BM
VT GEODETIC SURVEY
DISC IN CONCRETE
ELEV.1457.40
N:420032.94
E:1536276.18
W
O
O
D
W
A
R
D
O
A
D
U
S
O
U
T
E
HVCTRL4
1433.31
N:420016.24
E:1535731.78
HVCTRL5
1443.98
N:420205.86
E:1535811.67
3/2 1/2
2 0 9:
JL
B \\B
EA
RD
SL
EY
.C
OM
\D
FS
\P
AN
1\P
RO
JE
CT
S\
0\D
RA
W
IN
GS
\S
IT
E\
C1 -0
1.D W
G;
A.INGRAM
J.BUTLER
J.HEINL
C1-01
64 South Street Auburn, NY 13021 315.253.7301
320 West Main Street Malone, NY 12953 518.483.1585
5789 Widewaters Pkwy Dewitt, NY 13214 315.472.6980
150 State Street, 4th Floor Albany, NY 12207 315.253.7301
ALBANY
AUBURN MALONE SYRACUSE
21100
PROJECT NUMBER
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
SUPERVISOR'S
OFFICE
GREEN
MOUNTAIN &
FINGER LAKES
NATIONAL
FORESTS
MIDDLEBURY RANGER DISTRICT
21100
03/23/2022
AFFIX SEAL
ARCHIVE_NUMBER
EASTERN-REGION
(R09)
Beardsley Design Associates Architecture, Engineering, Landscape Architecture, D.P.C. © 2022
A
OVERALL SITE PLAN
SCALE: 1" = 40'-0"
SCALE: 1" = 40'-0"
40' 0' 40' 80'
OVERALL SITE PLAN
GARAGE, SEE
DRAWING C1-06
SITE WORK COMPLETED
UNDER PHASE 1
SUPERVISORS OFFICE
BUILDING SITE
SITE WORK COMPLETED
UNDER PHASE 1
SITE WORK COMPLETED
UNDER PHASE 1
PROPOSED BUILDING
FOOTPRINT
P
R
O
P
E
R
Y
L
I
N
E
B
U
F
F
S
T
B
A
C
K
N
E
P
R
O
P
E
R
Y
N
E
PROVIDE SITE SIGN STONE BASE PER
APPROVED CONTRACT CHANGE ORDER
DETAILS. LOCATION TO BE OUTSIDE HIGHWAY
R.O.W. AND FIELD COORDINATED WITH THE
CONTRACTING OFFICER REPRESENTATIVE
KatherineDefayette Pencil
KatherineDefayette Pencil davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Text Box Maintain grasses 5 ft from asphalt no longer than 3 inches. Remaining areas to be maintained at 6 inches, twice a growing season. Trees and shrubs to be pruned once a year. Existing mulch beds to be maintained once a year in May or June.
Maintain grasses as shown on the plans (5 ft to 25 ft from asphalt/sidewalks) no longer than 3 inches, throughout the growing season.
Maintain grasses as shown on the plans (minimum 5 ft to 25 ft from asphalt or buildings) no longer than 6 inches, throughout the growing season.
Maintain grass areas no longer than 3 inches, throughout the growing season. Trees and shrubs to be pruned once a year. Existing mulch beds to be maintained once a year in May or June.
davidpdonahue Rectangle davidpdonahue Rectangle davidpdonahue Rectangle davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Rectangle davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon
File details come from the government source that posted it. Updated .