Attachment 3 - Menu Board Drawing.pdf

PDF 3 MB Posted

Attached to
Warrior Restaurant BLDG 7011 Drive-Thru Upgrade Federal contract opportunity
Solicitation number
Amendment_01_W911RX-23-Q-0010
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DT FLEX INSTRUCTIONS

C102376-001 08-28-19

Phone: 1-262-782-6000 • Website: www.mainstreetmenus.com P2

*ONCE INSTALLED DO NOT TURN OFF POWER TO SYSTEM WITHOUT TURNING POWER OFF EACH

DIGITAL SCREEN VIA REMOTE. SEE DIGITAL SCREEN INSTRUCTIONS

(PACKED 1 PER SCREEN) FOR MORE INFORMATION*

INSTALL FOUNDATION AND LOCATION PAGES 2-5

ELECTRICAL WIRING PAGES 6

INSTALL SCREENS PAGES 7-11

INSTALL GRAPHICS PAGES 12

ON/OFF

SWITCH

**LIGHTING ONLY**

*DIGITAL SCREEN

POWERED DOWN

PER SCREEN

INSTRUCTIONS*

ELECTRICAL

SEE DIAGRAM Q

3 SCREEN MENU

SEE DIAGRAM S

1 AND 2

SCREEN MENU

7.38

*OPTIONAL

SPEAKER/MIC*

1 It is the intent of these drawings to be used as guidelines only, for the installation of the equipment illustrated. The information contained in these documents has set forth certain assumed conditions. It shall be the responsibility of the purchaser and his contractor to verify these assumptions with local governing agencies. In addition, certain assumptions have been made and noted on the drawings and specifications for soil bearing capacity. It shall be the responsibility of the purchaser and his contrac-tor to verify these assumptions and make the necessary revisions to the structure and the parking lot design, as indicated on the site documents provided by the owner/tenant. It shall be the responsibility of the purchaser and his contractor to submit these documents to the proper governing agencies for their review and to make all necessary modifications and/or revisions.

NOTE: For new concrete installations, it is possible that you have only received the necessary hardware to mount the pedestal base. This hardware is listed under item #1, below.

1. Before beginning installation, check that you have all required hardware:

MENU BOARD HARDWARE

A. One (1) Template B. Four (4) Anchor Bolts C. Eight (8) Hex Nuts

Determine whether the menu board will be installed on a curved or straight drive (see Diagram A). Follow the proper detail for information about locating the menu board and optional speaker post. Note: These diagrams are to be used as a guide only;

if they cannot be followed exactly, some modification may be made to allow for the best suited location for your installation.

9' - 7 " (292.1cm)

MENU DISPLA Y

6' - 5 " (195.6cm)

SPEAKER/MICROPHONE

DIAGRAM A see Diagram B & C for dimensions

MENU BOARD

LAYOUT A

24"

20"

CURVED DRIVE

STRAIGHT DRIVE

SPEAKER/MICROPHONE

COMM. SYSTEM CONDUIT

TO SERVICE WINDOW

1' - 4” (40.6cm)

7' - 0" (213.4cm)

20"

2'

120VAC

SERVICE

MENU

DISPLAY

SPEAKER/MICROPHONE

COMM. SYSTEM CONDUIT

TO SERVICE WINDOW

MENU BOARD

LAYOUT B

45˚

9' - 7 (292.1cm)

Phone: 1-262-782-6000 • Website: www.mainstreetmenus.com P3 C102376-001 08-28-19

Foundation The high voltage conduit must be installed in place by a qualified contractor. It runs from the power source to the menu board location. A conduit stub should protrude 4" above the concrete slab (see Diagram Q) Use the template supplied for the correct relation between the mounting bolts and the conduit location. Power and ground leads should be pulled through the conduit approximately 12" beyond the conduit stub, and be accessible at the time of final wiring. Note: The 120VAC power lines run up the inside back of the pedestal base (see Diagram CC, Mounting Template) After the location is established, pour the concrete footing per local codes. While the concrete is still soft, insert the four (4) anchor bolts. Use the supplied template as a bolt and conduit locator. Anchor bolts should be 2-3/4" above grade (see Diagram F, Foundation. Note: Prior to placing the template down, one (1) nut must be threaded onto each anchor bolt and sunk into the concrete, flush with the top of the nut. Place the template over the eight (4) anchor bolts and secure in place with four (4) more nuts.

Phone: 1-262-782-6000 • Website: www.mainstreetmenus.com P4

DIAGRAM Q

Install electrical conduit (per template)

3/4" dia. X 30" M314-90 Grade 55 anchor bolts and leveling nuts

Concrete cassion must conform to local codes

(2' diameter)recommended.

2-3/4" 4"

Mounting Template

5’9” DEEP

*1-3 SCREEN DIGITAL

MENU

CONDUIT 1.5” with pull string

FUTURE NEEDS/LOOP WITH SPEAKER/MIC

CONDUIT 2” with pull string

FOR DATA/CAT 5 OR

VIDEO HDMI

C102376-001 08-28-19

DT FLEX INSTRUCTIONS

DIAGRAM CC

Mounting Template

FRONT OF

HOLE SIZES:

A:

B: 2-5/8" SQUARE HOLE................(1 REQD)

0.813" DIA. HOLE.......................(4 REQD)

Template & Foundation

18.50

12.25

Ă .88 THRU

8.00

8.00

7.00

4.00 1.75

4.50

*STANDALONE*

conduit 1” (1) 120V STATIC (LIGHTING) W/ pull string to electrical panel

(1) 120V DIGITAL W/ pull string to electrical panel

*SECOND LINE OF 120V

NOT REQUIRED IF ALL

DIGITAL

***2X 120v LEADS FROM MENU

LABELED DIGITAL AND STATIC***

e

18.181118.888881188888.8118188881881118818.18888888888888888888.8888888..8888....8888....8

12.1111122.222221211111222222221111122222221112112222222222222222222222....2.222222....2222222

ĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂ .888888888888888888888888888888888888888888888 THRUTTTTTHHHHHRURRRRRUUHRUHRUTTTHHHHRRRRTTHRTHRRRUUHHHHRRRUHHHHRRRURRRUUU

8.08888888.0000008.0888888 08.00000088888888.0.00000088888 00000088888 0088888 0000000888888.88888888.8.0088888...000000008888...00088888888...0000000000000000000000000000000000000000000000000000000000000000

8.08.0888888.08.00000088.0888888 000000008 08.0888888 00008.000088888 00000088 08.008.08.008.08.888888 00008888888888888.0008..008.088...0000888888...0088.0000000000000000000000000000000000000000000000000000000000000000

7.07777 0000007.07.0777 07.0000007.0077777777.0000007.07777777.07.00000077777.00007.7777.000777 00007777.77 0077.0..00077..007777.00000077777..0000000000000000000000000000000000000000000000000000000000000000000000

4.04.04444 0000004444 00000444 00000004444.0000000.04444 004.04444.000044444.044.444444444444..0000000044..00.0000000000000000000000000000000000000000000000000000000000 1.71.71.11.77771.7111 7771111 777771.7111.77777.777777.7.777..7777..7775555555555555555555555555555555555555555555555555555555555555

444.54.54.5444444.54.554.555544444.4.554.55554 544 5555555.54.54444 55555544 544 554.54444 5555544444 5.555554.54444444 5555444.5554444444...554.555555..555555500000000000000000000000000000000000000000000000000000000000000000000000000000

2”

HDMI

Spare

1.5 or2”

1” 120v

1” spare

Set template on a 45* To the drive thru so that the I “ conduit For loop is perpendicular to drive thru.

All conduit is I.D.

Measurements

Set template on a 45* To the drive thru so that the I “ conduit For loop is perpendicular to drive thru.

After the concrete has set, remove template and discard. NOTE: Do not discard the four (4) or, (8) nuts that were just removed.

The pedestal base plate is now ready to be mounted. Remove any concrete residue from the threads of the anchor bolts.

Thread one (1) nut onto each bolt until it stops; then put a flat washer over each bolt. Feed the 120VAC power lines and ground lead into the inside back hole of the bottom of the pedestal base (see Diagram G). Set pedistal base onto anchor bolts, place a flat and

The top surface of the pedestal base should be rough leveled at this time. Adjust the upper and lower hex nuts until the pedestal base is level and tighten. NOTE: Final leveling can be done after the menu board is in place (if required). Use the same procedure as above.

Prepare the pedestal base for mounting the menu board in the following manner: (See Diagram G).

Remove the high voltage access cover.

Locate the power leads. These will be hanging from the opening in the bottom of the menu board.

Lift the menu board into position, so that the holes in the pedestal base align with the holes in the bottom of the unit.

Before placing the menu board all the way down, feed the power leads and ground lead from the menu board opening into the menu post opening.

The menu board is factory wired and needs only to be energized on the job site. This should be done by a qualified electrician only. No disassembly is required. FOR MENU BOARDS WITH BUILT-IN SPEAKER/MICROPHONE ONLY: If your menu board has a built-in speaker, run low voltage wires for speaker/microphone unit inside of pedetal base hole, Connect speaker/microphone to communication system, as indicated (See Diagram H)

Connect unit power leads and grounding conductor (green lead) to the power source. Power source must be 120VAC, 60 Hz. Energize the circuit to check the operation. WARNING: DO NOT CONNECT THE SPEAKER WIRE TO 120VAC (POWER SOURCE).

Connect the speaker/microphone (if provided) to the internal communication system (see Diagram H)

.Replace the high voltage access cover.

to front of menu board.

Mounting Menu Board to Foundation lock washer over each bolt, and thread on nut.

Phone: 1-262-782-6000 • Website: www.mainstreetmenus.com P5

DIAGRAM S

Install electrical conduit (per template)

3/4" dia. X 30" M314-90 Grade 55 anchor bolts and leveling nuts

Concrete cassion must conform to local codes

(2' diameter)recommended.

2-3/4"4"

Mounting Template

5’9” DEEP

*1-3 SCREEN

DIGITAL MENU

WITH SPEAKER/

MIC AND

LOOP DETECTOR

CONDUIT 2” With pull string FOR

DATA/CAT 5 OR VIDEO HDMI

CONDUIT 1.5” With pull string FOR

LOOP, SPEAKER AND MIC

conduit 1” LOOP FROM STREET

C102376-001 08-28-19

LOOP

DT FLEX INSTRUCTIONS

conduit 1” (1) 120V STATIC (LIGHTING) W/ pull string to electrical panel

(1) 120V DIGITAL W/ pull string to electrical panel

*SECOND LINE OF 120V

NOT REQUIRED IF ALL

DIGITAL

***2X 120v LEADS FROM MENU LABELED DIGITAL AND STATIC***

***2X 120v LEADS FROM MENU

LABELED DIGITAL AND STATIC***

Phone: 1-262-782-6000 • Website: www.mainstreetmenus.com P6

WIRING DIAGRAM EXAMPLE

**ALL MEDIA PLAYERS IN STORE**

1. From foundation to 2 pole switch connect 2 lines of 120V. 1 digital. 1 static (lighting).

2. From foundation bring up all HDMI

3. Run one HDMI to each screen for picture.

4. Run second HDMI to each screen for redundancy. *OPTIONAL*

5. Run 120 volt power 3 prong cord from each digital screen to DIGITAL receptacle in junction box/pedestal.

6. Run 120 volt power 3 prong cord from each static enclosure to STATIC (LIGHTING) receptacle in junction box/pedestal.

BACK VIEW

RACEWAY

HDMISPEAKER/MIC120 VAC

1.5” CONDUIT 1” CONDUIT (2X 120VAC)

FOR FUTURE

ORDER CONFIRMATION

SYSTEM

C102376-001 08-28-19

DIGITAL STATICSTATIC

DT FLEX INSTRUCTIONS

POWER 120V

TOTAL

EA SAMSUNG SCREEN 4.25AMPS

EA PEERLESS SCREEN 1.55AMPS

EA STATIC MODULE .5AMPS

STATIC (LIGHTING)DIGITAL

EACH

RECEPTACLE

CONTAINS

10 AMP

INLINE FUSE

TOTAL 4

*EACH RECEPTACLE CONTAINS 10 AMP INLINE FUSE.

4 RECEPTACLES TOTAL. 40 AMP TOTAL*

***2X 120v LEADS FROM MENU LABELED DIGITAL AND STATIC***

P7

ASSEMBLY

Step 1 ACCESS REAR PANELS

**STATIC/BACKLIT PANELS FACTORY INSTALLED**

**DIGITAL SCREENS ARE PACKED IN THEIR ORIGINAL

PACKAGING WITH BRACKETS FACTORY INSTALLED**

Back panels for digital screen are factory installed. Remove these back panels by using the provided T45 driver to remove the 4 pin-in-torx screws.

C102376-001 08-28-19

P8

Step 3 SECURING PEERLESS SCREEN

Step 2 LOADING PEERLESS SCREEN

Once in place add the (2) top screws to the screen mounting brackets.

Tighten the bottom screws. Do not over tighten.

Place digital screen on top of support tube with only the (2) bottom screws attached to the screen mounting brackets at an angle making sure the screws are engaged in the v-shaped openings of the cross bar supports and slowly tilt the screen up until it is vertical.

**Note: You may want to first place a shim underneath the screen to lift it up about a ¼” so the screws are above the v-shaped cutouts.**

C102376-001 08-28-19

SUPPORT TUBE

**PEERLESS SCREEN ONLY**

P9 C102376-001 08-28-19

Step 5 LOADING SAMSUNG SCREEN Place digital screen on top of support tube with only the (2) bottom screws attached to the screen mounting brackets at an angle making sure the screws are engaged in the v-shaped openings of the cross bar supports and slowly tilt the screen up until it is vertical.

**Note: You may want to first place a shim underneath the screen to lift it up about a ¼” so the screws are above the v-shaped cutouts.**

Step 4 PREPARE FOR SAMSUNG INSTALL Samsung screen will arrive with a spacer on the left and right side of the structure. It is held in place with 3M dual lock and is wrapped with masking tape during shipping.

Remove the tape before inserting screen.

SUPPORT TUBE

**SAMSUNG SCREEN ONLY**

MASKING TAPE

3M DUAL LOCK

P10 C102376-001 08-28-19

Step 6 SECURING SAMSUNG SCREEN Move screen over using the slots shown to match up with filler strip.

Once in place add the (2) top screws to the screen mounting brackets.

Tighten the bottom screws. Do not over tighten.

Step 7 ACCESS PEDESTAL JUNCTION Remove the back pedestal cover using a T25 driver to remove (4) pin-in-torx screws. The bottom of the cover fits into a groove and then is tilted into place. Review wiring diagram on page 6 and the following steps.

DT FLEX INSTRUCTIONS

Pin-in-torx screws

Ramp slides into groove

Groove

Step 8 CONNECTING POWER Static enclosures are factory installed and by now all screen are in place.

Access digital screen from back panel by removing the 4 security pin-in-torx hardware using the provided T45 driver. Static enclosures can be accesses from the front door using a phillips head screw driver. Drop the three prong power cord down into thte raceway and feed to pedestal base junction.

PEDESTAL BASE JUNCTIONRACEWAY

EXAMPLE ALL DIGITAL

Phone: 1-262-782-6000 • Website: www.mainstreetmenus.com P11 C102376-001 08-28-19

Step 9 CONNECTING HDMI Access digital screen from back panel by removing the 4 security pin-in-torx hardware using the provided T45 driver. Feed HDMI from pedestal base junction access panel on screen. 2 HDMI cords if hooked up to a redundant media player in store. See screen instructions for screen connections.

PEDESTAL BASE JUNCTIONRACEWAY

EXAMPLE ALL DIGITAL

P12 C102376-001 08-28-19

Step 10 LOADING GRAPHIC INTO STATIC Graphic is placed bewteen two lenses of .06” acrylic and held together with anti-rattle extrusion. The graphic carrier is then lift and dropped behind the door with the grips on the anti-rattle extrusion pointing to the inside of the cabinet.

GRAPHIC

ANTI-RATTLE GRIP POINTED TOWARD INSIDE OF CABINET

LENS

ANTI-RATTLE EXTRUSION DOOR TO

STATIC

DT FLEX INSTRUCTIONS

SECTION A-A

B

DETAIL B

SCALE 1 : 1