Attachment 3 - BPA SOW for Storage Tanks (Nov 23) TSM.pdf

PDF 84 KB Posted

Attached to
Storage Tank Maintenance Federal contract opportunity
Solicitation number
FA860124R0009
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This performance work statement outlines requirements for compliance testing, evaluation, and minor repair services for storage tank systems at Wright-Patterson Air Force Base in Ohio. The contractor shall provide personnel, equipment, materials, and supervision to conduct integrity and containment testing, evaluate tank gauging and release detection systems, and perform minor repairs on underground and aboveground storage tanks in accordance with applicable regulations and industry standards. Services include periodic testing and inspection of underground tanks listed in an attachment, as well as responding to leaks or other issues. The contractor must be qualified as an Underground Storage Tank installer by the Ohio Bureau of Underground Storage Tank Regulations and knowledgeable regarding automatic tank gauging systems. The contractor shall schedule work with the technical representative and respond within 24 hours for emergencies.

View the file

Other files for this federal contract opportunity

Other files attached to Storage Tank Maintenance, newest first.
File Type Posted
Questions and Answers FA8601-24-R-0009 Storage Tanks Follow on.pdf PDF
Attachment 5 Aboveground List.xlsx XLSX spreadsheet
Attachment 6 - Storage Tank Maintenance Price List.xlsx XLSX spreadsheet
Attachment 7 - Wage Determination FA860124R0009.pdf PDF
Solicitation - FA860124R0009.pdf PDF
Attachment 1 - Instruction To Offerors - FA860124R0009.pdf PDF
Attachment 2 - Evaluation Factors FA860124R0009.pdf PDF
Attachment 4 Underground List.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

FOR

COMPLIANCE TESTING, EVALUATION, AND

MINOR REPAIR OF STORAGE TANK SYSTEMS

AT

WRIGHT-PATTERSON AIR FORCE BASE, OHIO

14 November 2023

1.0 BACKGROUND

Wright-Patterson Air Force Base (WPAFB) is located in southwestern Ohio, between the cities of Dayton and Fairborn. It is situated approximately 60 miles north of Cincinnati, Ohio and 50 miles west of Columbus, Ohio and occupies portions of Greene and Montgomery counties. The base is comprised of two areas, known as Areas A and B. Storage tanks containing petroleum products are located throughout the installation in both areas.

2.0 DESCRIPTION OF WORK

In carrying out work assignment(s) issued under this PWS, the Contractor shall furnish the personnel, services, equipment, tools, materials, vehicles, facilities supervision and other requirements necessary for, or incidental to, the performance of work set forth herein and be responsible for safeguarding proprietary and other sensitive information. The Contractor shall be immediately capable of addressing and interpreting all aspects of applicable Federal, State, and local rules and regulations and industry standards.

Wright-Patterson AFB has an inventory of underground and aboveground storage tanks. The majority of these tanks store petroleum products and are equipped with tank gauging and release detection systems. In order to maintain compliance with Federal, State, and local tank regulations, it is necessary to periodically conduct integrity testing, containment testing, evaluation of tank gauging and release detection systems, compliance evaluations, and minor repair and adjustment of specific tank systems. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary to perform tasks under this statement of work. Under the terms of this agreement, all work performed shall be accomplished in accordance with all applicable Federal, State, and local rules and regulations and industry standards.

3.0 OBJECTIVES

The objective of this work is to conduct integrity testing, compliance evaluations, containment testing, evaluation of specific tank gauging and release detection systems, and minor repair and adjustment of specific tank systems as required by the Technical Representative and in accordance with all applicable tank regulations and accepted industry standards. A list of underground storage tanks which may require periodic integrity testing and containment testing in accordance with Ohio Administrative Code (OAC) 1301:7-9 requirements is attached. In addition, integrity testing, containment testing, and operational compliance inspection and documentation of other specific tank systems may be necessary periodically depending on condition of tanks, tank monitoring systems, and suspected problems or leaks. All operational compliance inspections on underground storage tanks will be conducted and documented in accordance with OAC 1301:7-9 and State of Ohio Bureau of Underground Storage Tank

Regulations (BUSTR) requirements. All work on aboveground storage tanks will be documented on accepted industry standard forms or equivalent.

The need for emergency integrity testing of underground storage tanks suspected of leaking may occur infrequently and may require expedited services of the Contractor to perform the required testing.

4.0 GENERAL CONTRACTOR REQUIREMENTS

The Contractor shall furnish all labor, materials, equipment, and supplies necessary to complete the requirements of this SOW within the schedule specified below. All costs incurred in completion of this SOW will be borne by the Contractor.

4.1. GOVERNMENT PROPERTY. All documents, photographs, maps, graphics, mailing lists, computer files and the like developed by the Contractor in completing the requirements of this SOW are Government property and will be delivered to the 88 CEG/CEIEA point of contact (POC) upon completion of the task. All contractors taking photographs must be escorted and use a digital camera. The pictures must be reviewed and approved by the WPAFB CE OPSEC Manager before the Contractor leaves the base.

4.2. DATA SECURITY. The Contractor shall not release any data, reports, or materials collected or developed while completing this project without the expressed written consent of the 88 CEG/CEIEA POC.

4.3. DELIVERABLES. Documentation of work performed under this scope will follow OAC requirements for USTs and industry standards or equivalent for other tank work and will be approved by the 88 CEG/CEIEA Technical Representative prior to use.

Documentation of work performed will be submitted to the 88 CEG/CEIEA Technical

Representative under separate cover letter containing the Contractor’s company name, address, and contact information. All cover letters will contain a description of the work performed, the date and location where the work was performed, and names of personnel involved. The results of work performed will be attached to the cover letter.

4.4. CONTRACTOR QUALIFICATIONS. All work under this scope must be performed by an experienced individual(s) with demonstrated knowledge of tank systems and holding a current certification from BUSTR as an Underground Storage Tank (UST) installer or supervised by an individual with current certification from BUSTR as a UST installer.

Evaluation of Veeder-Root and other Automatic Tank Gauging (ATG) and release detection systems shall be performed by an individual knowledgeable of these systems.

4.5. GENERAL PROVISIONS. All reports, maps, photographs, notes and other work developed in the performance of this contract shall be and remain the sole properties of the Government and may be used by the Government on any other work without additional compensation to the contractor. The contractor agrees not to assert any rights and not to establish any claim with respect thereto. The contractor agrees to furnish all retained materials on the request of the contracting officer. The contractor shall be responsible for the accuracy and validity of the material presented in their reports.

4.6. SCHEDULING. The Contractor shall schedule all work to be performed in advance with the Technical Representative to ensure regulatory compliance dates are met. The

Contractor shall respond to emergency work within 24 hours of notification. The

Technical Representative(s) will notify the contractor in advance of non-emergency work to be accomplished. The Contractor will obtain approval from the Technical

Representative for all schedules of work to be performed.

5.0 GENERAL INSTRUCTIONS TO THE CONTRACTOR. The following conditions shall be observed by the Contractor:

5.1. Any work performed in/around the War Fighter Training Center must be coordinated with the organization that manages the site. The CEIEA POC will coordinate all activities on behalf of the contractor prior to mobilization.

5.2. The contractor must familiarize himself with the hours of gates that impact access to each work area, and coordinate access to all work areas through the 88 ABW/CEIEA

POC.

5.3. The contractor must abide by applicable state traffic laws.

5.4. Before starting any work whereby traffic would be impeded or hindered, especially fire trucks and police vehicles, notify the Base Fire Department at 257-6933 and Security

Forces at 257-6959 or 257-6516 at least 72 hours prior to placing any barricades. The site work hours are Monday through Friday, daylight hours, however notify the program manager if planning to work past 5:00 p.m. Work may be accomplished on Saturdays, Sundays or government holidays with written concurrence from the program manager or contract administrator.

6.0 Services Summary

Performance

Objective

PWS para. Performance

Threshold

Method of

Surveillance

Remedy

Conduct tank repairs to UST and

AST systems

2.0 Description

of Work

Perform tank repairs within industrial standards and regulatory compliance

Respond to call from WPAFB

Technical POC as directed

Possible Remedies (and there are more than these)—

Reperformance, CPARS, Exercise

Option, Monetary

Deduction, Etc.

Compliance with all tank regulations when conducting work outlined in this PWS

3.0 Objectives Perform tank

repairs within industrial standards and regulatory compliance

Respond to call from WPAFB

Technical POC as directed

Possible Remedies (and there are more than these)—Reperformance, CPARS, Exercise

Option, Monetary

Deduction, Etc

Maintain BUSTR certified installer qualification for life of contract

4.4 Contractor

Qualifications

Maintain and be able to demonstrate upon request certified installer qualification

Respond to call from WPAFB

Technical POC as directed

Possible Remedies (and there are more than these)—Reperformance, CPARS, Exercise

Option, Monetary

Deduction, Etc

Ability of respond to emergency and non-emergency tank repairs

4.6 Scheduling Respond to work

request within 24 hours for emergency tank repairs

Respond to call from WPAFB

Technical POC as directed

Possible Remedies (and there are more than these)—Reperformance, CPARS, Exercise

Option, Monetary

Deduction, Etc

Attachment:

List of Active Underground Storage Tanks

List of Active Aboveground Storage Tanks

File details come from the government source that posted it. Updated .