The solicitation requires the delivery, installation, and testing of a total of four new cold drink vending machines - two for the northbound location and two for the southbound location. The existing four cold drink vending machines must also be removed. Delivery and installation must be coordinated with the designated contacts and completed within 5 weeks of the order. Invoices must include detailed information about each unit installed. The contract also specifies requirements for packaging removal, testing, training, and adherence to the delivery schedule, with potential penalties for noncompliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment__1_-_Request_for_Quote_Requirements.docx | DOCX document | |
| Attachment__2_Specifications_for_Vending_Machines_4.3.24_JI.docx | DOCX document | |
| std1000.pdf | ||
| Bidder_Declaration.docx | DOCX document | |
| Darfur_Contracting_Act_Cert_form.docx | DOCX document | |
| std204.pdf | ||
| DR815_Request_for_Quote.pdf | ||
| Post-Consumer_Recycled_Content_Certification.pdf | ||
| RFQ_Letterhead.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tejon Pass Rest Area, Lebec Ca Location 06-0739 Small Business Solicitation
ATTACHMENT #3
DELIVERY / INSTALLATION REQUIREMENTS
LOCATION INFORMATION:
06-739-Tejon Pass Rest Area Interstate 5 Tejon Pass, Lebec, CA 93243
Attn: Steve Alford (310) 809-8099 and Raghbir Tung (213) 220-1175
· Contact Steve Alford (310) 809-8099 and Raghbir Tung / (213) 220-1175 for delivery, installation, programming, testing and on-site training to end user.
· Include puck locks
· Remove all packing materials after installation is completed.
· Remove surveyed 4 vending machines listed in table below.
· If an unforeseen event prevents vendor and/or supplier from completing delivery, installation and/or testing as scheduled, supplier must coordinate a second visit to complete any pending tasks.
· Invoices will be signed off upon completion of all PO requirements.
· To expedite payment, invoices must include a complete description of each unit, including, delivery location number and address, brand, model and serial number.
| Location |
| New vending machines |
| Old vending machines to be removed |
Northbound
2 Cold Drink
2 Cold Drink # 10022339, 10022340
Southbound
2 Cold Drink
2 Cold Drink # 10022341, 10022342
TRUCK W/ LIFT-GATE REQUIRED
Scheduling:
MUST BE COORDINATED 2 WEEKS IN ADVANCE. Please contact Steve Alford (310) 809-8099 and Raghbir Tung (213) 220-1175, to coordinate delivery date and time, verify machine placement, configurations, and security / clearance requirements.
Delivery And Installation Requirements:
Equipment to be delivered, set-in-place, installed as per manufacturer’s instructions, remove existing unit(s) and all packing material. Installation must include testing to ensure proper working condition and training of operational features, including suggested operating procedures for coin mechanisms and bill validators, as well as preventative maintenance of vending units (proper cleaning of machine(s), air filters, inlet screens, etc.). It is imperative Supplier provide all necessary components required to complete delivery, set-up, and programming of new machine(s).
NOTE: Vending machines to be set in place, side by side, and banded together at time of installation.
Delivery Terms:
Delivery terms, as specified in paragraph 15 of the General Terms and Conditions, indicates Contractor’s responsibility for the furnishing of equipment and completed installation within 5 weeks (35 calendar days) After Receipt of Order (ARO). Upon the 35th day, equipment specified in this order is to be in place and fully operational. Contractor shall strictly adhere to the delivery terms and schedule as specified in this solicitation. Failure to comply with the delivery requirements may be considered a breach of contract under paragraph 24, entitled “Termination for Default” and paragraph 26, entitled “Rights and Remedies of the State for Default”, resulting in contract termination.
NOTE: In the event delivery terms cannot be met as specified, the awarded Contractor is responsible for notifying BEP within 10 days of receiving this order.
Existing Equipment:
Bid must include an offer for trade-in value OR declaration to move existing equipment to recycler. Prior to equipment transfer, the barcodes, as noted below, must be removed, and returned to the department at the time of invoicing, with a recycling receipt (if applicable). Payment will be delayed if barcodes are not received with invoice. Supplier shall NOT accept any substituted machines or barcodes for removal from premises.
Substitutions, Inspection, Acceptance, and Rejection:
As noted in paragraphs 16, and 17 of the General Terms and Conditions, substitution of goods may not be tendered without advance written consent of the Buyer. All goods may be subject to inspection by the State or its authorized representatives, therefore subject to rejection.
Newly Manufactured Goods:
All Goods furnished under this contract shall be newly manufactured Goods; used or reconditioned Goods are prohibited.
End of Attachment Attachment #3 – Tejon Pass Rest Area, Lebec Ca Page 1 of 3
File details come from the government source that posted it. Updated .