About this file
This federal solicitation seeks proposals for a communications duct bank project at the 145th Airlift Wing in North Carolina. The solicitation will be issued on May 24, 2023 and a pre-bid conference will be held that day at 9:00am EST to review requirements and answer questions. The project involves extending an existing communications duct bank to support the 145th Airlift Wing located at the Charlotte Air National Guard Base. The selected contractor will be responsible for installing new underground ductwork and manholes to connect communications infrastructure as depicted in the design drawings and specifications. The Department of the Army North Carolina Army National Guard is the issuing agency for this solicitation.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
LOCATION
CHARLOTTE
NORTH CAROLINA
AIR NATIONAL GUARD
EXTEND COMMUNICATIONS DUCT BANK
145th AIRLIFT WING
CHARLOTTE, NC
CONTRACT NO.: W9133L-15-D-0004
TASK ORDER NO.: W50S87-20-F-5014
PN: FJRP182510
B-3 DESIGN SUBMISSION
MARCH 2022
E-501 ELECTRICAL DETAILS
E-103 PARTIAL ELECTRICAL SITE PLAN 2
E-102 PARTIAL ELECTRICAL SITE PLAN 1
E-101 OVERALL ELECTRICAL SITE PLAN
E-001 ELECTRICAL LEGEND AND GENERAL NOTES
C-042 CIVIL EROSION CONTROL DETAILS 2
C-041 CIVIL EROSION CONTROL DETAILS 1
C-040 CIVIL EROSION CONTROL NOTES
C-030 CIVIL SITE DETAILS
CE102 PARTIAL EROSION AND SEDIMENT CONTROL PLAN 2
CE101 PARTIAL EROSION AND SEDIMENT CONTROL PLAN 1
CS102 PARTIAL SITE, UTILITY, AND GRADING PLAN 2
CS101 PARTIAL SITE, UTILITY, AND GRADING PLAN 1
CD102 PARTIAL EXISTING CONDITIONS AND DEMOLITION PLAN 2
CD101 PARTIAL EXISTING CONDITIONS AND DEMOLITION PLAN 1
VF101 OVERALL SITE PLAN
C-001 CIVIL LEGEND
SHEET NUMBER DESCRIPTION
INDEX OF DRAWINGS
G-001
G-001.DWG
CIVIL LEGEND
- MARCH 2022 B-3 DESIGN SUBMISSION
LIMITS OF DISTURBANCE
LOD LOD LOD
EXISTING CONTOUR W/ ELEVATION (MAJOR)
EXISTING CONTOUR (MINOR)
CONTOUR W/ ELEVATION (MAJOR)
X X X X X X
SECURITY FENCE
SILT FENCE
DOWNGUY
SURVEY BENCHMARK
SPOT ELEVATION
SURVEY CONTROL POINT
CIVIL MAPPING SYMBOLOGY
FLOW ARROW
CLEANOUT
HORIZONTAL CONTROL POINT
VERTICAL CONTROL POINT
PUMP STATION
SANITARY MANHOLE
EXISTING UTILITY POLE
UTILITY/CIVIL LINE SYMBOLOGY
FIRE HYDRANT
CP-X
CO
S
PS
X
X
TANK BELOW GROUND
TANK HORIZONTAL ABOVE GROUND
TANK VERTICAL ABOVE GROUND
X
X
X
A. SCREENING OR SHADING OF WORK IS USED TO INDICATE EXISTING
COMPONENTS.
DIVERSION SWALE
CONCRETE SIDEWALK
SEDIMENT TUBE
W
SS
UGE
EXISTING UNDERGROUND ELECTRICAL
EXISTING WATER
EXISTING SANITARY SEWER
CONTOUR (MINOR)
X X X X X X
EXISTING SECURITY FENCE
RIPRAP
SILT FENCE ROCK OUTLET
EXISTING OVERHEAD ELECTRICAL
EXISTING UNDERGROUND FIBER OPTIC
OHE
ASPHALT REMOVAL
COMM
W WATER MAIN
SEWER FORCE MAIN
STORM DRAINAGE PIPING
FM FM
SS GRAVITY SEWER PIPING
SD
CONSTRUCTION ENTRANCE
HEAVY DUTY CONCRETE PAVEMENT
1 STAKING POINT
FFE = 123
BUILDING FINISHED FLOOR ELEVATION
GENERAL SHEET NOTES
SEDIMENT TUBE INLET PROTECTION
EXISTING UNDERGROUND
COMMUNICATIONS
EXISTING STORM DRAINAGE PIPING
GATE VALVE
ASPHALT PAVEMENT REPAIR
EXISTING GUARDRAIL
PROJECT MANAGER
HDR PROJECT #:
0 1"
2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
BRANDY CHAPMAN
BRANDY CHAPMAN
CHRIS TYNES
10226692
DEREK WORLEY
EXTEND
COMMUNICATIONS DUCT
BANK
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC
ANG PROJECT #: FJRP182510
CONTRACT #: W9133L-15-D-0004
CHARLOTTE AIR NATIONAL GUARD BASE
COMM UNDERGROUND COMMUNICATIONS
CATCH BASIN INLET PROTECTION
CONCRETE REMOVAL
TOE OF SLOPE
TOS
ADS
ADVANCED DRAINAGE SYSTEMS
PLS PROFESSIONAL LAND SURVEYOR
LICENSED BUSINESS NUMBERLB
LIFT STATIONL.S.
WD
WOOD
INV.
INVERT
TOB
PVC
POLYVINYLCHLORIDE PIPE
TOP OF BANK
REINFORCED CONCRETE PIPE
RCP
CORRUGATED METAL PIPECMP
BUSSEN-MAYER ENG. GROUP, INC.
RADIUS
PARKER-KAYLON NAIL/WASHER
ALSO KNOWN AS
RIGHT-OF-WAY
WITH
TYPICAL
TYP.
W/
R/W
AKA
P.K. NAIL
R
BMEG
CONC. CONCRETE
EL.
ELEVATION
OFFICIAL RECORDS BOOK
PAGE
EASEMENTESM'T.
PG.
O.R.B.
ABBREVIATIONS
MECHANICAL JOINTMJ
EXISTINGEXIST.
LINEAR FEETLF
DI DUCTILE IRON
STATE ROADS.R.
NORTH
N
W
WATER MAIN CROSSINGS
SOUTHS
E EAST
MITERED END SECTIONMES
HIGH DENSITY POLYETHYLENEHDPE
FEET/FOOTFT
BEST MANAGEMENT PRACTICESBMPs
POINT OF CURVATUREPC
POINT OF TAGENCYPT
L LENGTH OF CURVE
RE-BAR WITH SURVEYOR'S CAPRB/C
D DELTA ANGLE
POINT OF REVERSE CURVEPRC
EP
END POINT
FORCE MAINFM
RIGHTRT
FOUNDFND
PORTABLE DOCUMENT FORMATPDF
COMPACT DISCCD
UTILITY AGENCY OWNER
UAO
MEAN LOW WATER LEVELMLWL
GAS MAINGM
WM
WATER MAIN
VERIFIED VERTICAL ELEVATION VVH
AND HORIZONTAL LOCATION
CONST. CONSTRUCT
PROPOSEDPROP.
RESTRAINED JOINT
(RJ)
SILT FENCESF
NORTHING
N:
E: EASTING
MPII
CEMENT LINED DUCTILE IRONCLDI
MANUFACTURERS PRINTED INSTALLATION
INSTRUCTIONS
DOMESTIC COPPER WATERDCW
RESEEDED AREA
03/04/2022 C-001
C-001.DWG
03/16/2022
W
O
H
E
O
H
E
O
H
E
S
W
S
S
S S
S S
C o n c r e t e
S i d e w a l k
O H
E
O H
E
O
H
E
OHE
OHE
W V
W
V
W V
W
W
W W
W
W
G
G
G
G
G
U G
E
U G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U G
E
U
G
E
C
O
M
M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C
O
M
M
C
O
M
M
W V
A N
G
D I S
K
X
X
X
X
X
X
X
X
X
X
X
W V
W V
W V
C O
M M
C
O
M
M
C O
M M
C O
M M
C O
M M
C O
M M
C
O
M
M
E
E
W
W
S
WV
WV
WV
WV
WV
WV
WV
WV
E
S
S
E
E
E
WV
E
T
CO
D
E
E
E
E
UGE
T
T
T
WV
G
E
C
O
M
M
C O
M M
C O
M M
C
O
M
M
C O
M M
C O
M M
C O
M M
C O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
T
T
E
E
C O
C O
CO
S ign
Shrubs
S h r u b s
S h r u b s
S
U tility
V ault
W
X
E
E
S i d e w a l k
E
E
Sidewalk
S i d e w a l k
D
D
S S
701.40
701.65
701.70
701.38
726.55
M
AN
H O
LE
LID
:728.21'
W A
TE
R
V A
LV
E
IN
SID
E
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
COMM
COMM
COMM
COMM
COMM
U
G
E
UGE
U
G
E
W
W
W
W
T
T
WV
W
S
S
W V
C
O
M
M
C
O
M
M
T
T
COMM
A P
P R
O X
IM
A
TE
LO
C A
TIO
N
O F
E X
IS
TIN
G C
O M
M
R E
FE
R
E N
C E
C -17 C
O R
R O
S
IO
N
FU
E
L
C E
LL H
A
N G
A R
P R
O
JE
C T
C O
N
TR
A C
TO
R
TO
C
O N
FIR
M
LO
C
A
TIO
N
U G
E
U
G
E
C O
M M
C
O
M
M
C
O
M
M
VF101
VF101.DWG
OVERALL SITE PLAN
1" = 150'
- MARCH 2022 B-3 DESIGN SUBMITTAL
OVERALL SITE PLAN
1" = 150'
PROJECT MANAGER
HDR PROJECT #:
0 1"
2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
BRANDY CHAPMAN
BRANDY CHAPMAN
CHRIS TYNES
10226692
DEREK WORLEY
EXTEND
COMMUNICATIONS DUCT
BANK
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC
ANG PROJECT #: FJRP182510
CONTRACT #: W9133L-15-D-0004
CHARLOTTE AIR NATIONAL GUARD BASE
AREA 1
MORRIS FIELD DRIVE
PAYNE BOULEVARD
H
E
R
C
U
L
E
S
A
V
E
N
U
E
N C
A N
G D
R
IV
E
F
I R
S
T
F
L
I G
H
D
R
I V
E
CAROLINAS AIR MUSEUM
S
A
B
I
V
E
A I R
P O
I V
E
CHARLOTTE INTERNATIONAL
AIRPORT
M
I
N
U
T
E
M
N
W
Y
W
I N
S
T
N
C
N
T
A
I N
A
D
B I L
Y
G
A
H A
M
P
A R
K W
A Y
AREA 2
AREA 3
03/04/202203/16/2022
G
G
G
U G
E
U
G
E U
G E
U G
E
U G
E
U G
E
U
G
E
UGE
U
G
E
COMM
C O
M M
COMM
COMM
COMM
COMM
C O
M M
COMM
C O H
V A
C
S ig n
Barricade Barricade
J e rs e y
B a rrie rs
S h ru b s
S h r u b s
S h r u b s
" C ra p e
M ry tle
" C ra p e
M ry tle
" C ra p e
M ry tle
" C ra p e
M ry tle
E lm
" C ra p e
M ry tle
" C ra p e
M ry tle
" E lm
E lm
E lm
S
C O
M M
C
O
M
M
C O
M M
COMM
C O
M M
C
O
M
M
C O
M M
COMM
C O
M
M
C
O
M
M
C
O
M
M
COMM
COMM
COMM
C
O
M
M
C O
M M
U tility
V a u lt
W
W
W
W
W
W
G a te
X
X X X X X
5' Chain Link Fence
E
E
T B
M
F L A
N G
E B
O L T
O N
H Y
D R
A N
T
E L E
V .:7
.4
F F
E :7
.1
M e ta l
G u a rd
S h a c k
C o n c re te
Sidewalk
S i d e w a l k
S S
M H
R
IM
:7 .6
F L O
W :7
.7
C o n c re te
A s p h a lt
A s p h a lt
A s p h a lt
P A
R C
E L
A
C
IT
Y O
F C
H A
R L O
T T
E
P A
R C
E L
A
C
IT
Y O
F C
H A
R L O
T T
E
C U
R B
IN
L E
T
T O
P C
U R
B :7
.9
IN
V
. IN
:7
.4
IN
V
. O U
T :7
.4
C U
R B
IN
L E
T
T O
P C
U R
B :7
.5
IN
V
. IN
:7
.5
IN
V
. O U
T :7
.0
C U
R B
IN
L E
T
T O
P C
U R
B :7
.9
IN
V
. IN
:7
.0
IN
V
. O U
T :7
.9
P
P
15" RCP
R
C P
Curbing
C u r b i n g
C u r b i n g
C u r b i n g
C u r b i n g
Curbing
C u r b i n g
S
S
S
S
G e n e ra to r o n C o n c re te
T ra n s fo rm e r
T ra n s fo rm e r o n C o n c re te
W V
W V
W V
W V
W V
W V
W V
W V
E
S
S S
M H
R
IM
:7 .1
IN
V
. IN
:7
.8
' (N
E
IN
V
. IN
:7
.5
' (E
IN
V
. O U
T :7
.4
S
S S
M H
R
IM
:7 .2
IN
V
. IN
:7
.1
IN
V
. O U
T :7
.0
E
E
E
W V
H
V
A
C
E
H V
A C
T
C O
D
E
E
E
E
T
T
T
W V
R ip
R a p
T B
M
F L A
N G
E B
O L T
O N
H Y
D R
A N
T
E L E
V .:7
.3
S i d e w a l k pavement edge pavement edge pavement edge
G u a rd
R a il &
C h a in
L in k F e n c e o n to p o f w a ll
E
E
C o n c re te
W a ll
Concrete Wall
C o n c re te
C o n c re te
B ric k
W a ll
Curb & gutter
F F
E :7
.8
F F
E :7
.8
P A
R C
E L
A
C
IT
Y O
F C
H A
R L O
T T
E
P A
R C
E L
A
C
IT
Y O
F C
H A
R L O
T T
E
P A
R C
E L
A
C
IT
Y O
F C
H A
R L O
T T
E
D
D
S
S
S
S
S
S
S S
S S
S S
S S
SS
SS
.4
.6
.7
.3
.5
C o n c re te
W a ll
R ip
R a p
D R
O P
IN
L E
T
R
IM
:7 .3
IN
V
. IN
:7
.7
IN
V
. O U
T :7
.7
D R
O P
IN
L E
T
R
IM
:7 .6
IN
V
. O U
T :7
.9
S T
O R
M M
A N
H O
L E
L
ID
:7 .9
IN
V
. IN
:7
.5
' (N
W
IN
V
. IN
:7
.6
' (W
IN
V
. O U
T :7
.5
D R
O P
IN
L E
T
R
IM
:7 .6
IN
V
. IN
:7
.2
' (N
W
IN
V
. IN
:7
.3
' (N
E
IN
V
. O U
T :7
.9
S T
O R
M M
A N
H O
L E
L
ID
:7 .3
IN
V
. IN
:7
.9
' (N
W
IN
V
. IN
:7
.8
' (W
IN
V
. O U
T :7
.7
M A
N H
O L E
L
ID
:7 .2
W A
T E
R V
A L V
E
IN
S
ID
E
S T
O R
M M
A N
H O
L E
L
ID
:7 .2
IN
V
. IN
:7
.6
IN
V
. O U
T :7
.3
M A
N H
O L E
L
ID
:7 .5
IN
V
. IN
:7
.0
IN
V
. O U
T :7
.1
D R
O P
IN
L E
T
R
IM
:7 .9
IN
V
. IN
:6
.1
C o n c r e t e
I
P
12" DIP
18" RCP
P
R
C P
R
C
P
P
P
"C l a y
C l a y
E X
IS
T
IN
G
B U
IL
D
IN
G
E X
IS
T
IN
G
B U
IL
D
IN
G
E X
IS
T
IN
G
B U
IL
D
IN
G
T ra n s fo rm e r o n C o n c re te
R a m p
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
C O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
COMM
C O
M
M
COMM
COMM
C O
M M
C O
M M
COMM
C O
M M
C O
M M
C O
M M
C
O
M
M
C
O
M
M
C O
M M
COMM
COMM
COMM
COMM
COMM
COMM
COM
M
COMM
COM
M
COMM
COMM
COMM
COMM COMM COMM
COMM
C O
M M
C
O
M
M
C O
M M
C O
M M
C O
M M
COMM
COMM
COMM
COMM
COMM
C
O
M
M
C O
M M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
C
O
M
M
C
O
M
M
C O
M M
U G
E
U G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U G
E
U G
E
UGE UGE
UGE UGE
UGE
U G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
UG
E
UG
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
G
G
G
G
W
W
W
W
W
W
W
W
W
W
W W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W V
W
S
P
C
" D
IP
S
P
T
T
C
O
M
M
COMM
COMM
COMM
COMM
COMM
C O
M M
C O
M M
B L D
G
B L D
G
A P
P R
O X
IM
A
T E
L O
C A
T
IO
N O
F
E X
IS
T
IN
G
C O
M M
R E
F E
R E
N C
E C
-1 C
O R
R O
S
IO
N
F U
E L
C E
L L H
A N
G A
R P
R O
J E
C T
C O
N T
R A
C T
O R
T O
C O
N F
IR
M
L O
C A
T
IO
N
C M
H -1
A
© 2020 Microsoft Corporation © 2020 Maxar ©CNES (2020) Distribution Airbus DS
W
S
W
S
S
C o n c r e t e
S i d e w a l k
W V
W V
W V
W
V
A N
G
D I S
K
X
X
W
V
W
V
W V
E
E
S
WV
WV
WV
WV
WV
WV
WVWV
E
S
S
E
E
E
WV
E
T
CO
D
E
E
E
E
T
T
T
WV
E
T
T
E
E
C O
C O
CO
S
E
E
E
E
D
D
T
T
WV
WS
S
W
V
T
T
CD101
CD101.DWG
PARTIAL EXISTING CONDITIONS AND
DEMOLITION PLAN 1 (AREA 1)
1" = 30'
- MARCH 2022 B-3 DESIGN SUBMITTAL
PARTIAL EXISTING CONDITIONS AND DEMOLITION PLAN AREA 1
1" = 30'
PARTIAL EXISTING CONDITIONS AND DEMOLITION PLAN AREA 2
1" = 30'
CD101
CD101
CD102
KEY MAP
PROJECT MANAGER
HDR PROJECT #:
0 1"
2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
BRANDY CHAPMAN
BRANDY CHAPMAN
CHRIS TYNES
10226692
DEREK WORLEY
EXTEND
COMMUNICATIONS DUCT
BANK
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC
ANG PROJECT #: FJRP182510
CONTRACT #: W9133L-15-D-0004
CHARLOTTE AIR NATIONAL GUARD BASE
KEY NOTES :
1. REMOVE AND REPLACE APPROXIMATELY 515 SF ASPHALT
2. REMOVE AND REPLACE APPROXIMATELY 225 SF CONCRETE
3. REMOVE AND REPLACE APPROXIMATELY 6 LF CURB AND GUTTER
4. REMOVE AND REPLACE APPROXIMATELY 1715 SF ASPHALT
5. REMOVE AND REPLACE APPROXIMATELY 8 LF GUARDRAIL
6. PROPOSED TREE UNDER HANGAR PROJECT. OWNER TO
COORDINATE RELOCATION.
7. REMOVE AND REPLACE APPROXIMATELY 265 SF ASPHALT
8. REMOVE AND INSTALL RIPRAP NECESSARY TO INSTALL DUCT
BANK.
GENERAL NOTES:
1. CONTRACTOR MUST PRESERVE AND PROTECT ALL EXISTING
UTILITIES WITHIN THE LIMITS OF WORK.
2. SEE LEGEND ON SHEET C-001
3. INSTALL AND MAINTAIN EROSION CONTROL MEASURES PRIOR TO
START OF CONSTRUCTION. SEE EROSION CONTROL SHEETS
CE101 & CE102.
4. REPAIR CURB AND PAVEMENT SECTIONS DAMAGED DURING
CONSTRUCTION
5. SURVEY AND EXISTING CONDITIONS WITHIN THIS SHEET ARE
BASED ON AS BUILT INFORMATION FROM CES GROUP
ENGINEERS, LLP PROJECT 7431 TOPO DRAWING, 2020/06/29 AND
SURVEY PERFORMED BY KENT C. HUDSON - NC PLS L-5187.
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
S
W
SS
SS
SS
SS
S
S
E X
IS
T
IN
G
B U
IL
D
IN
G
F F
E :6
.7 a s p h a lt a s p h a lt
Concrete Sidewalk p a v e m e n t e d g e
T B
M
F L A
N G
E B
O L T
O N
H Y
D R
A N
T
E L E
V .:6
.8
C u r b i n g
C u r b i n g
P A
R C
E L
A
C
IT
Y O
F C
H A
R L O
T T
E
P A
R C
E L
A
C
IT
Y O
F C
H A
R L O
T T
E
W V
W V
W V
S S
M H
R
IM
:6 .5
IN
V
.IN
:6
.7
IN
V
. O U
T :6
.4
S S
P O
S S
IB
L E
J U
N C
T
IO
N
B L O
C K
U N
F O
U N
D
WW
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
G
G
G
G
G
G
G
U G
E
UGE
U G
E
U G
E
U G
E
U G
E
U G
E
UG
E
U G
E
U G
E
UGE
UGE
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U G
E
U G
E
U
G
E
U G
E
U G
E
UGE
U G
E
U G
E
U G
E
U
G
E
U
G
E
U G
E
U G
E
U G
E
U G
E
U
G
E
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
W V
A N
G
D
IS
K
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
G u a rd
H o u s e
W V
W V
H eadw all
" R
C P
IN
V
.:6 .2
" R
C P
IN
V
.:6 .4
T ra n s fo rm e r o n C o n c re te
C O
M M
COMM
COMM
C O
M M
C O
M M
C O
M M
C O
M M
C
O
M
M
COM
M
COM
M
COMM
COMM
COMM
COMM COMM
COMM
COMM
COMM
COMM
COMM
C O
M M
CO
M
M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
C O
M M
E
E
W
W
W
W
W
W
W
W
W
W
W
B a r r i c a d e
U G
E
U G
E
U G
E
U G
E U
G
E
U
G
E
G
U
G
E
U
G
E
U G
E
E
COMM
COMM
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
COMMCOMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C
O
M
M
C
O
M
M
C O
M M
C O
M M
C
O
M
M
C
O
M
M
C O
M
M
C O
M M
C O
M M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COM
M
COMM
C O
M M
C O
M M
C O
M
M
C O
M
M
C O
M M
C O
M M
C O
M M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
T
T
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
E
T ra n s fo rm e r
E
H V
A C
C O
H V
A C
H
V
A
C
H
VAC
C O
F F
E :6
.0
F F
E :6
.7
P A
R C
E L
A
C
IT
Y O
F C
H A
R L O
T T
E
" R
C P
IN
V
.:6 .4
O rig in n o t fo u n d a s p h a lt a s p h a lt p a v e m e n t e d g e p a v e m e g e
T ra n s fo rm e r h a i k n c e a n c e
T
T
W V
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
© 2020 Microsoft Corporation © 2020 Maxar ©CNES (2020) Distribution Airbus DS
W
S
W
S
S
C o n c r e t e
S i d e w a l k
W V
W V
W V
W
V
X
X
W
V
W
V
W V
E
E
S
WV
WV
WV
WV
WV
WV
WVWV
E
S
S
E
E
E
WV
E
T
CO
D
E
E
E
E
T
T
T
WV
E
T
T
E
E
C O
C O
CO
S
E
E
E
E
D
D
T
T
WV
WS
S
W
V
T
T
CD102
CD102.DWG
PARTIAL EXISTING CONDITIONS AND
DEMOLITION PLAN 2 (AREA 3)
1" = 30'
- MARCH 2022 B-3 DESIGN SUBMITTAL
PARTIAL EXISTING CONDITIONS AND DEMOLITION AREA 3
1" = 30'
CD101
CD101
CD102
KEY MAP
PROJECT MANAGER
HDR PROJECT #:
0 1"
2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
BRANDY CHAPMAN
BRANDY CHAPMAN
CHRIS TYNES
10226692
DEREK WORLEY
EXTEND
COMMUNICATIONS DUCT
BANK
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC
ANG PROJECT #: FJRP182510
CONTRACT #: W9133L-15-D-0004
CHARLOTTE AIR NATIONAL GUARD BASE
KEY NOTES :
1. REMOVE AND REPLACE APPROXIMATELY 14 LF CURB AND
GUTTER
2. REMOVE AND REPLACE APPROXIMATELY 100 SF ASPHALT
3. REMOVE AND REPLACE APPROXIMATELY 6 LF CURB AND
GUTTER
4. REMOVE AND REPLACE APPROXIMATELY 445 SF ASPHALT
5. COORDINATE WITH OWNER TO OPEN GATE
GENERAL NOTES:
1. CONTRACTOR MUST PRESERVE AND PROTECT ALL
EXISTING UTILITIES WITHIN THE LIMITS OF WORK.
2. SEE LEGEND ON SHEET C-001
3. INSTALL AND MAINTAIN EROSION CONTROL MEASURES
PRIOR TO START OF CONSTRUCTION. SEE EROSION
CONTROL SHEETS CE101 & CE102.
4. REPAIR CURB AND PAVEMENT SECTIONS DAMAGED DURING
CONSTRUCTION
5. SURVEY AND EXISTING CONDITIONS WITHIN THIS SHEET
ARE BASED ON AS BUILT INFORMATION FROM CES GROUP
ENGINEERS, LLP PROJECT 7431 TOPO DRAWING, 2020/06/29
AND SURVEY PERFORMED BY KENT C. HUDSON - NC PLS
L-5187.
G
G
G
U G
E
U
G
E U
G E
U G
E
U G
E
U G
E
U
G
E
UGE
U
G
E
COMM
C O
M M
COMM
COMM
COMM
COMM
C O
M M
COMM
C O H
V A
C
S ig n
Barricade Barricade
J e rs e y
B a rrie rs
S h ru b s
S h r u b s
S h r u b s
" C ra p e
M ry tle
" C ra p e
M ry tle
" C ra p e
M ry tle
" C ra p e
M ry tle
E lm
" C ra p e
M ry tle
" C ra p e
M ry tle
" E lm
E lm
E lm
S
C O
M M
C
O
M
M
C O
M M
COM
M
C O
M M
C
O
M
M
C O
M M
COM
M
C O
M
M
C
O
M
M
C
O
M
M
COMM
COMM
COMM
C
O
M
M
C O
M M
U tility
V a u lt
W
W
W
W
W
W
G a te
X
X X X X X
5' Chain Link Fence
E
E
T B
M
F L A
N G
E B
O L T
O N
H Y
D R
A N
T
E L E
V .:7
.4
F F
E :7
.1
M e ta l
G u a rd
S h a c k
C o n c re te
Sidewalk
S i d e w a l k
S S
M H
R
IM
:7 .6
F L O
W :7
.7
C o n c re te
A s p h a lt
A s p h a lt
A s p h a lt
P A
R C
E L
A
C
IT
Y O
F C
H A
R L O
T T
E
P A
R C
E L
A
C
IT
Y O
F C
H A
R L O
T T
E
C U
R B
IN
L E
T
T O
P C
U R
B :7
.9
IN
V
. IN
:7
.4
IN
V
. O U
T :7
.4
C U
R B
IN
L E
T
T O
P C
U R
B :7
.5
IN
V
. IN
:7
.5
IN
V
. O U
T :7
.0
C U
R B
IN
L E
T
T O
P C
U R
B :7
.9
IN
V
. IN
:7
.0
IN
V
. O U
T :7
.9
P
P
15" RCP
R
C P
Curbing
C u r b i n g
C u r b i n g
C u r b i n g
C u r b i n g
Curbing
C u r b i n g
S
S
S
S
C O
M M
C
O
M
M
G e n e ra to r o n C o n c re te
T ra n s fo rm e r
T ra n s fo rm e r o n C o n c re te
W V
W V
W V
W V
W V
W V
W V
W V
E
S
S S
M H
R
IM
:7 .1
IN
V
. IN
:7
.8
' (N
E
IN
V
. IN
:7
.5
' (E
IN
V
. O U
T :7
.4
S
S S
M H
R
IM
:7 .2
IN
V
. IN
:7
.1
IN
V
. O U
T :7
.0
E
E
E
W V
H
V
A
C
E
H V
A C
T
C O
D
E
E
E
E
T
T
T
W V
R ip
R a p
T B
M
F L A
N G
E B
O L T
O N
H Y
D R
A N
T
E L E
V .:7
.3
S i d e w a l k pavement edge pavement edge pavement edge
G u a rd
R a il &
C h a in
L in k F e n c e o n to p o f w a ll
E
E
C o n c re te
W a ll
C o n c re te
W a ll
Concrete Wall
C o n c re te
C o n c re te
B ric k
W a ll
Curb & gutter
F F
E :7
.8
F F
E :7
.8
P A
R C
E L
A
C
IT
Y O
F C
H A
R L O
T T
E
P A
R C
E L
A
C
IT
Y O
F C
H A
R L O
T T
E
P A
R C
E L
A
C
IT
Y O
F C
H A
R L O
T T
E
D
D
S
S
S
S
S
S
S S
S S
S S
S S
SS
SS
.4
.6
.7
.3
.5
C o n c re te
W a ll
R ip
R a p
D R
O P
IN
L E
T
R
IM
:7 .3
IN
V
. IN
:7
.7
IN
V
. O U
T :7
.7
D R
O P
IN
L E
T
R
IM
:7 .6
IN
V
. O U
T :7
.9
S T
O R
M M
A N
H O
L E
L
ID
:7 .9
IN
V
. IN
:7
.5
' (N
W
IN
V
. IN
:7
.6
' (W
IN
V
. O U
T :7
.5
D R
O P
IN
L E
T
R
IM
:7 .6
IN
V
. IN
:7
.2
' (N
W
IN
V
. IN
:7
.3
' (N
E
IN
V
. O U
T :7
.9
S T
O R
M M
A N
H O
L E
L
ID
:7 .3
IN
V
. IN
:7
.9
' (N
W
IN
V
. IN
:7
.8
' (W
IN
V
. O U
T :7
.7
M A
N H
O L E
L
ID
:7 .2
W A
T E
R V
A L V
E
IN
S
ID
E
S T
O R
M M
A N
H O
L E
L
ID
:7 .2
IN
V
. IN
:7
.6
IN
V
. O U
T :7
.3
M A
N H
O L E
L
ID
:7 .5
IN
V
. IN
:7
.0
IN
V
. O U
T :7
.1
D R
O P
IN
L E
T
R
IM
:7 .9
IN
V
. IN
:6
.1
C o n c r e t e
I
P
12" DIP
18" RCP
P
R
C P
R
C
P
P
P
"C l a y
C l a y
E X
IS
T
IN
G
B U
IL
D
IN
G
E X
IS
T
IN
G
B U
IL
D
IN
G
E X
IS
T
IN
G
B U
IL
D
IN
G
T ra n s fo rm e r o n C o n c re te
R a m p
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
C O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
COMM
C O
M
M
COMM
COMM
C O
M M
C O
M M
COMM
C O
M M
C O
M M
C O
M M
C
O
M
M
C
O
M
M
C O
M M
COMM
COMM
COMM
COMM
COMM
COMM
COM
M
COMM
COM
M
COMM
COMM
COMM
COMM COMM COMM
COMM
C O
M M
C
O
M
M
C O
M M
C O
M M
C O
M M
COMM
COMM
COMM
COMM
COMM
C
O
M
M
C O
M M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
C
O
M
M
C
O
M
M
C O
M M
U G
E
U G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U G
E
U G
E
UGE UGE
UGE UGE
UGE
UG
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
UG
E
UG
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
G
G
G
G
W
W
W
W
W
W
W
W
W
W
W W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W V
W
S
P
C
" D
IP
S
P
T
T
C
O
M
M
COMM
COMM
COMM
COMM
COMM
C O
M M
C O
M M
B L D
G
B L D
G
A P
P R
O X
IM
A
T E
L O
C A
T
IO
N O
F
E X
IS
T
IN
G
C O
M M
R E
F E
R E
N C
E C
-1 C
O R
R O
S
IO
N
F U
E L
C E
L L H
A N
G A
R P
R O
J E
C T
C O
N T
R A
C T
O R
T O
C O
N F
IR
M
L O
C A
T
IO
N
C M
H -1
A
COMM
C O
M M
C
O
M
M
COMM
COMM
C
O
M
M
C
O
M
M
C O
M M
© 2020 Microsoft Corporation © 2020 Maxar ©CNES (2020) Distribution Airbus DS
W
S
W
S
S
C o n c r e t e
S i d e w a l k
W V
W V
W V
W
V
A N
G
D I S
K
X
X
W
V
W
V
W V
E
E
S
WV
WV
WV
WV
WV
WV
WVWV
E
S
S
E
E
E
WV
E
T
CO
D
E
E
E
E
T
T
T
WV
E
T
T
E
E
C O
C O
CO
S
E
E
E
E
D
D
T
T
WV
WS
S
W
V
T
T
CS101
CS101.DWG
PARTIAL SITE, UTILITY, AND GRADING
PLAN 1
1" = 30'
- MARCH 2022 B-3 DESIGN SUBMITTAL
PARTIAL SITE, UTILITY, AND GRADING PLAN AREA 1
1" = 30'
PARTIAL SITE, UTILITY, AND GRADING PLAN AREA 2
1" = 30'
CS101
CS101
CS102
KEY MAP
PROJECT MANAGER
HDR PROJECT #:
0 1"
2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
BRANDY CHAPMAN
BRANDY CHAPMAN
CHRIS TYNES
10226692
DEREK WORLEY
EXTEND
COMMUNICATIONS DUCT
BANK
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC
ANG PROJECT #: FJRP182510
CONTRACT #: W9133L-15-D-0004
CHARLOTTE AIR NATIONAL GUARD BASE
KEY NOTES :
1. MATCH EXISTING ASPHALT PAVEMENT, SEE DETAIL 1,
SHEET C-030.
2. MATCH EXISTING CONCRETE PAVEMENT, SEE DETAIL
4, SHEET C-030.
3. MATCH EXISTING CURB TYPE AND ELEVATION, SEE
DETAIL 2, SHEET C-030.
4. PROTECT EXISTING UNDERGROUND ELECTRIC.
5. PROTECT EXISTING UNDERGROUND
COMMUNICATION.
6. PROTECT EXISTING STORM DRAINAGE.
7. PROTECT EXISTING WATER.
8. PROTECT EXISTING SANITARY SEWER.
9. PROTECT EXISTING GAS.
10. CONNECT TO EXISTING COMMUNICATION MH20.
11. CONNECT TO EXISTING COMMUNICATION MH13.
12. CONNECT TO EXISTING COMMUNICATION MH12.
13. APPROXIMATELY 145 LF NEW DUCT BANK.
14. APPROXIMATELY 220 LF NEW DUCT BANK.
15. APPROXIMATELY 226 LF NEW DUCT BANK.
16. APPROXIMATELY 30 LF VERTICAL DUCT BANK.
(INCLUDED IN TOTAL LENGTH, NOTE 15)
17. INSTALL HANDHOLD AND CONNECT TO EXISTING
STUB. CONTRACTOR TO VERIFY LOCATION.
18. PROVIDE NEW COMMUNICATION MANHOLE. SEE
ELECTRICAL PLANS FOR CONTINUATION TO BUILDING.
19. APPROXIMATELY 99 LF NEW DUCT BANK.
20. REMOVE AND REPLACE GUARDRAIL.
21. RESTRIPE PARKING SPACES AS REQUIRED
GENERAL NOTES:
1. CONTRACTOR TO COORDINATE ALL ROAD CLOSURES
WITH GOVERNMENT
2. CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE
PATTERNS WHEN REPLACING PAVEMENT
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
O
H
E
S
W
SS
SS
SS
SS
S
S
E X
IS
T
IN
G
B U
IL
D
IN
G
F F
E :6
.7 a s p h a lt a s p h a lt
Concrete Sidewalk p a v e m e n t e d g e
T B
M
F L A
N G
E B
O L T
O N
H Y
D R
A N
T
E L E
V .:6
.8
C u r b i n g
C u r b i n g
P A
R C
E L
A
C
IT
Y O
F C
H A
R L O
T T
E
P A
R C
E L
A
C
IT
Y O
F C
H A
R L O
T T
E
W V
W V
W V
S S
M H
R
IM
:6 .5
IN
V
.IN
:6
.7
IN
V
. O U
T :6
.4
S S
P O
S S
IB
L E
J U
N C
T
IO
N
B L O
C K
U N
F O
U N
D
WW
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
G
G
G
G
G
G
G
U G
E
UGE
U G
E
U G
E
U G
E
U G
E
U G
E
UG
E
U G
E
U G
E
UGE
UGE
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U G
E
U G
E
U
G
E
U G
E
U G
E
UGE
U G
E
U G
E
U G
E
U
G
E
U
G
E
U G
E
U G
E
U G
E
U G
E
U
G
E
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
W V
A N
G
D
IS
K
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
G u a rd
H o u s e
W V
W V
H eadw all
" R
C P
IN
V
.:6 .2
" R
C P
IN
V
.:6 .4
T ra n s fo rm e r o n C o n c re te
C O
M M
COMM
COMM
C O
M M
C O
M M
C O
M M
C O
M M
C
O
M
M
COM
M
COM
M
COMM
COMM
COMM
COMM COMM
COMM
COMM
COMM
COMM
COMM
C O
M M
CO
M
M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
C O
M M
E
E
W
W
W
W
W
W
W
W
W
W
W
B a r r i c a d e
U G
E
U G
E
U G
E
U G
E U
G
E
U
G
E
G
U
G
E
U
G
E
U G
E
E
COMM
COMM
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
COMMCOMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C
O
M
M
C
O
M
M
C O
M M
C O
M M
C
O
M
M
C
O
M
M
C O
M
M
C O
M M
C O
M M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COM
M
COMM
C O
M M
C O
M M
C O
M
M
C O
M
M
C O
M M
C O
M M
C O
M M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
T
T
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
E
T ra n s fo rm e r
E
H V
A C
C O
H V
A C
H
V
A
C
H
VAC
C O
F F
E :6
.0
F F
E :6
.7
P A
R C
E L
A
C
IT
Y O
F C
H A
R L O
T T
E
" R
C P
IN
V
.:6 .4
O rig in n o t fo u n d a s p h a lt a s p h a lt p a v e m e g e p a v e m e g e
T ra n s fo rm e r a n c e a n c e
T
T
W V
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
U G
E
U
G
E
U G
E
U G
E
UGE
U G
E
U G
E
U G
E
U
G
E
U
G
E
U G
E
U G
E
U G
E
U G
E
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
C O
M M
C O
M M
C O
M
M
C O
M M
C O
M M
COMM
C O
M M
C O
M M
C O
M M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
© 2020 Microsoft Corporation © 2020 Maxar ©CNES (2020) Distribution Airbus DS
W
S
W
S
S
C o n c r e t e
S i d e w a l k
W V
W V
W V
W
V
X
X
W
V
W
V
W V
E
E
S
WV
WV
WV
WV
WV
WV
WVWV
E
S
S
E
E
E
WV
E
T
CO
D
E
E
E
E
T
T
T
WV
E
T
T
E
E
C O
C O
CO
S
E
E
E
E
D
D
T
T
WV
WS
S
W
V
T
T
CS102
CS102.DWG
PARTIAL SITE, UTILITY, AND GRADING PLAN 2
1" = 30'
- MARCH 2022 B-3 DESIGN SUBMITTAL
PARTIAL SITE, UTILITY, AND GRADING PLAN AREA 3
1" = 30'
CS101
CS101
CS102
KEY MAP
PROJECT MANAGER
HDR PROJECT #:
0 1"
2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
BRANDY CHAPMAN
BRANDY CHAPMAN
CHRIS TYNES
10226692
DEREK WORLEY
EXTEND
COMMUNICATIONS DUCT
BANK
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC
ANG PROJECT #: FJRP182510
CONTRACT #: W9133L-15-D-0004
CHARLOTTE AIR NATIONAL GUARD BASE
KEY NOTES :
1. MATCH EXISTING ASPHALT PAVEMENT ELEVATION
SEE DETAIL 1, SHEET C-030.
2. APPROXIMATELY 20 LF NEW CURB AND GUTTER SEE
DETAIL 2, SHEET C-030
3. CONNECT TO EXISTING COMMUNICATION MH6-1.
4. PROTECT EXISTING UNDERGROUND ELECTRIC.
5. PROTECT EXISTING UNDERGROUND
COMMUNICATION.
6. PROTECT EXISTING STORM DRAINAGE.
7. PROTECT EXISTING SANITARY SEWER.
8. PROTECT EXISTING UNDERGROUND GAS.
9. CONNECT TO EXISTING COMMUNICATION VAULT
HH-4.
10. APPROXIMATELY 192 LF NEW DUCT BANK.
11. APPROXIMATELY 502 LF NEW DUCT BANK.
12. APPROXIMATELY 529 LF NEW DUCT BANK.
13. APPROXIMATELY 162 LF NEW DUCT BANK.
14. REMOVE AND REPLACE EXISTING CHAIN LINK FENCE
AS REQUIRED. COORDINATE WITH GOVERNMENT.
15. PROVIDE NEW COMMUNICATION MANHOLE
ELEVATION = 683.4'.
16. PROVIDE NEW COMMUNICATION MANHOLE
ELEVATION = 673.3'.
17. PROVIDE NEW COMMUNICATION MANHOLE
ELEVATION = 685.7'.
GENERAL NOTES:
15. CONTRACTOR TO COORDINATE ALL ROAD CLOSURES
WITH GOVERNMENT
16. CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE
PATTERNS WHEN REPLACING PAVEMENT.
File details come from the government source that posted it. Updated .