Attachment 3 - Price Schedule Division Breakout.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C26025R0020
About this file
This is a pricing template spreadsheet file (Attachment 3 - Price Schedule Division Breakout) related to a construction project at the Vancouver VA Community Living Center. The file appears to be a template for contractors to provide detailed cost breakdowns by construction division for installing an access ramp and upgrading exterior egress at Building 1 of the nursing home facility. The project is being managed by the Department of Veterans Affairs Veterans Health Administration VISN 20 under solicitation number 36C26025R0020. As this is a template file, it does not contain actual pricing information or specific requirements beyond being a structured format for submitting construction cost estimates.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| PRICE SCHEDULE BREAKDOWN INSTRUCTIONS | |
| INSTRUCTIONS | |
| 1 | Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary |
| 2 | The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record. |
| 3 | The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables. |
| 4 | Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable. |
| 5 | All pricing is fixed price. |
Proposal Price Schedule
| PRICE SCHEDULE BREAKDOWN |
| RFQ: 36C26025R0020 |
Project Number / Title: 648-22-108 CLC Ramp Project Location: Portland VA Medical Center, Portland, OR
| Rates | Base Item | Alternate 1 | |
| Price | Price | ||
| Division 1 General Requirements | |||
| Division 2 Existing Conditions | |||
| Division 3 Concrete | |||
| Division 4 Masonry | |||
| Division 5 Metals | |||
| Division 6 Woods, Plastic and Composites | |||
| Division 7 Thermal and Moisture Protection | |||
| Division 8 Openings | |||
| Division 9 Finishes | |||
| Division 10 Specialties | |||
| Division 11 Equipment | |||
| Division 12 Furnishings | |||
| Division 13 Special Construction | |||
| Division 14 Conveying Equipment | |||
| Division 21 Fire Suppression | |||
| Division 22 Plumbing | |||
| Division 23 HVAC | |||
| Division 25 Integrated Automation | |||
| Divison 26 Electrical | |||
| Division 27 Communications | |||
| Divison 28 Electronic Safety and Security | |||
| Division 31 Earthwork | |||
| Division 32 Exterior Improvements | |||
| Division Item 33 Utilities |
SubTotals N/A $0.00 $0.00
Period of Performance (FAR 52.211-10) ________ days ________ days
| Mobilization / Demobilization | N/A | $0.00 | $0.00 |
| Insurance / Bonds | N/A | $0.00 | $0.00 |
| Taxes / Other Fees (provide itemized list) | N/A | $0.00 | $0.00 |
| O&M Manuals and Red Line Drawings | N/A | $0.00 | $0.00 |
| Overhead | Rate _______% | N/A | N/A |
| Overhead (daily rate) | Per Day $0.00 | N/A | N/A |
| SubContract Mark-Up | Rate _______% | N/A | N/A |
| Profit | Rate _______% | N/A | N/A |
| SubTotals | $0.00 | $0.00 |
Other Items not Requested Above (provide itemized list) $0.00 $0.00
CONTRACT TOTALS $0.00 $0.00