Attachment 3 Environmental Review Portfolio_Paint Striping PWS.pdf
PDF 2 MB Posted
- Attached to
- Pavement Markings, JBLM Federal contract opportunity
- Solicitation number
- W911S823B0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911S823B0003 AMEND 001.pdf | ||
| W911S823B0003 FINAL.pdf | ||
| Attachment 1 Pavement Marking - Statement of Work - Final.pdf | ||
| Attachment 4 Pavement Markings Map.pdf | ||
| Attachment 2 TE-1 Price Schedule.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
NPD Form 32 (LEF V1.0) Name (total number of comments) SHEET 1 OF 1
(FOR INTERNAL USE ONLY -DELIBERATIVE PROCESS)
0BREVIEW COMMENTS REVIEWERS: Isabella Castro, NEPA Specialist, Isabella.k.castro.ctr@army.mil
PROJECT: PWS Umbrella Contract_Road Striping, Painting, and Marking LOCATION: Joint Base Lewis-McChord WA PROJECT MANAGER: Name
IJO/SPEC/PKG:
REVIEW MEETING:
DATE OF REVIEW: date
Design Document Arch/LA Action taken on comment by:
D. Memo Concept Civ/San REVIEW
CONF
A-Accept W-Withdraw
DESIGN OFFICE
C-Correction made. List dwg or para number where correction is made
BACK
CHECK
(initial)
P&S x Prelim. Mech/El Draft final Final Struct
Item No.
Drawing Sht.
Spec. Para.
COMMENTS
w/ reviewers name in ( ) if multiple reviewers
1 No REC required, covered by Categorical exclusion (g): Maintenance (1): Routine repair and maintenance of buildings, airfields, grounds, equipment, and other facilities. Examples include, but are not limited to: Removal and disposal of asbestos-containing material (for example, roof material and floor tile) or lead-based paint in accordance with applicable regulations; removal of dead, diseased, or damaged trees; and repair of roofs, doors, windows, or fixtures
A Acknowledged.
2 End of comments
REVIEW COMMENTS
NPD Form 32 (LEF V1.0) Name (total number of comments) SHEET 1 OF 2
0BREVIEW COMMENTS REVIEWERS: Lois Leiding and Wendy Arjo, P2 Program, 253-967-6469
PROJECT: PWS Umbrella Contract, Road Striping, Painting, and Marking LOCATION: Joint Base Lewis-McChord WA PROJECT MANAGER: Isak Mattson, PMP
IJO/SPEC/PKG:
DATE OF REVIEW: 04/20/2022
1 If this is a new contract, they should be using the current 01 57 19 and 01 57 19.01 20 from the JBLM Design Standards rather than 01 57 20.00 10
A Page 57, title
2 Current version of the federal standard is TT-P-1952F A Page 94, paragraph 2.1 3 Based on lack of info on the web, the soyathane WB (listed in the Biopreferred Catalog) may no longer be sold or available.
A As a pre-submittal requirement, the prospective contractor is required to submit their AUL. You’ll see their alternative they’d like reviewed before they use it.
4 The Biostripe listed in the Biopreferred Catalog doesn't meet the no pick-up dry time requirements in the federal standard (but meets every other requirement). Unless they update the standard or don't include the standard in the contract spec, there will be a conflict precluding use of a biobased product. If the COR or KO want to include the federal standard, then the spec writer or contracting official should fill out a HJB 225 noting that they want to spec the FED STD and that no biobased paint currently meets it.
5 I believe the FED STD is for waterborne paint only. Thus, if there is need for solventborne from late fall through early spring, language to that effect should be included in the SOW/PWS, stating that solventborne materials may require submittal and approval of HJB 226 if the product contains any constituents on the RUL. 01 57 19.01 20 includes boilerplate guidance for AULs and RUL. It is also in the SOW section boilerplate from the Design Standards, but the assumption is this is being done as a PWS rather than a SOW. If so, the AUL and RUL boilerplate from 01 57 19.00 20 can be pulled to incorporate into the PWS (if not already there) or just append 01 57 19.01 20 and refer the contractor to that section.
A Like in 2018’s umbrella contract, the contractor will submit on what they intend to use for approval prior to its use. It will be a part of their initial proposal for award consideration. The contract TO’s will be in the form of SOW’s. Contract appended to 01 57 19.01 20.
6 No recycled content requirement for traffic paint. A Acknowledged End of comments
NPD Form 32 (LEF V1.0) Name (total number of comments) SHEET 2 OF 2
0BREVIEW COMMENTS REVIEWERS: Lois Leiding and Wendy Arjo, P2 Program, 253-967-6469
PROJECT: PWS Umbrella Contract, Road Striping, Painting, and Marking LOCATION: Joint Base Lewis-McChord WA PROJECT MANAGER: Isak Mattson, PMP
IJO/SPEC/PKG:
DATE OF REVIEW: 04/20/2022
REVIEW COMMENTS
0BREVIEW COMMENTS REVIEWERS: Alessandra Capretti DPW Stormwater 253-966-9011 usarmy.jblm.id-readiness.list.dpw-stormwater@army.mil PROJECT: 22-344
PWS Umbrella Contract_Road Striping, Painting, and Marking LOCATION: Joint Base Lewis-McChord WA
PROJECT MANAGER:
IJO/SPEC/PKG:
DATE OF REVIEW: 21-APR-22
1 Umbrella Contract – Environmental Review 1.2.13
1.0 All pressure washing shall be with only water: no chemical or detergents are to be used. All pressure washing shall be with only water: no chemical or detergents are to be used without strict compliance with waste water permit requirements.
1.1 All wash water shall be diverted away from catch basins connected directly to the storm sewer system.
1.2 Storm sewer catch basins shall be blocked with impervious membrane.
1.3 Membranes to be left in place until spent wash water evaporates or is removed by mechanical means.
1.4 Sludge and surface debris collected around catch basins shall be removed and properly disposed of before membranes are removed.
1.5 Catch basins which do not tie directly into the storm sewer system shall be equipped with a filtering membrane to prevent silt and organic debris from entering the drainage system.
1.6 All surface debris shall be properly removed before filter membranes are removed
A Verbiage added to paragraph 1.2.13, page 61 of the PWS.
mailto:usarmy.jblm.id-readiness.list.dpw-stormwater@army.mil
REVIEW COMMENTS
REVIEW COMMENTS REVIEWERS:
nking Water Contractor: Isabella.k.castro.ctr@army.mil
PROJECT:
LOCATION: JOINT BASE LEWIS MCCHORD, WA
PROJECT MANAGER:
IJO/SPEC/PKG:
DATE OF REVIEW:
C-Correction made. List dwg or para number where correction is made
1 The project is across JBLM, attached are all the well heads on the base.
JBLM-Lewis Public Water System (PWS): 26050
☐ (S01) Sequalitchew Springs ☐ (S11) Well 12B
☐ (S02) Well 06-Inactive ☐ (S14) Well 20
☐ (S06) Well 12A ☐ (S15) MAMC-Well 04
(S08) Well 14 (S16) Railroad Ave. Well 29
☐ (S09) Well 17-Inactive ☐ Pending-Soldier Field House Casing
☐ (S10) Well 13 ☐ Pending- Well 28
JBLM-McChord PWS: 52200
☐ (S01) 781 South ☐ (S08) 5001 Housing Well I
☐ (S02) 711 North ☐ (S09) 832 Mars Hill-Inactive
☐ (S03) 190 East ☐ (S10) 82058-Inactive
☐ (S04) 846 Sage I ☐ (S11) 568 Prime Beef
☐ (S05) 847 Sage II ☐ (S12) 512 Lincoln-Inactive
☐ (S06) 3410 Housing Well III ☐ Pending-Well 31
☐ (S07) 5003 Housing Well II
JBLM-Golf Course PWS: 46231
☐ (S02) Well 22
JBLM-Ammo Supply Point (ASP) PWS: 46241
☐ (S01) Well 10 ☐ (S02) Well 23
JBLM-Range 17 PWS: AB008D
☐ (S01) Well 24 ☐ Pending-Leschi Town
The ten year horizontal time of travel boundary is the surface area overlying the portion of the aquifer that contributes water to the well within a ten-year period. Precaution should be taken to not impact the groundwater within the following areas either by microbial or direct chemical contamination. Therefore, it is highly recommended the following figures (figure 1) are included within the projects Spill Response
Plan.
For more information please refer to Washington States Wellhead Protection Program Guidance
Document (DOH 331-018).
PWS Umbrella Contract_Road Striping, Painting, and Marking
A Attachment 1 will be added to the PWS appendix for contractors awareness.
Wellhead Protection Area (WHPA) PWS: 26050- JBLM-Lewis
Joint Base Lewis-McChord
Service Layer Credits: Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community
Legend Well Status
Wellhead Protection Area
!. Active
!. Inactive
!. Pending
Sanitary Control Area (SCA) Six-Month Time of Travel One-Year Time of Travel Five-Year Time of Travel Ten-Year Time of Travel
0 1 20.5 Miles
PWS: 52200 - JBLM-McChord
Service Layer Credits: Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community
!. Active !. Inactive !. Pending
One-Year Time of Travel
T19 R02E S23 NWNE
Well Status
Wellhead Protection Area
Public Land Survey System
0 1 20.5 Miles
PWS: 46241 - JLBM-ASP
TH
IN
FA
NT
RY
R
GM
T R D
TANK TRL
7T H
IN
FA
NT
RY
R
GM
T R
RECONDO RD
TH
SQU
AD
RO
NR
TRANSMISSION LINE RD
Joint Base Lewis-McChord
Service Layer Credits:
!. Active Wellhead
One-Year Time of Travel
0 0.35 0.70.175 Miles
NPD Form 32 -DW_344_PWS Umbrella Contract_Road Striping, Painting, and Marking
NPD Form 32 -DW_335_IJO_DEJ168348J_PS2245_SOW_Replace Fire Alarm Systems_Bldg_3657
NPD Form 32 -DW_334_IJO_CJA220172J_Open Storage Commanding General's Office_I Corps
PWS JBLM-Lewis
JBLM-McChord PWS
PWS JBLM-ASP
DEPARTMENT OF THE ARMY
DIRECTORATE OF PUBLIC WORKS, JOINT BASE LEWIS-MCCHORD
2012 LIGGETT AVENUE, BOX 339500, MAIL STOP 17
JOINT BASE LEWIS-MCCHORD, WA 98433-9500
AMIM-LMP-E 29 APRIL 2022
MEMORANDUM FOR RECORD
SUBJECT: Environmental Review for PWS Umbrella Contract_Road Striping, Painting, and Marking
1.Environmental Review Project # 22-344
Air Quality: NSP 29-APR-22 Cultural Resources: NSP29-APR-22 Drinking Water: RWC IKC 21-APR-22 Energy: NSP 29-APR-22 Fish & Wildlife: NSP 29-APR-22 Forestry: NSP 29-APR-22 Hazardous Waste: NSP 29-APR-22
IRP: RNC MJL 20-APR-22
NEPA: RWC IKC 27-APR-22
P2 (Haz. Mat., EMS, Sustainable Acquisition) :
RWC LAL
20 Apr 2022
PreTreatment: RNC MCA 26-APR-22 Solid Waste: RNC VG 25-APR-22 Storm Water: RWC AC 21-APR-22 Tanks: NSP 29-APR-22 Toxic Substances (Asbestos, Lead, Radon):
RNC MCR 14-APR-22
Waste Water: NSP 29-APR-22
2. Project Managers are reminded that this document is a review only. Additional actions may be required to comply with all environmental requirements. See individual Program Managers comments on NPD 32 for more information.
3. Definitions of Comments: RNC means Reviewed with No Comments, RWC means Reviewed with Comments (see NPD 32), NR means No Response, NSP means Not sent to Program
Encl WILLIAM BRITTON Environmental Review Project Manager
2022-05-02T08:19:02-0700
BRITTON.WILLIAM.CLIFFORD.II.1109170972
File details come from the government source that posted it. Updated .