Attachment_3_Liquidated_Damages_Schedule.pdf

PDF 87 KB Posted

Attached to
Inmate Medical Services
Solicitation number
RFP 32901-31409
Issued by
Davidson County, Tennessee

About this file

This is a Liquidated Damages Schedule attachment for a Tennessee Department of Correction (TDOC) contract that outlines financial penalties assessed for contractor noncompliance across multiple operational areas. The schedule specifies damages for failures in staffing management, utilization management, inmate transport notification, credentialing, accreditation maintenance, and contract monitoring compliance. Staffing vacancies exceeding 45 calendar days incur daily damages equal to the vacant position's daily salary and benefits until filled, though contractors may receive credits for documented costs to maintain required services. Other specific violations include $1,500 per failure to notify TDOC of emergency room or hospital admissions, $2,000 per failure to notify the Chief Medical Officer of death row inmate emergency transports, $500 per non-compliant personnel member lacking required licenses or certifications, and $25,000 per facility losing American Correctional Association accreditation.

The liquidated damages framework establishes $300 per occurrence for any noncompliance findings identified through TDOC audit instruments, with an additional $1,000 penalty per repeat finding that remains uncured before subsequent audits. These damages are explicitly intended to compensate the State for anticipated administrative, operational, and oversight costs resulting from contractor noncompliance rather than to serve as penalties. Unused staffing vacancy credits have no cash value and cannot be paid to the contractor or applied toward additional compensation or contract amount increases. TDOC retains authority to revise or update audit instruments with written notice to the contractor.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT Three

LIQUIDATED DAMAGES SCHEDULE

Unless otherwise specified, each amount stated below is assessed for each occurrence of the applicable event. Liquidated Damages are intended to compensate the State for anticipated administrative, operational, oversight, and other costs arising from the Contractor's noncompliance and are not intended as a penalty.

Contract Reference Liquidated Damages Event Liquidated Damages

Staffing (Section A.10)

Each staff vacancy that continues beyond forty-five

(45) calendar days.

An amount equal to the vacant position's Daily Salary and Benefits for each calendar day the vacancy continues after the forty-five (45)-day period until the position is filled.

The Contractor shall receive a credit only for documented costs incurred in continuing to provide the contractually required services. The credit shall be applied solely to offset Liquidated Damages assessed under this provision and shall not entitle the Contractor to additional compensation, reimbursement, funding, or an increase in the Contract amount. Any unused credit shall have no cash value and shall not be paid to the Contractor.

*Daily Salary and Benefits = Entry Hourly Wage x (1 + Average Facility Benefit Rate) x 2,080 / 365.

Utilization Management (Section A.11)

Failure to notify TDOC of an emergency-room transfer, emergency-room admission, or hospital admission as required by the Contract.

$1,500.00 per failure to notify TDOC.

Transport of a Death Row Inmate (Section A.8.c.2)

Failure to notify the TDOC Chief Medical Officer of the transport of a death-row inmate to an emergency room or hospital as required by the Contract.

$2,000.00 per failure to notify the TDOC Chief Medical Officer.

Credentialing (Section A.13)

Failure to ensure that personnel maintain current licenses, certifications, and registrations required by applicable Tennessee law or by the applicable licensing or health board.

$500.00 per non-compliant personnel member.

American Correctional Association Audits (Section A.15.d)

Failure to maintain applicable ACA standards that results in the loss of accreditation by a facility.

$25,000.00 per facility that loses accreditation.

State Contract Monitoring (Section A.20)

Any finding of noncompliance identified through a TDOC audit instrument used to monitor compliance with this Contract. TDOC may revise or update its audit instruments from time to time with written notice to the Contractor.

$300.00 for each occurrence of noncompliance, subject to any applicable minimum performance threshold and the assessment methodology specified in the applicable audit instrument.

Repeat Findings (Section A.20.a.9.)

A finding previously identified as noncompliant that remains uncured before the next applicable audit.

$1,000.00 per repeat finding identified during an audit in addition to the $300.00 per occurrence charge.

File details come from the government source that posted it. Updated .