This is a blank pricing schedule template for dockside maintenance and repair services on the USCGC ACTIVE (WMEC-210A) during Fiscal Year 2026, with a period of performance from September 7, 2026 to November 1, 2026.
The schedule contains 25 definite line items and 3 optional line items covering vessel maintenance and preservation work, including seawater heat exchanger cleaning and hydro testing, boiler exhaust stack cleaning, chiller and potable water system servicing, steering gear overhaul, davit inspection and service, sewage and grey water system cleaning and renewal, piping renewal for steam and countermeasure washdown systems, deck and bulkhead plating renewal, ventilation system overhaul, watertight door renewal, and interior deck covering renewal. Three optional items include partial preservation of grey water holding tanks and temporary heating and cooling services. The pricing template requires contractors to fill in unit prices for each job-based line item, with extended prices calculated by quantity. Additionally, the contract includes a composite labor rate (hours), GFP report submission, and travel/per diem costs. For open and inspect repairs identified during execution, contractors must provide a labor rate (estimated at 1,092 hours) and material markup/handling fee percentage against a fixed price ceiling of $42,114.00. All pricing is submitted to the U.S. Department of Homeland Security, U.S. Coast Guard, with evaluation based on total extended prices for definite items, optional items, and combined pricing.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PRICING SCHEDULE FOR: | Contractor's Name |
| USCGC ACTIVE (WMEC-210A) DOCKSIDE AVAILABILITY FY2026 |
The contractor shall fill-in all yellow labeled boxes and Foreseeable Costs Sheet.
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Seawater Heat Exchangers, Clean, Inspect And Hydro | JOB | |||
| D-002 | Boiler Exhaust Stack Uptakes, Commercial Clean | JOB | |||
| D-003 | Chill Water System, Clean and Flush | JOB | |||
| D-004 | Boilers, Renew | JOB | |||
| D-005 | Potable Water Pneumatic Tanks, Clean and Inspect | JOB | |||
| D-006 | Hot Water Accumulator Tanks, Clean and Inspect | JOB | |||
| D-007 | Steering Gear, General, Overhaul | JOB | |||
| D-008 | Single Point Davit, Inspect and Service | JOB | |||
| D-009 | Sewage Discharge and Vacuum Pumps, Renew | JOB | |||
| D-010 | Grey Water Holding Tanks, Clean and Inspect | JOB | |||
| D-011 | Sewage Piping, Clean and Flush | JOB | |||
| D-012 | Grey Water Piping, Clean and Flush | JOB | |||
| O-013 | Tanks, Grey Water Holding, Preserve, Partial - OPTION ITEM | JOB | |||
| O-014 | Temporary Services, Heating and Cooling - OPTION ITEM | JOB | |||
| D-015 | Whistle Timer, Replace | JOB | |||
| D-016 | Fan Room Deck, Preserve | JOB | |||
| D-017 | Deck and Bulkhead Plating, Renew | JOB | |||
| D-018 | Steam System Valves and Piping, Renew | JOB | |||
| D-019 | Countermeasure Washdown Piping, Renew | JOB | |||
| D-020 | Engine Flywheel Disc Coupling, Renew | JOB | |||
| D-021 | Deck Covering, Interior, Wet, Renew | JOB | |||
| D-022 | Deck Drain Piping, Renew | JOB | |||
| D-023 | Compartment(s), Interior, Lead Dust, Clean | JOB | |||
| D-024 | Ventilation Systems, Clean and Overhaul | JOB | |||
| D-025 | Watertight Door, External, Renew | JOB | |||
| O-00A | Composite Labor Rate | Hour | 0 | ||
| D-00B | GFP Report | NSP | EA | ||
| D-00C | Travel and Perdiem | JOB | |||
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
| Open and Inspect Repairs | |||||
| The Labor Rates and Material Markup/Handling Fee will be used throughout the life of the contract for all open and inspect repair items. Open and inspect related repairs will be incorporated via contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | |||||
| **Fill in the sections highlighted below: | |||||
| OA/G-001 | Labor Rate | Hour | 1,092 | $0.00 | |
| OA/G-002 | Material Markup/Handling Fee | $42,114.00 | Percent | $0.00 | |
| Total Fixed Price Ceiling of Open and Inspect Repairs | $0.00 |