Attachment 3 GMFL SO Property Maintenance Site Plan Maps (Summer).pdf

PDF 2 MB Posted

Attached to
Green Mountain and Finger Lakes National Forests Supervisor’s Office (GMFL SO) Property Maintenance (Winter and Summer).
Solicitation number
12444323Q0035
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BM

VT GEODETIC SURVEY

DISC IN CONCRETE

ELEV.1457.40

N:420032.94

E:1536276.18

W

O

O

D

W

A

R

D

O

A

D

U

S

O

U

T

E

HVCTRL4

1433.31

N:420016.24

E:1535731.78

HVCTRL5

1443.98

N:420205.86

E:1535811.67

3/2 1/2

2 0 9:

JL

B \\B

EA

RD

SL

EY

.C

OM

\D

FS

\P

AN

1\P

RO

JE

CT

S\

0\D

RA

W

IN

GS

\S

IT

E\

C1 -0

1.D W

G;

A.INGRAM

J.BUTLER

J.HEINL

C1-01

64 South Street Auburn, NY 13021 315.253.7301

320 West Main Street Malone, NY 12953 518.483.1585

5789 Widewaters Pkwy Dewitt, NY 13214 315.472.6980

150 State Street, 4th Floor Albany, NY 12207 315.253.7301

ALBANY

AUBURN MALONE SYRACUSE

21100

PROJECT NUMBER

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

SUPERVISOR'S

OFFICE

GREEN

MOUNTAIN &

FINGER LAKES

NATIONAL

FORESTS

MIDDLEBURY RANGER DISTRICT

21100

03/23/2022

AFFIX SEAL

ARCHIVE_NUMBER

EASTERN-REGION

(R09)

Beardsley Design Associates Architecture, Engineering, Landscape Architecture, D.P.C. © 2022

A

OVERALL SITE PLAN

SCALE: 1" = 40'-0"

SCALE: 1" = 40'-0"

40' 0' 40' 80'

OVERALL SITE PLAN

GARAGE, SEE

DRAWING C1-06

SITE WORK COMPLETED

UNDER PHASE 1

SUPERVISORS OFFICE

BUILDING SITE

SITE WORK COMPLETED

UNDER PHASE 1

SITE WORK COMPLETED

UNDER PHASE 1

PROPOSED BUILDING

FOOTPRINT

P

R

O

P

E

R

Y

L

I

N

E

B

U

F

F

S

T

B

A

C

K

N

E

P

R

O

P

E

R

Y

N

E

PROVIDE SITE SIGN STONE BASE PER

APPROVED CONTRACT CHANGE ORDER

DETAILS. LOCATION TO BE OUTSIDE HIGHWAY

R.O.W. AND FIELD COORDINATED WITH THE

CONTRACTING OFFICER REPRESENTATIVE

KatherineDefayette Pencil

KatherineDefayette Pencil davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Text Box Maintain grasses 5 ft from asphalt no longer than 3 inches. Remaining areas to be maintained at 6 inches, twice a growing season. Trees and shrubs to be pruned once a year. Existing mulch beds to be maintained once a year in May or June.

Maintain grasses as shown on the plans (5 ft to 25 ft from asphalt/sidewalks) no longer than 3 inches, throughout the growing season.

Maintain grasses as shown on the plans (minimum 5 ft to 25 ft from asphalt or buildings) no longer than 6 inches, throughout the growing season.

Maintain grass areas no longer than 3 inches, throughout the growing season. Trees and shrubs to be pruned once a year. Existing mulch beds to be maintained once a year in May or June.

davidpdonahue Rectangle davidpdonahue Rectangle davidpdonahue Rectangle davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Rectangle davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon

File details come from the government source that posted it. Updated .