This document is a Statement of Work (SOW) for a weather enclosure to be used on a 199" radius horizontal tank. The SOW requires a metal enclosure that provides temporary weather protection for a piping connection, with specific requirements including:

The enclosure must be sufficiently rigid to withstand jacking forces when compressing the gasket against the tank base. The contractor must submit fabrication drawings and objective quality evidence showing three similar completed projects before fabrication begins. Written authorization from Code 2380.2 is required to commence work. The enclosure can be delivered fully assembled or in kit form, with assembly possible using a warehouse forklift and standard hand tools. A minimum of three enclosures are required, and the design must be functionally equivalent to the attached sketches, featuring all-metal construction. Non-metallic items will be provided by others, and specific dimensions are not critical beyond maintaining the 199" radius sealing frame wall construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

[Type here]

WEATHER ENCLOSURE

Statement of work

(1) Supply a metal enclosure that will provide temporary weather protection for a piping connection on the lower side of a 199” radius horizontal tank.

The enclosure must be sufficiently ridged to withstand jacking forces applied against the base of the structure to compress the enclosure gasket against the tank.

(2) The attached sketches describe the enclosure currently in use. The new enclosures must be functionally equivalent to the existing design. Aside from the radius of the sealing frame wall construction and specific dimension are not critical but must feature all metal construction.

(3) The non metallic items in Figure 12 and Figure 14 will be provided by others.

(4) Prior to any fabrication the contractor must submit a package containing:

a. A complete set of fabrication drawings.

b. Objective Quality Evidence that shows 3 examples of similar projects completed by the contractor.

(5) No fabrication may commence until written authorization from Code

2380.2 is provided signifying technical acceptability of the design.

(6) The enclosure may be delivered fully assembled or in kit form provided assembly can be accomplished with a warehouse forklift and standard hand tools.

(7) A minimum of 3 enclosures are required.

Figure 1: Right Assembly

RIGHT ASSEMBLY

82.00

87.43

35.10 1.188

80.75

39.42

26.42

18.375

35.10

36.00

135°

A

DETAIL A

82°

45°

1 TYP

45° 63.7

65.7

45°

See Detail Below

46.33

80.188

Figure 2: Left Assembly

Do not provide HVAC cutout

UNCLASSIFIED

LEFT ASSEMBLY

79.562

1.188

8.25 13.41

38.313

39.42

22.00

19.812

48.47

B

DETAIL B

135°

82°

1 TYP

45°

1.312

46.80

48.66

135° 45° 45°

63.67

65.71

45°

73.812 82.25

Figure 3: Front Frame

Front Wall Frame

3/8Typ. 3/8

131.62

1.312

129.00

1.312

39.125

19.1919.19

132.00

35.875

36.500

1.3121.312

39.125

1.312''

1.312''

33.25''

35.88'' x 2

132.00''

45° 45°

36.25

Figure 4: Rear Frame

82 1/16

79.56

50.81

26.00

51.81

50.50

132.00

1.312

52.00 51.00

REAR ASSEMBLY

O .531 THRU

19.00

13.50

45v cut to form right angle with side frame

45v cut to form right angle with side frame

1 Typ.

See "Rear Wall" (Figure 6) for Details

33.25

Holes for table slots

Figure 5: Whole Frame

FRAME

132.00

46.25

85.75

132.0

51.0

80.0

E

DETAIL E

C

DETAIL C

D

DETAIL D

13.5

Approx. Tie-Down Locations

See Figure 7 for Left & Right Brace Details

See Table support drawings for more details (Figure 17)

See Table support drawings for more details (Figure 17)

Figure 6: Table and Hatch Frames

REAR WALL

FRONT WALL

REAR WALL RIGHT VERTICAL BRACE

REAR WALL LEFT VERTICAL BRACE

TABLE & HATCH FRAMES

50.81

3.250

3.00 19.25

35.50

1.312

.375

131.624

3.5 .375

47.812 64.062

80.312

1.312

.188

1.5

1.5 .188

82.062 1.188

1.312O .531

O .531 82.062

1.188

1.50

1.50

.438

.438

Through hole for Retaining Rod.

(Figure 10)

Figure 7: Pad Eyes

(4) REQUIRED

NOTE: SAME DIMENSIONS USED FOR BOTH SIDES

PAD EYES

(For Pivoting Sealing Panels)

R 1.0O .531

2''

3'' 4''

.25

F

DETAIL F

.625

.188.188

30''

30''

Padeyes centered on frame and parallel with pivot padeyes on opposite side

Figure 8: Roofing

138''

ROOF #1 ROOF #3

ROOF #2 (x2)

1.5'' (Typ.) 82°

132''

ROOF SUPPORT

#1

ROOF SUPPORT

#2

2 typ.

ROOFING

8''

1" Tab, 45v Bend, 1" Tab

9''

62.81''

3.00''

1.50'' 30.31'' 4.50''

138.00''

40''

1" Tab, 82v BendG

DETAIL G

3.50''

1.25''.438''

3.75''

132''

1.500''

8°

8v Cutout 1 5/16" Deep (Both Sides)1.312''

ROOF #4

132''

2.0''

2'' 1.50''

Can be bent or welded to achieve an 8v angle (From 90v)

40''

Figure 9: Roof Install

ROOF INSTALL

ROOF #4 ROOF #1

ROOF #2ROOF #2

ROOF #3

ROOF SUPPORT#2

(Dotted Line) Butt to Inside of Flange

Roof #3 Mounted Flush to Roof #2 ROOF SUPPORT #1

Flush to Outside of Flange. Position Vertically to Meet Roof #1

Rear Wall Flashing (Centered)

Pad Eyes for Lifting See Figure 19 for Detail

REAR WALL

FLASHING

(131.5" LONG)

1.3

98°1

1.6 H

DETAIL H

I

DETAIL I

J

DETAIL J

K

DETAIL K

3/8 TYP.

3/8

Pad Eye to Limit Swaying

Figure 10: Hatch

O .25'' 1/16" Chamfer24

34''

RETAINING ROD

23.5" TALL X 27.5" WIDE

DOOR

Hinges Placed To Fit

Retaining Rod

27.5" x 1" Hanger Plate Mounted 1/16" Above Door

HATCH

L

DETAIL L

Holes for Push Pins (PC 13)

Figure 11: Hatch Sleeve and Flashing

18''

20''

28''

25''

20 Mil Green Poly

SLEEVE

(Sail Loft)

Drawstring

HATCH J-CHANNEL

HATCH SILL

28''

1''

1.5''

98°

2''

1.5''

1''

90° (Typ.)

Sill

J-Channel

J-Channel

26''

Sleeve Installed Using Velcro

HATCH SLEEVE & FLASHING

x2

M

DETAIL M

O 20''

Figure 12: Sealing Panels

63''

14''R 200''

14''

132''

SEALING PANELS

(Sail Loft)

2 REQ.

2 REQ.

Figure 13: Door Install

DOOR INSTALL

8.5

11.0

22.75

72.0

Figure 14: HVAC and Lighting

HVAC & LIGHTING

Install J-Channel Around 3 Sides of the Opening

Install HVAC Unit per Manufacturers Instructions

1.5''

1''

2''

(3) Pieces Total:

(2) x 26.188 Long

(1) x 18.188 Long

HVAC

J-CHANNEL

Hang (2) Light Fixtures PC 26, per Manufacturers Instructions to Fit

N

DETAIL N

Do not provide HVAC cutout

Figure 15: Sealing Frame Parts

R 199''

O17/32 Centered Length and Widthwise

62.85'' Short to Short

FRAME 1

FRAME 2

FRAME 3

(2) REQUIRED

129.5''

1.75''

1.75''

1.75''

1.75''

134.63''

SEALING FRAME PARTS

(4) REQUIRED

(2) REQUIRED

Figure 16: Sealing Frame Assembly

TOP BOTTOM

Frame 1

Frame 1

Frame 2

Frame 3

Install Flex-A-Rail Along Bottom Perimeter

Compressible Bulb Seal Installed Along Top

NOTE: All Corners Use the Same Pattern

SEALING FRAME ASSEMBLY

Notice Flanges are Butt Together

O

DETAIL O

P

DETAIL P

Q

DETAIL Q

Figure 17: Table Assembly

39.5''

17''

1'' 1''

3'' 19.25''

35.5'' 3'' .75''

75v Bend Down

90v Bend Up

4 REQUIRED

TABLE ASSEMBLY

Bends May Be Substituted With Welds per Gen Note 2.2

23''

135° 135°

R DETAIL R

FRONT WALL TABLE

S

DETAIL S

REAR WALL TABLE

Figure 18: Pad Eyes for Lifting

2.625

2.000

O 1.000

R 1.312

1.312

.750

82°

(FOR LIFTING ATTACHMENTS)

PAD EYES

1/8" Camfer

2 REQUIRED

O 1.000

R 1.312

5.312

90°

2.625

1/8" Camfer

1.856

1 REQUIRED

3/8 TYP3/8

3/8 Typ.3/8

File details come from the government source that posted it. Updated .