Attachment_3_Oregon_II_Davit_Operation___Maintenance_Manual.pdf
PDF 18 MB Posted
- Attached to
- NOAA Ship Oregon II Replacement Rescue Boat
- Solicitation number
- 1305M226Q0051
About this file
This is an Operation & Maintenance Manual for the NOAA/Oregon II research vessel's Miranda davit and BHY 5300 winch systems, produced by Umoe Schat-Harding Limited. The manual comprises five parts: Part One contains general information including specifications, operating procedures, and fault-finding guidance; Part Two includes technical drawings and schematics; Part Three provides service and spare parts lists; Part Four addresses contract-specific information; and Part Five contains certification documentation.
The manual details the Miranda MRT 3900 gravity davit system, which is designed for rescue boat deployment with a 3,900 kg design load and lowering speeds of approximately 33 m/min. The BHY 5300 hydraulic winch features enclosed gearing running in oil bath, centrifugal brakes for speed control, and both power hoisting and manual hand crank backup capabilities. Key operational procedures include launching, recovery, and power pack startup/shutdown protocols. Maintenance requirements are specified at weekly, six-weekly, and annual intervals, with specific attention to lubrication points (19 for the davit, 2 for the winch), brake lining inspections, and rope maintenance. The document includes performance specifications for the 37.3 kW electric motor, 33 USGPM hydraulic pump capacity, and 2,500 psi maximum working pressure. Spare parts lists are provided for davit components (sheaves, rollers, grease nipples), winch assemblies (brake units, bearings, seals), and hydraulic systems. Service rates effective December 1, 2011 range from €774 per nine-hour onshore workday to €2,064 per 12-hour offshore working day, with test equipment rental available at €315–€420 per day. Various certificates of conformity and test documentation from third-party suppliers including Pfeifer Rope & Tackle, Ensign Hydraulic Services, Crosby Group, and The Solid Swivel Company Limited validate equipment compliance with applicable standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 5 Sol 1305M226Q0051 QA 0003.pdf | ||
| Sol_1305M226Q0051_Amd_0002.pdf | ||
| Sol_1305M226Q0051_Amd_0001.pdf | ||
| Attachment_4_Sol_1305M226Q0051_Q_A_0001.pdf | ||
| Sol_1305M226Q0051.pdf | ||
| Attachment_1_Price_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_2_Statement_of_Need.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scan Notes:
The parent pages were 8-1/4 x 11-5/8
| Page(s) | |
| Title | 1 |
Parts Index 2
Part 1 3 - 24
Part 2 25 - 37
Part 3 38 - 46
Part 4 47
| Page 1 |
| Scan Notes |
| Page 2 |
| Page 3 |
| Page 4 |
| Page 5 |
| Page 6 |
| Page 7 |
| Page 8 |
| Page 9 |
| Page 10 |
| Page 11 |
| Page 12 |
| Page 13 |
| Page 14 |
| Page 15 |
| Page 16 |
| Page 17 |
| Page 18 |
| Page 19 |
| Page 20 |
| Page 21 |
| Page 22 |
| Page 23 |
| Page 24 |
| Page 25 |
| Page 26 |
| Page 27 |
| Page 28 |
| Page 29 |
| Page 30 |
| Page 31 |
| Page 32 |
| Page 33 |
| Page 34 |
| Page 35 |
| Page 36 |
| Page 37 |
| Page 38 |
| Page 39 |
| Page 40 |
| Page 41 |
| Page 42 |
| Page 43 |
| Page 44 |
| Page 45 |
| Page 46 |
| Page 47 |
| Page 48 |
| Page 49 |
| Page 50 |
| Page 51 |
| Page 52 |
| Page 53 |
| Page 54 |
| Page 55 |
| Page 56 |
| Page 57 |
| Page 58 |
| Page 59 |
| Page 60 |
File details come from the government source that posted it. Updated .