Attachment 3 - Clearing Limits Diagram (AUG 2026).pdf
PDF 2 MB Posted
- Attached to
- CNF TRAIL BRUSHING
- Solicitation number
- 1240BF26Q0057
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a technical drawing document from the USDA depicting Chicago Intermodal Belt Railroad Project details. The document contains multiple detailed engineering schematics and data tables showing clearing units, stress loss calculations, and disposal methodology for what appears to be a railroad corridor or right-of-way project.
The drawings illustrate site plans with vegetation clearing zones, soil conditions, and structural elements related to railroad infrastructure. The accompanying tables provide specifications for clearing units with corresponding stress values and disposal notes. The document includes elevation views, cross-sections, and dimensional annotations typical of civil engineering and environmental assessment drawings. The header indicates this is an official USDA document (marked as "R9") with clearing dates and project references. The technical nature and level of detail suggest this document serves as a baseline for contract work involving right-of-way preparation, vegetation management, and site assessment for railroad operations or construction activities. However, the document quality and image resolution limit detailed extraction of specific numerical values, measurements, and certain table entries.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .