Attachment 3 - Price Schedule Division Breakout.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
648-22-108 Vancouver CLC Exterior Ramp and Access
Solicitation number
36C26025R0020
Issued by

About this file

This is a pricing template spreadsheet file (Attachment 3 - Price Schedule Division Breakout) related to a construction project at the Vancouver VA Community Living Center. The file appears to be a template for contractors to provide detailed cost breakdowns by construction division for installing an access ramp and upgrading exterior egress at Building 1 of the nursing home facility. The project is being managed by the Department of Veterans Affairs Veterans Health Administration VISN 20 under solicitation number 36C26025R0020. As this is a template file, it does not contain actual pricing information or specific requirements beyond being a structured format for submitting construction cost estimates.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Proposal Price Schedule

PRICE SCHEDULE BREAKDOWN
RFQ: 36C26025R0020

Project Number / Title: 648-22-108 CLC Ramp Project Location: Portland VA Medical Center, Portland, OR

RatesBase ItemAlternate 1
PricePrice
Division 1 General Requirements
Division 2 Existing Conditions
Division 3 Concrete
Division 4 Masonry
Division 5 Metals
Division 6 Woods, Plastic and Composites
Division 7 Thermal and Moisture Protection
Division 8 Openings
Division 9 Finishes
Division 10 Specialties
Division 11 Equipment
Division 12 Furnishings
Division 13 Special Construction
Division 14 Conveying Equipment
Division 21 Fire Suppression
Division 22 Plumbing
Division 23 HVAC
Division 25 Integrated Automation
Divison 26 Electrical
Division 27 Communications
Divison 28 Electronic Safety and Security
Division 31 Earthwork
Division 32 Exterior Improvements
Division Item 33 Utilities

SubTotals N/A $0.00 $0.00

Period of Performance (FAR 52.211-10) ________ days ________ days

Mobilization / DemobilizationN/A$0.00$0.00
Insurance / BondsN/A$0.00$0.00
Taxes / Other Fees (provide itemized list)N/A$0.00$0.00
O&M Manuals and Red Line DrawingsN/A$0.00$0.00
OverheadRate _______%N/AN/A
Overhead (daily rate)Per Day $0.00N/AN/A
SubContract Mark-UpRate _______%N/AN/A
ProfitRate _______%N/AN/A
SubTotals$0.00$0.00

Other Items not Requested Above (provide itemized list) $0.00 $0.00

CONTRACT TOTALS $0.00 $0.00

File details come from the government source that posted it. Updated .