Attachment_3_Oregon_II_Davit_Operation___Maintenance_Manual.pdf

PDF 18 MB Posted

Attached to
NOAA Ship Oregon II Replacement Rescue Boat
Solicitation number
1305M226Q0051
Issued by

About this file

This is an Operation & Maintenance Manual for the NOAA/Oregon II research vessel's Miranda davit and BHY 5300 winch systems, produced by Umoe Schat-Harding Limited. The manual comprises five parts: Part One contains general information including specifications, operating procedures, and fault-finding guidance; Part Two includes technical drawings and schematics; Part Three provides service and spare parts lists; Part Four addresses contract-specific information; and Part Five contains certification documentation.

The manual details the Miranda MRT 3900 gravity davit system, which is designed for rescue boat deployment with a 3,900 kg design load and lowering speeds of approximately 33 m/min. The BHY 5300 hydraulic winch features enclosed gearing running in oil bath, centrifugal brakes for speed control, and both power hoisting and manual hand crank backup capabilities. Key operational procedures include launching, recovery, and power pack startup/shutdown protocols. Maintenance requirements are specified at weekly, six-weekly, and annual intervals, with specific attention to lubrication points (19 for the davit, 2 for the winch), brake lining inspections, and rope maintenance. The document includes performance specifications for the 37.3 kW electric motor, 33 USGPM hydraulic pump capacity, and 2,500 psi maximum working pressure. Spare parts lists are provided for davit components (sheaves, rollers, grease nipples), winch assemblies (brake units, bearings, seals), and hydraulic systems. Service rates effective December 1, 2011 range from €774 per nine-hour onshore workday to €2,064 per 12-hour offshore working day, with test equipment rental available at €315–€420 per day. Various certificates of conformity and test documentation from third-party suppliers including Pfeifer Rope & Tackle, Ensign Hydraulic Services, Crosby Group, and The Solid Swivel Company Limited validate equipment compliance with applicable standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scan Notes:

The parent pages were 8-1/4 x 11-5/8

Page(s)
Title1

Parts Index 2

Part 1 3 - 24

Part 2 25 - 37

Part 3 38 - 46

Part 4 47

Page 1
Scan Notes
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
Page 25
Page 26
Page 27
Page 28
Page 29
Page 30
Page 31
Page 32
Page 33
Page 34
Page 35
Page 36
Page 37
Page 38
Page 39
Page 40
Page 41
Page 42
Page 43
Page 44
Page 45
Page 46
Page 47
Page 48
Page 49
Page 50
Page 51
Page 52
Page 53
Page 54
Page 55
Page 56
Page 57
Page 58
Page 59
Page 60

File details come from the government source that posted it. Updated .