Attachment 3 - Copy of Stage 1 survey.pdf

PDF 3 MB Posted

Attached to
Defense Manufacturing Readiness Exercise (DMRE)
Solicitation number
DIBC-RFS-26-02
Issued by

About this file

This is a Member Submission Form for the Defense Industrial Base Consortium (DIBC), managed by the Advanced Technology International (ATI). The form is designed to collect detailed information from manufacturing and engineering companies seeking to participate in the Defense Manufacturing Readiness Exercise (DMRE), a phased effort to identify and understand manufacturing capabilities, facilities, production roles, design capabilities, and manufacturing-readiness opportunities that may contribute to future defense production capacity.

The questionnaire is structured across nine sections covering company information, facility details, manufacturing capabilities, potential production roles, quality and operational readiness, conversion agility, optional comments, Group 3 UAS/UAV-specific information, and outreach sources. Respondents provide information on company type (e.g., manufacturer, contract manufacturer, electronics manufacturer, aerospace manufacturer, precision machining, systems integrator, engineering services provider), workforce size, prior defense and federal contracting experience, end markets served, facility functions and workforce levels, current manufacturing capabilities (precision machining, metal fabrication, composite fabrication, electronics assembly, testing and inspection, etc.), typical production environments and order quantities, quality certifications (ISO 9001, AS9100, IATF 16949, NADCAP, FAA Production Approval, CMMC, ITAR registration), ERP systems in use, and design and manufacturing engineering capabilities. The form also assesses production capacity availability, lead times, facility resources, ability to increase operations, multi-firm team participation willingness, and factors influencing participation. For Group 3 UAS/UAV design owners or current producers, additional sections address UAS-related production support capabilities and willingness to discuss production bottlenecks, supplier constraints, technical data needs, and qualification pathways. Submissions are valid for 36 months and may be shared with authorized U.S. Government agencies and, for Australia-, Canada-, and UK-based companies, their respective governments. This form is not a proposal, pricing request, commitment to future work, or source selection vehicle.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submitter Info

Name: John Doe

Organization: John Doe's Company

Address: 123 Main St, Anytown, USA

Phone: 123-456-7890

Email: john.doe@example.com

Member Submission Form

Purpose

The Defense Manufacturing Readiness Exercise (DMRE) is a phased effort to identify and better understand manufacturing capabilities, facilities, production roles, design capabilities, and other manufacturing-readiness opportunities that may contribute to future defense production capacity.

This questionnaire helps the Government understand your organization's capabilities, facilities, products, services, capacity, technical expertise, and potential production roles.

You do not need prior defense experience to participate.

Facility Submission Guidance

Each submission should represent a single facility.

If your organization wishes to nominate multiple facilities, submit a separate questionnaire for each facility.

Company-level information may be repeated across submissions. Facility-specific responses should reflect only the facility identified in this questionnaire.

Facilities may be evaluated independently for:

Production-role suitability Discovery participation Prototype participation Readiness assessment CRMN-related disposition

This questionnaire is:

Not a proposal Not a request for pricing Not a commitment to future work Not a source selection

Please answer based on your current operations.

The Government is not requesting:

Defense Industrial Base Consortium

Form - Defense Industrial Base Consortium

1/15 https://dibc-amp.ati.org/form-manager https://dibc-amp.ati.org/

Proprietary technical data Trade secrets Customer-sensitive information Controlled Unclassified Information (CUI) Export-controlled information Detailed pricing

Estimated completion time: 10–15 minutes.

Primary Sector and Requirement *

Technical Area *

Requirement *

Section 1 - Company Information

Company Website *

Primary POC Name * Title *

Phone * Email *

Company Type * Select all that apply. Please note the main category listed in parenthesis for the following sections.

Manufacturer

(Manufacturer)

Contract Manufacturer

(Manufacturer)

Electronics Manufacturer

(Manufacturer)

Aerospace Manufacturer

(Manufacturer)

Wire/Cable/Harness Manufacturer

(Manufacturer)

Precision Machining Company

(Manufacturer)

Fabrication Company

(Manufacturer)

Testing/Inspection Provider

(Manufacturer)

Logistics/Kitting Provider

First and Last Name Title

Phone Email check check check check check check check check check

Form - Defense Industrial Base Consortium

2/15

(Manufacturer)

Systems Integrator

(Manufacturer)

Supplier/Distributor

(Manufacturer)

Engineering Services Provider (to include Design)

(Engineering)

UAS / UAV Designer or OEM

(G3 UAS Design Owner / Current Producer)

Product Design Owner

(G3 UAS Design Owner / Current Producer)

Current Producer / Incumbent Producer

(G3 UAS Design Owner / Current Producer)

System Developer

(G3 UAS Design Owner / Current Producer)

Technical Data / Design Package Owner

(G3 UAS Design Owner / Current Producer)

Other

If "Other", please list company type here.

Primary Participation Role Desired * Select one.

Production Manufacturer

Contract Manufacturer

Component Supplier

Subassembly Supplier

Final Assembler

Systems Integrator

Test/Inspection Provider

Tooling Provider

Design Owner

Technical Data Holder

Current Producer

Supplier-Network Coordinator

Engineering Services Provider

Other

If "Other", please list desired role.

Total Company Workforce (All locations) *

Less than 50 check check check check check check check check check

3/15

50 – 250

251 – 1,000

1,001 – 5,000

More than 5,000

Prior Experience * Select all that apply.

Federal contracts

Defense contracts

Aerospace manufacturing

Automotive manufacturing

Medical-device manufacturing

Energy-sector manufacturing

FAA-regulated production

FDA-regulated production

None of the above

End Markets Currently Served *

Defense

Aerospace

Space

Automotive

Medical Device

Energy

Industrial Equipment

Telecommunications

Consumer Products

Other

If "Other", please list end market served.

Section 2 - Facility Information

In Section 1 did you select/list a manufacturing company type?

Yes

No

Facility Name *

City and State

City, State check check check check check check check check check check check check check check check check check check check

4/15

Primary Facility Function *

Manufacturing

Assembly

Engineering

Testing/Inspection

Logistics/Distribution

Mixed Use

Workforce at This Facility *

Less than 25

25 – 99

100 – 249

250 – 499

500 – 999

1,000+

Approximate Facility Operating Hours Per Week *

Less than 40

40 - 79

80 - 119

120 - 167

Continuous operation (168)

Varies by Demand

Could operating hours increase without major capital investment? *

Yes

No

Unsure

Approximate Available Production Capacity Today * Which best describes the production capacity currently available at this facility that could potentially be applied to additional work?

Less than 10%

10 – 25%

26 – 50%

More than 50%

Unknown

Prefer not to answer

Approximate Lead Time * What is the typical lead time to begin a new production project of similar complexity as you currently operate?

Less than 2 weeks

2–4 weeks

4–8 weeks

5/15

8–12 weeks

More than 12 weeks

Facility Resources for New Manufacturing Effort * Which facility resources could potentially support a new manufacturing effort? Select all that apply to this facility.

Available floor space

Available machine/equipment time

Available workforce capacity

Available engineering resources

Available quality/test resources

Existing supplier capacity

None currently available

Unsure

Section 3 - Manufacturing Capabilities

In Section 1 did you select/list a manufacturing company type?

Yes

No

Current Facility Capabilities * Select all that apply.

Precision machining

Metal fabrication

Composite fabrication

Injection molding

Additive manufacturing

Electronics assembly

Cable/wire/harness assembly

Mechanical assembly

System assembly

Testing and inspection

Calibration/metrology

Packaging/kitting

Engineering support

Quality assurance

Heat treatment

Surface finishing

Plating/coating operations

Specialty coatings

Chemical processing

Other check check check check check check check check check check check check check check check check check check check check check check check check check check check check

6/15

If "Other", please list current facility capabilities.

Typical Production Environment * Prototype/custom work

Job shop

Build-to-print manufacturing

Contract manufacturing

Batch production

High-volume production

Engineer-to-order

Mixed

Typical Order Quantity *

1 – 10 units

11 – 100 units

101 – 1,000 units

1,001–10,000 units

More than 10,000 units

Varies significantly

Product Areas Most Relevant * Select all that apply.

UAS/UAV systems or components

Electrical assemblies

Wiring harnesses/connectors

Electronics assemblies

Precision mechanical components

Tooling/fixtures/test equipment

Industrial machinery

Automotive components

Aerospace components

Other

If "Other", please list relevant product area.

Section 4 - Potential Production Role

In Section 1 did you select/list a manufacturing company type

OR select/list an engineering company type?

Yes

No check check check check check check check check check check

7/15

Section 4 What type of work could your company potentially perform? * Select all that apply.

Make individual parts or components

Build electrical or wiring assemblies

Build electronics assemblies

Assemble mechanical subassemblies

Assemble larger products from supplied parts

Test, inspect, or calibrate products

Build tooling, fixtures, gauges, or test equipment

Modify or refurbish products

Package, kit, store, or ship products

Manage suppliers or production partners

Translate designs into manufacturing processes

Provide contract manufacturing

Provide engineering or production-support services

Unsure

Other

If "Other", please specify type of work.

Which Role Best Reflects Where your Organization Could Contribute Most Effectively? *

Make individual parts or components

Build electrical or wiring assemblies

Build electronics assemblies

Assemble mechanical subassemblies

Assemble larger products from supplied parts

Test, inspect, or calibrate products

Build tooling, fixtures, gauges, or test equipment

Modify or refurbish products

Package, kit, store, or ship products

Manage suppliers or production partners

Translate designs into manufacturing processes

Provide contract manufacturing

Provide engineering or production-support services

Unsure

Other

If "Other", please state where your organization could contribute most effectively.

check check check check check check check check check check check check check check check

8/15

How would this work mostly likely be performed? *

Mostly in-house

Mostly through suppliers/partners

Combination of both

Unsure

Would Your Organization Potentially Participate As Part Of A Multi-Firm Production Team? *

Yes

No

Depends on opportunity

Unsure

Which Would Be Required Before Your Organization Could Realistically Participate? * Select all that apply.

Technical data package

Customer design authority

Incumbent producer coordination

Supplier identification/support

Qualification guidance

Government sponsorship

Additional equipment

Additional workforce

None

Unsure

Section 5 - Quality and Operational Readiness

In Section 1 did you select/list a manufacturing company type

OR select/list an engineering company type?

Yes

No

Which certifications, registrations, or quality systems are currently maintained? * Select all that apply.

ISO 9001

AS9100

IATF 16949

ISO 13485

ISO 17025

NADCAP

FAA Production Approval

FDA-Regulated Manufacturing check check check check check check check check check check check check check check check check check check

9/15

ITAR Registration

NIST 800-171 Implemented

CMMC Certified

Other

None

If "Other", please list certifications, registrations, or quality systems currently maintained.

Does the facility support traceability, configuration control, or documented work instructions? *

Yes

Partially

No

Which systems are currently used? * Select all that apply.

CAD

CAM

ERP

MES

PLM

Digital work instructions

Configuration management system

Automated inspection systems

Other

None

If "Other", please list which systems are currently used.

Primary ERP System * Select all that apply.

SAP

Oracle

Microsoft Dynamics

Epicor

Plex

NetSuite

JobBOSS

DELMIAWorks

Other

No ERP

Prefer not to answer check check check check check check check check check check check check check check check check check check check check check check check check check check

10/15

If "Other", please list primary ERP system.

Engineering Change Management Method *

Manual documents

Controlled document system

ERP/MES workflow

Digital thread / model-based workflow

Unsure

Section 6 - Conversation Agility

In Section 1 did you select/list a manufacturing company type

OR select/list an engineering company type?

Yes

No

If demand increased tomorrow, how could production increase? * In other words, what immediate actions would you take to increase production?

Select all that apply.

Add overtime

Add shifts

Activate idle equipment

Reallocate workforce

Utilize supplier capacity

Lease equipment

Purchase equipment

Utilize contract manufacturing partners

Unsure

New manufacturing effort dedication * Assuming designs, materials, and approvals were available, how long would it take to dedicate part of this facility to a new manufacturing effort?

Less than 30 days

30–60 days

61–90 days

91–180 days

More than 180 days

Unknown

Design For Manufacturability / Production Engineering Capabilities * Select all that apply.

Design for Manufacturability (DFM)

Design for Assembly (DFA) check check check check check check check check check check check

11/15

Production engineering

Tooling design

Process engineering

Test engineering

Automation engineering

None

Which factors would most influence participation? * Select up to three.

Access to technical information

Workforce availability

Equipment or tooling needs

Supplier availability

Qualification requirements

Cyber/security requirements

Capital investment

Business case

Government coordination

Other

Level of Interest in Follow-On Discovery *

Highly interested and ready to engage

Interested but need additional information

Interested for specific opportunities only

Monitoring opportunities

Unsure

Section 7 - Optional Comments

Optional Comments Briefly describe why your company believes it could contribute to future manufacturing readiness efforts.

This is your opportunity to tell the team anything else they should know about your organization in regard to the RFS. For example, if there is anything you would like to clarify for answers provided above.

Section 8 - G3 UAS Design Owner / Current Producer Information

In Section 1 did you select/list a design owner, OEM, current producer, or technical-data holder for a Group 3 UAS/UAV system, subsystem, or component company type?

Yes

No check check check check check check check check check check check check check check check check

12/15

What type of UAS-related item or information could you potentially support matching to manufacturing capacity? * Select all that apply.

Complete air vehicle

Airframe or structure

Propulsion-related component

Electrical subsystem

Wiring harness / connector package

Payload integration

Ground support equipment

Test / inspection requirements

Production drawings or models

Bill of materials

Manufacturing process knowledge

Supplier or vendor information

Qualification or acceptance requirements

Other

If "Other", please list type UAS-related item.

What would you be willing to discuss during Phase 1 discovery? * Select all that apply.

Production bottlenecks

Supplier constraints

Technical-data needs

Build-to-print opportunities

Subcontracting opportunities

Workshare opportunities

Test or acceptance requirements

Qualification pathway

Candidate production roles

Prefer to discuss only under appropriate protections

Relationship to Technical Data *

We create and own technical data

We maintain technical data for products we produce

We manufacture from customer-provided technical data

We require technical data from others

Not applicable

Section 9 - Outreach Source check check check check check check check check check check check check check check check check check check check check check check check check

13/15

How did you hear about this opportunity? * Select all that apply.

Manufacturing association

Industry association

SAM.gov

SBA event

APEX Accelerator / PTAC

DIBC / ATI communication

LYNX

State or local economic development organization

Defense industry event

University or research partner

Prime contractor / OEM referral

Supplier network referral

LinkedIn or social media

Direct Government outreach

If you selected association, event, referral, or other, please identify the source.

Submitter Agreements

Proposal Validity * I certify that this submission is valid for 36 months.

Agree

Classified Information * I certify no classified information is contained in the information being submitted.

Agree

Information Sharing * I acknowledge that submission information contained on this form, to include the accompanied documents (i.e. Quad Chart and White Paper), may also be provided to authorized personnel within other U.S. Government agencies upon request.

Agree

Submission Validation * I confirm that the Rough Order of Magnitude (ROM) provided on my AMP submission form matches the ROM provided in my attachment (i.e. Quad Chart, White Paper, Project Execution Plan, etc.).

I confirm that the Quad Chart provided on my AMP submission is the correct template as refenced in the RPP.

Agree

CMO Responsibilities * I understand The Government intends to use the Consortium Management Organization (CMO), ATI, to assist in the processing of Submitter's white papers/proposals to this solicitation. The CMO shall take the necessary steps to protect all proprietary information and shall not use such proprietary information for purposes other than the evaluation of a Submitter's white check check check check check check check check check check check check check check check check check check

14/15 paper/proposal and the subsequent contract administration if the white paper/proposal is selected for award. A Submitter’s submission under this RPP indicates concurrence with the aforementioned CMO responsibilities.

For Australia-, Canada-, and UK-based companies only: additionally, I acknowledge that my submission information may also be provided to personnel within my respective Government upon request.

Agree

Unauthorized attempts to deny service, upload information, change information, or attempt to access a non-public site from this service are strictly prohibited and may be punishable under Title 18 of the U.S. Code to include the

Computer Fraud and Abuse Act of 1986 and the National Information Infrastructure Protection Act.

Managed and operated by

Version 1.26.520.101

Built 2026-06-22 14:27:00

Frequently Asked Solicitation Questions Privacy & Terms of Use check

Form - Defense Industrial Base Consortium https://dibc-amp.ati.org/form-preview/3a51357d-8165-4903-1f70-08ded07916c2 15/15 https://ati.org/ https://www.dibconsortium.org/solicitations/ https://www.ati.org/privacy-terms-of-use/

File details come from the government source that posted it. Updated .