ATTACHMENT 3 Paint Coating Form.pdf
PDF 274 KB Posted
- Attached to
- Emsworth Miter Gate Cylinders Federal contract opportunity
- Solicitation number
- W911WN22Q0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911WN22Q0005 00001.pdf | ||
| ATTACHMENT 5 LRP Security Information Sheet - CUI (May 22).xlsx | XLSX spreadsheet | |
| ATTACHMENT 2 Submittal Register.xlsx | XLSX spreadsheet | |
| ATTACHMENT 1 Reference Drawings.pdf | ||
| W911WN22Q0005 .pdf | ||
| ATTACHMENT 4 Table 1 (Nickel) Chromium Piston Rod Coating Requirements.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: / / M T W Th F S Su
Project #:
Inspector:
QC Mgr Owner
Project/Client: Contr
Location:
Description: DFT Sheet NCR/CAR
Requirements:
Contractor: Spec # Revision #
1 Pre Surface Pep/Condition & Cleanliness 2 Surface Preparation Monitoring 3 Post Surface Preparation/Cleanliness & Profile 4 Pre Application Prep/Surface Cleanliness 5 Application Monitoring/Wet Film Thickness (WFT) 6 Post Application/Application Defects 7 Post Cure/Dry Film Thickness (DFT) 8 Nonconformance/Corrective Actions Follow-up 9 Final Inspection
Approved By:
New Maint Primer/Paint Age/Dry/Cure Time (Indicate AM or PM) : : : :
Steel Galvanize Concrete Other Dry Bulb Temp0 (C/F)
Hazard Sample Report # Wet Bulb Temp0 (C/F)
Degree of contamination: % Relative Humidity % % % % Test: Cl µg/cm2 / ppm Fe ppm pH Surface Temp0
(C/F) Min/Max / / / / Degree of Corrosion: Dew Point Temp0 (C/F)
Scale Pitting/Holes Crevices Sharp Edges Wind Direction/Speed Weld Moisture Oils Other Weather Conditions:
Painted Surface Condition:
Dry to: Touch Handle Recoat Start Time : Finish Time : Est. Sq/ft.
Dry/Over Spray Runs/Sags Pinholes Holidays Abrasion Fall Out Other Generic Type: Qty Mixed:
Manuf.: Mix Ratio:
Prod Name: Mix Method:
Solvent Clean Hand Tool Power Tool Prod #: Strain/Screen:
HP Wash PSI Other Color: Material Temp: F Abrasive Blast Abrasive Type Sample Kit Sz/Cond.: Sweat-in Time: Min/Hrs
Blast Hose Size Nozzle Size / PSI Shelf Life: Pot Life: Min/Hrs
Air Supply CFM Air Supply Cleanliness Reducer #:
Water/Oil Trap Check Equipment Condition Check (A) Qty Added: Pt/Qt/Gal
(B) % by Vol: %
(C) Specified WFT Avg: Mils
Job Specification SSPC/NACE - SP- Reducer: Achieved WFT Avg: Mils
SSPC/NACE Spec / Visual Stds Profile Check: Disc Tape Gauge Pump Pot Hose Dia. Air Check Specified mils avg. / Achieved mils Ratio/Size Hose Lng. SEP/Trap Surface effect on DFT Gauge/BMR mils GPM/CFM Spray Gun Filter
PSI Tip Sz. Agitator
Total Avg
DFT
Inspector's Signature Date
Airless/Conv. Spray Brush Roller Other
Dry Film Thickness DFT Last
Coat DFT This
Coat Spec Avg.
DFT
Gage Type /
Model Gage
Serial #
Batch #'s
Gage Calib.
Verified
Pg. Of COPY To:
Hold Point Inspections Performed
Ambient Conditions
Surface Cleanliness & Profile Measurement
Surface Preparation
Description of Areas & Work Performed
Attachments:
Paint Inspection:
Daily Coating Inspection Report
Primer Intermediate Topcoat Touch-up
Surface Conditions
Start Time: Finish Time: Est Sq/ft:
Application o o o o o o o o o o o o o o o o o
H4TSTJPP
Typewritten Text
ATTACHMENT 1
H4TSTJPP
Typewritten Text
File details come from the government source that posted it. Updated .