Attachment 2 QASP.docx

DOCX document 38 KB Posted

Attached to
WRDA Tree Service MATOC
Solicitation number
W9123821R0057
Issued by

View the file

Other files

File Type Posted
SREL_ConstructionSeasons Graphic.pdf PDF
W9123821R0057 Letter RFP Amendment 1.pdf PDF
ARCF limits.pdf PDF
Questions Responses.docx DOCX document
Sacramento Weir.pdf PDF
Attachment 1 WRDA16 Tree Service MATOC PWS Final Revised 5-25-21.docx DOCX document
Attachment 4 CLIN Details and Quantities.docx DOCX document
Attachment 3 CLIN Pricing Worksheet.xlsx XLSX spreadsheet
Attachment 1 WRDA16 Tree Service MATOC PWS Final.docx DOCX document
W9123821R0057 Letter RFP.pdf PDF
Attachment 5 Provisions and Clauses.docx DOCX document
Attachment 6 Past Performance References.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B

Quality Assurance Surveillance Plan

(QASP)

The QASP will consist of periodic inspections conducted by the COR. A surveillance report will be prepared by the COR and forwarded to the Contractor. The Contractor shall respond to any complaints and/or ratings of poor performance within five (5) calendar days, after receipt of the report.

MANAGEMENT SUPPORT RATING CRITERIA

No.
PERFORMANCE OBJECTIVE
INDICATORS OF SUCCESS
001
Plan Preparation and Submission Meeting
All plan submittals have been prepared and submitted. Plans shall include: EPP, APP, QCP, and ID.
Tree Removal
Designated trees (57) have been felled and properly removed from the site with stumps left to 3’ above grade unless otherwise noted or specified.
Tree Trimming
Designated trees (158) and haul road/access trees have been trimmed properly with limbs and foliage removed from site. Haul road/access.
Elderberry Transplant
Designated elderberry shrubs (5) have been transplanted per 2017 USFWS guidelines.

(1) OBJECTIVE: Comply with Environmental and Safety Regulations

Performance Standard
Acceptable Quality Level (AQL)
Method and Frequency of Inspection)
Remedy
Invoice Re-calculation percentage
Submit all plans and install protection fencing
100% required. The contractor must be in compliance with the US Army Corps of Engineers EM 385-1-1,
Review by COR
Develop a plan for recovery and submit required plans within 5 working days of discovery. Continuous review until performance is satisfactory.
100% if fail to meet AQL

(2) OBJECTIVE: Remove and Trim Trees and at Levee System

1
Acceptable Quality Level (AQL)
Method and Frequency of Inspection)
Remedy
Invoice Re-calculation percentage

Remove 57trees by cutting them down to 3’ above grade. (Includes Base and Options 1: cut 3 trees is for contingency.

100% required
Periodic field inspection by COR during repair and/or removal
Develop a plan for recovery and submit required plans within 5 working days of discovery. Continuous review until performance is satisfactory.
100% if fail to meet AQL

Trim 157 trees with limbs and foliage within the levee degrade area.

Options 1: trim 3 trees is for contingency.

Trim trees within the haul road/access areas to create 15 foot vertical clearance.

100% required
Periodic field inspection by COR during repair and/or removal
Develop a plan for recovery and submit required plans within 5 working days of discovery. Continuous review until performance is satisfactory.
100% if fail to meet AQL

(3) OBJECTIVE: Transplant Elderberry Shrubs

1
Acceptable Quality Level (AQL)
Method and Frequency of Inspection)
Remedy
Invoice Re-calculation percentage
Transplant 5 elderberry shrubs to specified receiving area per USFWS 2017 guidelines.
100% required
Periodic field inspection by COR during repair and/or removal
Develop a plan for recovery and submit required plans within 5 working days of discovery. Continuous review until performance is satisfactory.
100% if fail to meet AQL