About this file
This set of drawings and specifications is for a forest-wide toilet decommissioning and replacement project on multiple ranger districts of the Nez Perce-Clearwater National Forests. The project involves decommissioning and removing several existing wooden pit toilets and vault toilets, and replacing them with new precast concrete vault toilets or wooden vault toilets. Drawings provide site plans showing the specific locations and details for work at Tukaytespe, Five Mile Pond, Coolwater Ridge, Elk Mountain, Pete Forks, Weitas Meadows, and Weitas Guard Station. Additional drawings include details for decommissioning the existing toilets, installing new vault toilets, and constructing single-unit wooden vault toilets. Specifications address requirements for excavation, concrete work, structural components, roofing, siding, doors and windows. The related federal contract opportunity is solicitation number 1240LU23R0018 issued by the Department of Agriculture Forest Service for the forest-wide toilet decommissioning and replacement project on the Nez Perce-Clearwater National Forests.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Forest Wide Toilet Decommission and Install
Nez Perce-Clearwater National Forests Idaho County, Idaho
SHEET
NO. DESCRIPTION
INDEX TO SHEETS
2-8
TITLE SHEET
SITE PLANS
VAULT TOILET DECOMMISSIONING
10 VAULT TOILET INSTALLATION
Site Location Map
16 WOOD TOILET SECTION AA.
VAULT TOILET INSTALL DETAILS
WOOD TOILET DETAILS
WOOD TOILET SECTION BB.
WOOD TOILET FLOOR PLAN
WOOD TOILET DETAILS
WOOD TOILET ROOF PLAN
VAULT TOILET INSTALL SIGNAGE
VAULT TOILET INSTALL ELEVATION
VAULT TOILET INSTALL SECTIONS
Five Mile Pond
Weitas Meadows
Weitas Guard Station
Pete Fork Fork Junction
Tukaytespe'
Elk Mountain
Lookout Butte
Coolwater Ridge
Tom Beal
Split Creek
Sherman Creek
Castle Butte
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
U.S. DEPARTMENT OF AGRICULTURE FOREST SERVICE REGION ONE
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
STAFF OFFICER
AutoCAD SHX Text
FOREST SUPERVISOR
AutoCAD SHX Text
TECH. SERVICES
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text sound engineering practice and approve
AutoCAD SHX Text use prescriptions for the area and with
AutoCAD SHX Text designed in accordance with the land
AutoCAD SHX Text I certify that this project has been
AutoCAD SHX Text
RECOMMENDED:
AutoCAD SHX Text it for construction.
AutoCAD SHX Text
DISTRICT RANGER
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
DATE
AutoCAD SHX Text /s/
AutoCAD SHX Text /s/
AutoCAD SHX Text /s/
AutoCAD SHX Text for
AutoCAD SHX Text
NEZ PERCE - CLEARWATER N.F.
Middle Fork of the Clearwater River
U.S. Highway 12
Parking
DWG SHEET NO.
OF
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LTU
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
FOREST WIDE TOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 TUKAYTESPE SITE
PLAN
11-11-22 S. DIETERICH S. GRAVES 2
Replace Existing Concrete Vault Toilet
Not to Scale
TUKAYTESPE' PICNIC AREA
Stairway to RiverLight Pole
Stairs to Picnic Area
Picnic Tables and Grills (3)
Pathway to River
PROJECT NAME
DWG SHEET NO.
OF
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LTU
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
FOREST WIDE TOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 FIVE MILE POND SITE
PLAN
11-11-22 S. DIETERICH S. GRAVES 3
Decommission Existing Wood Toilet
Install Single Concrete Vault Toilet
Crooked River R
d. #233
FIVE MILE POND CAMP SITE
Five Mile Camp Rd. #2003
Not to Scale
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LTU
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
FOREST WIDE TOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 COOLWATER RIDGE
SITE PLAN
11-11-22 S.DIETERICH S. GRAVES 4
Co ol w at er R id ge
R d.
Coolwater Ridge Rd. #317
COOLWATER RIDGE
Not to Scale
Decommission Existing Wooden Pit Toilet Replace with Concrete Vault Toilet
Idaho Point Rd. #331
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LTU
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
FOREST WIDE TOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 ELK MOUNTAIN SITE
PLAN
11-11-2022 S. DIETERICH S. GRAVES 5
Elk M ountain
Rd. #285
Decommission Existing Wooden Pit Toilet
Elk Mountain Trail #517
Not to Scale
ELK MOUNTAIN TRAILHEAD
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LTU
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
FOREST WIDE TOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 PETE FORKS SITE
PLAN
11-11-22 S. DIETERICH S. GRAVES 6
Lolo Motorway Rd. #500
Decommission Existing Wooden Pit Toilet
Not to Scale
PETE FORKS
Peirce Lochsa Rd. #104
Walking Path
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LTU
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
FOREST WIDE TOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 WEITAS MEADOWS
SITE PLAN
11-11-22 S. DIETERICH S.GRAVES 7
Lolo Motorway Rd. #500
Decommission Existing Wooden Pit Toilet
Not to Scale
Weitas Meadows Camp Site
WEITAS MEADOWS CAMP SITE
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LTU
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
MULTI SITE TOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 WEITAS GUARD
STATION SITE PLAN
11-11-22 S. DIETERICH S. GRAVES 8
Decommission Existing Wooden Pit Toilet
Lean To Ridge Rd. #555
Not to Scale
Weitas Creek
Weitas Guard Station
Weitas Creek Trail #20
WEITAS GUARD STATION
Install New Wooden Vault Toilet
Notes:
and disposed of off Forest lands. The edges of the asphalt be properly installed.
1 - Reference drawings give an approximation of the size and shape of the buildings. All work is required to be checked in the field for actual sizes and materials of the existing buildings to be removed.
2 - Pumping of the toilets by the Contractor is required prior to any demolition work on the existing toilets.
3 - All components of the toilet building must be disposed of in an appropriate manner in accordance with the specifications. It is required to dispose of all waste material off Forest lands.
4 - All concrete components shall be removed approach shall be cut so that the concrete apron can Roof Plan
12'-6"
6'-3
8'-6"
2'-6
SlopeSlope
10 1/4"
Floor Plan
8'-6"
1'0"
1'0"
4'-6"
1'-0"
12 1/2" Pipe
3'0" x 6'8" Steel Door
Steel Lid for Clean Out
Opening for Vent Pipe
Exposed Concrete Vault Toilet Roof
6'-6"
1'-0"
2'-6"
13'-6"
1-0"
Roof Edge
2'-0" 5'-8" 4'-10" 1'-0"
4" 4"
1'-5 3/4"
Drawings for Reference Only
13'-0"
4"
7'-4" 1'-0"
3'-8"
1'-0"
4'-0"
5"
5'-4"
4" 1'-4"
7'-0"
2'0"
1-3" 2'-6" 1'-3"
Slope 1/4" per Foot 5'-0"
Toilet Section
12" ID Vent Pipe Exposed aggregate roof.
Toilet Side Elevation
Barn Wood Texture Exterior Walls
Exposed Aggregate Roof Panel
Toilet Section
8'-6"
1'-0" 1'-0"
6'-6"
5'-10"
Entrance Screen Metal Door
Barnwood Finish Vault Toilet
Exposed Aggregate Roof Panel
12" ID Vent Pipe
Barn Wood Texture Exterior Entrance Walls
Metal Roof Support
Metal Door
6'-6"
1'-4" 3'-10" 1'-4"
Toilet Front Elevation
DWG SHEET NO.
OF
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LT U
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
FOREST WIDE TOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 TOILET
DECOMMISSION
DETAILS
11-11-22 S. DIETERICH S. GRAVES 9
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LTU
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
FOREST WIDE TOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 TOILET INSTALLTION
FLOOR PLAN
11-11-22 S. DIETERICH S. GRAVES 10
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LTU
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
FORES WIDE TOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 TOILET INSTALLTION
SECTIONS
11-11-22 S. DIETERICH S. GRAVES 11
Section 1-1 Section 2-2 Section 3-3 Section 4-4
NTSNTS NTS NTS
STAINLESS STEEL CARRIER SUPPORTS
INCH THICK X 8" X 12"
ALL TWO EACH. PROVIDE 2 INCHES OF BEARING
SUPPORT TO THE CONCRETE SIDEWALK PAD
PRE-CAST CONCRETE SIDEWALK
THICKNESS TO MATCH TOILET ENTRY
(TYPICALLY 5 INCHES THICK)
REINFORCED WITH NO. 4 BARS SPACED 12 INCHES
EACH WAY OR WIRE MESH
PROVIDE 6 INCHES
OF DROP WITHIN
10 FEET OF STRUCTURE
ON ALL SIDES
STEEL CARRIER
SUPPORTS
PROVIDE "TONGUE AND
GROOVE" OR OTHER JOINT
SYSTEM TO PREVENT
UNEVEN SETTLEMENT
SLOPE CONCRETE
" / FOOT
PRECAST
CONCRETE
SIDEWALK
3 INCHES COMPACTED
AGGREGATE
STEEL CARRIER SUPPORTS
6'-10"
5'
5'
5'
14'-8"
6'-6"
4'-4"
DWG SHEET NO.
OF
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LTU
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
FOREST WIDE TOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 TOILET INSTALLTION
ELEVATION
11-11-22 S. DIETERICH S. GRAVES 12
SECTION A-A SECTION B-B
NOT TO SCALE
NOT TO SCALE
PLAN VIEW
NOT TO SCALE
EXHAST PIPE DETAIL
NOT TO SCALE
EXTERIOR SIGN DETAIL
NOT TO SCALE
ROOF SUPPORT DETAIL
NOT TO SCALE
RISER CAULKING DETAIL
NOT TO SCALE
12" ID
12-1/2" OD
CAULK
CAULK
SILICON
CAULKING
CAULKING
SILICON
WELD COLUMN
TO PLATES
ROOF SLAB
PRECAST SCREEN
3/4" CHAMFER
6" X 8" X 1/2" STEEL PLATE
WITH NO. 4 REBAR STUDS.
LOCATE PER FLOOR PLAN.
3" X 3" X 1/4" SQUARE
STEEL TUBING CUT TO ROOF SLOPE. 4" X 6" 1/2" STEEL PLATE
NO. 4 REBAR STUDS
6" LONG - 2 PER SUPPORT
45° BEVEL
-1
/2
12"
12-1/2" 14"
FRONT VIEW SECTIONAL VIEW
WALL JOINT DETAIL
NOT TO SCALE
GROUT
5"
4"
3"
2"
NOT TO SCALE
DOOR DETAIL
3'-0"
3"
POLYETHYLENE TOILET RISER
CROSS-LINKED
13"
11-3/4"
FRONT VIEW
INTERIOR SIGN DETAIL
NOT TO SCALE
7"
10"
SECTIONAL VIEW
1"1- 1/
2"
4- 1/
2"
3"
4"
3/4"
3/4"
4"
45° BEVEL
BACKER ROD
AND
SILICON CAULKING
(PLEASE DON'T/TRASH) (WOMEN/UNISEX/MEN/ACCESSIBLE)
6' -8
M A
X
18"
COAT HOOK
(HANDICAP
ACCESSIBLE)
24"
6"
SYMBOL AS REQUIRED
(SEE SPECIFICATIONS)
DWG SHEET NO.
OF
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LTU
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
FOREST WIDE TOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 TOILET INSTALLTION
SIGNAGE
11-11-22 S. DIETERICH S. GRAVES 13
6'-0"
5'-0"
Plan View
NO SCALE
Single Unit Toilet Installation Detail
Elevation
Single Vault Right Hand Screen - Barnwood Finish Image For Reference Only
Concrete Vault
Right Hand Single
Reinforcement - #4 Rebar, one foot centers both directions.
Pour concrete entrance slab 5' x 6' x 4" with reinforcement.
Crushed aggregate apron surrounding vault toilet and concrete pad.
Apron shall be 3" compacted 34"- crushed aggregate, approximately 2'-0" all sides.
Concrete vault toilet.
Concrete entrance pad. Slope to drain away from toilet building.
3" compacted, 34" crushed aggregate for apron and under concrete entrance pad.
6" compacted, 3/4"- crushed aggregate leveling course under building vault.
3" compacted, 34"- crushed aggregate for apron around building.
Native soil.
Concrete Vault Toilet
Note:
Follow all concrete vault toilet installation instructions from the manufacturer when setting finished floor elevation, depth of excavation, backfill and site finishing.
Crushed aggregate apron sloped to drain away from toilet building.
DWG SHEET NO.
OF
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LTU
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
FOREST WIDE TOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 TOILET INSTALLTION
DETAILS
11-11-22 S. DIETERICH S. GRAVES 14
Weight
· Building - 24,000 lbs.
· Vault - 16,000 lbs.
Excavation
· Vault hole - 8' wide x 16' long x 4' 9" below desired finish floor elevation.
· See specifications for additional requirements.
Fascia, HardieTrim 4 /4 Board, smooth finish (34" x9.5")
InterLock Metal Shake roofing
2" MiraTEC Batten Boards, place every 12" OC, paint with ****
HardieTrim Board 4 /4 Board, smooth finish (34" x 3.5")
HardiePanel Cedarmill Vertical Siding
Therma-Tru Standard Adjusta-fit 2 No-sill Steel Door Frame Therma-Tru Flush Panel Steel Door, painted with ****
Schlage Satin Nickel Deadbolt
Metal Door Pull Handle (RM_31065)
Sealeze 4' aluminum door bottom sweep
12" O.D. PVC vent pipe with cricket at roof opening.
CIP Concrete Pad, 6" above FFE
Unisex wheelchair sign RM_33001, brown
DuraVent 12GVSC aluminum storm collar with DuraVent 12GVF aluminum adjustable roof flashing
Siding overhangs concrete lip by 2"
2'-93 8"
6'-2"
Drip edge
7' -6
1 4"
Vent pipe reaches min. of 5' above roof
1'0 2' 8'4'6"
24 x 48 Lexan Protect- A-Glaze 90318 pebble finish sheet
4" x 3 12" HardieTrim NT3 board, smooth finish
1'0 2' 8'4'6"
InterLock Metal Shake Roofing
3'-23 4"
16'-11"
'-5
1 1
InterLock metal shake roofing
1'0 2' 8'4'6"
Expansion joint with
4" hardboard
16'-11" 3'-23
4"
DWG SHEET NO.
OF
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LTU
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
FOREST WIDE TOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 SINGLE UNIT WOOD
VAULT ELEVATION
11-11-22 S. DIETERICH S. GRAVES 15
Front Elevation
East Elevation
West Elevation
Lexan 24x48 Window (see detail)
Simpson H-1 hurricane tie
Sub Fascia/Treated 2x10
Fascia, HardieTrim 4 /4 Board, smooth finish (34" x9.5")
4" Plyboard Sheathing, secured with 8d galvanized rinkshanked nail every 4-6" around perimeter, topped with water protective barrier
HardiePanel Vertical Cedarmilll Paneling
MIraTEC 1x2 primed wooden batten, painted with sherwin williams ***
2x4 double BTM plate (top 2x4 treated)
2" dia. Anchor Bolt
(every 24" O.C.)
(2) #5 Rebar every 12" O.C.
each way
#4 Rebar, (12" O.C. each way)
Metal flashing
CIP Concrete Slab Compacted Backfill
4" compacted crushed aggregate bed, 6" deep
1'0 2' 8'4'6"
SECTION AA.
Romtec 1000 gal. tank
3.5x9.5 1.9E LVL, with LSTA18 strap every other joist 2x10 rafter
'-1
'-4
2x10 support beam
12" O.D. PVC vent pipe
6"
6" 6" 6"
Slope floor 1%
6"
24x48, 14" Lexan pebble finish glazing
Sidewall support bar
Steel strap seat stop
3"
7"
12"42"
Doubleroll dispenser with shelf3
'-4
18"
16"
12"
Riser C/L
Rear wall support bar
Polyethelene Romtec riser
DWG SHEET NO.
OF
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LTU
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
FOREST WIDE TOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 SINGLE UNIT WOOD
VAULT SECTION AA.
11-11-22 S. DIETERICH S. GRAVES 16
Section AA.
Sidewall Equipment Placement
NTS
Backwall Equipment Placement
NTS
AutoCAD SHX Text C/L
AutoCAD SHX Text C/L
AutoCAD SHX Text C/L
Slope floor 1%
3.5x9.5 1.9E LVL header
Therma-Tru Standard Adjusta-fit 2 no-sill steel door frame, and Therma-Tru flush panel steel door with
LVRSG-2 Louvre (see detail)
2x4 stud
2x4 double BTM plate
Fascia, HardieTrim 4 /4 Board, smooth finish (34" x9.5")
4" Plyboard sheathing and interior FRP wall panel, caulked joints on ceiling
3'-13 4"
16'-89 16"
2x10 rafter, every 12" O.C.
and hugging both sides of PVC pipe
'-5
12"
6"
12" O.D. PVC vent pipe with cricket at roof opening.
Flashing at drip edge
InterLock Metal Shake roofing, 26 gauge
APA roof sheathing, 4" plyboard with vapor barrier, 10d common, at 6" on center edge.
12" on center field
2x10 support beam
4" x 3 12" HardieTrim
NT3 Board (Smooth Finish) trimming door, installed before HardiePanel Vertical Cedarmilll Paneling
Expansion joint with 4" hardboard
(2) #5 Rebar every 12" O.C. each way
12"
24"
1'0 2' 8'4'6"
SECTION BB.
DWG SHEET NO.
OF
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LTU
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
FOREST WIDE TOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 SINGLE UNIT WOOD
VAULT SECTION BB.
11-11-22 S. DIETERICH S. GRAVES 17
Section BB.
60" Dia.
Riser opening
CIP concrete pad
Building wall
Expansion joint with 4" hardboard
Floating concrete pad
'-5
'-4
8' 4-1/8"
7'-5"
'-1
16'-11"
Romtec 1000 gallon vault
Roof line 9'-5" x 11'-11" (18" past building wall)
Concrete cut-out for 12" dia. vent stack pipe
B
12"
'-1
B
A.
A.
'-2
3 1
'-5
1 1
'-1
6"
Manhole cleanout
1'0 2' 8'4'6"
'-1
3 1
3'-23 4"
DWG SHEET NO.
OF
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LTU
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
FOREST WIDE TOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 SINGLE UNIT WOOD
VAULT FLOOR PLAN
11-11-22 S. DIETERICH S. GRAVES 18
Floor Plan
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LTU
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
FOREST WIDE TOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 SINGLE UNIT WOOD
VAULT DETAILS
11-11-22 S. DIETERICH S. GRAVES 19
(2) 2x10 Headers with 15
32" CDX
4" x 5 12" HardieTrim NT3 Board, smooth finish, typ.
4" x 24" x 48" Lexan Protect-A-Glaze 90318 Pebble Finish Sheet
2 x 10 framing rafters, start 12" O.C. at building center line.
2 x full depth blocking and 10d. common at 6" O.C.
4" Plyboard sheathing and interior FRP wall panel, caulked joints on ceiling
APA roof sheathing, 4" plyboard with vapor barrier, 10d common, at 6" on center edge.
12" on center field
Simpson H-2joist fastener, every joist
Simpson A35 at 48" O.C.
HardiePanel Cedarmill
Vertical Siding
(2) 2x4 support plates
Window Stops; 1x blocking, typ.
4" x 3 12" HardieTrim
NT3 Board, smooth, typ.
framing window;
install before siding leaving 18" gap between trim and vertical siding, then caulk.
2x4 Stud
2x4 double top plate
Interlock 26 gauge metal shake roofing
LVRSG-2 Louvre shall be ordered in a 4" frame and installed in metal door according to manufacturers standards
1-1/4"
Metal door
Thru-bolt available from manufacturer by request
ExteriorInterior
1-1/16"
1/2"
2x4 Stud
Plyboard sheathing Vertical siding 1x2 batten
HardieTrim NT3 Board, installed before HardiePanel Vertical Paneling
Window Detail
Trim Detail
Louvre/door Detail
NTS
NTS
NTS
11' - 11"
1'-6" to edge of bldg
2' - 78" to edge of bldg
1'-0 "
26 gauge Interlock metal shake roof 4" CDX nail with 10D commons 6" O/C edge, 12" O/C field, w/ 30# felt paper
'-4
5 8 " O
U
TS
ID
E
TO
O
U
TS
ID
E
O F
W A
LL
B
EA
M S
3 12" x 9 12" 1.9E LVL continuous wall beam (typ.)
Provide a 2x10 rafter on each side of vent stack
2" x 9 12" 1.9E LVL continuous ridge beam, provide (4) 2X4 studs at each support
2x10 DFL NO. 2 or better rafter @ 1'-0" O/C, provide full bottom bearing on wall beam, attach to wall beam with Simpson H2 Hurrican clip, attach to ridge beam with LSSU210, strap every other rafter across the ridge beam with a LSTA18
12" dia. vent stack
1 2
1 2
Provide 2X bird blocking per section A-A
1'-0"
1'0 2' 8'4'6"
DWG SHEET NO.
OF
SHEET
9/2 8/1
8 0 7:
M
AR
KL
F
CA
D
ST
AN
DA
RD
S\
AG
EN
CY
S
TA
ND
AR
DS
\F
OR
ES
T
SE
RV
IC
E\
NF
S-
CT
B.
DW
G;
CHECKEDDESIGNERDATE
DRAWING TITLE
FOREST SERVICE
DEPARTMENTOF AGRICU LTU
RE
United States Department of Agriculture Forest Service
NO. DATEBYREVISION DESCRIPTION
MULTIPLE RANGER DISTRICTS
NEZ PERCE - CLEARWATER NATIONAL FORESTS
FOREST WIDETOILET REPLACEMENT PROJECT
NORTHERN REGION
REGION 1 SINGLE UNIT WOOD
VAULT ROOF PLAN
11-11-22 S. DIETETRICH S. GRAVES 20
Roof Plan
AutoCAD SHX Text Ridge
| Sheets and Views |
| Forestwide_toiletreplace_11-11-22-1. Title Sheet |
| Forestwide_toiletreplace_11-11-22-Tukaytespe Site Plan |
| Forestwide_toiletreplace_11-11-22-Five Mile Pond Site Plan |
| Forestwide_toiletreplace_11-11-22-Coolwater Ridge Site Plan |
| Forestwide_toiletreplace_11-11-22-Elk Mountain Site Plan |
| Forestwide_toiletreplace_11-11-22-Pete Forks Site Plan |
| Forestwide_toiletreplace_11-11-22-Weitas Meadows Site Plan |
| Forestwide_toiletreplace_11-11-22-Weitas Guard Station Site Plan |
| Forestwide_toiletreplace_11-11-22-Toilet Decommission Details |
| Forestwide_toiletreplace_11-11-22-Toilet Installtion Floor Plan |
| Forestwide_toiletreplace_11-11-22-Toilet Installtion Sections |
| Forestwide_toiletreplace_11-11-22-Toilet Installtion Elevation |
| Forestwide_toiletreplace_11-11-22-Toilet Installtion Signage |
| Forestwide_toiletreplace_11-11-22-Toilet Installtion Details |
| Forestwide_toiletreplace_11-11-22-Single Unit Wood Vault Elevation |
| Forestwide_toiletreplace_11-11-22-Single Unit Wood Vault Section AA. |
| Forestwide_toiletreplace_11-11-22-Single Unit Wood Vault Section BB. |
| Forestwide_toiletreplace_11-11-22-Single Unit Wood Vault Floor Plan |
| Forestwide_toiletreplace_11-11-22-Single Unit Wood Vault Details |
| Forestwide_toiletreplace_11-11-22-Single Unit Wood Vault Roof Plan |