ATTACHMENT_3___LPTA_TECHNICAL_ACCEPTABILITY___PRICE_SUBMISSION_TEMPLATE_(SERVICES).docx
DOCX document 31 KB Posted
- Attached to
- MACA - RE-COMMISSION VC HVAC Federal contract opportunity
- Solicitation number
- 140P5326Q0016
About this file
This is a Lowest Price Technically Acceptable (LPTA) technical acceptability and price submission template for a federal service contract to recommission the HVAC system at Mammoth Cave National Park Visitor Center in Kentucky (RFQ No. 140P5326Q0016). Quoters must complete all required sections to achieve technical acceptability; omission of any entry results in disqualification. The template requires quoter information including legal name, UEI, CAGE code, and primary point of contact. Quoters must demonstrate relevant experience through documentation of two completed projects within the last five years involving HVAC preventative maintenance, troubleshooting, and recommissioning of central plant and terminal equipment (chillers, AHUs, VAVs, FCUs) in occupied commercial or institutional facilities, with timing evidence and customer references required for each project. Quoters must identify any specialized subcontractors and their roles, such as those performing controls integration, Testing and Balancing (TAB), or electrical work.
The Statement of Work compliance checklist requires quoters to confirm their ability to perform comprehensive preventative maintenance and functional testing on exhaust fans, AHUs, AC/chiller systems, VAVs, FCUs, and cabinet heaters; replace specified equipment (3 condenser fan motors/blades, 6 VAV CFM controllers, 2 FCU fan motors, and 3 CO2 sensors); perform leak detection and minor chilled water/glycol loop repairs; provide weekly progress reports and final commissioning/quality assurance reports with data logs and photos; provide qualified, licensed, EPA-certified HVAC technicians and electrical workers compliant with OSHA 29 CFR 1926 and ASHRAE/NEC 2023 standards; and complete all work within 180 calendar days from award notice during specified work hours (7:00 AM–5:00 PM, Monday–Friday, excluding federal holidays). The template includes a certification section requiring the authorized representative's signature confirming accuracy of submitted information and full compliance with the Statement of Work and specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT_1-MACA_250854A_SOW_Final_2_25_26.pdf | ||
| ATTACHMENT_2-_Service_Contract_Act_WD___2015-4679.pdf | ||
| Sol_140P5326Q0016.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 3 — LPTA TECHNICAL ACCEPTABILITY & PRICE SUBMISSION TEMPLATE (SERVICES) Project Name: Re‑Commission Visitor Center HVAC System to Ensure High Efficiency Park Location: Mammoth Cave National Park Visitor Center, Mammoth Cave, KY 42259
RFQ No.: 140P5326Q0016______________________
INSTRUCTIONS (READ FIRST):
Quoter shall complete and submit this template with its quotation. To be rated Technically Acceptable (PASS), the quotation must include all required entries below. Omission of any required entry will result in Technically Unacceptable (FAIL) and ineligibility for award. The Government will make award on a Lowest Price Technically Acceptable (LPTA) basis; no tradeoffs. Evaluation will be on the basis established in the solicitation.
1) Quoter Information (Required) Legal name: Click or tap here to enter text.
UEI (if applicable):Click or tap here to enter text.
CAGE (if applicable): Click or tap here to enter text.
Primary POC (name/title): Click or tap here to enter text.
Email / Phone: Click or tap here to enter text.
2) Relevant Experience (PASS/FAIL) — Two (2) completed projects within last five (5) years Each project must be relevant to HVAC preventative maintenance, troubleshooting, and recommissioning of central plant and terminal equipment (e.g., chillers, AHUs, VAVs, FCUs) in occupied commercial or institutional facilities. Complete all fields:
Project 1 Customer/Owner: Click or tap here to enter text.
Location (city/state): Click or tap here to enter text.
Relevance (check):
☐ HVAC recommissioning of central plant ☐ HVAC preventative maintenance (chillers/AHUs/VAVs/FCUs) ☐ Both ☐ Other (explain):Click or tap here to enter text.
Brief scope (1–3 sentences):
Timing evidence (required):
☐ Month/Year–Month/Year ☐ Year completed; Enter: Click or tap here to enter text.
Contract/PO No. (if applicable): Click or tap here to enter text.
POC name/title + email/phone: Click or tap here to enter text.
Project 2 Customer/Owner: Click or tap here to enter text.
Location (city/state): Click or tap here to enter text.
Relevance (check):
☐ HVAC recommissioning of central plant ☐ HVAC preventative maintenance (chillers/AHUs/VAVs/FCUs) ☐ Both ☐ Other (explain): Click or tap here to enter text.
Brief scope (1–3 sentences):
Timing evidence (required):
☐ Month/Year–Month/Year ☐ Year completed; Enter: Click or tap here to enter text.
Contract/PO No. (if applicable): Click or tap here to enter text.
POC name/title + email/phone: Click or tap here to enter text.
3) Key Subcontractor Identification (PASS/FAIL) — As applicable Will specialized work be subcontracted (e.g., controls integration, TAB, electrical)? ☐Yes ☐ No If yes, identify subcontractor(s) and role(s):
Subcontractor name: Click or tap here to enter text.
Trade/role: Click or tap here to enter text.
City/state + phone/email: Click or tap here to enter text.
(Repeat as needed.)
4) SOW/Specs Compliance Checklist (PASS/FAIL) Mark one box per row (no blanks). Notes optional.
| Minimum requirement (from SOW/specs) |
| Comply |
| Does Not Comply |
| Notes |
| Perform comprehensive preventative maintenance and functional testing on exhaust fans, AHUs, AC/chiller systems, VAVs, FCUs, and cabinet heaters as specified in Item 1.1. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Replace 3 condenser fan motors/blades, 6 VAV CFM controllers, 2 FCU fan motors, and 3 CO₂ sensors as specified. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Perform leak detection and minor chilled water/glycol loop leak repairs only; treat substantial piping replacement, rerouting, or new construction as out‑of‑scope to be separately authorized by the Contracting Officer. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Provide weekly progress reports and a final commissioning/QA report (with data logs, photos, and checklists) in accordance with Items 1.1 and 9. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Provide qualified and licensed personnel (journeyman‑level HVAC technicians, EPA refrigerant certification, qualified electrical workers) and comply with OSHA 29 CFR 1926, ASHRAE/NEC 2023, and other safety requirements identified in the SOW. | ||
| ☐ | ☐ | Click or tap here to enter text. |
| Complete all work within 180 calendar days from Award notice and within specified work hours (7:00 AM–5:00 PM, Monday–Friday, excluding federal holidays). | ||
| ☐ | ☐ | Click or tap here to enter text. |
(You can trim to 5–6 rows depending on your local template rules.)
Period of Performance:
The quoter acknowledges the period of performance and agrees to complete all services required by the Statement of Work within 180 calendar days from the Award Notice. The quoter has identified below any known or anticipated schedule constraints, material lead times, or other factors that could affect meeting this period of performance.
Known or anticipated delays/constraints: ☐N/A Click or tap here to enter text.
5) Quoter Certification (Required) Authorized representative name/title: Click or tap here to enter text.
Signature: _______________________________________________ Date: Click or tap to enter a date.
By signing above, the quoter certifies that the information provided in this template is accurate and that the quoter’s quotation fully complies with the Statement of Work and specifications for this HVAC service contract.
File details come from the government source that posted it. Updated .