Summary Sheet
| PROJECT TITLE | | AI Ambient Scribe Pilot Per Solution Costs | |
| Pilot Non-Severable Costs | | | |
| Overhead | | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | | $ - 0 |
| 2 | Configuration to VA system needs (including deployment to VAEC & ATO) | | $ - 0 |
| 3 | Configuration for Primary Care | | Included in License cost |
| 4 | EHR Integration Costs (VistA) | | $ - 0 |
| 4 | Coding Integration Support | | $ - 0 |
| Per Site Costs | | | |
| 6 | Document Shipping | | Included in cost |
| 7 | Site Customization | | $ - 0 |
| 8 | Licenses | | $ - 0 |
| Pilot Non-Severable Tasks Total Cost Per Vendor | | | $ - 0 |
| Optional Tasks - Base Period | | |
| 9 | Additional Site Customization and Support (up to 20 sites during base period) | $ - 0 |
| 10 | Ambient Scribe Licenses - Billed Monthly for Active Users | $ - 0 |
| 11 | Integration to Cerner | $ - 0 |
| 11 | Confifiguration of Additional Capabilities | $ - 0 |
| 10 | Additional License Costs for Capabilities | $ - 0 |
| 12 | Additional Specialty Service Configuration (2) | $ - 0 |
| 13 | Additional Year Pilot Support Deliverables (meetings, document prep, document production, training document development) | $ - 0 |
| Total Cost Optional Tasks | | $ - 0 |
| Option Year 1 Tasks | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | $ - 0 |
| 9 | Additional Site Customization (remaining 145) | $ - 0 |
| 10 | Ambient Scribe Licenses - Billed Monthly for Active Users | $ - 0 |
| 10 | Additional License Costs for Coding, After-Visit Summaries, Order Capture, Care Plans | $ - 0 |
| 12 | Additional Specialty Service Configuration (4) | $ - 0 |
| Total Cost Option Year 1 | | $ - 0 |
| Option Year 2 Tasks | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | $ - 0 |
| 10 | Ambient Scribe Licenses - Billed Monthly for Active Users | $ - 0 |
| 10 | Additional License Costs for Capabilities | $ - 0 |
| 12 | Additional Specialty Service Configuration (4) | $ - 0 |
| Total Cost Option Year 2 | | $ - 0 |
| Option Year 3 Tasks | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | $ - 0 |
| 10 | Ambient Scribe Licenses - Billed Monthly for Active Users | $ - 0 |
| 10 | Additional License Costs for Capabilities | $ - 0 |
| 12 | Additional Specialty Service Configuration (4) | $ - 0 |
| Total Cost Option Year 3 | | $ - 0 |
| Option Year 4 Tasks | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | $ - 0 |
| 10 | Ambient Scribe Licenses - Billed Monthly for Active Users | $ - 0 |
| 10 | Additional License Costs for Capabilities | $ - 0 |
| 12 | Additional Specialty Service Configuration (4) | $ - 0 |
| Total Cost Option Year 4 | | $ - 0 |
| Pilot Non-Severable Tasks | $ - 0 |
| Optional Tasks in Base Period | $ - 0 |
| Base Period Total Cost | $ - 0 |
| Option Year 1 Total Cost | $ - 0 |
| Option Year 2 Total Cost | $ - 0 |
| Option Year 3 Total Cost | $ - 0 |
| Option Year 4 Total Cost | $ - 0 |
Base Period and Optional Tasks
| PROJECT TITLE | | | | |
| Pilot Non-Severable Costs | | | | |
| Overhead | | | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | | | $ - 0 |
| 2 | Configuration to VA system needs (including deployment to VAEC & ATO) | | | $ - 0 |
| Role | Rate | Hours | Total |
| Project Manager | $ - 0 | | $ - 0 |
| Technical Developer | $ - 0 | | $ - 0 |
| Program Manager | $ - 0 | | $ - 0 |
| Technical Writer | $ - 0 | | $ - 0 |
| | | | $ - 0 |
| 3 | Configuration for Primary Care | | | Included in License cost |
| 4 | EHR Integration Costs (VistA) | | | $ - 0 |
| Role | Rate | Hours | Total |
| Project Manager | $ - 0 | | $ - 0 |
| Technical Developer | $ - 0 | | $ - 0 |
| Program Manager | $ - 0 | | $ - 0 |
| Technical Writer | $ - 0 | | $ - 0 |
| | | | $ - 0 |
| 5 | Coding Integration Support | | | |
| Role | Rate | Hours | Total |
| Project Manager | $ - 0 | | $ - 0 |
| Technical Developer | $ - 0 | | $ - 0 |
| Program Manager | $ - 0 | | $ - 0 |
| Technical Writer | $ - 0 | | $ - 0 |
| | | | $ - 0 |
| Per Site Costs | | | | |
| 6 | Document Shipping | | | Included in cost |
| 7 | Site Customization | | | $ - 0 |
| Role | Rate | Hours | Total |
| Project Manager | $ - 0 | | $ - 0 |
| Technical Developer | $ - 0 | | $ - 0 |
| Program Manager | $ - 0 | | $ - 0 |
| Technical Writer | $ - 0 | | $ - 0 |
| Cost per site | | | $ - 0 |
| Number of Sites | | | 5 |
| Total Site-Specfic costs | | | $ - 0 |
| 8 | Licenses | | | |
| Cost per user per month | | | $ - 0 |
| Users | | | 100 |
| Months | | | 12 |
| Total Cost Per Month | | | $ - 0 |
| Non-Severable Tasks Total Cost | | | $ - 0 |
| Optional Tasks - Base Period | | | | |
| 9 | Additional Site Customization | | | |
| Role | Rate | Hours | Total |
| Project Manager | $ - 0 | | $ - 0 |
| Technical Developer | $ - 0 | | $ - 0 |
| Program Manager | $ - 0 | | $ - 0 |
| Technical Writer | $ - 0 | | $ - 0 |
| Total cost per site | | | $ - 0 |
| Sites | | | 20 |
| Site specfic costs | | | $ - 0 |
| 10 | Ambient Scribe Licenses - Billed Monthly for Active Users | | | |
| Total cost per site | | | $ - 0 |
| Sites | | | 20 |
| Site specfic costs | | | $ - 0 |
| 11 | Integration to Cerner | | | |
| Role | Rate | Hours | Total |
| Project Manager | $ - 0 | | $ - 0 |
| Technical Developer | $ - 0 | | $ - 0 |
| Program Manager | $ - 0 | | $ - 0 |
| Technical Writer | $ - 0 | | $ - 0 |
| | | | $ - 0 |
| 12 | Confifiguration of Additional Capabilities | | | |
| Capability | | | Implementation Cost |
| After VIsit Summary | | | $ - 0 |
| Order Capture & Drafting | | | $ - 0 |
| Care Plan Generation | | | $ - 0 |
| | | | $ - 0 |
| 13 | Additional License Costs for Capabilities | | | |
| Cost per user per month | | | $ - 0 |
| Total User Months | | | - 0 |
| Total Cost | | | $ - 0 |
| 14 | Additional Specialty Service Configuration | | | |
| Role | Rate | Hours | Total |
| Project Manager | $ - 0 | 50 | $ - 0 |
| Technical Developer | $ - 0 | 50 | $ - 0 |
| Program Manager | $ - 0 | 280 | $ - 0 |
| Technical Writer | $ - 0 | 120 | $ - 0 |
| | | | $ - 0 |
| New Specialties | | | 2.00 |
| Specialties Cost | | | $ - 0 |
| 15 | Additional Year Pilot Support Deliverables (meetings, document prep, document production, training document development) | | | $ - 0 |
| Cost of Optional Tasks | | | $ - 0 |
| Cost of Base Period | $ - 0 |
| Cost of Optional Tasks | $ - 0 |
| Non-Severable Tasks | $ - 0 |
| Optional Tasks | $ - 0 |
| Total Value Base Period | $ - 0 |
| Option Period 1 Total Cost | $ - 0 |
| Option Period 2 Total Cost | $ - 0 |
| Option Period 3 Total Cost | $ - 0 |
| Option Period 4 Total Cost | $ - 0 |
Total Contract Value Base + All Option Period $ - 0
OY1
| PROJECT TITLE | | | AI Ambient Scribe Pilot | | | |
| Option Year Tasks | | | | | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | | | | | $ - 0 |
| | Data Repatriation, Customer Success, Implementation | | | | |
| 9 | Additional Site Customization | | | | | |
| Role | | | Rate | Hours | Total |
| Project Manager | | | $ - 0 | 100 | $ - 0 |
| Technical Developer | | | $ - 0 | 100 | $ - 0 |
| Program Manager | | | $ - 0 | 560 | $ - 0 |
| Technical Writer | | | $ - 0 | 120 | $ - 0 |
| Travel to support Site | | | | | $ - 0 |
| Total cost per site | | | | | $ - 0 |
| Sites | | | | | 145 |
| Site specfic costs | | | | | $ - 0 |
| 10 | Ambient Scribe Licenses - Billed Monthly for Active Users | | | | | |
| Cost per user per month | | | | | $ - 0 |
| Total User Months | | | | | 150,000.00 |
| Total Cost | | | | | $ - 0 |
| 10 | Additional License Costs for Capabilities | | | | | |
| Cost per user per month | | | | | $ - 0 |
| Total User Months | | | | | 120,000.00 |
| Total Cost | | | | | $ - 0 |
| 12 | Additional Specialty Service Configuration | | | | | |
| Role | | | Rate | Hours | Total |
| Project Manager | | | $ - 0 | 50 | $ - 0 |
| Technical Developer | | | $ - 0 | 50 | $ - 0 |
| Program Manager | | | $ - 0 | 280 | $ - 0 |
| Technical Writer | | | $ - 0 | 120 | $ - 0 |
| Total Cost | | | | | $ - 0 |
| New Specialties | | | | | 4.00 |
| Specialties Cost | | | | | $ - 0 |
| Option Year 1 Total Cost | | | | | | $ - 0 |
OY2
| PROJECT TITLE | | | AI Ambient Scribe Pilot | | | |
| Option Year Tasks | | | | | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | | | | | $ - 0 |
| | Data Repatriation, Customer Success, Implementation | | | | |
| 9 | Additional Site Customization | | | | | |
| Role | | | Rate | Hours | Total |
| Project Manager | | | $ - 0 | 100 | $ - 0 |
| Technical Developer | | | $ - 0 | 100 | $ - 0 |
| Program Manager | | | $ - 0 | 560 | $ - 0 |
| Technical Writer | | | $ - 0 | 120 | $ - 0 |
| Travel to support Site | | | | | $ - 0 |
| Total cost per site | | | | | $ - 0 |
| Sites | | | | | 145 |
| Site specfic costs | | | | | $ - 0 |
| 10 | Ambient Scribe Licenses - Billed Monthly for Active Users | | | | | |
| Cost per user per month | | | | | $ - 0 |
| Total User Months | | | | | 150,000.00 |
| Total Cost | | | | | $ - 0 |
| 10 | Additional License Costs for Capabilities | | | | | |
| Cost per user per month | | | | | $ - 0 |
| Total User Months | | | | | 120,000.00 |
| Total Cost | | | | | $ - 0 |
| 12 | Additional Specialty Service Configuration | | | | | |
| Role | | | Rate | Hours | Total |
| Project Manager | | | $ - 0 | 50 | $ - 0 |
| Technical Developer | | | $ - 0 | 50 | $ - 0 |
| Program Manager | | | $ - 0 | 280 | $ - 0 |
| Technical Writer | | | $ - 0 | 120 | $ - 0 |
| Total Cost | | | | | $ - 0 |
| New Specialties | | | | | 4.00 |
| Specialties Cost | | | | | $ - 0 |
| Option Year 2 Total Cost | | | | | | $ - 0 |
OY3
| PROJECT TITLE | | | AI Ambient Scribe Pilot | | | |
| Option Year Tasks | | | | | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | | | | | $ - 0 |
| | Data Repatriation, Customer Success, Implementation | | | | |
| 9 | Additional Site Customization | | | | | |
| Role | | | Rate | Hours | Total |
| Project Manager | | | $ - 0 | 100 | $ - 0 |
| Technical Developer | | | $ - 0 | 100 | $ - 0 |
| Program Manager | | | $ - 0 | 560 | $ - 0 |
| Technical Writer | | | $ - 0 | 120 | $ - 0 |
| Travel to support Site | | | | | $ - 0 |
| Total cost per site | | | | | $ - 0 |
| Sites | | | | | 145 |
| Site specfic costs | | | | | $ - 0 |
| 10 | Ambient Scribe Licenses - Billed Monthly for Active Users | | | | | |
| Cost per user per month | | | | | $ - 0 |
| Total User Months | | | | | 150,000.00 |
| Total Cost | | | | | $ - 0 |
| 10 | Additional License Costs for Capabilities | | | | | |
| Cost per user per month | | | | | $ - 0 |
| Total User Months | | | | | 120,000.00 |
| Total Cost | | | | | $ - 0 |
| 12 | Additional Specialty Service Configuration | | | | | |
| Role | | | Rate | Hours | Total |
| Project Manager | | | $ - 0 | 50 | $ - 0 |
| Technical Developer | | | $ - 0 | 50 | $ - 0 |
| Program Manager | | | $ - 0 | 280 | $ - 0 |
| Technical Writer | | | $ - 0 | 120 | $ - 0 |
| Total Cost | | | | | $ - 0 |
| New Specialties | | | | | 4.00 |
| Specialties Cost | | | | | $ - 0 |
| Option Year 3 Total Cost | | | | | | $ - 0 |
OY4
| PROJECT TITLE | | | AI Ambient Scribe Pilot | | | |
| Option Year Tasks | | | | | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | | | | | $ - 0 |
| | Data Repatriation, Customer Success, Implementation | | | | |
| 9 | Additional Site Customization | | | | | |
| Role | | | Rate | Hours | Total |
| Project Manager | | | $ - 0 | 100 | $ - 0 |
| Technical Developer | | | $ - 0 | 100 | $ - 0 |
| Program Manager | | | $ - 0 | 560 | $ - 0 |
| Technical Writer | | | $ - 0 | 120 | $ - 0 |
| Travel to support Site | | | | | $ - 0 |
| Total cost per site | | | | | $ - 0 |
| Sites | | | | | 145 |
| Site specfic costs | | | | | $ - 0 |
| 10 | Ambient Scribe Licenses - Billed Monthly for Active Users | | | | | |
| Cost per user per month | | | | | $ - 0 |
| Total User Months | | | | | 150,000.00 |
| Total Cost | | | | | $ - 0 |
| 10 | Additional License Costs for Capabilities | | | | | |
| Cost per user per month | | | | | $ - 0 |
| Total User Months | | | | | 120,000.00 |
| Total Cost | | | | | $ - 0 |
| 12 | Additional Specialty Service Configuration | | | | | |
| Role | | | Rate | Hours | Total |
| Project Manager | | | $ - 0 | 50 | $ - 0 |
| Technical Developer | | | $ - 0 | 50 | $ - 0 |
| Program Manager | | | $ - 0 | 280 | $ - 0 |
| Technical Writer | | | $ - 0 | 120 | $ - 0 |
| Total Cost | | | | | $ - 0 |
| New Specialties | | | | | 4.00 |
| Specialties Cost | | | | | $ - 0 |
| Option Year 4 Total Cost | | | | | | $ - 0 |
Phased IGCE with Timeline (OLD)
| IDEPENDENT GOVERNMENT COST ESTIMATE (IGCE) | | | | | Target Submission | 6/28/24 |
| | | | | | Date Submitted | 7/5/24 |
| 1 PROJECT TITLE | | | | | | Weeks Delayed | 1 |
| 2. PROJECT MANAGER | | | Period of Performance | | | Weeks to Award | 4 |
| | | From | To | | | |
| | | 8/2/24 | 8/1/27 | | Timeline: Awarded | 8/2/24 |
| Pilot Non-Severable Costs | | | | | | | |
| Overhead costs | | | | | | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | | | | $ 175,000.00 | | |
| | Data Repatriation, Customer Success, Implementation | | | | | |
| 2 | Configuration to VA system needs (including deployment to VAEC & ATO) | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 600 | $ 72,510.00 |
| | Technical Developer | $ 139.30 | 600 | $ 83,580.00 |
| | Program Manager | $ 139.30 | 2800 | $ 390,040.00 |
| | Technical Writer | $ 74.25 | 480 | $ 35,640.00 |
| | | | | $ 581,770.00 |
3 Configuration for Primary Care Included in License cost
| 4 | EHR Integration Costs (VistA) | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 240 | $ 29,004.00 |
| | Technical Developer | $ 139.30 | 240 | $ 33,432.00 |
| | Program Manager | $ 139.30 | 1000 | $ 139,300.00 |
| | Technical Writer | $ 74.25 | 200 | $ 14,850.00 |
| | | | | $ 216,586.00 |
| Per site costs | | | |
| 5 | Travel | | |
| | People | 6 |
| | Days | 3 |
| | Air (per person) | $ 450.00 |
| | Lodging (per person per day) | $ 300.00 |
| | Per Diem (per person per day) | $ 60.00 |
| | Travel per site | $ 9,180.00 |
| 6 | Document Shipping | | | | Included |
| 7 | Site Customization | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 50 | $ 6,042.50 |
| | Technical Developer | $ 139.30 | 50 | $ 6,965.00 |
| | Program Manager | $ 139.30 | 280 | $ 39,004.00 |
| | Technical Writer | $ 74.25 | 120 | $ 8,910.00 |
| | | | | $ 60,921.50 |
| Total cost per site | $ 70,101.50 | |
| Sites | 1 | San Francisco / KCVA |
| Site specfic costs | $ 70,101.50 | |
| Licenses | | | | | | | |
| 8 | | | Cost per user per month | | | $ 600.00 | Weeks to ATO (Contingent on FedRAMP Situation/VAEC willingness) | 16 |
| | | Users | | | 20 | Timeline ATO Complete & Deployed | 11/22/24 |
| | | Months | | | 6 | | |
| | | | | | $ 72,000.00 | | |
| | | | | | | Weeks to Provision & Train | 1 |
| | | | Base Period Total cost | | $ 1,115,457.50 | Timeline: Pilot Active at First Sites(2 of 11) | 11/29/24 |
| | | | | | $ 2,230,915.00 | | |
| Optional Tasks | | | | | | | | |
| First Expansion @ 90 Days After ATO & Go Live | | | | | | | Execute Optional Task | 2/6/25 |
| 9 | Site Customization | | | | | | | |
| | Role | | Rate | Hours | Total | | |
| | Project Manager | | $ 120.85 | 50 | $ 6,042.50 | | |
| | Technical Developer | | $ 139.30 | 50 | $ 6,965.00 | | |
| | Program Manager | | $ 139.30 | 280 | $ 39,004.00 | | |
| | Technical Writer | | $ 74.25 | 120 | $ 8,910.00 | | |
| | | | | | $ 60,921.50 | | |
| Total cost per site | $ 60,921.50 | |
| Sites | 1 | Prescott / Loma Linda |
| Site specfic costs | $ 60,921.50 | |
| Licenses | | | |
| 10 | | Cost per user per month | $ 600.00 | |
| | Users | 20 | |
| | Months | 3 | Period (3 months to catchup to initial task order) |
| | | $ 36,000.00 | |
| Cost of Additional Tasks | $ 96,921.50 | | |
| New Contract Ceiling | $ 1,212,379.00 | Timeline: Expansion to Cohort 2 (4 of 11) | 2/27/25 |
| Second Expansion @ 60 Days After First Expansion | | | | | | Execute Optional Task | 4/7/25 |
| 11 | Site Customization | | | | | | |
| | Role | Rate | Hours | Total | | |
| | Project Manager | $ 120.85 | 50 | $ 6,042.50 | | |
| | Technical Developer | $ 139.30 | 50 | $ 6,965.00 | | |
| | Program Manager | $ 139.30 | 280 | $ 39,004.00 | | |
| | Technical Writer | $ 74.25 | 120 | $ 8,910.00 | | |
| | | | | $ 60,921.50 | | |
| Total cost per site | $ 60,921.50 | |
| Sites | 1 | Tampa / Ft. Harrison |
| Site specfic costs | $ 60,921.50 | |
| Licenses | | | |
| 12 | | Cost per user per month | $ 600.00 | |
| | Users | 20 | |
| | Months | 1 | Period 1 month to catch up to existing renewals |
| | | $ 12,000.00 | |
| Cost of Additional Tasks | $ 72,921.50 | | |
| New Contract Ceiling | $ 1,285,300.50 | Timeline: Expansion to Cohort 3 (6 of 11) | 4/28/25 |
| Licenses - Renewals Existing Sites - Pilot Months 7-9 | | | | | | Execute Optional Task | 5/7/25 |
| 13 | | | Cost per user per month | | | $ 600.00 | | |
| | | Users | | | 60 | All above | |
| | | Months | | | 3 | | |
| | | | | | $ 108,000.00 | | |
| Third Expansion @ 30 Days After Second Expansion | | | | | | | | |
| 9 | Site Customization | | | | | | | |
| | Role | | Rate | Hours | Total | | |
| | Project Manager | | $ 120.85 | 50 | $ 6,042.50 | | |
| | Technical Developer | | $ 139.30 | 50 | $ 6,965.00 | | |
| | Program Manager | | $ 139.30 | 280 | $ 39,004.00 | | |
| | Technical Writer | | $ 74.25 | 120 | $ 8,910.00 | | |
| | | | | | $ 60,921.50 | | |
| Total cost per site | $ 60,921.50 | |
| Sites | 1 | Dallas / Eerie |
| Site specfic costs | $ 60,921.50 | |
| Licenses | | |
| 14 | | Cost per user per month | $ 600.00 |
| | Users | 20 |
| | Months | 3 |
| | | $ 36,000.00 |
| Cost of Additional Tasks | $ 204,921.50 | License Renewals, 2 New Site Customizations, 40 new licenses for new sites | |
| New Contract Ceiling | $ 1,490,222.00 | Timeline: Expand to cohort 4 (8 of 11) | 5/28/25 |
| 4th Expansion @ 30 Days After Last Expansion | | | | | | Execute Optional Task | 6/6/25 |
| 15 | Site Customization | | | | | | |
| | Role | Rate | Hours | Total | | |
| | Project Manager | $ 120.85 | 50 | $ 6,042.50 | | |
| | Technical Developer | $ 139.30 | 50 | $ 6,965.00 | | |
| | Program Manager | $ 139.30 | 280 | $ 39,004.00 | | |
| | Technical Writer | $ 74.25 | 120 | $ 8,910.00 | | |
| | | | | $ 60,921.50 | | |
| Total cost per site | $ 60,921.50 | |
| Sites | 1 | Ann Arbor / Wilmington |
| Site specfic costs | $ 60,921.50 | |
| Licenses | | |
| 16 | | Cost per user per month | $ 600.00 |
| | Users | 20 |
| | Months | 2 |
| | | $ 24,000.00 |
| Cost of Additional Tasks | $ 84,921.50 | | |
| New Contract Ceiling | $ 1,575,143.50 | Timeline: Expand to cohort 5 (10 of 11) | 6/27/25 |
| Fifth Expansion (30 Days after last) | | | | | | Execute Optional Task | 7/6/25 |
| 17 | Site Customization | | | | | | |
| | Role | Rate | Hours | Total | | |
| | Project Manager | $ 120.85 | 50 | $ 6,042.50 | | |
| | Technical Developer | $ 139.30 | 50 | $ 6,965.00 | | |
| | Program Manager | $ 139.30 | 280 | $ 39,004.00 | | |
| | Technical Writer | $ 74.25 | 120 | $ 8,910.00 | | |
| | | | | $ 60,921.50 | | |
| Total cost per site | $ 60,921.50 | |
| Sites | 1 | Marion |
| Site specfic costs | $ 60,921.50 | |
| Licenses | | |
| 18 | | Cost per user per month | $ 600.00 |
| | Users | 20 |
| | Months | 1 |
| | | $ 12,000.00 |
| Cost of Additional Tasks | $ 72,921.50 | | |
| New Contract Ceiling | $ 1,648,065.00 | Timeline: Expand to final cohort (11 of 11) | 7/27/25 |
| Licenses - Renewals Existing Sites - Pilot Months 10-12 | | | Execute Optional Task | 8/5/25 |
| 19 | | Cost per user per month | $ 600.00 | | |
| | Users | 120 | All 11 Sites | |
| | Months | 3 | | |
| | | $ 216,000.00 | | |
| | | Cost of Additional Tasks | | $ 216,000.00 | | | |
| | | New Contract Ceiling | | $ 1,864,065.00 | Total Single Contract Needs in FY25 | $ 3,726,339.00 | (Ceiling - Base Period) |
| | | | | | | $ 7,452,678.00 | |
| Additional Tasks in Scope of Pilot - Year 2 (Expansion to Other Specialties, Cerner, Continued Pilot Support) | | | | | | | $ 9,952,678.00 | |
| 20 | Integration to Cerner | | | | Available Out of Box | Execute Task Order | 11/29/25 | |
| | Role | Rate | Hours | Total | | | |
| | Project Manager | $ 120.85 | 600 | $ 72,510.00 | | | |
| | Technical Developer | $ 139.30 | 600 | $ 83,580.00 | | | |
| | Program Manager | $ 139.30 | 3400 | $ 473,620.00 | | | |
| | Technical Writer | $ 74.25 | 1200 | $ 89,100.00 | Weeks for Cerner Integration | 8 | |
| | | | | $ 718,810.00 | TimeLine: Cerner Integration within 8 weeks of Task Order | 1/24/26 | |
| 21 | Additional Specialty Service Configuration | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 50 | $ 6,042.50 |
| | Technical Developer | $ 139.30 | 50 | $ 6,965.00 |
| | Program Manager | $ 139.30 | 280 | $ 39,004.00 |
| | Technical Writer | $ 74.25 | 120 | $ 8,910.00 |
| | | | | $ 60,921.50 |
| New Specialties | 1.00 | Wait for New Specialties in Weeks | 8 |
| Specialties Cost | $ 60,921.50 | Timeline: New Specialty Care Templates Available | 1/24/26 |
| 22 | Year 2 Pilot Deliverables (meetings, document prep, document production, training document development) | | | $ 350,000.00 | Priced @ $175K per 5 sites supported includes travel |
| | Data Repatriation, Customer Success, Implementation | | | |
| | | Cost of Additional Tasks | $ 1,129,731.50 | |
| | | New Contract Ceiling | $ 2,993,796.50 | |
| 23 | Licenses - Renewals Existing Sites - Pilot Months 12-24 (FY26 Money) | | | |
| | Cost per user per month | $ 600.00 | |
| | Sites | 22.00 | Optional Tasks to keep ongoing |
| | Users Per Site | 20.00 | |
| Users (Qtr 1) | 440.00 | Execute Optional Task | 11/3/25 | Welcome to FY26 |
| Cost | $ 264,000.00 | | | |
Specialty Care Users Per Site 20.00 Goes Live 1/17/2024 Approximately
| Users (Qtr 1) | 880.00 | Execute Optional Task | 2/1/26 |
| Cost | $ 528,000.00 | | |
| Users (Qtr 1) | 880.00 | Execute Optional Task | 5/2/26 |
| Cost | $ 528,000.00 | | |
| Users (Qtr 1) | 880.00 | Execute Optional Task | 7/31/26 |
| Cost | $ 528,000.00 | | |
| Cost of Additional Tasks | $ 1,848,000.00 | | |
| New Contract Ceiling | $ 4,841,796.50 | Timeline: Period of Performance Planned End | 11/28/26 |
| Cost of Base Period | $ 1,115,457.50 | $ 2,230,915.00 | $ 9,952,678.00 | $ 12,183,593.00 |
| Total Contract Ceiling | $ 4,841,796.50 | | | |
| Cost of licenses | $ 2,292,000.00 |
| User Months | $ 3,820.00 |
Phased Implementation Schedule
| IDEPENDENT GOVERNMENT COST ESTIMATE (IGCE) | | | | | Target Submission | 6/28/24 |
| | | | | | Date Submitted | 6/28/24 |
| 1 PROJECT TITLE | | | | | | Weeks Delayed | |
| 2. PROJECT MANAGER | | | Period of Performance | | | Weeks to Award | 8 |
| | | From | To | | | |
| | | 9/27/24 | 9/26/27 | | Timeline: Awarded | 9/27/24 |
| Pilot Non-Severable Costs | | | | | | | |
| Overhead costs | | | | | | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | | | | $ 175,000.00 | | |
| | Data Repatriation, Customer Success, Implementation | | | | | |
| 2 | Configuration to VA system needs (including deployment to VAEC & ATO) | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 600 | $ 72,510.00 |
| | Technical Developer | $ 139.30 | 600 | $ 83,580.00 |
| | Program Manager | $ 139.30 | 2800 | $ 390,040.00 |
| | Technical Writer | $ 74.25 | 480 | $ 35,640.00 |
| | | | | $ 581,770.00 |
3 Configuration for Primary Care Included in License cost
| 4 | EHR Integration Costs (VistA) | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 240 | $ 29,004.00 |
| | Technical Developer | $ 139.30 | 240 | $ 33,432.00 |
| | Program Manager | $ 139.30 | 1000 | $ 139,300.00 |
| | Technical Writer | $ 74.25 | 200 | $ 14,850.00 |
| | | | | $ 216,586.00 |
| | | Overhead total | | $ 200,000.00 |
| Per site costs | | | |
| 5 | Travel | | |
| | People | 6 |
| | Days | 3 |
| | Air (per person) | $ 450.00 |
| | Lodging (per person per day) | $ 300.00 |
| | Per Diem (per person per day) | $ 60.00 |
| | Travel per site | $ 9,180.00 |
| 6 | Document Shipping | | | | Included |
| 7 | Site Customization | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 50 | $ 6,042.50 |
| | Technical Developer | $ 139.30 | 50 | $ 6,965.00 |
| | Program Manager | $ 139.30 | 280 | $ 39,004.00 |
| | Technical Writer | $ 74.25 | 120 | $ 8,910.00 |
| | | | | $ 60,921.50 |
| Total cost per site | $ 70,101.50 | |
| Sites | 2 | KCVA & Loma Linda |
| Site specfic costs | $ 158,563.00 | |
| Licenses | | | | | |
| 8 | | Cost per user per month | | $ 600.00 | Weeks to ATO | 16 |
| | Users | | 40 | Timeline ATO Complete & Deployed | 1/17/25 |
| | Months | | 6 | | |
| | | | $ 144,000.00 | | |
| | | | | Weeks to Provision & Train | 1 |
| | | Base Period Total cost | $ 1,275,919.00 | Timeline: Pilot Active at First Sites(2 of 11) | 1/24/25 |
| Optional Tasks | | | | | | | |
| First Expansion @ 90 Days After ATO & Go Live | | | | | | Execute Optional Task | 4/3/25 |
| 9 | Site Customization | | | | | | |
| | Role | Rate | Hours | Total | | |
| | Project Manager | $ 120.85 | 50 | $ 6,042.50 | | |
| | Technical Developer | $ 139.30 | 50 | $ 6,965.00 | | |
| | Program Manager | $ 139.30 | 280 | $ 39,004.00 | | |
| | Technical Writer | $ 74.25 | 120 | $ 8,910.00 | | |
| | | | | $ 60,921.50 | | |
| Total cost per site | $ 60,921.50 | |
| Sites | 9 | San Francisco, Ft. Harrison |
| Site specfic costs | $ 548,293.50 | |
| Licenses | | | |
| 10 | | Cost per user per month | $ 600.00 | |
| | Users | 180 | |
| | Months | 3 | Period (3 months to catchup to initial task order) |
| | | $ 324,000.00 | |
| Cost of Additional Tasks | $ 872,293.50 | | |
| New Contract Ceiling | $ 2,148,212.50 | Timeline: Expansion to Cohort 2 (4 of 11) | 4/24/25 |
| Second Expansion @ 60 Days After First Expansion | | | | | | Execute Optional Task | 6/2/25 |
| 11 | Site Customization | | | | | | |
| | Role | Rate | Hours | Total | | |
| | Project Manager | $ 120.85 | 50 | $ 6,042.50 | | |
| | Technical Developer | $ 139.30 | 50 | $ 6,965.00 | | |
| | Program Manager | $ 139.30 | 280 | $ 39,004.00 | | |
| | Technical Writer | $ 74.25 | 120 | $ 8,910.00 | | |
| | | | | $ 60,921.50 | | |
| Total cost per site | $ 60,921.50 | |
| Sites | 2 | Marion & Prescott |
| Site specfic costs | $ 121,843.00 | |
| Licenses | | | |
| 12 | | Cost per user per month | $ 600.00 | |
| | Users | 40 | |
| | Months | 1 | Period 1 month to catch up to existing renewals |
| | | $ 24,000.00 | |
| Cost of Additional Tasks | $ 145,843.00 | | |
| New Contract Ceiling | $ 2,294,055.50 | Timeline: Expansion to Cohort 3 (6 of 11) | 6/23/25 |
| Licenses - Renewals Existing Sites - Pilot Months 7-9 | | | | | | Execute Optional Task | 7/2/25 |
| 13 | | | Cost per user per month | | | $ 600.00 | | |
| | | Users | | | 260 | KCVA, Loma Linda, San Francisco, Ft. Harrison, Marion, & Prescott | |
| | | Months | | | 3 | | |
| | | | | | $ 468,000.00 | | |
| Third Expansion @ 30 Days After Second Expansion | | | | | | | | |
| 9 | Site Customization | | | | | | | |
| | Role | | Rate | Hours | Total | | |
| | Project Manager | | $ 120.85 | 50 | $ 6,042.50 | | |
| | Technical Developer | | $ 139.30 | 50 | $ 6,965.00 | | |
| | Program Manager | | $ 139.30 | 280 | $ 39,004.00 | | |
| | Technical Writer | | $ 74.25 | 120 | $ 8,910.00 | | |
| | | | | | $ 60,921.50 | | |
| Total cost per site | $ 60,921.50 | |
| Sites | 2 | Tampa & Eerie |
| Site specfic costs | $ 121,843.00 | |
| Licenses | | |
| 14 | | Cost per user per month | $ 600.00 |
| | Users | 40 |
| | Months | 3 |
| | | $ 72,000.00 |
| Cost of Additional Tasks | $ 661,843.00 | License Renewals, 2 New Site Customizations, 40 new licenses for new sites | |
| New Contract Ceiling | $ 2,955,898.50 | Timeline: Expand to cohort 4 (8 of 11) | 7/23/25 |
| 4th Expansion @ 30 Days After Last Expansion | | | | | | Execute Optional Task | 8/1/25 |
| 15 | Site Customization | | | | | | |
| | Role | Rate | Hours | Total | | |
| | Project Manager | $ 120.85 | 50 | $ 6,042.50 | | |
| | Technical Developer | $ 139.30 | 50 | $ 6,965.00 | | |
| | Program Manager | $ 139.30 | 280 | $ 39,004.00 | | |
| | Technical Writer | $ 74.25 | 120 | $ 8,910.00 | | |
| | | | | $ 60,921.50 | | |
| Total cost per site | $ 60,921.50 | |
| Sites | 2 | Dallas, Wilmington |
| Site specfic costs | $ 121,843.00 | |
| Licenses | | |
| 16 | | Cost per user per month | $ 600.00 |
| | Users | 40 |
| | Months | 2 |
| | | $ 48,000.00 |
| Cost of Additional Tasks | $ 169,843.00 | | |
| New Contract Ceiling | $ 3,125,741.50 | Timeline: Expand to cohort 5 (10 of 11) | 8/22/25 |
| Fifth Expansion (30 Days after last) | | | | | | Execute Optional Task | 8/31/25 |
| 17 | Site Customization | | | | | | |
| | Role | Rate | Hours | Total | | |
| | Project Manager | $ 120.85 | 50 | $ 6,042.50 | | |
| | Technical Developer | $ 139.30 | 50 | $ 6,965.00 | | |
| | Program Manager | $ 139.30 | 280 | $ 39,004.00 | | |
| | Technical Writer | $ 74.25 | 120 | $ 8,910.00 | | |
| | | | | $ 60,921.50 | | |
| Total cost per site | $ 60,921.50 | |
| Sites | 1 | Ann Arbor |
| Site specfic costs | $ 60,921.50 | |
| Licenses | | |
| 18 | | Cost per user per month | $ 600.00 |
| | Users | 20 |
| | Months | 1 |
| | | $ 12,000.00 |
| Cost of Additional Tasks | $ 72,921.50 | | |
| New Contract Ceiling | $ 3,198,663.00 | Timeline: Expand to final cohort (11 of 11) | 9/21/25 |
| Licenses - Renewals Existing Sites - Pilot Months 9-12 | | | Execute Optional Task | 9/30/25 |
| 19 | | Cost per user per month | $ 600.00 | | |
| | Users | 360 | All 11 Sites | |
| | Months | 3 | | |
| | | $ 648,000.00 | | |
| Cost of Additional Tasks | $ 648,000.00 | | | |
| New Contract Ceiling | $ 3,846,663.00 | Total Single Contract Needs in FY25 | $ 4,944,318.50 | (Ceiling - Base Period) |
| Additional Tasks in Scope of Pilot - Year 2 (Expansion to Other Specialties, Cerner, Continued Pilot Support) | | | | | | | |
| 20 | Integration to Cerner | | | | Available Out of Box | Execute Task Order | 1/24/26 |
| | Role | Rate | Hours | Total | | |
| | Project Manager | $ 120.85 | 600 | $ 72,510.00 | | |
| | Technical Developer | $ 139.30 | 600 | $ 83,580.00 | | |
| | Program Manager | $ 139.30 | 3400 | $ 473,620.00 | | |
| | Technical Writer | $ 74.25 | 1200 | $ 89,100.00 | Weeks for Cerner Integration | 8 |
| | | | | $ 718,810.00 | TimeLine: Cerner Integration within 8 weeks of Task Order | 3/21/26 |
| 21 | Additional Specialty Service Configuration | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 50 | $ 6,042.50 |
| | Technical Developer | $ 139.30 | 50 | $ 6,965.00 |
| | Program Manager | $ 139.30 | 280 | $ 39,004.00 |
| | Technical Writer | $ 74.25 | 120 | $ 8,910.00 |
| | | | | $ 60,921.50 |
| New Specialties | 3.00 | Wait for New Specialties in Weeks | 8 |
| Specialties Cost | $ 182,764.50 | Timeline: New Specialty Care Templates Available | 3/21/26 |
| 22 | Year 2 Pilot Deliverables (meetings, document prep, document production, training document development) | | | $ 350,000.00 | Priced @ $175K per 5 sites supported includes travel |
| | Data Repatriation, Customer Success, Implementation | | | |
| | | Cost of Additional Tasks | $ 1,251,574.50 | |
| | | New Contract Ceiling | $ 5,098,237.50 | |
| 23 | Licenses - Renewals Existing Sites - Pilot Months 12-24 (FY26 Money) | | |
| | Cost per user per month | $ 600.00 |
| | Sites | 11.00 |
| | Users Per Site | 20.00 |
| Users (Qtr 1) | 220.00 | Execute Optional Task | 12/29/25 | Welcome to FY26 |
| Cost | $ 132,000.00 | | | |
Specialty Care Users Per Site 30.00 Goes Live 1/17/2024 Approximately
| Users (Qtr 1) | 550.00 | Execute Optional Task | 3/29/26 |
| Cost | $ 330,000.00 | | |
| Users (Qtr 1) | 550.00 | Execute Optional Task | 6/27/26 |
| Cost | $ 330,000.00 | | |
| Users (Qtr 1) | 550.00 | Execute Optional Task | 9/25/26 |
| Cost | $ 330,000.00 | | |
| Cost of Additional Tasks | $ 1,122,000.00 | | |
| New Contract Ceiling | $ 6,220,237.50 | Timeline: Period of Performance Planned End | 1/23/27 |
| Cost of Base Period | $ 1,275,919.00 | $ 2,551,838.00 | 848 |
| Total Contract Ceiling | $ 6,220,237.50 | | 121.1428571429 |
| | | 2.3232876712 |
Base Period with Optional
| IDEPENDENT GOVERNMENT COST ESTIMATE (IGCE) | | | | | | | | Target Submission | 6/28/24 |
| | | | | | | | | Date Submitted | 6/28/24 |
| 1 PROJECT TITLE | | | | | | | | | Weeks Delayed | 0 |
| 2. PROJECT MANAGER | | | Period of Performance | | | | | | | |
| | | From | | To | | | | | |
| | | 7/26/24 | | 7/25/27 | | | | Timeline: Awarded | 7/26/24 |
| Pilot Non-Severable Costs | | | | | | | | | | |
| Overhead costs | | | | | | | | | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | | | | | | | Included in license cost | | |
| | Data Repatriation | | | | | | | | |
| 2 | Configuration to VA system needs (including deployment to VAEC & ATO) | | | | | | | | | |
| | | | Role | | Rate | Hours | Total | | |
| | | | Project Manager | | $ 120.85 | 600 | $ 72,510.00 | | |
| | | | Technical Developer | | $ 139.30 | 600 | $ 83,580.00 | | |
| | | | Program Manager | | $ 139.30 | 2800 | $ 390,040.00 | | |
| | | | Technical Writer | | $ 74.25 | 480 | $ 35,640.00 | | |
| | | | | | | | $ 581,770.00 | | |
3 Configuration for Primary Care Included in License cost
| 3 | EHR Integration Costs (VistA) | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 50 | $ 6,042.50 |
| | Technical Developer | $ 139.30 | 50 | $ 6,965.00 |
| | Program Manager | $ 139.30 | 280 | $ 39,004.00 |
| | Technical Writer | $ 74.25 | 120 | $ 8,910.00 |
| | | | | $ 60,921.50 |
Overhead total $ 60,921.50
| Per site costs | | | |
| 5 | Travel | | |
| | People | 6 |
| | Days | 3 |
| | Air (per person) | $ 450.00 |
| | Lodging (per person per day) | $ 300.00 |
| | Per Diem (per person per day) | $ 60.00 |
| | Travel per site | $ 9,180.00 |
| 6 | Document Shipping | | | | Included |
| 7 | Site Customization | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 50 | $ 6,042.50 |
| | Technical Developer | $ 139.30 | 50 | $ 6,965.00 |
| | Program Manager | $ 139.30 | 280 | $ 39,004.00 |
| | Technical Writer | $ 74.25 | 120 | $ 8,910.00 |
| | | | | $ 60,921.50 |
| | | Total cost per site | $ 70,101.50 | | |
| | | Sites | 5 | | |
| | | Site specfic costs | $ 350,507.50 | Weeks to ATO | 8 |
| | | | | Timeline ATO Complete & Deployed | 9/20/24 |
| Licenses | | | | | |
| 8 | | Cost per user per month | | $ 600.00 | | |
| | Users | | 100 | | |
| | Months | | 6 | | |
| | | | $ 360,000.00 | | |
| | | | | Weeks to Provision & Train | 2 |
| | | Base Period Total cost | $ 1,353,199.00 | End Base Task | 10/4/24 |
Optional Tasks
9 Integration to Cerner Available Out of Box
| 10 | Additional Specialty Service Configuration | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 50 | $ 6,042.50 |
| | Technical Developer | $ 139.30 | 50 | $ 6,965.00 |
| | Program Manager | $ 139.30 | 280 | $ 39,004.00 |
| | Technical Writer | $ 74.25 | 120 | $ 8,910.00 |
| | | | | $ 60,921.50 |
| New Specialties | - 0 |
| Specialties Cost | $ - 0 |
| 11 | Additional Site Customization | | | | | |
| | Role | | Rate | Hours | Total |
| | Project Manager | | $ 120.85 | 50 | $ 6,042.50 |
| | Technical Developer | | $ 139.30 | 50 | $ 6,965.00 |
| | Program Manager | | $ 139.30 | 280 | $ 39,004.00 |
| | Technical Writer | | $ 74.25 | 120 | $ 8,910.00 |
| | | Per Site New Cost | | | $ 60,921.50 |
| | | New Sites | | | - 0 |
| 12 | Travel for Additional Site Support | | |
| | People | 6 |
| | Days | 3 |
| | Air (per person) | $450 |
| | Lodging (per person per day) | $300 |
| | Per Diem (per person per day) | $60 |
| | Travel per site | $9,180 |
| 13 | Additional Licenses (In 3 Month Increments) | | | |
| | Cost per user per month | | $ 600.00 |
| | Users | | $ 100.00 |
| | Months | | 24 |
| | | License Costs | $ 1,440,000.00 |
| Cost of Additional Tasks | $ 1,440,000.00 |
| Cost of Base Period | $ 1,353,199.00 |
| Total Contract Ceiling | $ 2,793,199.00 |
Base Period with Optional Tasks
| IDEPENDENT GOVERNMENT COST ESTIMATE (IGCE) | | | | | | |
| 1 PROJECT TITLE | | | | | | | |
| 2. PROJECT MANAGER | | Period of Performance | | | | | |
| | From | | To | | | |
| | 8/1/24 | | 7/31/27 | | | |
| Pilot Non-Severable Costs | | | | | | | |
| Overhead costs | | | | | | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | | | | | | Included in license cost |
| 2 | Configuration to VA system needs | | | | | | Included in License cost |
| 3 | Configuration for Primary Care | | | | | | Included in License cost |
| 3 | EHR Integration Costs (VistA) | | | | | | |
| | | Role | | Rate | Hours | Total |
| | | Project Manager | | $ 120.85 | 50 | $ 6,042.50 |
| | | Technical Developer | | $ 139.30 | 50 | $ 6,965.00 |
| | | Program Manager | | $ 139.30 | 280 | $ 39,004.00 |
| | | Technical Writer | | $ 74.25 | 120 | $ 8,910.00 |
| | | | | | | $ 60,921.50 |
Overhead total $ 60,921.50
| Per site costs | | | |
| 5 | Travel | | |
| | People | 6 |
| | Days | 3 |
| | Air (per person) | $ 450.00 |
| | Lodging (per person per day) | $ 300.00 |
| | Per Diem (per person per day) | $ 60.00 |
| | Travel per site | $ 9,180.00 |
| 6 | Document Shipping | | | | Included |
| 7 | Site Customization | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 50 | $ 6,042.50 |
| | Technical Developer | $ 139.30 | 50 | $ 6,965.00 |
| | Program Manager | $ 139.30 | 280 | $ 39,004.00 |
| | Technical Writer | $ 74.25 | 120 | $ 8,910.00 |
| | | | | $ 60,921.50 |
| Total cost per site | $ 70,101.50 |
| Sites | 5 |
| Site specfic costs | $ 350,507.50 |
| Licenses | | |
| 8 | | Cost per user per month | $ 600.00 |
| | Users | 100 |
| | Months | 12 |
| | | $ 720,000.00 |
Base Period Total cost $1,131,429.00
Optional Tasks
9 Integration to Cerner Available Out of Box
| 10 | Additional Specialty Service Configuration | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 50 | $ 6,042.50 |
| | Technical Developer | $ 139.30 | 50 | $ 6,965.00 |
| | Program Manager | $ 139.30 | 280 | $ 39,004.00 |
| | Technical Writer | $ 74.25 | 120 | $ 8,910.00 |
| | | | | $ 60,921.50 |
| New Specialties | - 0 |
| Specialties Cost | $ - 0 |
| 11 | Additional Site Customization | | | | | |
| | Role | | Rate | Hours | Total |
| | Project Manager | | $ 120.85 | 50 | $ 6,042.50 |
| | Technical Developer | | $ 139.30 | 50 | $ 6,965.00 |
| | Program Manager | | $ 139.30 | 280 | $ 39,004.00 |
| | Technical Writer | | $ 74.25 | 120 | $ 8,910.00 |
| | | Per Site New Cost | | | $ 60,921.50 |
| | | New Sites | | | - 0 |
| 12 | Travel for Additional Site Support | | |
| | People | 6 |
| | Days | 3 |
| | Air (per person) | $450 |
| | Lodging (per person per day) | $300 |
| | Per Diem (per person per day) | $60 |
| | Travel per site | $9,180 |
| 13 | Additional Licenses (In 3 Month Increments) | | | |
| | Cost per user per month | | $ 600.00 |
| | Users | | $ 100.00 |
| | Months | | 24 |
| | | License Costs | $ 1,440,000.00 |
| Cost of Additional Tasks | $ 1,440,000.00 |
| Cost of Base Period | $ 1,131,429.00 |
| Total Contract Ceiling | $ 2,571,429.00 |
Base Year
| IDEPENDENT GOVERNMENT COST ESTIMATE (IGCE) | | | | | | | Implementation Sites | 5 |
| | | | | | | | Users Per Site | 20 |
| 1 PROJECT TITLE | | | | | | | | | |
| 2. PROJECT MANAGER | | Period of Performance | | | | | | | |
| | From | | To | | | | | |
| | 8/1/24 | | 7/31/25 | | | | | |
| Overhead costs | | | | | | | | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | | | | | | Included in license cost | | |
| 2 | Configuration to VA system needs | | | | | | Included in License cost | | |
| 3 | Configuration for Primary Care | | | | | | Included in License cost | | |
| 3 | EHR Integration Costs (VistA) | | | | | | | | |
| | | Role | | Rate | Hours | Total | | |
| | | Project Manager | | $ 120.85 | 50 | $ 6,042.50 | | |
| | | Technical Developer | | $ 139.30 | 50 | $ 6,965.00 | | |
| | | Program Manager | | $ 139.30 | 280 | $ 39,004.00 | | |
| | | Technical Writer | | $ 74.25 | 120 | $ 8,910.00 | | |
| | | | | | | $ 60,921.50 | | |
Overhead total $ 60,921.50
| Per site costs | | | |
| 1 | Travel | | |
| | People | 6 |
| | Days | 3 |
| | Air (per person) | $450 |
| | Lodging (per person per day) | $300 |
| | Per Diem (per person per day) | $60 |
| | Travel per site | $9,180 |
| 2 | Document Shipping | | | | Included |
| 3 | Site Customization | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 50 | $ 6,042.50 |
| | Technical Developer | $ 139.30 | 50 | $ 6,965.00 |
| | Program Manager | $ 139.30 | 280 | $ 39,004.00 |
| | Technical Writer | $ 74.25 | 120 | $ 8,910.00 |
| | | | | $ 60,921.50 |
| Total cost per site | $ 70,101.50 |
| Sites | 5 |
| Site specfic costs | $ 350,507.50 |
| Liscenes | | |
| 1 | | Cost per user per month | $600 |
| | Users | 100 |
| | Months | 12 |
| | | $720,000 |
Total cost $1,131,429.00
| NEED TO ADD EXISTING SUPPORT STAFF WE ARE LOSING IN AUGUST |
| 5 + 3 more |
| Total amount of money: full contract, eval costs, support costs |
| How much money for the 2237 |
Base
| IDEPENDENT GOVERNMENT COST ESTIMATE (IGCE) | | |
| 1 PROJECT TITLE | | | |
| 2. PROJECT MANAGER | | Period of Performance | |
| | From | To |
| Overhead costs | | | | | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | | | | | |
| | Role | Rate | Hours | Total | |
| | Project Manager | $ 120.85 | 80 | $ 9,668.00 | Costs sourced from IHT Contract |
| | Technical Lead | $ 139.30 | 30 | $ 4,179.00 | |
| | Technical Developer | $ 139.30 | 30 | $ 4,179.00 | |
| | Design Lead | $ 90.92 | 30 | $ 2,727.60 | |
| | Technical Writer | $ 74.25 | 80 | $ 5,940.00 | |
| | | | | $ 26,693.60 | |
| 2 | Configuration to VA system needs | | | | | |
| | Role | Rate | Hours | Total | |
| | Project Manager | $ 120.85 | 80 | $ 9,668.00 | |
| | Technical Lead | $ 139.30 | 200 | $ 27,860.00 | |
| | Technical Developer | $ 139.30 | 240 | $ 33,432.00 | |
| | Design Lead | $ 90.92 | 200 | $ 18,184.00 | |
| | Technical Writer | $ 74.25 | 40 | $ 2,970.00 | |
| | | | | $ 92,114.00 | |
| 3 | Printing of trainign materials | | | |
| | Rate | Qty | |
| | $5 | 100 | $500 |
| 4 | EHR Integration Costs (VistA) | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 400 | $ 48,340.00 |
| | Technical Lead | $ 139.30 | 400 | $ 55,720.00 |
| | Technical Developer | $ 139.30 | 400 | $ 55,720.00 |
| | Design Lead | $ 90.92 | 400 | $ 36,368.00 |
| | Technical Writer | $ 74.25 | 80 | $ 5,940.00 |
| | | | | $ 202,088.00 |
Overhead total $321,395.60
| Per site costs | | | |
| 1 | Travel | | |
| | People | 6 |
| | Days | 3 |
| | Air (per person) | $400 |
| | Lodging (per person per day) | $254 |
| | Per Diem (per person per day) | $50 |
| | Travel per site | $7,872 |
| 2 | Document Shipping | | | |
| | Rate | Qty | |
| | $50 | 5 | $250 |
| 3 | Site Customization | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 40 | $ 4,834.00 |
| | Technical Lead | $ 139.30 | 40 | $ 5,572.00 |
| | Technical Developer | $ 139.30 | 40 | $ 5,572.00 |
| | Design Lead | $ 90.92 | 40 | $ 3,636.80 |
| | Technical Writer | $ 74.25 | 20 | $ 1,485.00 |
| | | | | $ 21,099.80 |
| Total cost per site | $ 29,221.80 |
| Sites | 5 |
| Site specfic costs | $ 186,719.00 |
| Liscenes | | | |
| 1 | | Cost per user per month | $600 | Validated by online search of license costs prior to any discounting |
| | Users | 100 | |
| | Months | 12 | |
| | | $720,000 | |
Total cost $1,228,114.60
| Punch List: |
| EHR Integration Costs |
| Costs for Specialty Integrations |
Option 1 - 6 Mo
| IDEPENDENT GOVERNMENT COST ESTIMATE (IGCE) | | | | |
| 1 PROJECT TITLE | | | | New Specialties | 3 |
| 2. PROJECT MANAGER | | Period of Performance | | New Sites | 8 |
| | From | To | | |
| Overhead costs | | | | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | | | | Included |
| 2 | Integration to Cerner | | | | Available Out of Box |
| 3 | Additional Specialty Service Transcription Service | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 50 | $ 6,042.50 |
| | Technical Developer | $ 139.30 | 50 | $ 6,965.00 |
| | Program Manager | $ 139.30 | 280 | $ 39,004.00 |
| | Technical Writer | $ 74.25 | 120 | $ 8,910.00 |
| | | | | $ 60,921.50 |
| New Specialties | 3.00 |
| Specialties Cost | $ 182,764.50 |
| 4 | Printing of trainign materials | | Included |
| | Overhead total | $ 182,764.50 |
| Per site costs | | | |
| 1 | Travel | | |
| | People | 6 |
| | Days | 3 |
| | Air (per person) | $500 |
| | Lodging (per person per day) | $125 |
| | Per Diem (per person per day) | $50 |
| | Travel per site | $6,150 |
| 2 | Document Shipping | | | |
| | Rate | Qty | |
| | $5 | 100 | $500 |
| 3 | Site Customization | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 40 | $ 4,834.00 |
| | Technical Lead | $ 139.30 | 40 | $ 5,572.00 |
| | Technical Developer | $ 139.30 | 40 | $ 5,572.00 |
| | Design Lead | $ 90.92 | 40 | $ 3,636.80 |
| | Technical Writer | $ 74.25 | 20 | $ 1,485.00 |
| | | | | $ 21,099.80 |
| Total cost per site | $ 27,749.80 |
| New Sites | 9 |
| Site specfic costs | $ 249,748.20 |
| Liscenes | | |
| 1 | | Cost per user per month | $600 |
| | Users | 280 |
| | Months | 6 |
| | | $1,008,000 |
Total cost $1,440,512.70
Option 1
| IDEPENDENT GOVERNMENT COST ESTIMATE (IGCE) | | |
| 1 PROJECT TITLE | | | |
| 2. PROJECT MANAGER | | Period of Performance | |
| | From | To |
| Overhead costs | | | | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 30 | $ 3,625.50 |
| | Technical Lead | $ 139.30 | 24 | $ 3,343.20 |
| | Technical Developer | $ 139.30 | 24 | $ 3,343.20 |
| | Design Lead | $ 90.92 | 24 | $ 2,182.08 |
| | Technical Writer | $ 74.25 | 24 | $ 1,782.00 |
| | | | | $ 14,275.98 |
| 2 | Cintegration to Cerner | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 400 | $ 48,340.00 |
| | Technical Lead | $ 139.30 | 400 | $ 55,720.00 |
| | Technical Developer | $ 139.30 | 400 | $ 55,720.00 |
| | Design Lead | $ 90.92 | 400 | $ 36,368.00 |
| | Technical Writer | $ 74.25 | 80 | $ 5,940.00 |
| | | | | $ 202,088.00 |
| 3 | Additional Specialty Service Transcription Service | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 80 | $ 9,668.00 |
| | Technical Lead | $ 139.30 | 200 | $ 27,860.00 |
| | Technical Developer | $ 139.30 | 200 | $ 27,860.00 |
| | Design Lead | $ 90.92 | 200 | $ 18,184.00 |
| | Technical Writer | $ 74.25 | 80 | $ 5,940.00 |
| | | | | $ 89,512.00 |
| 4 | Printing of trainign materials | | | |
| | Rate | Qty | |
| | $5 | 450 | $2,250 |
Overhead total $218,613.98
| Per site costs | | | |
| 1 | Travel | | |
| | People | 6 |
| | Days | 3 |
| | Air (per person) | $500 |
| | Lodging (per person per day) | $125 |
| | Per Diem (per person per day) | $50 |
| | Travel per site | $6,150 |
| 2 | Document Shipping | | | |
| | Rate | Qty | |
| | $5 | 100 | $500 |
| 3 | Site Customization | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 40 | $ 4,834.00 |
| | Technical Lead | $ 139.30 | 40 | $ 5,572.00 |
| | Technical Developer | $ 139.30 | 40 | $ 5,572.00 |
| | Design Lead | $ 90.92 | 40 | $ 3,636.80 |
| | Technical Writer | $ 74.25 | 20 | $ 1,485.00 |
| | | | | $ 21,099.80 |
| Total cost per site | $ 27,749.80 |
| New Sites | 5 |
| Site specfic costs | $ 138,749.00 |
| Liscenes | | |
| 1 | | Cost per user per month | $600 |
| | Users | 200 |
| | Months | 6 |
| | | $720,000 |
Total cost $1,077,362.98
Option 2 -Old
| IDEPENDENT GOVERNMENT COST ESTIMATE (IGCE) | | |
| 1 PROJECT TITLE | | | |
| 2. PROJECT MANAGER | | Period of Performance | |
| | From | To |
| Overhead costs | | | | | |
| 1 | Deliverables (meetings, document prep, document production, training document development) | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 30 | $ 3,625.50 |
| | Technical Lead | $ 139.30 | 24 | $ 3,343.20 |
| | Technical Developer | $ 139.30 | 24 | $ 3,343.20 |
| | Design Lead | $ 90.92 | 24 | $ 2,182.08 |
| | Technical Writer | $ 74.25 | 24 | $ 1,782.00 |
| | | | | $ 14,275.98 |
| 2 | Additional specalities | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 150 | $ 18,127.50 |
| | Technical Lead | $ 139.30 | 150 | $ 20,895.00 |
| | Technical Developer | $ 139.30 | 150 | $ 20,895.00 |
| | Design Lead | $ 90.92 | 150 | $ 13,638.00 |
| | Technical Writer | $ 74.25 | 80 | $ 5,940.00 |
| | | | | $ 79,495.50 |
| | | Number of speaclites | | 4 |
| | | | Total | $ 317,982.00 |
| 3 | Printing of trainign materials | | | |
| | Rate | Qty | |
| | $5 | 50 | $250 |
Overhead total $332,507.98
| Per site costs | | | |
| 1 | Travel | | |
| | People | 6 |
| | Days | 3 |
| | Air (per person) | $500 |
| | Lodging (per person per day) | $125 |
| | Per Diem (per person per day) | $50 |
| | Travel per site | $6,150 |
| 2 | Document Shipping | | | |
| | Rate | Qty | |
| | $5 | 100 | $500 |
| 3 | Site Customization | | | | |
| | Role | Rate | Hours | Total |
| | Project Manager | $ 120.85 | 40 | $ 4,834.00 |
| | Technical Lead | $ 139.30 | 40 | $ 5,572.00 |
| | Technical Developer | $ 139.30 | 40 | $ 5,572.00 |
| | Design Lead | $ 90.92 | 40 | $ 3,636.80 |
| | Technical Writer | $ 74.25 | 20 | $ 1,485.00 |
| | | | | $ 21,099.80 |
| Total cost per site | $ 27,749.80 |
| Sites | 2 |
| Site specfic costs | $ 55,499.60 |
| Liscenes | | |
| 1 | | Cost per user per month | $600 |
| | Users | 500 |
| | Months | 6 |
| | | $1,800,000 |
Total cost $2,188,007.58
| Total Costs | |
| Base Year | $1,228,114.60 |
| Option 1 | $1,077,362.98 |
| Option 2 | $2,188,007.58 |
| Total | $4,493,485.16 |