These are architectural design drawings for a water heater replacement project at Trapper Creek Job Corps Civilian Conservation Center, a U.S. Department of Agriculture Forest Service facility located in Darby, Montana on the Bitterroot National Forest. The project involves removing two existing water heaters (300 and 50 gallons, 480V) and furnishing and installing two new 480V, 3-phase, 45kW, 119-gallon water heaters with specified accessories and incidental materials required for complete functional installation.

The technical specifications require parallel cold water piping (1.5 inches) with globe isolation/throttling valves on each supply line and equal pipe lengths for balanced distribution; parallel hot water piping (1.5 inches) with full port ball valves on outlet sides of each heater; expansion tanks on cold water supply downstream from isolation valves; manufacturer-standard T&P valves with down piping; and seismic restraints for both heaters. The electrical work requires dedicated 480V, 3-phase branch circuits with 70-amp overcurrent protection disconnect switches at each heater, with final connections via liquid-tight AC or MC raceway and other conduit in EMT raceway; branch circuit modifications are to be performed by USFS electrician. All hot water piping in the mechanical room must be insulated, and existing conforming water pipe and electrical may be re-utilized. The installation includes pipe and expansion tank supports, brackets, seismic bracing, and connection to existing hot water distribution and cold water supply piping within the mechanical room of Building 15 (Food Service).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOB CORPS

NATIONAL OFFICE

B15 WATER HEATERS

TRAPPER CREEK JOB

CORPS

CIVILIAN CONSERVATION

CENTER

BITTERROOT NATIONAL FOREST

07/2025 04

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

TITLE SHEET

A. GARRISON, PE

D. VALLES, PE

T1.0

1. T1.0 TITLE SHEET GENERAL

2. G1.0 CAMPUS MAP GENERAL

3. A1.0 B15 FLOOR PLAN B15

4. P1.0 WATER HEATERS B15

INDEX

SHEET SHEET

SUB

TITLE OF SHEET

PROJECT ADDRESS

5139 West Fork Rd, Darby, MT 59829

(NO SCALE)

PROJECT LOCATION

BUILDING

UNITED STATES DEPARTMENT OF AGRICULTURE

FOREST SERVICE

B15 WATER HEATERS

BITTERROOT NATIONAL

FOREST

TRAPPER CREEK JOB

CORPS CENTER

RAVALLI COUNTY,

MONTANA

NORTHERN REGION

U.S. LOCATION MAP

PROJECT

LOCATION

SOURCE: GOOGLE, 2025

AutoCAD SHX Text 7/30/25 14:53 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\USFS-BDR-JCC-COVER.DWG; 14:53 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\USFS-BDR-JCC-COVER.DWG;14:53 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\USFS-BDR-JCC-COVER.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\USFS-BDR-JCC-COVER.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\USFS-BDR-JCC-COVER.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\USFS-BDR-JCC-COVER.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\USFS-BDR-JCC-COVER.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

DATE

A

B

D

C

E

B i t t e r r o o t

R i v e r

Pedestrian

ATHLETIC FIELDS

F

W e s

F r k a d u e

K

SEPTIC

TANKS

EXISTING

R o u e

G

L

M

N

Bridge

T

P

Q

R

S

GH

U

TO WATER

WELL & TANK

DIRECTION

AC

AA

BB

CC

DD

EE

FF

GG

HH

II

JJ

AB

ZZ

YY

XX

WW

VA

VV

UU

TT

SS

RR

QQ

PP

OO

NM

NN

LL

KK

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

CAMPUS MAP

A. GARRISON, PE

D. VALLES, PE

G1.0

JOB CORPS

NATIONAL OFFICE

B15 WATER HEATERS

TRAPPER CREEK JOB

CORPS

CIVILIAN CONSERVATION

CENTER

BITTERROOT NATIONAL FOREST

07/2025 4

Trapper Creek Civilian Conservation Center

Darby, Montana

BUILDINGS

1 - TRANSITIONAL DORMITORY

2 - TRANSITIONAL DORMITORY

3 - TRANSITIONAL DORMITORY

6 - FACILITIES SHOP/ LAUNDRY

7 - CENTRAL VEHICLE MAINTENANCE

8 - WELDING SHOP / FORESTRY

9 - PAINTING/FORESTRY SHOPS

10 - MEN'S DORMITORY

11 - MEN'S DORMITORY

12 - MEN'S DORMITORY

13 - WOMEN'S DORMITORY

14 - MEDICAL DISPENSARY

15 - FOOD SERVICE

16 - ADMINISTRATION

18 - ACADEMIC EDUCATION

21 - GYMNASIUM

57 - WAREHOUSE

59 - FIRE CACHE

60 - RECREATION

62 - CARPENTRY SHOP

67 - MASONRY SHOP

70 - ELEC. REPAIR SHOP

73 - CARPENTRY STORAGE

STRUCTURES

A - WELL HOUSE

AA-STORAGE SHED

AB-STORAGE SHED

AC-GAZEBO

B - MAIN PUMP/GENERATOR HOUSE

BB-STORAGE SHED

C - FUEL DISPENSING SHELTER

CC-STORAGE SHED

D - ADVANCED WELDING SHED

DD-STORAGE SHED

E - SAND BLASTING SHED

EE-STORAGE SHED

F - FLAMMABLE STORAGE

FF-STORAGE SHED

G - MASONRY SHED

GG-STORAGE SHED

GH - GREENHOUSE

HH-STORAGE SHED

II-STORAGE SHED

JJ-STORAGE SHED

K - ELECTRICAL STORAGE

KK-GAZEBO

L - PUMP HOUSE

LL-STORAGE SHED

M - PAVILION

MM-STORAGE SHED

N - VOCATIONAL STORAGE

NN-STORAGE SHED

OO-STORAGE SHED

P - PAVILION - SMOKING

PP-STORAGE SHED

Q - PAVILION - SMOKING

QQ-STORAGE SHED

R - PAVILION - SMOKING

RR-GAZEBO

S - PAVILION - SMOKING

SS-STORAGE SHED

T - PAVILION - SMOKING

TT-STORAGE SHED

U - SAW SHED

UU-STORAGE SHED

VA - STORAGE SHED

VV - STORAGE SHED

WW-STORAGESHED

XX - GAZEBO

YY - GAZEBO

ZZ - STORAGE SHED

B15 FOOD SERVICE

AutoCAD SHX Text 7/30/25 14:35 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG; 14:35 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG;14:35 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

BASEMENT FOOD

STORAGE

CULINARY ARTS

KITCHEN

DISHWASHING

R A

M P

D

N

CONFERENCE

MECH.

CENTER COMPUTER

TECHNICIAN

TOILET

DINING

SERVING

RAMP DN

R A

M P

D

N

DN

UP

BAKING

LOADING DOCK

COLD

STORAGE

FREEZER

M W

VENDING

MECH

INSTRUCTOR

LOADING

DOCK

FREEZER

STORAGE

U P

FIRST FLOOR

BASEMENT

DN

ST.

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

B15 FLOOR PLAN

A. GARRISON, PE

D. VALLES, PE

A1.0

JOB CORPS

NATIONAL OFFICE

B15 WATER HEATERS

TRAPPER CREEK JOB

CORPS

CIVILIAN CONSERVATION

CENTER

BITTERROOT NATIONAL FOREST

07/2025 4

A

A1.0

B15 FLOOR PLAN

KEY NOTES

REMOVE AND DISPOSE OF EXISTING 300 AND 50 GALLON 480V WATER HEATERS AND ASSOCIATED

MATERIALS THAT WILL NOT BE RE-USED. FURNISH AND INSTALL 2 NEW 480V, 3PH, 45KW, 119 GALLON

WATER HEATERS WITH SPECIFIED ACCESSORIES AND INCIDENTAL MATERIALS AS REQUIRED FOR

COMPLETE FUNCTIONAL INSTALLATION. USFS ELECTRICIAN WILL MODIFY BRANCH CIRCUIT WIRING -

COORDINATE ELECTRICAL CONNECTION OF NEW WATER HEATERS WITH USFS ELECTRICIAN. INSULATE

ALL NEW AND EXISTING HOT WATER PIPES THAT WILL BE RE-USED WITHIN THE MECHANICAL ROOM. SEE

SPECIFICATIONS, DETAIL A/P1.0 AND ASSOCIATED NOTES FOR GENERAL SCHEMATIC AND OTHER

REQUIREMENTS.

8 0 8 2416

SCALE OF FEET

AutoCAD SHX Text 7/30/25 14:35 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG; 14:35 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG;14:35 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

W

H

W

H

W

H W

E

E

E

E

E

E

E

E

E

E

W

W

W

W

W

W

W

W

HW

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

WATER HEATERS

A. GARRISON, PE

D. VALLES, PE

P1.0

JOB CORPS

NATIONAL OFFICE

B15 WATER HEATERS

TRAPPER CREEK JOB

CORPS

CIVILIAN CONSERVATION

CENTER

BITTERROOT NATIONAL FOREST

07/2025 4

A

P1.0

WATER HEATERS ISOMETRIC, PARALLEL PLUMBED

NO SCALE, SCHEMATIC, RE-USE OF CONFORMING EXISTING MATERIALS IS ACCEPTABLE

WH1

WH2

C

W

BALL VALVE, NORMALLY OPEN, MATCH PIPE SIZE

COLD WATER (CW)

HOT WATER (HW)

B

P1.0

PLUMBING LEGEND

NO SCALE

GENERAL NOTES

1. EXISTING INFORMATION SHOWN ON DRAWINGS HAS BEEN TAKEN FROM LIMITED FIELD OBSERVATIONS. FIELD VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK.

2. EXISTING WATER PIPE AND ELECTRICAL THAT CONFORMS TO THESE DRAWINGS, THE REFERENCED CODES, AND MANUFACTURER'S REQUIREMENTS MAY BE RE-UTILIZED.

3. PHOTOS SHOW EXISTING CONDITIONS SURROUNDING THE AREAS FOR NEW WORK. FILED VERIFY CONDITIONS PRIOR TO BEGINNING WORK.

4. DRAWING IS SCHEMATIC IN NATURE AND IS INTENDED ONLY TO SHOW REQUIRED PRODUCTS AND REQUIREMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYING OUT THE PROJECT IN A NEAT

WORKMANLIKE MANNER THAT DOES NOT OBSTRUCT ANY REQUIRED BUILDING OR EQUIPMENT SUCH AS ELECTRICAL PANELBOARDS AND ALLOWS FOR FULL ACCESS TO PERFORM ROUTINE AND

PREVENTATIVE MAINTENANCE ON INSTALLED EQUIPMENT INCLUDING INTAKE FILTERS, VALVES, CONTROL BOARDS, ETC.

5. THE FOLLOWING TERMS IN ANY COMBINATION RELATING TO THE INSTALLATION OF PRODUCTS/MATERIALS: INSTALL, FURNISH, PROVIDE, OR SIMILAR STATEMENTS; MEAN THAT THE CONTRACTOR IS

RESPONSIBLE FOR THE PROCUREMENT AND INSTALLATION OF THE PRODUCTS UNLESS IT IS SPECIFICALLY DESIGNATED AS A GOVERNMENT FURNISHED ITEM, SUPPLY ONLY PRODUCT, OR SPARE.

KEY NOTES

EACH WATER HEATER SHALL BE ON DEDICATED 480V, 3PH BRANCH CIRCUIT WITH 70A OCPD DISCONNECT SWITCH AT EACH WATER HEATER. FINAL CONNECTION TO WATER HEATERS FROM

SWITCH SHALL BE IN LIQUID TIGHT AC OR MC RACEWAY. ALL OTHER CONDUIT SHALL BE IN EMT RACEWAY. VERIFY EXISTING CONDITIONS AND MODIFY, EXTEND, OR PROVIDE NEW AS REQUIRED

FOR INSTALLATION. BRANCH CIRCUITS MODIFICATIONS BY USFS ELECTRICIAN.

FURNISH AND INSTALL COLD WATER 1.5" PARALLEL PIPING TO PROVIDE APPROXIMATELY EQUAL PIPE LENGTHS AND MATCHING VALVES AND FITTINGS FOR EACH WATER HEATER. PROVIDE GLOBE

(ISOLATION/THROTTLING) VALVES ON THE COLD WATER SUPPLY LINE FOR EACH TANK.

FURNISH AND INSTALL HOT WATER 1.5" PARALLEL PIPING TO PROVIDE APPROXIMATELY EQUAL PIPE LENGTHS AND MATCHING VALVES AND FITTINGS FOR EACH WATER HEATER PROVIDE FULL

PORT BALL VALVE (ISOLATION ONLY) ON THE OUTLET SIDE OF EACH WATER HEATER

MANUFACTURER STANDARD T&P VALVE AND DOWN PIPING BY CONTRACTOR.

FURNISH AND INSTALL EXPANSION TANK ON COLD WATER SUPPLY PIPE TO EACH WATER HEATER, DOWNSTREAM FROM INDIVIDUAL WATER HEATER COLD WATER SUPPLY ISOLATION VALVES..

FURNISH AND INSTALL NEW WATER HEATERS AS SPECIFIED.

CONNECT TO EXISTING HOT

WATER DISTRIBUTION

PIPING (MATCH SIZE)

CONNECT TO EXISTING

COLD WATER SUPPLY

PIPING (MATCH SIZE)

PROVIDE LEG KIT OR SEAL

WATER HEATERS TO SLAB

PER MANUFACTURER'S

DIRECTIONS.

INSTALLATION NOTES

1. INSULATE ALL HOT WATER PIPE IN MECHANICAL ROOM W/ SPECIFIED PIPE INSULATION.

2. PROVIDE PIPE AND EXPANSION TANK SUPPORTS, BRACKETS, SEISMIC BRACING.

3. PROVIDE SEISMIC RESTRAINTS FOR BOTH WATER HEATERS.

AutoCAD SHX Text 7/30/25 14:35 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG; 14:35 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG;14:35 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\TRAPPERCREEK\B15-FOODSERVICE\2025 BOILER-WATER HEATER REPLACE\DRAWINGS\WATER HEATERS DWG.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

Sheets and Views
USFS-BDR-JCC-COVER-Layout1
Water Heaters dwg-G1.0 SITE
Water Heaters dwg-A1.0 B15
Water Heaters dwg-P1.0WaterHeaters

File details come from the government source that posted it. Updated .