This document package includes plans and specifications for a trail bridge replacement project on the Boise National Forest. The project involves designing, fabricating, transporting, and installing a prefabricated steel trail bridge with precast concrete footings to replace an existing bridge over Bull Creek at mile 6.35 of the Silver Summit Trail. The attached maps show the project location, existing conditions, and design details.

The related federal contract opportunity is a solicitation issued by the USDA Forest Service under the Great American Outdoors Act for trail bridge construction projects on the Boise National Forest. Proposals are due July 22nd and this is a 100% small business set-aside. The solicitation package includes specifications, plans for five trail bridge replacement projects, and standard contract clauses. Offerors should submit past performance and contact information.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Alpha

Smiths Ferry

Ola

Crouch Garden ValleyBanks Lowman

¬«21

UV678

UV671

UV653

UV693

UV644

UV643

UV644

UV671

UV693

UV422

UV693

UV644

UV382

UV698

UV614

UV312

UV374

UV693 UV582

UV348

UV698

UV678

UV643

UV609

UV671

UV643

UV17A

UV643

UV685

UV698

UV615

UV626

UV563

UV698UV626

UV312

UV382

UV555

UV555

UV582

UV409

UV644

UV582

UV601

UV653

UV555

UV579

Idaho City Ranger District

Emmett Ranger District

Cascade Ranger District

Lowman Ranger District

¬«21

¬«55

¬«21

¬«17

¬«55

PROJECT DESCRIPTION

SPECIFICATION:

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, U.S. Customary Units www.wfl.fha.dot.gov/design/specs/fp14.htm Site Specific Specifications will be as shown in Page 5 Construction Notes.

APPROVED:

_____________________ DATE:______

DISTRICT RANGER

APPROVED:

_____________________ DATE:______

FOREST ENGINEER

This project consists of construction of a remote trail bridge on the Silver Summit Trail approximately 35 miles north of Crouch, Idaho. The site is located on Bull Creek, off NFSR #671E at Mile 6.35 of the Silver Creek Summit Trail. Major items of work include:design, furnish and install one steel prefabricated trail bridge with precast concrete footings; remove and dispose of existing bridge off of Forest Lands. Existing abutments consisting of gabion baskets, retaining wall, and timber members will be reused for constuction of new bridge.

*This is a remote site and will require helicopter support.

PLANS FOR PROPOSED PROJECT

BOISE NATIONAL FOREST

EMMETT RANGER DISTRICT

VALLEY COUNTY

IDAHO

Bull Creek Trail Bridge - 044-6.35

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION 4

IDAHO MAP

PROJECT

LOCATION

Sheet Name Sheet # Title Sheet 1 Vicinity Map 2 Plan View of Profile View of Bridge 3 Existing Abutment and Retaining Wall 4 General Notes and Schedule of Items 5 Details 6

INDEX TO SHEETS

JOHN

WALLACE

Digitally signed by JOHN

WALLACE

Date: 2022.03.11 17:00:13 -07'00'

JEFFREY

ALEXANDER

Digitally signed by

JEFFREY ALEXANDER

Date: 2022.03.11 15:53:44 -07'00'

NOT TO SCALE

Item No. Description Unit Quantity 151-01 Mobilization Lump Sum 1 157-01 Soil erosion and pollution control Lump Sum 1 203-01 Removal and dispose of existing bridge Lum Sum 1

571-01

Design, Purchase, Transport, and Install Prefabricated Steel Trail Bridge and Precast Concrete Grade Beams to Staging Area