,429.00

NEED TO ADD EXISTING SUPPORT STAFF WE ARE LOSING IN AUGUST
5 + 3 more
Total amount of money: full contract, eval costs, support costs
How much money for the 2237

Base

IDEPENDENT GOVERNMENT COST ESTIMATE (IGCE)
1 PROJECT TITLE
2. PROJECT MANAGERPeriod of Performance
FromTo
Overhead costs
1Deliverables (meetings, document prep, document production, training document development)
RoleRateHoursTotal
Project Manager$ 120.8580$ 9,668.00Costs sourced from IHT Contract
Technical Lead$ 139.3030$ 4,179.00
Technical Developer$ 139.3030$ 4,179.00
Design Lead$ 90.9230$ 2,727.60
Technical Writer$ 74.2580$ 5,940.00
$ 26,693.60
2Configuration to VA system needs
RoleRateHoursTotal
Project Manager$ 120.8580$ 9,668.00
Technical Lead$ 139.30200$ 27,860.00
Technical Developer$ 139.30240$ 33,432.00
Design Lead$ 90.92200$ 18,184.00
Technical Writer$ 74.2540$ 2,970.00
$ 92,114.00
3Printing of trainign materials
RateQty
$5100$500
4EHR Integration Costs (VistA)
RoleRateHoursTotal
Project Manager$ 120.85400$ 48,340.00
Technical Lead$ 139.30400$ 55,720.00
Technical Developer$ 139.30400$ 55,720.00
Design Lead$ 90.92400$ 36,368.00
Technical Writer$ 74.2580$ 5,940.00
$ 202,088.00

Overhead total $321,395.60

Per site costs
1Travel
People6
Days3
Air (per person)$400
Lodging (per person per day)$254
Per Diem (per person per day)$50
Travel per site$7,872
2Document Shipping
RateQty
$505$250
3Site Customization
RoleRateHoursTotal
Project Manager$ 120.8540$ 4,834.00
Technical Lead$ 139.3040$ 5,572.00
Technical Developer$ 139.3040$ 5,572.00
Design Lead$ 90.9240$ 3,636.80
Technical Writer$ 74.2520$ 1,485.00
$ 21,099.80
Total cost per site$ 29,221.80
Sites5
Site specfic costs$ 186,719.00
Liscenes
1Cost per user per month$600Validated by online search of license costs prior to any discounting
Users100
Months12
$720,000

Total cost $1,228,114.60

Punch List:
EHR Integration Costs
Costs for Specialty Integrations

Option 1 - 6 Mo

IDEPENDENT GOVERNMENT COST ESTIMATE (IGCE)
1 PROJECT TITLENew Specialties3
2. PROJECT MANAGERPeriod of PerformanceNew Sites8
FromTo
Overhead costs
1Deliverables (meetings, document prep, document production, training document development)Included
2Integration to CernerAvailable Out of Box
3Additional Specialty Service Transcription Service
RoleRateHoursTotal
Project Manager$ 120.8550$ 6,042.50
Technical Developer$ 139.3050$ 6,965.00
Program Manager$ 139.30280$ 39,004.00
Technical Writer$ 74.25120$ 8,910.00
$ 60,921.50
New Specialties3.00
Specialties Cost$ 182,764.50
4Printing of trainign materialsIncluded
Overhead total$ 182,764.50
Per site costs
1Travel
People6
Days3
Air (per person)$500
Lodging (per person per day)$125
Per Diem (per person per day)$50
Travel per site$6,150
2Document Shipping
RateQty
$5100$500
3Site Customization
RoleRateHoursTotal
Project Manager$ 120.8540$ 4,834.00
Technical Lead$ 139.3040$ 5,572.00
Technical Developer$ 139.3040$ 5,572.00
Design Lead$ 90.9240$ 3,636.80
Technical Writer$ 74.2520$ 1,485.00
$ 21,099.80
Total cost per site$ 27,749.80
New Sites9
Site specfic costs$ 249,748.20
Liscenes
1Cost per user per month$600
Users280
Months6
$1,008,000

Total cost $1,440,512.70

Option 1

IDEPENDENT GOVERNMENT COST ESTIMATE (IGCE)
1 PROJECT TITLE
2. PROJECT MANAGERPeriod of Performance
FromTo
Overhead costs
1Deliverables (meetings, document prep, document production, training document development)
RoleRateHoursTotal
Project Manager$ 120.8530$ 3,625.50
Technical Lead$ 139.3024$ 3,343.20
Technical Developer$ 139.3024$ 3,343.20
Design Lead$ 90.9224$ 2,182.08
Technical Writer$ 74.2524$ 1,782.00
$ 14,275.98
2Cintegration to Cerner
RoleRateHoursTotal
Project Manager$ 120.85400$ 48,340.00
Technical Lead$ 139.30400$ 55,720.00
Technical Developer$ 139.30400$ 55,720.00
Design Lead$ 90.92400$ 36,368.00
Technical Writer$ 74.2580$ 5,940.00
$ 202,088.00
3Additional Specialty Service Transcription Service
RoleRateHoursTotal
Project Manager$ 120.8580$ 9,668.00
Technical Lead$ 139.30200$ 27,860.00
Technical Developer$ 139.30200$ 27,860.00
Design Lead$ 90.92200$ 18,184.00
Technical Writer$ 74.2580$ 5,940.00
$ 89,512.00
4Printing of trainign materials
RateQty
$5450$2,250

Overhead total $218,613.98

Per site costs
1Travel
People6
Days3
Air (per person)$500
Lodging (per person per day)$125
Per Diem (per person per day)$50
Travel per site$6,150
2Document Shipping
RateQty
$5100$500
3Site Customization
RoleRateHoursTotal
Project Manager$ 120.8540$ 4,834.00
Technical Lead$ 139.3040$ 5,572.00
Technical Developer$ 139.3040$ 5,572.00
Design Lead$ 90.9240$ 3,636.80
Technical Writer$ 74.2520$ 1,485.00
$ 21,099.80
Total cost per site$ 27,749.80
New Sites5
Site specfic costs$ 138,749.00
Liscenes
1Cost per user per month$600
Users200
Months6
$720,000

Total cost $1,077,362.98

Option 2 -Old

IDEPENDENT GOVERNMENT COST ESTIMATE (IGCE)
1 PROJECT TITLE
2. PROJECT MANAGERPeriod of Performance
FromTo
Overhead costs
1Deliverables (meetings, document prep, document production, training document development)
RoleRateHoursTotal
Project Manager$ 120.8530$ 3,625.50
Technical Lead$ 139.3024$ 3,343.20
Technical Developer$ 139.3024$ 3,343.20
Design Lead$ 90.9224$ 2,182.08
Technical Writer$ 74.2524$ 1,782.00
$ 14,275.98
2Additional specalities
RoleRateHoursTotal
Project Manager$ 120.85150$ 18,127.50
Technical Lead$ 139.30150$ 20,895.00
Technical Developer$ 139.30150$ 20,895.00
Design Lead$ 90.92150$ 13,638.00
Technical Writer$ 74.2580$ 5,940.00
$ 79,495.50
Number of speaclites4
Total$ 317,982.00
3Printing of trainign materials
RateQty
$550$250

Overhead total $332,507.98

Per site costs
1Travel
People6
Days3
Air (per person)$500
Lodging (per person per day)$125
Per Diem (per person per day)$50
Travel per site$6,150
2Document Shipping
RateQty
$5100$500
3Site Customization
RoleRateHoursTotal
Project Manager$ 120.8540$ 4,834.00
Technical Lead$ 139.3040$ 5,572.00
Technical Developer$ 139.3040$ 5,572.00
Design Lead$ 90.9240$ 3,636.80
Technical Writer$ 74.2520$ 1,485.00
$ 21,099.80
Total cost per site$ 27,749.80
Sites2
Site specfic costs$ 55,499.60
Liscenes
1Cost per user per month$600
Users500
Months6
$1,800,000

Total cost $2,188,007.58

Total Costs
Base Year$1,228,114.60
Option 1$1,077,362.98
Option 2$2,188,007.58
Total$4,493,485.16