Attachment 3 - Performance Requirements Summary Table (PRST).pdf

PDF 143 KB Posted

Attached to
Solicitation - Submarine High Data Rate (SubHDR) LN-100 Mast Motion Sensor (MMS) Repair, Restoration and Replacement Services
Solicitation number
N6660426R0086
Issued by

About this file

This document is a Performance Requirements Summary Table for SubHDR Materiel Management System (MMS) for the Naval Underwater Warfare Center Division Newport (NUWCDIVNPT NMC). The table outlines detailed performance requirements across six key areas: Incoming Evaluation, Standard Repair, Over and Above Repair, MMS Overhaul, Manufacture of Shop Replaceable Units (SRUs), and Material Management of SRUs, and Non-Recurring Engineering. For each requirement, the document specifies performance objectives, standards, acceptable quality levels (consistently 95%), and monitoring methods. The primary focus is on comprehensive reporting, technical accuracy of repair and replacement activities, documentation of repair statuses, and management of replacement parts and inventory.

The monitoring will be conducted by NUWCDIVNPT NMC, who will review reports and cost estimates for accuracy, performance standards, and timely submission in accordance with specified turnaround times. Contract deliverables are tracked through multiple CDRL (Contract Data Requirements List) documents (A001-A006), with key requirements including repair activity summaries, status reports, replacement part readiness, material inventory tracking, and proactive notification of potential component obsolescence. The performance standards emphasize precise documentation, accurate diagnostics, and maintaining high-quality repair and replacement processes for the SubHDR MMS.

View the file

Other files

File Type Posted
N6660426R00850002.pdf PDF
N6660426R00850001.pdf PDF
Attachment 1 - Pricing Tables.docx DOCX document
Exhibit A - CDRLs.pdf PDF
Solicitation - N6660426R0085.pdf PDF
Attachment 4 - NUWCDIVNPT Cost Proposal Spreadsheet.xlsx XLSX spreadsheet
Attachment 2 - Government Furnished Property.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

v1.3_JANUARY2023

SubHDR MMS

Performance Requirements Summary Table

Requirement (Task number and title from SOW/PWS)

CDRL

(if applicable)

Performance Objective Performance

Standard

Acceptable

Quality

Level

(AQL)

Monitoring Method

4.1.1 Incoming

Evaluation A001

-Receipt of repair activity summary (RAS) report, detailing all failures and recommended corrective actions.

-Receipt of Biweekly status report.

-RAS report are technically correct & diagnostics are accurate. The technical reports accurately reflect repair activities.

Standard met 95% of the time.

NUWCDIVNPT NMC

will monitor the reports and cost estimates for accuracy, Performance

Standards and timely submission in accordance with the turnaround times specified in the applicable

CDRL(s).

4.1.2 Standard

Repair

A001

A002

A003

-Receipt of RAS report documenting all repair and replacement activities, calibration of MMS and reloading of firmware.

-Receipt of report detailing additional failures and recommendations corrective actions for Over and Above repairs (OAR).

-Receipt of report detailing the condition of the MMS and the basis for the BER determination.

-Receipt of Biweekly status report.

-RAS report accurately detail all repair services.

-OAR reports accurately detail failures and recommended corrective actions.

-BER reports accurately detail the condition of the MMS and the basis for the BER determination.

-Biweekly Status

Report accurately details the MMS standard repair status.

Standard met 95% of the time.

NUWCDIVNPT NMC

will monitor the reports and cost estimates for accuracy, Performance

Standards and timely submission in accordance with the turnaround times specified in the applicable

CDRL(s).

4.1.3 Over and

Above Repair

(OAR)

A001

A002

-Receipt of RAS report detailing all recommended corrective actions.

-Receipt of report detailing additional failures and recommendations corrective actions for Over and Above repairs (OAR).

-Receipt of Biweekly status report.

-RAS report accurately detail all repair services.

-OAR reports accurately detail failures and recommended corrective actions.

-Biweekly Status

Report accurately details the MMS OAR repair status.

Standard met 95% of the time.

NUWCDIVNPT NMC

will monitor the reports and cost estimates for accuracy, Performance

Standards and timely submission in accordance with the turnaround times specified in the applicable

CDRL(s).

4.2 MMS Overhaul A001

-Receipt of RAS report detailing all SRU replacement serial numbers, findings and corrective actions.

-Receipt of overhaul report detailing overhaul activities and status.

-Receipt of Biweekly status report

-RAS report accurately detail all repair services.

-Overhaul reports accurately detail replacement of components with new

Shop Replaceable Units

(SRUs).

-Biweekly Status

Report accurately

Standard met 95% of the time.

NUWCDIVNPT NMC

will monitor the reports and cost estimates for accuracy, Performance

Standards and timely submission in accordance with the turnaround times specified in the applicable

CDRL(s).

v1.3_JANUARY2023 documents MMS overhaul status.

4.3.1 Manufacture

of SRUs A004

-Provides new replacement parts

(components and subassemblies) for

SubHDR MMS repairs and overhauls.

-Receipt of Biweekly status report.

-New SubHDR MMS replacement parts are in a RFI condition, meet all performance specifications, and are delivered within the time constraints of the delivery schedule.

-Biweekly Status

Report accurately documents SRU manufacturing status.

Standard met 95% of the time.

NUWCDIVNPT NMC

will monitor the reports and cost estimates for accuracy and timely submission in accordance with the turnaround times specified in the applicable

CDRL(s).

4.3.2 Material

Management of

SRUs

A004

-Provide material management of manufactured SRU replacement parts MMS replacement units and

Government Furnished

Material (GFM)

-Receipt of Biweekly status report.

-Documentation of the use of replacement parts, replacement units and material inventory levels are current and accurate.

-Biweekly Status

Report accurately documents material inventory levels and provide recommendations for replacement parts.

Standard met 95% of the time.

NUWCDIVNPT NMC

will monitor the reports and cost estimates for accuracy and timely submission in accordance with the turnaround times specified in the applicable

CDRL(s).

4.4 Non-Recurring

Engineering A006

-Provide written notice to

COR upon learning a component or item is to become obsolete

-Provide a resolution plan and recommendations on how to address the replacement of the item that is to become obsolete

Resolution Plan accurately details the reasons for obsolescence (e.g. end of life, non-procurable, etc.)

-Resolution Plan accurately presents recommended corrective actions of the obsolete part and technically defines potential item replacement

Standard met 95% of the time.

NUWCDIVNPT NMC

will monitor the reports and cost estimates for accuracy, Performance

Standards and timely submission in accordance with the turnaround times specified in the applicable

CDRL(s).

File details come from the government source that posted it. Updated .