Attachment 3 CLIN Pricing Worksheet.xlsx

XLSX spreadsheet 74 KB Posted

Attached to
WRDA Tree Service MATOC Federal contract opportunity
Solicitation number
W9123821R0057
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

View the file

Other files for this federal contract opportunity

Other files attached to WRDA Tree Service MATOC, newest first.
File Type Posted
Sacramento Weir.pdf PDF
Attachment 1 WRDA16 Tree Service MATOC PWS Final Revised 5-25-21.docx DOCX document
Questions Responses.docx DOCX document
ARCF limits.pdf PDF
SREL_ConstructionSeasons Graphic.pdf PDF
W9123821R0057 Letter RFP Amendment 1.pdf PDF
Attachment 2 QASP.docx DOCX document
Attachment 6 Past Performance References.doc DOC document
Attachment 5 Provisions and Clauses.docx DOCX document
W9123821R0057 Letter RFP.pdf PDF
Attachment 4 CLIN Details and Quantities.docx DOCX document
Attachment 1 WRDA16 Tree Service MATOC PWS Final.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions Proposal Template

GENERAL INFORMATION

The Government template is for guidance purposes, and is not all inclusive. This template serves as an illustration of the format and details required to complete the Government cost/price evaluation.
The Offeror is responsible to ensure compliance with federal regulations and provide the necessary data as required by the request for proposal/quotation (RFP/RFQ).

Offeror shall complete the Government issued template as instructed:

1) Complete the CLIN Summary and all corresponding sheets.
The Government must be able to verify and track all proposed pricing from the proposed details through to the CLIN Summary.
All links to the corresponding sheet/cells shall be made/linked prior to submitting a proposal
Note, that it is the Offeror's responsibility to ensure the calculations are correct.

2) The spreadsheet shall include all formulas.

3) The Offeror shall provide the required detailed as instructed in the RFP/RFQ.

4) The Contractor shall not include any "pricing notes" in the proposal template.

5) The Offeror can add additional rows/columns or tabs in the template as necessary.
If additional tabs are necessary to reflect further details, the costs on subordinate tabs shall roll up to the appriopriate sheets.
In addition, the Offeror can provide supporting documentation through an attachment if required. The information provided shall allow traceability between the proposed price included in the cost/price template and any provided source information.

CLIN Summary

Proposal Template
COMPLETE THE FOLLOWING:
Solicitation Title
Solicitation Number
Contractor Name
Cage Code
Contract Vehicle
Date
CLIN STRUCTURE SUMMARY
CLIN NumberCLIN DescriptionContract TypeBase PeriodOption Period 1Option Period 2Option Period 3Option Period 4Subtotal6-Month Ext*Total Price
0001Administration FY21FFP$ - 0$ - 0$ - 0
0001AASubmittals - OwnerFFP$ - 0$ - 0$ - 0
0001ABSubmittals - Elderberry ShrubFFP$ - 0$ - 0$ - 0
0001ACPrecon - ArboristFFP$ - 0$ - 0$ - 0
0001ADPrecon Tree Saw Equipment OperatorsFFP$ - 0$ - 0$ - 0
0001AEPrecon Tree Ground Personnel LaborersFFP$ - 0$ - 0$ - 0
0001AFPrecon Elderberry Sub-ConsultantFFP$ - 0$ - 0$ - 0
0001AGPrecon Elderberry LaborersFFP$ - 0$ - 0$ - 0
0002Tree Removal and Trimming FY21FFP$ - 0$ - 0$ - 0
0002AATree Removal 0-10 inchFFP$ - 0$ - 0$ - 0
0002ABTree Removal 10-20 inchFFP$ - 0$ - 0$ - 0
0002ACTree Removal 20-30 inchFFP$ - 0$ - 0$ - 0
0002ADTree Removal 30 inch and overFFP$ - 0$ - 0$ - 0
0002AETree Removal 48 inch and overFFP$ - 0$ - 0$ - 0
0002AFTree Trimming 10-50 feet highFFP$ - 0$ - 0$ - 0
0002AGTree Trimming 50 feet and overFFP$ - 0$ - 0$ - 0
0002AHSaw Equipment OperatorsFFP$ - 0$ - 0$ - 0
0002AJGround Personnel LaborersFFP$ - 0$ - 0$ - 0
0002AKSite FormanFFP$ - 0$ - 0$ - 0
0002ALArboristFFP$ - 0$ - 0$ - 0
0002AMForestry Bucket TruckFFP$ - 0$ - 0$ - 0
0002ANLog Truck Self LoaderFFP$ - 0$ - 0$ - 0
0002AP20 inch Brush ChipperFFP$ - 0$ - 0$ - 0
0002AQ10 yard Chip TruckFFP$ - 0$ - 0$ - 0
0002ARDump run feesFFP$ - 0$ - 0$ - 0
0002ASTravel IAW JTR and FAR Part 31FFP$ - 0$ - 0$ - 0
0003Base Elderberry Transplant FY21FFP$ - 0$ - 0$ - 0
0003AAMobilizationFFP$ - 0$ - 0$ - 0
0003ABGround Personnel LaborerFFP$ - 0$ - 0$ - 0
0003ACEquipment OperatorFFP$ - 0$ - 0$ - 0
0003ADSite FormanFFP$ - 0$ - 0$ - 0
0003AEExcavatorFFP$ - 0$ - 0$ - 0
0003AF15 inch Brush ChipperFFP$ - 0$ - 0$ - 0
0003AG10 yard Chip TruckFFP$ - 0$ - 0$ - 0
0003AHFlat bed transport truckFFP$ - 0$ - 0$ - 0
0003AJTravel IAW JTR and FAR Part 31FFP$ - 0$ - 0$ - 0
0004Biological Monitoring Services FY21FFP$ - 0$ - 0$ - 0
0004AASenior Biological Monitor - Bat SurveysFFP$ - 0$ - 0$ - 0
0004ABReporting and DocumentationFFP$ - 0$ - 0$ - 0
Subtotal:- 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
9999**Surge (Cost Reimbursable NTE)35%- 0- 0- 0- 0- 0$ - 0$ - 0
TOTAL EVALUATED PRICE:- 0- 0- 0- 0- 0- 0- 0- 0

NOTE 1: *6-Month Extension - For Evaluation Purposes only. Provide pricing for Optional 6-month extension authorized in accordance with FAR 52.217-8. CLIN(s) will not appear on contract. Assume all previous option periods have been exercised. DO NOT INCLUDE SURGE CLIN PRICING IN THIS NUMBER.

NOTE 2: **Surge CLIN OF ALL BASE PERIOD and OPTION PERIOD CLINs, excluding 6-mo extension authorized IAW FAR 52.217-8, see subtotal above). Surge CLINs are Cost Reimbursable (CR) Not to exceed (NTE).

Remove the text box and any notes in red italics prior to issuing the RFP/RFQ.

Contract specialists should tailor the CLIN summary to the specifics of your RFP/RFQ, i.e., the CLIN numbering, inserting plug numbers, contract types, PWS/SOW Task Area(s), number of option periods (removing the option period excell sheets that don't apply), PWS paragraph numbers, and surge percentage. Double-check formulas after adding or deleting CLINs to ensure they are accurate. Offerors are required to complete the Base Period (BP) and associated option year excel sheets with the labor categories that make up the pricing for the CLINs.

Consult with DISA Cost and Pricing Branch (PL842) if additional assistance is necessary.

BP

Proposal Template

Base Period
FP LABOR
CLIN #Company Name (Prime/Sub)PWS/SOW Task(s)Labor Category #Proposed Contract Labor CategoryOfferor's Mapped Labor CategoryGovernment Site / Contractor SiteContract/Schedule Labor Hr RateProposed Discount PercentProposed FP Labor Hr RateProposed Labor HoursAmount
(if applicable)(if applicable)
ADD ADDITIONAL ROWS IF NECESSARY
Total FP Labor- 0$ - 0
Materials1$ - 0
Travel/ODC1$ - 0
Total Price$ - 0

NOTE 1: All proposed Materials or Travel/ODC NOT part of a Government provided plug number shall be annotated in as much detail as known below.

**COMPLETE THE SECTION BELOW ONLY IF THE PROPOSED MATERIAL AND TRAVEL/ODC COST ABOVE ARE NOT PART OF A PLUG NUMBER**
Materials
CLINOEM/Vendor SourcePWS/SOW TaskPart NumberProposed ItemDescriptionUnit CostQuantitySub TotalApplicable IndirectApplicable IndirectTotalSupportingSupporting
0%0%Basis of RateData Reference
$ - 0$ - 0$ - 0$ - 0(e.g. invoices, price history, etc)(e.g. Tab A, attachment xyz)
$ - 0$ - 0$ - 0$ - 0
ADD ADDITIONAL ROWS IF NECESSARY$ - 0$ - 0$ - 0$ - 0
- 0
Travel Cost
CLINLocations (To and From)Number of DaysNumber of PersonnelMeals and IncidentalsLodgingAirfareRental CarOtherTotalApplicable IndirectTotalSupportingSupporting
0%Basis of RateData Reference
$ - 0$ - 0$ - 0(e.g. GSA detail, commercial pricing, etc)(e.g. Tab A, attachment xyz)
$ - 0$ - 0$ - 0
ADD ADDITIONAL ROWS IF NECESSARY$ - 0$ - 0$ - 0
- 0
Other
TBDTBDTBDTBDTBDTBDTBDTBDTotalApplicable IndirectTotalSupportingSupporting
0%Basis of RateData Reference
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
ADD ADDITIONAL ROWS IF NECESSARY$ - 0$ - 0$ - 0
- 0

OP1

Proposal Template

Option Period 1
FP LABOR
CLIN #Company Name (Prime/Sub)PWS/SOW Task(s)Labor Category #Proposed Contract Labor CategoryMapped Internal Labor CategoryGovernment Site /Contractor SiteContract/Schedule Labor Hr RateProposed Discount PercentProposed FP Labor Hr RateProposed Labor HoursAmount
(if applicable)(if applicable)
ADD ADDITIONAL ROWS IF NECESSARY
Total FP Labor- 0$ - 0
Materials1$ - 0
Travel/ODC1$ - 0
Total Price$ - 0

NOTE 1: All proposed Materials or Travel/ODC NOT part of a Government provided plug number shall be annotated in as much detail as known below.

**COMPLETE THE SECTION BELOW ONLY IF THE PROPOSED MATERIAL AND TRAVEL/ODC COST ABOVE ARE NOT PART OF A PLUG NUMBER**
Materials
CLINOEM/Vendor SourcePWS/SOW TaskPart NumberProposed ItemDescriptionUnit CostQuantitySub TotalApplicable IndirectApplicable IndirectTotalSupportingSupporting
0%0%Basis of RateData Reference
$ - 0$ - 0$ - 0$ - 0(e.g. invoices, price history, etc)(e.g. Tab A, attachment xyz)
$ - 0$ - 0$ - 0$ - 0
ADD ADDITIONAL ROWS IF NECESSARY$ - 0$ - 0$ - 0$ - 0
- 0
Travel Cost
CLINLocations (To and From)Number of DaysNumber of PersonnelMeals and IncidentalsLodgingAirfareRental CarOtherTotalApplicable IndirectTotalSupportingSupporting
0%Basis of RateData Reference
$ - 0$ - 0$ - 0(e.g. GSA detail, commercial pricing, etc)(e.g. Tab A, attachment xyz)
$ - 0$ - 0$ - 0
ADD ADDITIONAL ROWS IF NECESSARY$ - 0$ - 0$ - 0
- 0
Other
TBDTBDTBDTBDTBDTBDTBDTBDTotalApplicable IndirectTotalSupportingSupporting
0%Basis of RateData Reference
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
ADD ADDITIONAL ROWS IF NECESSARY$ - 0$ - 0$ - 0
- 0

OP2

Proposal Template

Option Period 2
FP LABOR
CLIN #Company Name (Prime/Sub)PWS/SOW Task(s)Labor Category #Proposed Contract Labor CategoryMapped Internal Labor CategoryGovernment Site /Contractor SiteContract/Schedule Labor Hr RateProposed Discount PercentProposed FP Labor Hr RateProposed Labor HoursAmount
(if applicable)(if applicable)
ADD ADDITIONAL ROWS IF NECESSARY
Total FP Labor- 0$ - 0
Materials1$ - 0
Travel/ODC1$ - 0
Total Price$ - 0

NOTE 1: All proposed Materials or Travel/ODC NOT part of a Government provided plug number shall be annotated in as much detail as known below.

**COMPLETE THE SECTION BELOW ONLY IF THE PROPOSED MATERIAL AND TRAVEL/ODC COST ABOVE ARE NOT PART OF A PLUG NUMBER**
Materials
CLINOEM/Vendor SourcePWS/SOW TaskPart NumberProposed ItemDescriptionUnit CostQuantitySub TotalApplicable IndirectApplicable IndirectTotalSupportingSupporting
0%0%Basis of RateData Reference
$ - 0$ - 0$ - 0$ - 0(e.g. invoices, price history, etc)(e.g. Tab A, attachment xyz)
$ - 0$ - 0$ - 0$ - 0
ADD ADDITIONAL ROWS IF NECESSARY$ - 0$ - 0$ - 0$ - 0
- 0
Travel Cost
CLINLocations (To and From)Number of DaysNumber of PersonnelMeals and IncidentalsLodgingAirfareRental CarOtherTotalApplicable IndirectTotalSupportingSupporting
0%Basis of RateData Reference
$ - 0$ - 0$ - 0(e.g. GSA detail, commercial pricing, etc)(e.g. Tab A, attachment xyz)
$ - 0$ - 0$ - 0
ADD ADDITIONAL ROWS IF NECESSARY$ - 0$ - 0$ - 0
- 0
Other
TBDTBDTBDTBDTBDTBDTBDTBDTotalApplicable IndirectTotalSupportingSupporting
0%Basis of RateData Reference
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
ADD ADDITIONAL ROWS IF NECESSARY$ - 0$ - 0$ - 0
- 0

OP3

Proposal Template

Option Period 3
FP LABOR
CLIN #Company Name (Prime/Sub)PWS/SOW Task(s)Labor Category #Proposed Contract Labor CategoryMapped Internal Labor CategoryGovernment Site /Contractor SiteContract/Schedule Labor Hr RateProposed Discount PercentProposed FP Labor Hr RateProposed Labor HoursAmount
(if applicable)(if applicable)
ADD ADDITIONAL ROWS IF NECESSARY
Total FP Labor- 0$ - 0
Materials1$ - 0
Travel/ODC1$ - 0
Total Price$ - 0

NOTE 1: All proposed Materials or Travel/ODC NOT part of a Government provided plug number shall be annotated in as much detail as known below.

**COMPLETE THE SECTION BELOW ONLY IF THE PROPOSED MATERIAL AND TRAVEL/ODC COST ABOVE ARE NOT PART OF A PLUG NUMBER**
Materials
CLINOEM/Vendor SourcePWS/SOW TaskPart NumberProposed ItemDescriptionUnit CostQuantitySub TotalApplicable IndirectApplicable IndirectTotalSupportingSupporting
0%0%Basis of RateData Reference
$ - 0$ - 0$ - 0$ - 0(e.g. invoices, price history, etc)(e.g. Tab A, attachment xyz)
$ - 0$ - 0$ - 0$ - 0
ADD ADDITIONAL ROWS IF NECESSARY$ - 0$ - 0$ - 0$ - 0
- 0
Travel Cost
CLINLocations (To and From)Number of DaysNumber of PersonnelMeals and IncidentalsLodgingAirfareRental CarOtherTotalApplicable IndirectTotalSupportingSupporting
0%Basis of RateData Reference
$ - 0$ - 0$ - 0(e.g. GSA detail, commercial pricing, etc)(e.g. Tab A, attachment xyz)
$ - 0$ - 0$ - 0
ADD ADDITIONAL ROWS IF NECESSARY$ - 0$ - 0$ - 0
- 0
Other
TBDTBDTBDTBDTBDTBDTBDTBDTotalApplicable IndirectTotalSupportingSupporting
0%Basis of RateData Reference
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
ADD ADDITIONAL ROWS IF NECESSARY$ - 0$ - 0$ - 0
- 0

OP4

Proposal Template

Option Period 4
FP LABOR
CLIN #Company Name (Prime/Sub)PWS/SOW Task(s)Labor Category #Proposed Contract Labor CategoryMapped Internal Labor CategoryGovernment Site /Contractor SiteContract/Schedule Labor Hr RateProposed Discount PercentProposed FP Labor Hr RateProposed Labor HoursAmount
(if applicable)(if applicable)
ADD ADDITIONAL ROWS IF NECESSARY
Total FP Labor- 0$ - 0
Materials1$ - 0
Travel/ODC1$ - 0
Total Price$ - 0

NOTE 1: All proposed Materials or Travel/ODC NOT part of a Government provided plug number shall be annotated in as much detail as known below.

**COMPLETE THE SECTION BELOW ONLY IF THE PROPOSED MATERIAL AND TRAVEL/ODC COST ABOVE ARE NOT PART OF A PLUG NUMBER**
Materials
CLINOEM/Vendor SourcePWS/SOW TaskPart NumberProposed ItemDescriptionUnit CostQuantitySub TotalApplicable IndirectApplicable IndirectTotalSupportingSupporting
0%0%Basis of RateData Reference
$ - 0$ - 0$ - 0$ - 0(e.g. invoices, price history, etc)(e.g. Tab A, attachment xyz)
$ - 0$ - 0$ - 0$ - 0
ADD ADDITIONAL ROWS IF NECESSARY$ - 0$ - 0$ - 0$ - 0
- 0
Travel Cost
CLINLocations (To and From)Number of DaysNumber of PersonnelMeals and IncidentalsLodgingAirfareRental CarOtherTotalApplicable IndirectTotalSupportingSupporting
0%Basis of RateData Reference
$ - 0$ - 0$ - 0(e.g. GSA detail, commercial pricing, etc)(e.g. Tab A, attachment xyz)
$ - 0$ - 0$ - 0
ADD ADDITIONAL ROWS IF NECESSARY$ - 0$ - 0$ - 0
- 0
Other
TBDTBDTBDTBDTBDTBDTBDTBDTotalApplicable IndirectTotalSupportingSupporting
0%Basis of RateData Reference
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
ADD ADDITIONAL ROWS IF NECESSARY$ - 0$ - 0$ - 0
- 0

FP Rate Sheet

Proposal Template
Contract/Schedule Labor RatesBlended Contract/Schedule Rate (if necessary)
Year 1Year 2Year 3Year 4Year 5BPOP1OP2OP3OP4
Labor CategoryMapped Labor CategoryGovernment Site/Contractor SiteRateRateRateRateRateRateRateRateRateRate
Prime Labor

Subcontracting Labor

Instructions:Provide all proposed FP labor rates for each of the labor category.
Add additional columns/rows if needed. For example, the offeror can illustrate a blended rate between periods.

File details come from the government source that posted it. Updated .