This pre-solicitation notice announces an upcoming solicitation for extend communications duct bank work at the 145th Airlift Wing in Charlotte, North Carolina. The solicitation number is W50S87-23-B-0002 and will include exhibits, specifications, and details on the required work. A pre-bid conference will be held on May 24, 2023 at 9:00 AM EST to review bid requirements and answer questions. Interested offerors should register as instructed in Solicitation Section 00100. The work involves extending communications duct banks for the 145th Airlift Wing located at the Charlotte Air National Guard Base. The Department of the Army North Carolina Army National Guard will serve as the contracting agency.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G

G

G

G

G

U G

E

U

G

E U

G E

U G

E

U G

E

U G

E

U

G

E

UGE

U

G

E

COMM

C O

M M

COMM

COMM

COMM

COMM

C O

M M

COMM

C O H

V A

C

S ig n

Barricade Barricade

J e rs e y

B a rrie rs

S h ru b s

S h r u b s

S h r u b s

" C ra p e

M rytle

" C ra p e

M ry tle

" C ra p e

M ry tle

" C ra p e

M ry tle

E lm

" C ra p e

M ry tle

" C ra p e

M ry tle

" E lm

E lm

E lm

S

C O

M M

C

O

M

M

C O

M M

COMM

C O

M M

C

O

M

M

C O

M M

COMM

C O

M

M

C

O

M

M

C

O

M

M

COMM

COMM

COMM

C

O

M

M

C O

M M

U tility

V a u lt

W

W

W

W

W

W

G a te

X

X X X X X

5' Chain Link Fence

E

E

T B

M

F L A

N G

E B

O L T

O N

H Y

D R

A N

T

E L E

V .:7

.4

F F

E :7

.1

M e ta l

G u a rd

S h a c k

C o n c re te

Sidewalk

S i d e w a l k

S S

M H

R

IM

:7 .6

F L O

W :7

.7

C o n c re te

A s p h a lt

A s p h a lt

A s p h a lt

P A

R C

E L

A

C

IT

Y O

F C

H A

R L O

T T

E

P A

R C

E L

A

C

IT

Y O

F C

H A

R L O

T T

E

C U

R B

IN

L E

T

T O

P C

U R

B :7

.9

IN

V

. IN

:7

.4

IN

V

. O U

T :7

.4

C U

R B

IN

L E

T

T O

P C

U R

B :7

.5

IN

V

. IN

:7

.5

IN

V

. O U

T :7

.0

C U

R B

IN

L E

T

T O

P C

U R

B :7

.9

IN

V

. IN

:7

.0

IN

V

. O U

T :7

.9

R

C

P

P

15" RCP

R

C P

Curbing

C u r b i n g

C u r b i n g

C u r b i n g

C u r b i n g

Curbing

C u r b i n g

S

S

S

S

C O

M M

C

O

M

M

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

LOD

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L O

D

LOD

LO

D

LO

D

L

O

D

L O

D

G e n e ra to r o n C o n c re te

T ra n s fo rm e r

T ra n s fo rm e r o n C o n c re te

W V

W V

W V

W V

W V

W V

W V

W V

E

S

S S

M H

R

IM

:7 .1

IN

V

. IN

:7

.8

' (N

E

IN

V

. IN

:7

.5

' (E

IN

V

. O U

T :7

.4

S

S S

M H

R

IM

:7 .2

IN

V

. IN

:7

.1

IN

V

. O U

T :7

.0

E

E

E

W V

H

V

A

C

E

H V

A C

T

C O

D

E

E

E

E

T

T

T

W V

R ip

R a p

T B

M

F L A

N G

E B

O L T

O N

H Y

D R

A N

T

E L E

V .:7

.3

S i d e w a l k pavement edge pavement edge pavement edge

G u a rd

R a il &

C h a in

L in k F e n c e o n to p o f w a ll

E

E

C o n c re te

W a ll

C o n c re te

W a ll

Concrete Wall

C o n c re te

C o n c re te

B ric k

W a ll

Curb & gutter

F F

E :7

.8

F F

E :7

.8

P A

R C

E L

A

C

IT

Y O

F C

H A

R L O

T T

E

P A

R C

E L

A

C

IT

Y O

F C

H A

R L O

T T

E

P A

R C

E L

A

C

IT

Y O

F C

H A

R L O

T T

E

D

D

S

S

S

S

S

S

S S

S S

S S

S S

SS

SS

.4

.6

.7

.3

.5

C o n c re te

W a ll

R ip

R a p

D R

O P

IN

L E

T

R

IM

:7 .3

IN

V

. IN

:7

.7

IN

V

. O U

T :7

.7

D R

O P

IN

L E

T

R

IM

:7 .6

IN

V

. O U

T :7

.9

S T

O R

M M

A N

H O

L E

L

ID

:7 .9

IN

V

. IN

:7

.5

' (N

W

IN

V

. IN

:7

.6

' (W

IN

V

. O U

T :7

.5

D R

O P

IN

L E

T

R

IM

:7 .6

IN

V

. IN

:7

.2

' (N

W

IN

V

. IN

:7

.3

' (N

E

IN

V

. O U

T :7

.9

S T

O R

M M

A N

H O

L E

L

ID

:7 .3

IN

V

. IN

:7

.9

' (N

W

IN

V

. IN

:7

.8

' (W

IN

V

. O U

T :7

.7

M A

N H

O L E

L

ID

:7 .2

W A

T E

R V

A L V

E

IN

S

ID

E

S T

O R

M M

A N

H O

L E

L

ID

:7 .2

IN

V

. IN

:7

.6

IN

V

. O U

T :7

.3

M A

N H

O L E

L

ID

:7 .5

IN

V

. IN

:7

.0

IN

V

. O U

T :7

.1

D R

O P

IN

L E

T

R

IM

:7 .9

IN

V

. IN

:6

.1

C o n c r e t e

D

I

P

12" DIP

18" RCP

P

R

C P

R

C

P

P

P

"C l a y

C l a y

E X

IS

T

IN

G

B U

IL

D

IN

G

E X

IS

T

IN

G

B U

IL

D

IN

G

E X

IS

T

IN

G

B U

IL

D

IN

G

T ra n s fo rm e r o n C o n c re te

R a m p

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C O

M M

C O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

COMM

C O

M

M

COMM

COMM

C O

M M

C O

M M

COMM

C O

M M

C O

M M

C O

M M

C

O

M

M

C

O

M

M

C O

M M

COMM

COMM

COMM

COMM

COMM

COMM

COM

M

COMM

COM

M

COMM

COMM

COMM

COMM COMM COMM

COMM

C O

M M

C

O

M

M

C O

M M

C O

M M

C O

M M

COMM

COMM

COMM

COMM

COMM

C

O

M

M

C O

M M

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

C

O

M

M

C

O

M

M

C O

M M

U G

E

U G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U G

E

U G

E

UGE UGE

UGE UGE

UGE

UG

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

UG

E

UG

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

G

G

G

G

W

W

W

W

W

W

W

W

W

W

W W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W V

W

S

P

V

C

" D

IP

S

P

T

T

C

O

M

M

COMM

COMM

COMM

COMM

COMM

C O

M M

C O

M M

B L D

G

B L D

G

A P

P R

O X

IM

A

T E

L O

C A

T

IO

N O

F

E X

IS

T

IN

G

C O

M M

R E

F E

R E

N C

E C

-1 C

O R

R O

S

IO

N

F U

E L

C E

L L H

A N

G A

R P

R O

J E

C T

C O

N T

R A

C T

O R

T O

C O

N F

IR

M

L O

C A

T

IO

N

C M

H -1

A

COMM

C O

M M

C

O

M

M

COMM

COMM

C

O

M

M

C

O

M

M

C O

M M

SF

SF

SF

SF

SF

S

F

SF SF SF

SF

SF

S

F

S

F

S

F

L O

D

L O

D

L O

D

L O

D

L O

D

LOD

LOD

LOD

LOD

LOD

L

O

D

L

O

D

LOD

LOD

LOD

L O

D

LOD

LOD

L

O

D

L

O

D

L O

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

L

O

D

L

O

D

LOD

LOD

LO

D

LO

D

LO

D

LOD

L O

D

LOD

LOD

LOD

LOD

L O

D

L O

D

LO

D

L

O

D

L

O

D

LOD

LOD

LOD

L O

D

L O

D

L O

D

L O

D

L O

D

S F

© 2020 Microsoft Corporation © 2020 Maxar ©CNES (2020) Distribution Airbus DS

W

S

W

S

S

C o n c r e t e

S i d e w a l k

W V

W V

W V

W

V

A N

G

D I S

K

X

X

W

V

W

V

W V

E

E

S

WV

WV

WV

WV

WV

WV

WVWV

E

S

S

E

E

E

WV

E

T

CO

D

E

E

E

E

T

T

T

WV

E

T

T

E

E

C O

C O

CO

S

E

E

E

E

D

D

T

T

WV

WS

S

W

V

T

T

L

O

D

L O

D L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D L O

D

LOD

LO

D

L O

D

CE101

CE101.DWG

PARTIAL EROSION AND

SEDIMENT CONTROL PLAN 1

1" = 30'

- MARCH 2022 B-3 DESIGN SUBMITTAL

PARTIAL EROSION AND SEDIMENT CONTROL PLAN AREA 1

1" = 30'

PARTIAL EROSION AND SEDIMENT CONTROL PLAN AREA 2

1" = 30'

CE101

CE101

CE102

KEY MAP

PROJECT MANAGER

HDR PROJECT #:

0 1"

2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

BRANDY CHAPMAN

BRANDY CHAPMAN

CHRIS TYNES

10226692

DEREK WORLEY

EXTEND

COMMUNICATIONS DUCT

BANK

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

CHARLOTTE, NC

ANG PROJECT #: FJRP182510

CONTRACT #: W9133L-15-D-0004

CHARLOTTE AIR NATIONAL GUARD BASE

KEY NOTES :

1. CONCRETE WASHOUT AREA SEE SHEET C-041,

DETAIL 2

2. WATTLE, SEE SHEET C-042, DETAIL 1

3. RESEED DISTURBED AREA, SEE SHEET C-040, CLDS

DETAIL 30.17

GENERAL NOTES:

1. PLACE SOIL ON THE HIGH SIDE OF THE TRENCH

1. PLACE SPOIL ON THE HIGH SIDE OF THE TRENCH.

03/04/202203/16/2022

O

H

E

O

H

E

O

H

E

O

H

E

O

H

E

O

H

E

O

H

E

O

H

E

O

H

E

O

H

E

O

H

E

O

H

E

O

H

E

S

W

SS

SS

SS

SS

S

S

E X

IS

T

IN

G

B U

IL

D

IN

G

F F

E :6

.7 a s p h a lt a s p h a lt

Concrete Sidewalk p a v e m e n t e d g e

T B

M

F L A

N G

E B

O L T

O N

H Y

D R

A N

T

E L E

V .:6

.8

C u r b i n g

C u r b i n g

P A

R C

E L

A

C

IT

Y O

F C

H A

R L O

T T

E

P A

R C

E L

A

C

IT

Y O

F C

H A

R L O

T T

E

W V

W V

W V

S S

M H

R

IM

:6 .5

IN

V

.IN

:6

.7

IN

V

. O U

T :6

.4

S S

P O

S S

IB

L E

J U

N C

T

IO

N

B L O

C K

U N

F O

U N

D

WW

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

G

G

G

G

G

G

G

U G

E

UGE

U G

E

U G

E

U G

E

U G

E

U G

E

UG

E

U G

E

U G

E

UGE

UGE

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U

G

E

U G

E

U G

E

U

G

E

U G

E

U G

E

UGE

U G

E

U G

E

U G

E

U

G

E

U

G

E

U G

E

U G

E

U G

E

U G

E

U

G

E

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

W V

A N

G

D

IS

K

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

G u a rd

H o u s e

W V

W V

H eadw all

" R

C P

IN

V

.:6 .2

" R

C P

IN

V

.:6 .4

T ra n s fo rm e r o n C o n c re te

C O

M M

COMM

COMM

C O

M M

C O

M M

C O

M M

C O

M M

C

O

M

M

COM

M

COM

M

COMM

COMM

COMM

COMM COMM

COMM

COMM

COMM

COMM

COMM

C O

M M

CO

M

M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C O

M M

C O

M M

E

E

W

W

W

W

W

W

W

W

W

W

W

B a r r i c a d e

U G

E

U G

E

U G

E

U G

E U

G

E

U

G

E

G

U

G

E

U

G

E

U G

E

E

COMM

COMM

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

COMMCOMM

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C

O

M

M

C

O

M

M

C O

M M

C O

M M

C

O

M

M

C

O

M

M

C O

M

M

C O

M M

C O

M M

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COM

M

COMM

C O

M M

C O

M M

C O

M

M

C O

M

M

C O

M M

C O

M M

C O

M M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C O

M M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

T

T

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

E

T ra n s fo rm e r

E

H V

A C

C O

H V

A C

H

V

A

C

H

VAC

C O

F F

E :6

.0

F F

E :6

.7

P A

R C

E L

A

C

IT

Y O

F C

H A

R L O

T T

E

" R

C P

IN

V

.:6 .4

O rig in n o t fo u n d a s p h a lt a s p h a lt p a v e m e n t e d g e p a v e m e t d g e

T ra n s fo rm e r h a i

L k

F n c e h a k

F n c e

T

T

W V

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

U G

E

U

G

E

U G

E

U G

E

UGE

U G

E

U G

E

U G

E

U

G

E

U

G

E

U G

E

U G

E

U G

E

U G

E

C

O

M

M

C

O

M

M

C

O

M

M

C O

M M

C O

M M

C O

M M

C O

M

M

C O

M M

C O

M M

COMM

C O

M M

C O

M M

C O

M M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

L

O

D

LOD

LOD

LOD

LOD L

O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

LOD

LOD

LOD

LOD

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

LOD

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L O

D

L O

D

L O

D

L O

D

LOD

LOD

LO

D

L O

D

L O

D

L O

D

L O

D

L O

D

LOD

LOD

LOD

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

L O

D

LOD

LOD

LOD

LOD

LOD

S

F

S

F

S

F

S

F

S

F

S

F

S F

SF

SF

S

F

S F

S F

S F

S F

S F

S F

S F

S F

SF

SF

S F

S F

S F

S F

S F

SF

S F

S F

S

F

S F

S F

S

F

© 2020 Microsoft Corporation © 2020 Maxar ©CNES (2020) Distribution Airbus DS

W

S

W

S

S

C o n c r e t e

S i d e w a l k

W V

W V

W V

W

V

X

X

W

V

W

V

W V

E

E

S

WV

WV

WV

WV

WV

WV

WVWV

E

S

S

E

E

E

WV

E

T

CO

D

E

E

E

E

T

T

T

WV

E

T

T

E

E

C O

C O

CO

S

E

E

E

E

D

D

T

T

WV

WS

S

W

V

T

T

L

O

D

L O

D L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D L O

D

LOD

LO

D

L O

D

CE102

CE102.DWG

PARTIAL EROSION AND

SEDIMENT CONTROL PLAN 2

1" = 30'

- MARCH 2022 B-3 DESIGN SUBMITTAL

PARTIAL EROSION AND SEDIMENT CONTROL PLAN AREA 3

1" = 30'

CE101

CE101

CE102

KEY MAP

PROJECT MANAGER

HDR PROJECT #:

0 1"

2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

BRANDY CHAPMAN

BRANDY CHAPMAN

CHRIS TYNES

10226692

DEREK WORLEY

EXTEND

COMMUNICATIONS DUCT

BANK

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

CHARLOTTE, NC

ANG PROJECT #: FJRP182510

CONTRACT #: W9133L-15-D-0004

CHARLOTTE AIR NATIONAL GUARD BASE

KEY NOTES :

1. WATTLE, SEE SHEET C-042, DETAIL 1

2. BEGINNING OF OF DOUBLE ROW SILT FENCE. SEE

SHEET C-042, DETAIL 1.

3. END OF DOUBLE ROW SILT FENCE. SEE SHEET C-042,

DETAIL 1.

GENERAL NOTES:

1. PLACE SOIL ON THE HIGH SIDE OF THE TRENCH

1. PLACE SPOIL ON THE HIGH SIDE OF THE TRENCH.

TYPE 1 UTILITY TRENCH PATCH

NOT TO SCALE

1'-6" CONCRETE CURB AND GUTTER

NOT TO SCALE

1" DIA. PVC PIPE AND

CAP, FILL WITH GREASE

BOND BREAKER

AT BACKER ROD

POLYURETHANE SEALANT

1/4" RADIUS

TOOLED EDGE

1/4" MIN,

1/2" MAX.

SUBGRADE

NO. 5 BARS

AT 10" O.C. E.W.

BACKER ROD

DIA. = "W"+1/8"

M

I N

C O

N C

S

U R

F A

C E

E Q

U A

L E

Q U

A L

℄ EXP. JOINT

2" CLEAR

3/4" DIA. SMOOTH S.ST. DOWEL

x 2'-0" LONG @ 18" O.C., CENTERED ON EXP. JOINT

COMPRESSIBLE FILLER,

EXTEND TO SUBGRADE

EXIST. CONC. SURFACENEW CONC. SURFACE

EPOXY ADHESIVE

EXIST. CONCRETE

SURFACE, TYP.

EXIST. COMPACTED

BASE MATERIAL

EXPANSION JOINT,

TYP. SEE DETAIL

TRACER WIRE (BARE 10-GAUGE

COPPER) FOR NON-FERROUS PIPE

NO. 5 BARS AT 10" O.C. E.W.

PIPE EMBEDMENT NOTE:

FOR ADDITIONAL TRENCH DIMENSION

REQUIREMENTS SEE DETAIL

UNDISTURBED SOIL

CEMENT STABILIZED BACKFILL

BELOW CONCRETE SURFACE,

COMPACT TO MIN. 95% ASTM D698

FOR PIPE EMBEDMENT MATERIAL

AND TRENCH DIMENSIONS,

SEE PIPE EMBEDMENT DETAIL

CENTER PIPE IN TRENCH

SAW CUT EXIST. CONC. SURFACE,

WIDTH OF TRENCH + 4'-0" MIN.

1'-0" MIN.

2'-0" MAX.

METALLIC WARNING

TAPE, 12"-18" BELOW

FINISHED GRADE

PIPE EMBEDMENT:

FOR COVER LESS THAN 10-FEET

UTILIZE CLEAN SILICA SAND EMBEDMENT,

FOR COVER GREATER THAN 10-FEET UTILIZE

CEMENT STABILIZED EMBEDMENT

TYPICAL PIPE EMBEDMENT DETAIL

NOT TO SCALE

COMPACTED BACKFILL,

REFER TO THE SPECIFICATIONS

TRENCH SIDE SLOPE,

AS NEEDED FOR STABILITY

EXCAVATION LINE MAY BE CURVED

TO SHAPE OF TRENCHER, MAINTAIN

MIN. BEDDING LAYER DEPTH

CENTER PIPE IN TRENCH

POLYETHYLENE UNDERGROUND WARNING

TAPE, REFER TO THE SPECIFICATIONS

OUTSIDE DIAMETER OF PIPE (O.D.)

TRENCH WIDTH:

O.D. + 4" MIN. FOR PIPE 2" - 4" DIA.

O.D. + 12" MIN. FOR PIPE 6" DIA. AND LARGER

CONCRETE SURFACE

TRENCH AND REPAIR DETAIL

NOT TO SCALE

CONCRETE

EXPANSION JOINT (EJ) DETAIL

NOT TO SCALE

1" JOINT WIDTH

6" MIN.6" MIN.

T R

E N

E P

T H

C L E

A R

TRENCH WIDTH

T R

E N

P

T H

C O

V E

R

V

A R

I E

S

M

I N

M

I N

M

I N

F

P

E

D

I A

A

N

S

S

M

I N

F

P

E

L A

R G

T

A

N

D

I A

RESTORE ALL AREAS

DISTURBED BY CONSTRUCTION

FOR TRENCH IN GRADE, PROVIDE 6" TOPSOIL;

FOR TRENCH CUTS IN PAVEMENT, REFER TO

SPECIFIC DETAILS ON THIS SHEET

MATCH ELEV. AT EXIST.

CONC. SURFACE, TYP.

CONCRETE PAVEMENT NOTE:

CONCRETE PAVEMENT REPAIR SHALL BE

IN COMPLIANCE WITH NCDOT

SPECIFICATION 723 FROM STANDARD

SPECIFICATIONS FOR ROADS AND

STRUCTURES.

C-030

C-030.DWG

CIVIL

SITE DETAILS

AS NOTED

- MARCH 2022 B-3 DESIGN SUBMITTAL

PROJECT MANAGER

HDR PROJECT #:

0 1"

2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

BRANDY CHAPMAN

BRANDY CHAPMAN

CHRIS TYNES

10226692

DEREK WORLEY

EXTEND

COMMUNICATIONS DUCT

BANK

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

CHARLOTTE, NC

ANG PROJECT #: FJRP182510

CONTRACT #: W9133L-15-D-0004

CHARLOTTE AIR NATIONAL GUARD BASE

TEMPORARY NON LAWN SEEDING MEASURES

A. GENERAL:

1. AFTER CONSTRUCTION IS COMPLETE IN ANY AREA OR PHASE OF THE PROJECT, THE

DISTURBED AREAS SHALL RECEIVE A PERMANENT GROUND COVER. SEEDING AND

MULCHING SHALL BE PERFORMED IMMEDIATELY BEHIND CONSTRUCTION. THE

CONTRACTOR SHALL PROVIDE PERMANENT SEEDING IN ALL DISTURBED AREAS AS

INDICATED IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL ADAPT

PERMANENT SEEDING OPERATIONS TO PROTECT AND TO ACCOMMODATE ANY

TEMPORARY SEEDING AND SOIL AND EROSION CONTROL MEASURES THAT MAY

ALREADY BE IN PLACE DURING THE WORK PERIOD.

2. WHEN SEEDING MUST TAKE PLACE OUT OF SEASON FOR PERMANENT GRASS THE

APPROPRIATE TEMPORARY SEEDING SHALL BE DONE AND THE CONTRACTOR SHALL

BE RESPONSIBLE FOR PERMANENT SEEDING AS SPECIFIED IN SEASON AT NO

ADDITIONAL COST TO OWNER.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR TURF MAINTENANCE THROUGH

SUBSTANTIAL COMPLETION. SLOPES MUST BE AT 90% COVERAGE AT SUBSTANTIAL

COMPLETION REVIEW TO BE ACCEPTED. IF NOT AT 90% COVERAGE, SUBSTANTIAL

COMPLETION WILL BE DELAYED UNTIL 90% COVERAGE IS ACHIEVED AND/OR UNTIL

THE FOLLOWING GROWING SEASON.

B. SITE PREPARATION AND INSTALLATION:

1. GROUND COVER: ALL DISTURBED AREAS SHALL BE DRESSED TO A DEPTH OF SIX (6)

INCHES. THE TOP THREE (3) INCHES SHALL BE PULVERIZED TO PROVIDE A UNIFORM

SEEDBED. RAKE OR HARROW THE SITE TO ESTABLISH A SMOOTH AND LEVEL FINAL

GRADE. SOIL PARTICLES SHOULD BE NO LARGER THAN MARBLE SIZE, AND PEA

GRAVEL SIZE IS EVEN BETTER. AGRICULTURAL LIME SHALL BE APPLIED AT THE

RATE OF 1 TONS/ACRE IMMEDIATELY BEFORE PLOWING. GRASS SEED SHALL BE

APPLIED AT THE RATES OUTLINED IN TABLES 2A AND 2B.

2. 10-10-10 FERTILIZER SHALL BE APPLIED TO ALL DISTURBED AREAS AT A RATE OF

750 LBS./ACRE. MULCHING SHALL CONSIST OF SMALL GRAIN STRAW APPLIED AT A

RATE OF 2 TONS/ACRE. MULCHED AREAS SHALL BE TACKED WITH ASPHALT OR

OTHER APPROVED METHOD SUFFICIENT TO HOLD THE STRAW IN PLACE, AT A RATE

OF 150 TO 200 GALLONS PER TON OF STRAW.

3. SOME AREAS MAY REQUIRE TEMPORARY SEEDING DUE TO AN INTERRUPTION OF

WORK OR SEASONAL RESTRICTIONS AS SPECIFIED IN THE PERMANENT SEEDING

SCHEDULE, OR A COMBINATION THEREOF. THESE AREAS SHALL BE RE-SEEDED IN

ACCORDANCE WITH THE PERMANENT SEEDING SCHEDULE. IF TEMPORARY

SEEDING IS REQUIRED DUE TO CONTRACTOR DELAYS, THERE WILL BE NO

COMPENSATION FOR THE TEMPORARY SEEDING. TEMPORARY SEEDING SHALL BE

PERFORMED ONLY AT THE DIRECTION OF THE ENGINEER OR INSPECTOR.

C. CLEANUP AND INSPECTION:

1. UPON COMPLETION OF WORK, THE CONTRACTOR SHALL REMOVE FROM THE SITE

ALL EQUIPMENT AND OTHER ARTICLES USED. ALL EXCESS SOIL, STONE, AND

DEBRIS SHALL BE REMOVED AND LEGALLY DISPOSED OF AT NO ADDITIONAL COST

TO THE OWNER. ALL WORK AREAS SHALL BE LEFT IN A CLEAN AND NEAT

CONDITION. ALL DAMAGE TO EXISTING CONSTRUCTION CAUSED BY LANDSCAPING

OPERATIONS SHALL BE REPAIRED TO THE SATISFACTION OF THE TOWN AT THE

CONTRACTOR'S EXPENSE.

2. SEEDED AREAS SHALL BE PROTECTED AND REPLANTED AS NECESSARY TO

ESTABLISH A UNIFORM STAND OF SPECIFIED GRASS. SCATTERED BARE SPOTS,

NONE OF WHICH SHALL BE LARGER THAT ONE (1) SQUARE FOOT, WILL BE ALLOWED

UP TO A MAXIMUM OF 3% OF THE SEEDED AREA FOR EACH PROPERTY. WHEN

SEEDED AREAS ARE READY FOR INSPECTION, THE MAINTAINED TURF AREAS SHALL

BE NEATLY MOWED TO THE UNIFORM HEIGHT OF APPROXIMATELY TWO AND

ONE-HALF (2.5) INCHES. THE LAWNS SHALL BE CONSIDERED ESTABLISHED ONLY

WHEN THE SPECIFIED GRASS IS VIGOROUS AND GROWING WELL IN ADDITION TO

MEETING THE OTHER REQUIREMENTS SPECIFIED.

GENERAL EROSION CONTROL NOTES

1. THE CONTRACTOR SHALL INSTALL ALL EROSION AND SEDIMENTATION CONTROL MEASURES AND

DEVICES NECESSARY TO COMPLY WITH THE STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA

DEPARTMENT OF ENVIRONMENTAL QUALITY (NC DEQ) AND APPLICABLE STATE AND LOCAL LAWS AND

ORDINANCES, AND PREVENT STANDING WATER WITHIN PROJECT LIMITS, UNLESS OTHERWISE DIRECTED.

2. INSTALL CONSTRUCTION ENTRANCES AND ACCESS ROADS IN LOCATIONS SHOWN, IN ACCORDANCE WITH

STATE STANDARDS AND WITH MINIMAL DISTURBANCE TO SURROUNDING VEGETATION AND TREES.

CONTRACTOR SHALL RECEIVE PRIOR APPROVAL FROM ENGINEER BEFORE TREE REMOVAL FOR ACCESS

ROAD CONSTRUCTION. WITHIN 30 DAYS AFTER CONSTRUCTION IS COMPLETED FOR WHICH ACCESS

ROAD IS USED, AND UNLESS OTHERWISE APPROVED, CONTRACTOR SHALL REMOVE ALL REMNANTS OF

THE ACCESS ROADS AND RETURN AREA TO AS GOOD AS OR BETTER CONDITION. ADDITIONAL

MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BASED ON CONTRACTOR'S

PRACTICES OR BY THE CONTRACTING OFFICER AND WILL BE EMPLOYED WHERE DETERMINED

NECESSARY BY ACTUAL SITE CONDITIONS.

3. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLE OR SITE ONTO PUBLIC

ROADWAY OR INTO STORM DRAIN MUST BE REMOVED.

4. ALL DITCH LINES DISTURBED DURING CONSTRUCTION SHALL BE STABILIZED BY THE CONTRACTOR. ON

ALL NEW OR UNDISTURBED, UNPAVED DITCHES INSTALL EROSION CONTROL MATTING (NAG SC150, SC150BN OR APPROVED EQUAL) A TEMPORARY DITCH LINER OF FIBERGLASS ROVING ON THE DITCH

BOTTOM AND SIDE SLOPES.

5. PROVIDE SILT FENCE ADJACENT TO DITCHES AND AT THE TOE OF FILL SLOPES. ALSO, PROVIDE

ADEQUATE MEASURES IN AREAS WHERE NATURAL VEGETATION DOES NOT PROVIDE A SUFFICIENT

BUFFER AND AS DIRECTED BY THE ENGINEER. WHERE SILT FENCE AND TREE PROTECTION CONFLICT, STOP SILT FENCE AT TREE PROTECTION.

6. PROVIDE INLET SEDIMENT FILTER AT ALL NEW STORM INLETS. INLET PROTECTION MAY BE REQUIRED AT

EXISTING INLETS IN THE EVENT SEDIMENT WILL RUN DOWNSTREAM TO AN EXISTING INLET.

7. PRIOR TO COMMENCING LAND DISTURBANCE ACTIVITY:

a. THE LIMITS OF LAND DISTURBANCE SHALL BE CLEARLY AND ACCURATELY DEMARCATED WITH

STAKES, FENCING, OR OTHER APPROPRIATE MEANS. THE LOCATION AND EXTENT OF ALL

AUTHORIZED LAND DISTURBANCE ACTIVITY SHALL BE DEMARCATED FOR THE DURATION OF THE

CONSTRUCTION ACTIVITY. NO LAND DISTURBANCE SHALL OCCUR OUTSIDE THE APPROVED LIMITS

INDICATED ON THE APPROVED PLANS.

b. ALL TREE PROTECTION FENCING SHALL BE INSTALLED, INSPECTED AND APPROVED BY THE

INSPECTOR. TREES WITHIN THE PROTECTION AREAS MAY ONLY BE REMOVED WITH APPROVAL BY

THE INSPECTOR.

8. COMPLY WITH THE FOLLOWING CONSTRUCTION SEQUENCE FOR EACH CONSTRUCTION PHASE:

a. GRUBBING SHALL BE PERFORMED DURING PREDICTED PERIODS OF DRY WEATHER.

b. EROSION CONTROL DEVICES AND STORMWATER MANAGEMENT DEVICES SHALL BE INSTALLED PRIOR

TO ANY OTHER CONSTRUCTION AND WITHIN 24 HOURS OF GRUBBING. THIS MAY REQUIRE GRUBBING

IN STAGES TO ENSURE EROSION CONTROL MEASURES ARE PUT IN PLACE PRIOR TO RAIN EVENT.

THE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM

THAT SHOWN ON THE APPROVED PLANS IF DRAINAGE PATTERNS DURING CONSTRUCTION ARE

DIFFERENT FROM THE FINAL PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTOR'S

RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT

VARIOUS STAGES DURING CONSTRUCTION. ANY DIFFICULTY IN CONTROLLING EROSION DURING ANY

PHASE OF CONSTRUCTION SHALL IMMEDIATELY BE REPORTED TO THE ENGINEER.

c. SILT FENCE SHALL BE INSTALLED WITHIN 24 HOURS OF GRUBBING ALL PERIMETERS. THE

CONTRACTOR SHALL REMOVE ACCUMULATED SILT WHEN THE SILT IS WITHIN 12" OF THE TOP OF THE

SILT FENCE UTILIZED FOR EROSION CONTROL.

9. THE CONSTRUCTION OF THE SITE WILL COMMENCE WITH INSTALLATION OF EROSION CONTROL

MEASURES SUFFICIENT TO CONTROL SEDIMENT DEPOSITS AND EROSION. ALL SEDIMENT CONTROL WILL

BE MAINTAINED UNTIL ALL UPSTREAM GROUND WITHIN THE CONSTRUCTION AREA HAS BEEN

COMPLETELY STABILIZED WITH PERMANENT VEGETATION.

10. FAILURE TO INSTALL, OPERATE OR MAINTAIN ALL EROSION CONTROL MEASURES WILL RESULT IN ALL

CONSTRUCTION BEING STOPPED ON THE JOB SITE UNTIL SUCH MEASURES ARE CORRECTED TO NORTH

CAROLINA EROSION AND SEDIMENT CONTROL REGULATIONS.

11. A COPY OF THE APPROVED LAND DISTURBANCE PLAN AND PERMIT SHALL BE PRESENT ON THE SITE

WHENEVER LAND DISTURBANCE ACTIVITY IS IN PROGRESS.

12. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CHECKED DAILY AND ANY DEFICIENCIES

NOTED WILL BE CORRECTED BY THE END OF EACH DAY. ADDITIONAL EROSION AND SEDIMENT CONTROL

MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON-SITE INSPECTION.

13. ON-SITE STOCKPILING OF SOIL IS ALLOWED WITHIN THE LIMITS OF DISTURBANCE SUBJECT TO PLACING

APPROPRIATE EROSION CONTROL DEVICES TO PREVENT SOIL LOSS DURING RAIN EVENTS. LOCATIONS

SHALL BE PRE-APPROVED BY THE INSPECTOR.

14. GROUND STABILIZATION SHALL BE ACHIEVED CONSISTENT WITH NCDEQ GENERAL PERMIT NCG01000

EFFECTIVE AS OF AUGUST 2, 2011. WHERE LAND DISTURBING ACTIVITIES HAVE TEMPORARILY OR

PERMANENTLY CEASED, ALL DISTURBED AREAS SHALL BE PROVIDED WITH TEMPORARY OR PERMANENT

STABILIZATION WITH GROUND COVER WITHIN 14 CALENDAR DAYS FROM THE LAST LAND DISTURBING

ACTIVITY EXCEPT FOR ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES

STEEPER THAN 3:1 (H:V), WHICH SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH

GROUND COVER WITHIN 7 CALENDAR DAYS FROM THE LAND DISTURBING ACTIVITY. THE CONTRACTOR

SHALL REFER TO GENERAL PERMIT NCG01000 FOR SPECIFIC CONDITIONS, EXEMPTIONS, AND

DEFINITIONS FOR MEETING THESE STABILIZATION REQUIREMENTS. SEE TABLE 1.

15. SITE DISTURBED AREA = 0.84 ACRES.

16. PROVIDE NOTIFICATION TO ALL AFFECTED PROPERTY OWNERS PRIOR TO CONSTRUCTION, AS

APPLICABLE.

17. EFFECTIVE OCTOBER 1, 2010, PERSONS RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST INSPECT

THE SEDIMENT AND EROSION CONTROL MEASURES ON A PROJECT AFTER EACH PHASE OF THE PROJECT

TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING

FOLLOWED. SELF-INSPECTION REPORTS ARE REQUIRED. A SAMPLE SELF-INSPECTION REPORT AS WELL

AS DETAILS OF THE SELF-INSPECTION PROGRAM CAN BE FOUND ON THE LAND QUALITY WEB SITE:

http://deq.nc.gov/about/divisions/energy-mineral-lan-resources/erosion-sediment-control/forms.

18. ANY OFF-SITE BORROW OR WASTE REQUIRED FOR THIS PROJECT MUST COME FROM AN APPROVED

EROSION CONTROL SITE PLAN REGULATED UNDER THE MINING ACT OF 1971 OR A LANDFILL REGULATED

BY THE DIVISION OF SOLID WASTE MANAGEMENT. DEBRIS FROM DEMOLITION ACTIVITIES SHOULD BE

DISPOSED OF AT AN APPROVED FACILITY.

EROSION MAINTENANCE REQUIREMENTS

1. SEDIMENT FENCE (SILT FENCE):

a. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY

REQUIRED REPAIRS IMMEDIATELY.

b. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME

INEFFECTIVE, REPLACE IT PROMPTLY.

c. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE

NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE.

d. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.

e. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO

GRADE. STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED.

2. SEDIMENT TUBES:

a. INSPECT CHANNELS FOR DAMAGE AFTER EACH RUNOFF EVENT.

b. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE WATTLE AND EROSION FROM HIGH FLOWS

AROUND THE EDGES OF THE WATTLE. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT

EROSION OCCURS BETWEEN WATTLES, INSTALL A PROTECTIVE RIPRAP LINER IN THAT PORTION OF

THE CHANNEL.

c. REMOVE SEDIMENT ACCUMULATED BEHIND THE WATTLES AS NEEDED TO PREVENT DAMAGE TO

CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STRAW WATTLE AND

PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE WATTLE.

3. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT:

a. INSPECT ON LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH

2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND

CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS.

4. ROCK OUTLET PROTECTION:

a. INSPECT STONE ARRANGEMENT WEEKLY AND AFTER EVERY RAINFALL EVENT.

b. MAINTAIN SPECIFIED DIMENSIONS AND REMOVE SEDIMENT BUILDUP WHEN THE SEDIMENT LEVEL IS

½ THE HEIGHT OF THE ROCKS.

5. INLET PROTECTION:

a. INSPECT STONE ARRANGEMENT WEEKLY AND AFTER EVERY RAINFALL EVENT.

b. REPLACE STONE AS NEEDED TO MAINTAIN SPECIFIED DIMENSIONS

c. REMOVE SEDIMENT BUILDUP WHEN THE SEDIMENT LEVEL IS ½ THE HEIGHT OF THE ROCKS. TAKE

ARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL.

6. TEMPORARY DIVERSIONS:

a. INSPECT WEEKLY AND, AFTER EVERY RAINFALL, REMOVE SEDIMENT FROM THE FLOW AREA AND

REPAIR THE DIVERSION RIDGES. ALSO CHECK AND MAINTAIN OUTLETS.

b. WHEN THE PROTECTED AREA IS PERMANENTLY STABILIZED, REMOVE THE RIDGES AND THE

CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE SITE.

7. CHECK DAM:

a. INSPECT CHECK DAMS AND CHANNELS FOR DAMAGE AFTER EACH RUNOFF EVENT.

b. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH

FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT

EROSION OCCURS BETWEEN DAMS, INSTALL A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE

CHANNEL.

c. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO

CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM AND

PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS

NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION.

3. AN INSPECTION OF THE COMPLETED SEEDING SHALL BE MADE AT THE

CONCLUSION OF THE LANDSCAPE WORK UPON WRITTEN NOTICE REQUESTING

SUCH INSPECTION SUBMITTED BY THE CONTRACTOR TO THE ENGINEER, AT LEAST

TEN (10) DAYS PRIOR TO THE ANTICIPATED DATE OF INSPECTION.

4. A FINAL INSPECTION SHALL BE PERFORMED WHEN A SATISFACTORY STAND OF

SEEDED TURF GRASS HAS BEEN PRODUCED, UPON WRITTEN NOTICE REQUESTING

SUCH INSPECTION SUBMITTED BY THE CONTRACTOR TO THE ENGINEER, AT LEAST

TEN (10) DAYS PRIOR TO THE ANTICIPATED DATE OF INSPECTION. IF A

SATISFACTORY STAND OF TURF HAS NOT BEEN PRODUCED AT THE TIME OF FINAL

INSPECTION, NECESSARY REPAIRS SHALL BE PERFORMED IN CONFORMANCE WITH

THE REQUIREMENTS OF THIS SECTION. UPON COMPLETION OF THESE REPAIRS,

THE SEEDED GRASS SHALL BE REINSPECTED UPON WRITTEN NOTICE AS ABOVE.

EROSION CONTROL CONSTRUCTION SEQUENCE

1. OBTAIN AND MAINTAIN ON SITE THE LAND-DISTURBING PERMIT FROM NCDEQ FOR

THE 0.26 ACRES OF DISTURBANCE.

2. CALL NCDEQ WILMINGTON REGIONAL OFFICE AT 910-796-7215 TO SCHEDULE A

PRE-CONSTRUCTION MEETING AT LEAST 48 HOURS PRIOR TO PROJECT ACTIVATION.

3. PRIOR TO COMMENCING ANY LAND DISTURBANCE ACTIVITY, CLEARLY AND

ACCURATELY DEMARCATE THE LIMITS OF THE LAND DISTURBANCE WITH STAKES,

RIBBONS, OR OTHER APPROPRIATE MEANS.

4. INSTALL STABILIZED CONSTRUCTION ENTRANCE AND SILT FENCE PRIOR TO ANY

LAND DISTURBANCE ACTIVITIES (CLEARING, GRADING, GRUBBING, OR EXCAVATION).

CLEAR ONLY AS NECESSARY TO INSTALL THE SKIMMER BASIN AS SHOWN ON THE

PHASE I EROSION CONTROL PLANS.

5. CONTACT THE INSPECTOR (910-796-7215) FOR AN ON-SITE INSPECTION OF THE

INSTALLED MEASURES. WHEN APPROVED, INSTALL REMAINING EROSION CONTROL

DEVICES (TEMPORARY DIVERSION DITCHES, STRAW WATTLES, ETC.).

6. INSPECT ALL EROSION CONTROL DEVICES AT WEEKLY INTERVALS AND AFTER

EVERY RAINFALL EVENT EXCEEDING

" TO VERIFY THAT THEY ARE FUNCTIONING

PROPERLY. ANY ACCUMULATED SEDIMENT SHALL BE REMOVED AND PLACED IN A

DESIGNATED SPOIL DISPOSAL AREA APPROVED BY THE INSPECTOR. CONDUCT

PERIODIC INSPECTIONS OF ALL EROSION AND SEDIMENTATION CONTROLS AND

MAKE ANY REPAIRS OR MODIFICATIONS NECESSARY TO ASSURE CONTINUED

EFFECTIVE OPERATION OF EACH DEVICE.

7. BEGIN REMAINDER OF CLEARING, GRUBBING, AND GRADING OF SITE.

8. STABILIZE SITE PER EROSION CONTROL NOTES AND SEEDING SCHEDULE AS AREAS

ARE BROUGHT TO FINISHED GRADE WITH VEGETATION, PAVING, DITCH LININGS, ETC.

PER GENERAL PERMIT NCG010000. ALL PERIMETER DIKES, SWALES, DITCHES,

PERIMETER SLOPES, AND ALL SLOPES STEEPER THAN 3:1 SHALL BE PROVIDED

TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS

PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND

DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED

TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS

PRACTICABLE BUT IN EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND

DISTURBING ACTIVITY.

9. THE STORM DRAINAGE NETWORK MUST BE CONSTRUCTED TO DISCHARGE INTO THE

SKIMMER BASIN AS INDICATED ON THE PHASE II EROSION CONTROL PLANS. ONCE

STORM NETWORK IS COMPLETELY CONSTRUCTED, ALL INLETS ARE PROPERLY

PROTECTED, AND VEGETATION HAS BEEN ESTABLISHED ON A MAJORITY OF THE

SITE, THE SKIMMER BASIN CAN BE CLEANED OF ACCUMULATED SEDIMENT AND

SODDED. PIPES INTERCONNECTING THE FORMER SKIMMER BASIN TO THE SAND

FILTER CAN BE INSTALLED AS SHOWN ON SHEET CG103 WHEN DEEMED

APPROPRIATE BY THE CONTRACTING OFFICER.

10. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN

ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION.

11. CONTACT THE INSPECTOR (910-796-7215) FOR AN INSPECTION WHEN

CONSTRUCTION IS COMPLETE AND ALL AREAS ARE FULLY PLANTED AND

STABILIZED.

12. WHEN FINAL SITE STABILIZATION IS APPROVED, REMOVE ALL EROSION CONTROL

DEVICES AND STABILIZE THESE AND ANY RESULTING BARE AREAS.

13. CONTACT THE INSPECTOR (910-796-7215) FOR A FINAL SITE INSPECTION WHEN

VEGETATION HAS BECOME ESTABLISHED.

C-040

C-040.DWG

CIVIL

EROSION CONTROL NOTES

AS NOTED

- MARCH 2022 B-3 DESIGN SUBMITTAL

PROJECT MANAGER

HDR PROJECT #:

0 1"

2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

BRANDY CHAPMAN

BRANDY CHAPMAN

CHRIS TYNES

10226692

DEREK WORLEY

EXTEND

COMMUNICATIONS DUCT

BANK

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

CHARLOTTE, NC

ANG PROJECT #: FJRP182510

CONTRACT #: W9133L-15-D-0004

CHARLOTTE AIR NATIONAL GUARD BASE

*PERMANENT SEEDING SCHEDULE CAN BE FOUND ON C-041

TEMPORARY SILT FENCE

NOT TO SCALE

CATCH BASIN INLET PROTECTION

NOT TO SCALE

PLAN

SECTION A-A

STAKE

(2 PER BALE)

STRAW BALE

(TYP)

10 MIL PLASTIC

LINER

10 MIL PLASTIC

LINER

STRAW

BALE

BINDING

WIRE

STAPLES

(2 PER BALE)

WOOD OR

METAL STAKES

(2 PER BALE)

NATIVE MATERIAL

(OPTIONAL)

1/8" DIA

STEEL WIRE

A A

EXISTING

GRADE

1. ACTUAL LAYOUT DETERMINED IN FIELD.

2. INSTALL CONCRETE WASHOUT SIGN (24"X24", MINIMUM) WITHIN 30' OF THE TEMPORARY

CONCRETE WASHOUT FACILITY.

3. TEMPORARY WASHOUT AREA MUST BE AT LEAST 50' FROM A STORM DRAIN, CREEK BANK OR

PERIMETER CONTROL.

4. REMOVE STRUCTURE AND SIGN UPON PROJECT COMPLETION. GRADE THE EARTH MATERIAL TO

MATCH THE EXISTING CONTOURS AND PERMANENTLY SEED AND MULCH AREA.

5. REFER TO EROSION CONTROL GENERAL NOTES FOR INSPECTION AND MAINTENANCE

SPECIFICATIONS.

NOTES:

CONCRETE WASHOUT AREA

NOT TO SCALE

C-041

C-041.DWG

CIVIL

EROSION CONTROL DETAILS 1

AS NOTED

- MARCH 2022 B-3 DESIGN SUBMITTAL

PROJECT MANAGER

HDR PROJECT #:

0 1"

2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

BRANDY CHAPMAN

BRANDY CHAPMAN

CHRIS TYNES

10226692

DEREK WORLEY

EXTEND

COMMUNICATIONS DUCT

BANK

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

CHARLOTTE, NC

ANG PROJECT #: FJRP182510

CONTRACT #: W9133L-15-D-0004

CHARLOTTE AIR NATIONAL GUARD BASE

PERMANENT SEEDING SCHEDULE

03/04/2022

6.11.14 R

ev. 5/08

03/16/2022

NOTE:

1. Other materials providing equivalent protection against erosive velocities may be substituted for use in silt socks or wattles.

2. Fill silt sock/wattle netting uniformly with compost to the desired length such that logs do not deform.

3. Silt sock/Wattle(s) should be installed parallel to and a minimum of 10 feet beyond the toe of a graded slope. Silt Sock/Wattle(s) located below flat areas should be located at the edge of the land disturbance. The ends of the silt sock/wattle(s) should be turned slightly upslope to prevent runoff from going around the end of the silt sock/wattle(s).

4. Oak or other durable hardwood stakes with a 2 inch x 2 inch cross section should be driven vertically plumb, through the center of the silt sock/wattle. Stakes should be placed at a maximum interval of 4 feet or a maximum interval of 8 feet if the silt sock/wattle is placed in a 4 inch trench.

5. In the event staking is not possible (ie. when socks/wattles are used on pavement) heavy concrete blocks shall be used behind the silt sock/wattle to hold it in place during runoff events.

MAINTENANCE:

1. Inspect silt sock/wattle at least weekly and after each 1 inch or greater rainfall. Remove accumulated sediment and any debris as needed to allow for adequate flow.

2. Silt sock/Wattle must be replaced if clogged or torn.

3. If ponding becomes excessive, the silt sock/wattle may need to be replaced with a larger diameter or a different measure.

4. Reinstall if damaged or dislodged.

5. Silt socks/wattles shall be inspected until land disturbance is compete and the area above the measure has been permanently stabilized.

M a x

12" Min.

SECTION

UNTRENCHED INSTALLATION

M a x

12" Min.

SECTION

ENTRENCHED INSTALLATION*

*THIS APPLICATION MAY NOT BE USED WITH COMPOST

SOCKS SMALLER THAN 12".

Work Area

Area To Be

Protected

ISOMETRIC VIEW

SILT SOCK/WATTLE

NOT TO SCALE

C-042

C-042.DWG

CIVIL

EROSION CONTROL DETAILS 2

AS NOTED

- MARCH 2022 B-3 DESIGN SUBMITTAL

PROJECT MANAGER

HDR PROJECT #:

0 1"

2"

SCALE

FILENAME

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUE DATE DESCRIPTION

1 2 3 4 5 6 7 8

D

C

B

A

SHEET

BRANDY CHAPMAN

BRANDY CHAPMAN

CHRIS TYNES

10226692

DEREK WORLEY

EXTEND

COMMUNICATIONS DUCT

BANK

NC AIR NATIONAL GUARD

145TH AIRLIFT WING

CHARLOTTE, NC

ANG PROJECT #: FJRP182510

CONTRACT #: W9133L-15-D-0004

CHARLOTTE AIR NATIONAL GUARD BASE

File details come from the government source that posted it. Updated .