Attachment 3 B400 Drawings.pdf
PDF 14 MB Posted
- Solicitation number
- 1232SA26Q0989
About this file
Design Documentation Summary
This is a comprehensive final design package for the USDA-ARS Cereal Disease Laboratory Building B400 Greenhouse Evaporative Cooling Upgrade project located at 1551 Lindig Avenue, St. Paul, Minnesota 55108. The project was designed by Bailey Edward Design (BED) and IMEG Corp, with final design documents dated March 20, 2026. The scope encompasses the complete design of an evaporative cooling system upgrade for the existing greenhouse facility, including demolition of existing cooling infrastructure, installation of ten new evaporative cooling units with supporting mechanical, electrical, plumbing, and structural systems.
The design package includes final architectural, structural, mechanical (HVAC), electrical, and plumbing drawings with detailed specifications, schedules, and general notes. Key components specified include ten Phoenix Manufacturing IS500/WS144/ISVSPC20-163 evaporative coolers rated at 4,000 CFM each with 0.75 hp motors at 208V three-phase, integrated control systems with programmable thermostats maintaining space temperatures between 68°F and 77°F, supply and return ductwork with insulation, water supply infrastructure with backflow preventers, a new 100-amp electrical panel (EC1-1) fed from the existing switchboard, and concrete pier foundations with structural steel support frames. The design incorporates specific provisions for fire-rated wall penetrations, equipment pad construction, water line supply with 1/2-inch connections to each unit, and integration with existing greenhouse controls and electrical systems. Construction coordination requirements include biweekly progress meetings, RFI management, submittal tracking, and formal documentation of existing conditions prior to work commencement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER SHEETD
ORDER DATE:
TASK ORDER NO.:
A
U S
BAILEY EDWARD
DESIGN
EPM:
AOE:
BED PROJECT NO.:
CHECKED BY:
PROJECT MANAGER:
REAL PROPERTY:
SAFETY & HEALTH:
USDA
DWG. NO.
SHEET OF
GREENHOUSE B400
Agricultural Research Service
KL
25054 t 312.440.2300 f 312.440.2303 www.baileyedward.com
35 East Wacker Dr Suite 2800 Chicago, IL 60601-2308 Design Firm License No. 184-001962
KURT DUGGINS
KURT DUGGINSREO
5/16/25
Pr in t D at e/ Ti m e:
/2
2/
1:
A M
P:
\P ro je ct
F ile s\
-0 0-
U
SD
A C
D L
EV
AP
O R
AT
IV
E C
O O
LI
N
G S
YS
TE
M D
ES
IG
N \0
2_ C
AD
\B
C
AD
DESIGNER:
EM
ST. PAUL, MN 55108
1551 LINDIG ST.
ST. PAUL CDL
DESCRIPTIONBYDATENO.
01 07/22/2025 BED 95% DESIGN QC
02 07/29/2025 BED 95% DESIGN
02/19/2025 BED 95% DESIGN_RESUBMITTAL QC04
03/17/2026 BED FINAL DESIGN QC05
03/20/2026 BED FINAL DESIGN06
02/12/2025 BED 95% DESIGN_RESUBMITTAL
U.S DEPARTMENT OF AGRICULTURE CEREAL DISEASE LABORATORY (CDL)
ST. PAUL BUILDING GREENHOUSE B400 EVAPORATIVE COOLING UPGRADE
1551 LINDIG AVENUE ST. PAUL, MN 55108
SEQUENCE OF EFFORTS
1. SUBMIT NECESSARY FRONT END PAPERWORK, BONDS, INSURANCE.
2. OBTAIN ANY SECURITY CLEARANCES OR BACKGROUND CHECKS NECESSARY TO ACCESS FACILITY.
3. SUBMIT QUALIFICATION DATA FOR TECHNICAL TRADES. REFER TO PROJECT MANUAL.
4. VISIT THE SITE TO VERIFY EXISTING CONDITIONS AND PLAN FOR COMPLETION OF CONSTRUCTION.
5. DEVELOP AND SUBMIT COORDINATED SHOP DRAWINGS WITH SIGN OFF FROM THE TRADES. PROVIDE PRODUCT DATA.
DEVELOP STRATEGY FOR TEMPORARY LIGHTING. SUBMIT PLAN, NARRATIVE, ETC.
6. SCHEDULE EFFORTS WITH THE USDA TO ENSURE THAT RESEARCH SPECIMEN HAVE BEEN REMOVED.
7. REMOVE THE EVAPORATIVE COOLING, CONTROLS, POWER AND APPURTENANCES.
8. PROVIDE UTILITY ROUGH-INS TO ACCOMMODATE EVAPORATIVE COOLING. INFORM THE USDA SO A FIELD INSPECTION
CAN B PERFORMED.
9. PROVIDE COMMISSIONING SERVICES. PROVIDE CX REPORT WITH CLOSEOUT.
10. PERFORM TRAINING. TRAINING SHALL BE RECORDED BY A PROFESSIONAL VIDEOGRAPHER.
11. PROVIDE CLOSEOUT DOCUMENTS.
12. PERFORM ANY WARRANTY WORK.
SCOPE OF WORK
1. THE CONTRACTOR SHALL HAVE ACCESS TO BOTH GREENHOUSES TO SIMULTANEOUSLY UPGRADE THE COOLING AT
EACH END.
2. VISIT THE SITE TO WALK THROUGH THE SUITES, PLAN FOR COMPLETION OF CONSTRUCTION, PLAN FOR
STORAGE/STAGING, CHOOSE A DUMPSTER LOCATION AND BECOME FAMILIAR WITH THE SITE.
3. PROVIDE PRODUCT DATA SUBMITTALS, QUALIFICATIONS, CONTROL SHOP DRAWINGS, SCHEDULE, AND OTHER
DOCUMENTS REQUIRED BY THE SPECIFICATIONS.
4. PROVIDE EFFORTS TO REMOVE THE EVAPORATIVE COOLING PLUMPS, PADS, POWER, CONTROLS AND PLUMBING.
PROVIDE TEMPORARY CAPS FOR UTILITIES
5. PROVIDE EVAPORATIVE COOLING EQUIPMENT, CONTROLS AND UTILITIES TO RESULT IN A COMPLETE OPERATIONAL
SYSTEM. MODIFY GREENHOUSE PANELS TO ACCOMMODATE.
6. EXTEND THE BUILDING AUTOMATION SYSTEM TO MONITOR THE EVAPORATIVE COOLING EQUIPMENT. ALARMS SHALL BE
TRANSMITTED TO THE USDA ENGINEERS.
7. PROVIDE EFFORTS TO COMMISSION THE UPGRADES. VERIFY SEQUENCES OF OPERATIONS IS ACCOMMODATED BY
CONTROLS AND PROGRAMMING.
8. SUBMIT TRAINING AGENDA FOR REVIEW. TRAINING SHALL BE RECORDED BY A PROFESSIONAL VIDEOGRAPHER.
9. PROVIDE CLOSEOUT DOCUMENTS INCLUDING WARRANTY, AS-BUILT DOCUMENTS, TESTING REPORTS, AND
COMMISSIONING REPORT.
GENERAL PROJECT NOTES
1. THE CONTRACTOR SHALL COORDINATE, SCHEDULE, TEST AND PROVIDE ANY EFFORT NECESSARY TO RESULT IN A COMPLETE
AND OPERATING SYSTEM.
2. DETAILS SHOWN ARE INDICATIVE OF THE CHARACTER, PROFILES, MATERIAL, AND SYSTEMS REQUIRED FOR THE WORK. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, LABOR, SUNDRIES, TESTING AND REPORTING TO PROVIDE A COMPLETE AND OPERATIONAL SYSTEM. THE CONTRACTOR SHALL INCLUDE THOSE CONDITIONS NOT COVERED BY SPECIFIC DETAILS.
3. WHERE THE DESIGN INTENT CANNOT BE DETERMINED FROM THE DRAWINGS OR SPECIFICATIONS, CONSULT THE
CONTRACTING OFFICER'S REPRESENTATIVE BEFORE PROCEEDING WITH THE WORK.
4. FIELD VERIFY ALL CONDITIONS & DIMENSIONS BEFORE PROCEEDING WITH THIS WORK. IF CONDITIONS VARY FROM INFORMATION WITHIN THE CONTRACT DOCUMENTS, CONSULT THE ARCHITECT OR ENGINEER BEFORE PROCEEDING WITH
THE WORK.
5. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE OF ANY AND ALL DISCREPANCIES BETWEEN THE CONTRACT DOCUMENTS AND EXISTING CONDITIONS PRIOR TO PROCEEDING WITH THE WORK. PROVIDE RFI'S
DURING COORDINATION DRAWING EFFORT TO AVOID FIELD REVISIONS.
6. PROVIDE A FULL AND COMPLETE, OPERATING EVAPORATIVE COOLING SYSTEMS, UTILITIES, CONTROLS AND LIGHTING
CONTROL SYSTEM.
7. ALL PENETRATIONS OF ROOF AND FIRE RATED WALL OR SMOKE PARTITIONS SHALL BE PATCHED & REPAIRED AS REQUIRED TO MAINTAIN THE EXISTING FIRE RATING OR SMOKE INFILTRATION INTEGRITY OF THE FLOOR AND WALL. ALL SLEEVES, WIREWAYS, CABLE TRAYS, PIPES, DUCTWORK, ARE TO BE FIRE SEALED TIGHT TO THE WALL OR FLOOR PENETRATIONS TO
MAINTAIN THE REQUIRED CODE COMPLIANT FIRE RATING.
8. THE CONTRACTOR IS RESPONSIBLE FOR THE TIMELY REMOVAL OF ALL DEMOLITION DEBRIS AND PROTECTION OF EXISTING AREAS WHICH ARE NOT AFFECTED BY THE SCOPE OF WORK. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE OF ANY INCIDENTAL DAMAGE ASSOCIATED WITH THEIR EFFORTS. ANY DAMAGE TO THE PREMISES SHALL BE BROUGHT BACK TO ORIGINAL CONDITION AT THE COST OF THE GENERAL CONTRACTOR OR SUBCONTRACTOR INFLICTING THE DAMAGE. RUBBISH SHALL BE REMOVED DAILY AT THE END OF EACH SHIFT.
9. CONTRACTOR RESPONSIBLE FOR PROTECTING EXISTING WALL, CEILING, AND FLOOR FINISHES DURING CONSTRUCTION.
REPAIR ANY DAMAGES RESULTING FROM THIS PROJECT AT NO ADDITIONAL COST TO THE OWNER.
10. ALL SUBSTITUTIONS TO BE REVIEWED AND APPROVED IN WRITING BY ARCHITECT/ENGINEER REFER TO SPECIFICATIONS FOR
SUBSTITUTION PROCEDURES.
11. PROVIDE TEMPORARY PROTECTION FROM DUST, NOISE, DAMAGE, ETC. GRINDING OR HOT WORK SHALL BE ACCOMPANIED WITH SOURCE CAPTURE DEVICES TO REMOVE PARTICULATE AND ODORS. THE CONTRACTOR SHALL OBTAIN DAILY PERMITS
FOR HOT WORK.
12. MAINTAIN EXISTING BUILDING EXITS. THE BUILDING IS TO REMAIN IN COMPLIANCE WITH ALL ASPECTS OF THE LIFE SAFETY CODE DURING THE COURSE OF CONSTRUCTION INCLUDING BUT NOT LIMITED TO EXISTING FIRE ALARM SYSTEM, SMOKE AND
FIRE DETECTION SYSTEM, SPRINKLER SYSTEM, ETC. AS APPLICABLE.
13. INDIVIDUAL DRAWINGS ARE PART OF A LARGER SET OF DRAWINGS WHICH, WHEN COMPLETE CONSIST OF ALL DRAWINGS LISTED BY THE INDEX OF DRAWINGS. THE WORK DESCRIBED BY THE DRAWINGS OF ANY ONE DISCIPLINE MAY BE AFFECTED BY THE WORK DESCRIBED ON DRAWINGS OF ANOTHER DISCIPLINE AND MAY REQUIRE REFERENCE TO DRAWINGS OF ANOTHER DISCIPLINE. PARTIAL SETS OF DRAWINGS ARE INCOMPLETE AND SHALL NOT BE DISTRIBUTED AND UTILIZED BY THE CONTRACTOR. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF ALL SUBCONTRACTORS, TRADES, AND SUPPLIERS WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT ALL PARTIES ARE AWARE OF ALL REQUIREMENTS, REGARDLESS OF
WHERE THE REQUIREMENTS OCCUR ON THE CONTRACT DOCUMENTS.
14. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE WORK OF ALL SUBCONTRACTORS, TRADES, AND SUPPLIERS, THE CONTRACTOR SHALL ENDEAVOR TO IDENTIFY AND NOTIFY THE ARCHITECT OF ANY CONFLICTS BETWEEN THE WORK OF DIFFERENT PARTIES AT THE EARLIEST POSSIBLE DATE SO AS TO ALLOW REASONABLE AND ADEQUATE TIME FOR THE CONFLICT TO BE RESOLVED WITHOUT DELAYING THE WORK. ALL DEVIATIONS FROM THAT WHICH IS REQUIRED BY THE
CONTRACT DOCUMENTS MUST BE APPROVED IN ADVANCE BY THE OWNER.
15. THE CONTRACTOR SHALL COORDINATE LOCATIONS FOR STORAGE OF CONSTRUCTION MATERIALS, DUMPSTER ,TOOL STORAGE, AND LAY-DOWN SPACE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE AND FIELD CONDITIONS.
16. THE CONTRACTOR SHALL MANAGE KICK-OFF AND PROGRESS MEETINGS EVERY OTHER WEEK, PROVIDE AGENDA RFI LOG, SUBMITTAL LOG, AND THREE WEEK LOOK AHEAD 24 HOURS IN ADVANCE OF THE MEETING. PROVIDE MINUTES FOR REVIEW
WITHIN 48 HOURS OF THE MEETING.
17. THE DRAWINGS REPRESENT DESIGN INTENT. THEY ARE SCALED GRAPHIC REPRESENTATIONS OF A LARGE BUILDING. THE DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, FITTINGS, SUPPORTS, OR DEVICES TO RESULT IN A SUCCESSFUL INSTALLATION. THE CONTRACTOR SHALL COORDINATE WITH THE FIELD CONDITIONS, TRADES, AND EQUIPMENT
MANUFACTURES TO PROVIDE A FULL AND COMPLETE INSTALLATION.
18. SCHEDULE EFFORTS WITH COR. IDENTIFY LOCATIONS OWNER NEEDS TO REMOVE OR RELOCATE ITEMS TO FACILITATE
WORK.
PROJECT SITE AERIAL PHOTO
NORTH
B400
NORTH
VICINITY LOCATION MAP
CAMPUS AERIAL PHOTO MAP
NORTH
INDEX - GENERAL
G000 COVER SHEET
G001 OVERALL PLAN
G002 ENLARGED PLAN
CIVIL
MECHANICAL
ELECTRICAL
PLUMBING
G000
C100 CIVIL COVER SHEET
C101 CIVIL EXISTING CONDITIONS AND DEMO PLAN
C200 CIVIL SITE AND UTILITY PLAN
STRUCTURAL
S000 STRUCTURAL GENERAL NOTES
S001 STRUCTURAL GENERAL NOTES
S002 STRUCTURAL SPECIAL INSPECTIONS
S200 STRUCTURAL FOUNDATION PLAN
S201 STRUCTURAL FRAMING PLAN
M000 HVAC COVERSHEET
MD200 LEVEL 01 DEMOLITION PLAN - HVAC
M200 GREENHOUSE OVERALL PLAN - HVAC
M300 GREENHOUSE ENLARGED PLAN - HVAC
M400 HVAC DETAILS
M600 HVAC SCHEDULES
E000 ELECTRICAL COVERSHEET
E200 GREEN HOUSE OVERALL PLAN - ELEC
E300 GREEN HOUSE ENLARGED PLAN - ELEC
E400 ELECTRICAL DETAILS AND SCHEDULES
E500 ELECTRICAL DIAGRAMS
E600 ELECTRICAL PANEL SCHEDULES
P000 PLUMBING COVER SHEET
PD200 GREEN HOUSE DEMOLITION PLAN - PLUMBING
P200 GREEN HOUSE OVERALL PLAN - PLUMBING
P300 GREEN HOUSE ENLARGED PLANS - PLUMBING
Expiration Date of Seal: 11-30-2026
HEAD
HOUSE
HEAD
HOUSE
HEAD
HOUSE
GROWTH
CHAMBER
LAB
PREP
ROOM
BOILER
ROOM
CORRIDOR SERVER
ROOM
GRAPHICS
OFFICE
LAB
LAB
CORRIDOR
LAB
COLD
LAB
MICROSCOPE
ROOM
MENS
ROOM
WOMENS
ROOM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
ENTRY
LAB
LAB
KITCHEN
X04
CHEMICAL
STORAGE
X07
RECEPTIONIST
ADMINISTRATION
X02
STAIR
X
CONFERENCE
LUNCH
ROOM
X03
CONFERENCE
ROOM
CORRIDOR
CORRIDOR
CORRIDOR
LAB
LAB
PREP
ROOM
OPEN
OFFICE
M.E.P.
MENS
ROOM
WOMENS
ROOM
CONTAINMENT
LAB
AUTO-
CLAVE
108C
ANALYSIS
ROOM
108B
ANTEROOM
108A
DARK
ROOM
NORTH
GREEN
HOUSE
SOUTH
GREEN
HOUSE
RECEIVING
CORRIDOR
SEED
SORTING
SEED
STORAGE
ROOM
D
ORDER DATE:
TASK ORDER NO.:
A
U S
BAILEY EDWARD
DESIGN
EPM:
AOE:
BED PROJECT NO.:
CHECKED BY:
PROJECT MANAGER:
REAL PROPERTY:
SAFETY & HEALTH:
USDA
DWG. NO.
SHEET OF
GREENHOUSE B400
Agricultural Research Service
KL
25054 t 312.440.2300 f 312.440.2303 www.baileyedward.com
35 East Wacker Dr Suite 2800 Chicago, IL 60601-2308 Design Firm License No. 184-001962
KURT DUGGINS
KURT DUGGINSREO
5/16/25
Pr in t D at e/ Ti m e:
/2
2/
0:
ro je ct
F ile s\
-0 0-
U
SD
A C
D L
EV
AP
O R
AT
IV
E C
O O
LI
N
G S
YS
TE
M D
ES
IG
N \0
2_ C
AD
\B
C
AD
DESIGNER:
EM
ST. PAUL, MN 55108
1551 LINDIG ST.
ST. PAUL CDL
DESCRIPTIONBYDATENO.
01 07/22/2025 BED 95% DESIGN QC
02 07/29/2025 BED 95% DESIGN
02/19/2025 BED 95% DESIGN_RESUBMITTAL QC04
03/17/2026 BED FINAL DESIGN QC05
03/20/2026 BED FINAL DESIGN06
02/12/2025 BED 95% DESIGN_RESUBMITTAL
SCALE: 1/16" = 1'-0"
0 8' 16' 32'
GENERAL PLAN - OVERALL PLAN
G001
HEAD HOUSE
INTERIOR GLASS PARTITION
HEAD HOUSE
INTERIOR GLASS PARTITION
HEAD HOUSE GROWTH CHAMBER
BOILER ROOM
GRAPHICS
OFFICE
PREP ROOM
M.E.P.
MENS
ROOM
WOMENS
CONTAINMENT LAB
AUTO-
CLAVE
108C
ANALYSIS
ROOM
108B
ANTEROOM
108A
NORTH GREEN
HOUSE
SOUTH GREEN
HOUSE
SEED STORAGE
D
ORDER DATE:
TASK ORDER NO.:
A
U S
BAILEY EDWARD
DESIGN
EPM:
AOE:
BED PROJECT NO.:
CHECKED BY:
PROJECT MANAGER:
REAL PROPERTY:
SAFETY & HEALTH:
USDA
DWG. NO.
SHEET OF
GREENHOUSE B400
Agricultural Research Service
KL
25054 t 312.440.2300 f 312.440.2303 www.baileyedward.com
35 East Wacker Dr Suite 2800 Chicago, IL 60601-2308 Design Firm License No. 184-001962
KURT DUGGINS
KURT DUGGINSREO
5/16/25
Pr in t D at e/ Ti m e:
/2
2/
0:
ro je ct
F ile s\
-0 0-
U
SD
A C
D L
EV
AP
O R
AT
IV
E C
O O
LI
N
G S
YS
TE
M D
ES
IG
N \0
2_ C
AD
\B
C
AD
DESIGNER:
EM
ST. PAUL, MN 55108
1551 LINDIG ST.
ST. PAUL CDL
DESCRIPTIONBYDATENO.
01 07/22/2025 BED 95% DESIGN QC
02 07/29/2025 BED 95% DESIGN
02/19/2025 BED 95% DESIGN_RESUBMITTAL QC04
03/17/2026 BED FINAL DESIGN QC05
03/20/2026 BED FINAL DESIGN06
02/12/2025 BED 95% DESIGN_RESUBMITTAL
ENLARGED PLAN
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
G002
D
ORDER DATE:
TASK ORDER NO.:
A
U S
DESCRIPTIONBYDATENO.
BAILEY EDWARD
DESIGN
EPM:
AOE:
BED PROJECT NO.:
CHECKED BY:
PROJECT MANAGER:
REAL PROPERTY:
SAFETY & HEALTH:
USDA
COPYRIGHT BAILEY EDWARD DESIGN 2025 - BED# 023119
DWG. NO.
SAINT PAUL, MN 55108
1551 LINDIG STREET
USDA-ARS
CEREAL DISEASE LABORATORY
GREENHOUSE B400
Agricultural Research Service
KWL
REO
023119 t 312.440.2300 f 312.440.2303 www.baileyedward.com
35 East Wacker Dr Suite 2800 Chicago, IL 60601-2308 ©2024 Bailey Edward Design Design Firm License No. 184-001962
RANDY KIEHNE
KARLA TEBBEN
KURT DUGGINS
PAM GROTHREO
01 7/22/2025 IMEG 95% DESIGN QC
AG-5114-D-09-0084
15 MAY, 2025
P rin t D at e/ Ti m e:
/2
0/
:4
P
\\f ile s\
A ct iv e\
P ro je ct s\
\2
9.
\D es ig n\ C iv il\
C 3D
\P lo t
02 7/29/2025 IMEG 95% DESIGN
03 3/20/2026 IMEG FINAL DESIGN
COVER SHEET
C100REFERENCE SCALE IN INCHES
0 1 2 3
PROJECT #25002949.00
IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS
DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE
THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN
APPROVAL AND PARTICIPATION OF IMEG CORP. © 2025 IMEG CORP.
1717 STATE STREET - SUITE 201
BETTENDORF, IA 52722
563.344.0260 www.imegcorp.com
RAILROAD SPIKE, FOUND
SURVEY BOUNDARY
HANDHOLE
POWER POLE
STORM MANHOLE
HYDRANT
WATER VALVE
GAS VALVE
STORM INLET
LIGHT POLE
SIGN
STORM DOUBLE INLET
SPOT ELEVATION
MEASURED DIMENSION
L E G E N D
RECORDED DIMENSION
R.O.W. MARKER, FOUND
ELECTRIC PEDESTAL/TRANSFORMER
TELEPHONE PEDESTAL
TELEPHONE POLE
SOIL BORING HOLE
FLARED END SECTION
SECTION LINE
EASEMENT LINE
CHAIN LINK FENCE
OVERHEAD ELECTRIC
GAS LINE
UNDERGROUND ELECTRIC
GUARD RAIL
SANITARY/STORM CLEANOUT
TELEPHONE LINE
R.O.W. LINE
ELECTRIC MANHOLE
TELEPHONE MANHOLE
UTILITY MANHOLE
LIGHT JUNCTION BOX
CONIFER TREE
DECIDUOUS TREE
TREE STUMP
BUSH/SHRUB
VAPOR LIGHT
CONTROL POINT
UNKNOWN MANHOLE
WELL
GUY WIRE
FLAGPOLE
POST/BOLLARD
TREE LINE
HISTORICAL LINE - AS NOTED
PROPERTY LINE
DOWNSPOUT
BENCHMARK
ELECTRIC METER
WATER METER
FORCE MAIN
SANITARY SEWER
STORM SEWER
PIPE UNDERDRAIN
WATER LINE
SETBACK LINE
UTILITY LINE
GUY POLE
GRADE LABEL
POWER POLE W/ LIGHT
POWER POLE W/ METER
DRAINAGE SLOPE
LINE CONTINUATION
CONTOUR
CENTERLINE
SANITARY MANHOLE
FLOOD PLAIN
FLOODWAY
PROPOSED EXISTING
SILT FENCE
CONCRETE MONUMENT, FOUND
CONSTRUCTION LIMITS
PIPE, FOUND
STORM INLET
SPRINKLER BOX
WATER SERVICE
EDGE OF WATER LINE/DITCH FLOWLINE
GENERAL NOTES
1. ALL IMPROVEMENTS SHOWN ON THESE ENGINEERING PLANS SHALL COMPLY WITH THE ################ DESIGN AND SPECIFICATIONS, LATEST EDITION, THE STANDARDS OF THE ######### POLLUTION CONTROL AGENCY, THE STATE OF #########, DEPARTMENT OF TRANSPORTATION, "STANDARDS SPECIFICATIONS FOR CONSTRUCTION," 2025 EDITION, AND THE LATEST SUPPLEMENTAL SPECIFICATIONS TO THE 2025 STANDARD
SPECIFICATIONS.
2. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE SURVEYS, RECORDS, AND FIELD INVESTIGATION. THEIR LOCATIONS MUST BE CONSIDERED APPROXIMATE ONLY. IT IS POSSIBLE THERE MAY BE OTHERS, THE EXISTENCE OF WHICH PRESENTLY NOT KNOWN OR SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR EXISTENCE AND EXACT LOCATION AND TO AVOID
DAMAGE THERETO.
3. ALL DEBRIS RESULTING FROM CONSTRUCTION OPERATIONS SHALL BE PROPERLY DISPOSED OF OFF-SITE
UNLESS NOTED.
4. THE CONTRACTOR SHALL EXERCISE PROPER CAUTION TO PROTECT THE EXISTING IMPROVEMENTS. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY DAMAGE.
5. PORTLAND CEMENT CONCRETE. CONCRETE SHALL HAVE THE FOLLOWING PROPERTIES. COMPRESSING STRENGTH SHALL BE 4000PSI IN 28 DAYS, AIR ENTRAINMENT SHALL BE BETWEEN 5 % AND 8% AND SLUMP SHALL BE 4 INCHES OR LESS ALL AS MEASURED BY THE APPROPRIATE ASTM METHODS. REINFORCING STEEL SHALL BE ASTM CERTIFIED 60KSI TENSILE STRENGTH. REINFORCING STEEL SHALL BE #4 SIZE UNLESS OTHERWISE SPECIFIED. HANDRAILS, BOLLARDS, AND OTHER APPURTENANCES SHALL BE INSTALLED PER
PLAN AND MEET JURISDICTIONAL REQUIREMENTS.
6. CLEANUP AND FINAL INSPECTION. WORK BROKEN OR DAMAGED BY CONTRACTOR ACTIVITY SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE. ALL WASTE MATERIAL, CONCRETE WASHOUT, LANDSCAPE WASTE AND BUILDING MATERIAL SHALL BE REMOVED. SOIL SHALL BE REMOVED FROM PAVED
AREAS AND THE PROJECT SHALL BE LEFT IN A CLEAN AND WORKMANLIKE MANNER.
9. ACCESS TO PRIVATE PROPERTIES SHALL BE MAINTAINED AT ALL TIMES. THE COST OF THIS WORK SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR PERFORMING ALL THEIR OWN QUANTITIES/TAKEOFFS. NO ADDITIONAL COMPENSATION WILL BE MADE FOR VARIATIONS FROM QUANTITIES SHOWN ON PLANS.
CONTRACTORS SHALL MAKE ENGINEER AWARE OF ANY VARIATIONS THEY DEEM SIGNIFICANT IN CASE
CLARIFICATION IS NEEDED DURING BIDDING PROCESS.
11. ADJUSTMENTS TO ANY ESTIMATED QUANTITIES SHOWN ON PLANS TO ACCOUNT FOR MINOR VARIATIONS IN REMOVAL AND REPLACEMENTS ITEMS ARE THE RESPONSIBILITY OF THE CONTRACTOR AND NO ADDITIONAL
COMPENSATION SHALL BE MADE.
12. CONCRETE PAVEMENT SHALL BE CONSTRUCTED IN ACCORDANCE WITH MNDOT SPECIFICATION "2301 CONCRETE PAVEMENT" IN THE STANDARD SPECIFICATIONS FOR CONSTRUCTION, 2025 EDITION.
GRADING NOTES
1. ALL ELEVATIONS SHOWN ARE TO FLOWLINE FINISHED GRADE OR TOP OF PAVEMENT UNLESS OTHERWISE
STATED.
2. PROVIDE POSITIVE DRAINAGE AT ALL TIMES WITHIN THE CONSTRUCTION AREAS. DO NOT ALLOW WATER TO
POND ON PROPERTY.
3. PRIOR TO PLACEMENT OF ANY FILL, THE STRIPPED SITE SHALL BE SCARIFIED TO A DEPTH OF 9 INCHES AND RE-COMPACTED TO 95% DENSITY. ANY UNSUITABLE SOILS FOUND AT THIS TIME SHALL BE DRIED AND RECOMPACTED OR REMOVED IF REQUIRED COMPACTION CANNOT BE OBTAINED. CUT AREAS SHALL ALSO BE
SCARIFIED TO A DEPTH OF 9 INCHES AND RE-COMPACTED TO 95% DENSITY.
4. ALL FILL MATERIAL SHALL CONSIST OF APPROVED, SUITABLE SOILS PLACED IN LOOSE LIFTS OF 9 INCHES OR LESS AND COMPACTED TO AT LEAST 95% OF THE MATERIAL'S MAXIMUM STANDARD PROCTOR DRY DENSITY (ASTM D-698) IN ALL PAVEMENT, BUILDING ADDITION AND ATHLETIC FIELD AREAS. THE COMPACTION WILL BE
FIELD TESTED BY A SOILS ENGINEERING CONSULTANT REPRESENTING THE OWNER.
5. PROJECT WILL BE COVERED BY A GENERAL PERMIT REGULATING RUNOFF FROM CONSTRUCTION SITES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PERFORM THE REQUIRED MONITORING, INSPECTION AND
MAINTENANCE AS REQUIRED BY THE PERMIT.
6. ALL DISTURBED EMBANKMENTS GREATER THAN 3:1 SLOPES SHALL BE SEEDED ACCORDING TO A RECOMMENDED SEEDING MIX BY THE LANDSCAPER AND COVERED WITH EROSION CONTROL BLANKETS OR
AS DIRECTED BY PLAN DOCUMENTS.
7. CONTRACTOR SHALL ADHERE TO THE ################ EROSION AND SEDIMENT CONTROL REGULATIONS
AND THE STATE OF ######### CONSTRUCTION SITE EROSION CONTROL MANUAL.
8. ALL AREAS TO BE GREENSPACE AT PROJECT COMPLETION SHALL BE LEFT WITH 6 INCHES OF TOPSOIL WHEN
MASS GRADING ACTIVITIES ARE COMPLETE.
9. THE SUBGRADE PREPARATION SHALL BE PERFORMED IN ACCORDANCE WITH THE PROVISIONS OF MNDOT
2112 EXCEPT AS MODIFIED IN THE SPECIAL PROVISIONS.
UTILITY NOTES
1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL EXISTING
UTILITIES AND PAVED STREETS, INCLUDING ANY NOT SHOWN ON THESE DRAWINGS.
THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION
AND NOTIFY THE ENGINEER IF ANY CONFLICTS WITH THE DRAWINGS OCCUR. ANY
DAMAGE TO EXISTING UTILITIES AND/OR PAVED STREETS CAUSED BY TRENCHING AND
GRADING OPERATIONS SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
EXISTING UTILITY LOCATIONS SHOWN ON THE DRAWINGS ARE APPROXIMATE.
2. ALL EXISTING UNDERGROUND UTILITIES SHOWN WERE LOCATED PARTIALLY IN THE
FIELD AND PARTIALLY FROM REVIEW OF EXISTING PUBLIC RECORDS. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO CONTACT EACH UTILITY COMPANY FOR THE
FIELD LOCATION OF THEIR EXISTING LINES IN OR NEARBY THE CONSTRUCTION AREA
PRIOR TO BEGINNING ANY CONSTRUCTION.
3. THE CONTRACTOR SHALL EXERCISE PROPER CAUTION TO PROTECT THE EXISTING
IMPROVEMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY
DAMAGE.
4. THE LOCATIONS OF THOSE BURIED AND ABOVE GROUND UTILITIES SHOWN ARE
APPROXIMATE, ARE SHOWN FOR CONTRACTOR INFORMATIONAL USE ONLY, AND ARE
NOT TO BE REFERENCED FOR CONSTRUCTION PURPOSES. THE IMPLIED PRESENCE OR
ABSENCE OF UTILITIES IS NOT TO BE CONSTRUED BY THE OWNER, ENGINEER,
CONTRACTOR, OR SUBCONTRACTORS TO BE AN ACCURATE AND COMPLETE
REPRESENTATION OF UTILITIES THAT MAY OR MAY NOT EXIST ON THE CONSTRUCTION
SITE. BURIED AND ABOVE GROUND UTILITY LOCATION, IDENTIFICATION, AND MARKING
ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. REROUTING, DISCONNECTION,
PROTECTION, ETC. OF ANY UTILITY MUST BE COORDINATED BETWEEN THE
CONTRACTOR, UTILITY COMPANY AND OWNER. SITE SAFETY, INCLUDING THE
AVOIDANCE OF HAZARDS ASSOCIATED WITH BURIED AND ABOVEGROUND UTILITIES,
REMAINS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
5. UTILITY PIPING. ALL WORK SHALL BE PERFORMED IN CONFORMANCE WITH THE PIPE
MANUFACTURER'S RECOMMENDATIONS FOR INSTALLATION METHODS INCLUDING
BACKFILL MATERIAL AND MATERIAL DEPTHS. PIPE MATERIAL SHALL BE AS SPECIFIED ON
THE PLANS. ALL MATERIAL SHALL MEET THE REQUIREMENTS OF THE LOCAL
JURISDICTION FOR STRENGTH, MATERIAL TYPE AND CONFORMITY WITH THE EXISTING
SYSTEM. SEWER LINES SHALL BE CONSTRUCTED STRAIGHT TO THE SPECIFIED LINE AND
GRADES. MANHOLES, STORM INLETS, VALVE BOXES AND APPURTENANCES SHALL BE
ADJUSTED TO GRADE OR PER PLAN PRIOR TO SEEDING/LANDSCAPING ACTIVITIES.
6. ALL UTILITY SERVICES SHALL BE MAINTAINED DURING CONSTRUCTION.
7. CONTRACTOR SHALL COORDINATE WITH OWNERS REGARDING UTILITY REMOVALS AND
RELOCATIONS.
8. STORM SEWERS SHALL BE CONSTRUCTED PER MNDOT SPECIFICATION "2503 PIPE
SEWER." ALL MANHOLES AND CATCH BASINS SHALL BE CONSTRUCTED IN ACCORDANCE
WITH MNDOT SPECIFICATION "2506 MANHOLES AND CATCH BASINS," 2025 EDITION.
EROSION CONTROL NOTES
1. EROSION CONTROL SHALL BE INSTALLED PRIOR TO ANY GRADING OPERATIONS WHERE POSSIBLE.
2. CONSTRUCTION ENTRANCE SHALL BE MAINTAINED TO PREVENT OFF-SITE TRACKING OF SEDIMENT ONTO PUBLIC ROADWAYS. ANY SEDIMENT DEPOSITED ON PUBLIC ROADS SHALL BE REMOVED BY SHOVELING OR
STREET CLEANING BEFORE THE END OF EACH WORKING DAY.
3. SHOWN LOCATION OF SILTATION CONTROL IS APPROXIMATE. ACTUAL LOCATIONS TO BE DETERMINED IN THE
FIELD AT THE TIME OF CONSTRUCTION.
4. WATER PUMPED DURING CONSTRUCTION OPERATIONS SHALL BE FILTERED.
5. ONCE CONSTRUCTION HAS BEEN COMPLETED, OR TEMPORARILY SUSPENDED FOR LONGER THAN 14 DAYS (SUCH AS WINTER SHUTDOWN), THE CONTRACTOR SHALL INITIATE SEEDING ON ALL AREAS DISTURBED IMMEDIATELY OF THE LAST DISTURBANCE. EROSION CONTROL DEVICES SHALL REMAIN IN PLACE AND BE MAINTAINED UNTIL THE CONTRACTOR ESTABLISHES A GOOD STAND OF GRASS OF UNIFORM COLOR AND
DENSITY TO THE SATISFACTION OF THE ENGINEER.
6. CONTRACTOR SHALL ADHERE TO THE ######### CONSTRUCTION SITE EROSION CONTROL MANUAL.
7. ALL EROSION CONTROL MEASURES MUST BE INSTALLED ( WHERE POSSIBLE ) PRIOR TO THE COMMENCEMENT OF ANY EARTH DISTURBING OPERATIONS. THE REMAINING EROSION CONTROL MEASURES SHALL BE INSTALLED AS SOON AS REASONABLY POSSIBLE AFTER GRADING OPERATIONS BEGIN. WHERE THE PRESENCE OF SILT FENCE WILL INTERFERE WITH ACTIVITIES, DIVERSION DITCHES AND SMALL TEMPORARY SEDIMENT TRAPS SHALL BE UTILIZED UNTIL SILT FENCE OR OTHER MEASURES MAY BE INSTALLED AND
VEGETATION ESTABLISHED.
8. EROSION CONTROL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER EACH PRECIPITATION EVENT AND
REPLACED OR REPAIRED AS NECESSARY.
9. SILT FENCE AND SEDIMENT BASIN SHALL BE CLEANED OR REPLACED WHEN SILT BUILDS UP TO WITHIN ONE
HALF CAPACITY OF THE TOP OF THE SILT FENCE.
10. PROJECT WILL BE COVERED BY A GENERAL PERMIT REGULATING RUNOFF FROM CONSTRUCTION SITES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PERFORM THE REQUIRED MONITORING, INSPECTION AND
MAINTENANCE AS REQUIRED BY THE PERMIT.
11. CONCRETE WASHOUT DEBRIS SHOULD BE HAULED OFF-SITE. WASHOUT SHOULD BE FILLED IN AND SEEDED.
12. ALL AREAS DISTURBED BEYOND LIMITS SHOWN SHOULD BE SEEDED WITH ADJACENT SEED MIXTURE OR
IN-KIND.
PROPOSED BUILDING
REMOVAL LIMITS
PCC HATCH
PAVEMENT HATCH
Stamp
DESCRIPTIONBYDATENO.
01 07/22/2025 IMEG 95% DESIGN QC
02 07/29/2025 IMEG 95% DESIGN
03 02/19/2026 IMEG 95% DESIGN_RESUBMITTAL
05 03/17/2026 IMEG FINAL DESIGN QC
06 03/20/2026 IMEG FINAL DESIGN
35 East Wacker Dr Suite 2800 Chicago, IL 60601-2308 Design Firm License No. 184-001962
SCALE: 1" = '
0 10 20
D
ORDER DATE:
TASK ORDER NO.:
A
U S
DESCRIPTIONBYDATENO.
BAILEY EDWARD
DESIGN
EPM:
AOE:
BED PROJECT NO.:
CHECKED BY:
PROJECT MANAGER:
REAL PROPERTY:
SAFETY & HEALTH:
USDA
COPYRIGHT BAILEY EDWARD DESIGN 2025 - BED# 023119
DWG. NO.
SAINT PAUL, MN 55108
1551 LINDIG STREET
USDA-ARS
CEREAL DISEASE LABORATORY
GREENHOUSE B400
Agricultural Research Service
KWL
REO
023119 t 312.440.2300 f 312.440.2303 www.baileyedward.com
35 East Wacker Dr Suite 2800 Chicago, IL 60601-2308 ©2024 Bailey Edward Design Design Firm License No. 184-001962
RANDY KIEHNE
KARLA TEBBEN
KURT DUGGINS
PAM GROTHREO
01 7/22/2025 IMEG 95% DESIGN QC
AG-5114-D-09-0084
15 MAY, 2025
P rin t D at e/ Ti m e:
/2
0/
:4 s\
A ct iv e\
P ro je ct s\
\2
9.
\D es ig n\ C iv il\
C 3D
\P lo t
02 7/29/2025 IMEG 95% DESIGN
03 3/20/2026 IMEG FINAL DESIGN
EXISTING CONDITIONS & DEMO PLAN
C101REFERENCE SCALE IN INCHES
0 1 2 3
PROJECT #25002949.00
IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS
DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE
THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN
APPROVAL AND PARTICIPATION OF IMEG CORP. © 2025 IMEG CORP.
1717 STATE STREET - SUITE 201
BETTENDORF, IA 52722
563.344.0260 www.imegcorp.com
Stamp
DESCRIPTIONBYDATENO.
01 07/22/2025 IMEG 95% DESIGN QC
02 07/29/2025 IMEG 95% DESIGN
03 02/19/2026 IMEG 95% DESIGN_RESUBMITTAL
05 03/17/2026 IMEG FINAL DESIGN QC
06 03/20/2026 IMEG FINAL DESIGN
35 East Wacker Dr Suite 2800 Chicago, IL
SCALE: 1" = '
0 10 20
D
ORDER DATE:
TASK ORDER NO.:
A
U S
DESCRIPTIONBYDATENO.
BAILEY EDWARD
DESIGN
EPM:
AOE:
BED PROJECT NO.:
CHECKED BY:
PROJECT MANAGER:
REAL PROPERTY:
SAFETY & HEALTH:
USDA
COPYRIGHT BAILEY EDWARD DESIGN 2025 - BED# 023119
DWG. NO.
SAINT PAUL, MN 55108
1551 LINDIG STREET
USDA-ARS
CEREAL DISEASE LABORATORY
GREENHOUSE B400
Agricultural Research Service
KWL
REO
023119 t 312.440.2300 f 312.440.2303 www.baileyedward.com
35 East Wacker Dr Suite 2800 Chicago, IL 60601-2308 ©2024 Bailey Edward Design Design Firm License No. 184-001962
RANDY KIEHNE
KARLA TEBBEN
KURT DUGGINS
PAM GROTHREO
01 7/22/2025 IMEG 95% DESIGN QC
AG-5114-D-09-0084
15 MAY, 2025
P rin t D at e/ Ti m e:
/2
0/
:4 s\
A ct iv e\
P ro je ct s\
\2
9.
\D es ig n\ C iv il\
C 3D
\P lo t
02 7/29/2025 IMEG 95% DESIGN
03 3/20/2026 IMEG FINAL DESIGN
SITE & UTILITY PLAN
C200REFERENCE SCALE IN INCHES
0 1 2 3
PROJECT #25002949.00
IMEG CORP RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS
DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE
THE EXCLUSIVE PROPERTY OF IMEG CORP AND SHALL NOT BE USED OR
REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN
APPROVAL AND PARTICIPATION OF IMEG CORP. © 2025 IMEG CORP.
1717 STATE STREET - SUITE 201
BETTENDORF, IA 52722
563.344.0260 www.imegcorp.com
1 11" AGGREGATE SECTION
N.T.S.####
11" AGGREGATE SECTION
(98% STD. DENSITY)
COMPACTED SUBGRADE
(95% STD. DENSITY)
GEOTECH FABRIC FOR
GROUND STABILIZATION
MIRAFI 500X OR EQUAL0.5" CLEAN STONE
C200
Stamp
DESCRIPTIONBYDATENO.
01 07/22/2025 IMEG 95% DESIGN QC
02 07/29/2025 IMEG 95% DESIGN
03 02/19/2026 IMEG 95% DESIGN_RESUBMITTAL
05 03/17/2026 IMEG FINAL DESIGN QC
06 03/20/2026 IMEG FINAL DESIGN
35 East Wacker Dr Suite 2800 Chicago, IL
MATERIAL LEGEND
MATERIAL LEGEND:
CONCRETE
CONCRETE - EXISTING
EARTH
GRAVEL OR GRANULAR FILL
GROUT OR DRYPACK OR SAND
CMU OR MASONRY
METAL / COLD-FORM STUD
WOOD / STUD
PRECAST CONCRETE
STEEL
OTHER/SPECIALTY
D A
U S
COPYRIGHT BAILEY EDWARD DESIGN 2025 - BED# 25054
Agricultural Research Service
DDG
ORDER DATE:
TASK ORDER NO.:
DESCRIPTIONBYDATENO.
EPM:
AOE:
BED PROJECT NO.:
CHECKED BY:
PROJECT MANAGER:
REAL PROPERTY:
SAFETY & HEALTH:
USDA
DWG. NO.
ST. PAUL, MN 55108
1551 LINDIG ST.
ST. PAUL CDL
GREENHOUSE B400
25054 t 312.440.2300 f 312.440.2303 www.baileyedward.com
35 East Wacker Dr
Suite 2800
Chicago, IL
60601-2308
©2024 Bailey Edward Design
Design Firm License No. 184-001962
KURT DUGGINS
KURT DUGGINS
01 07/22/2025 IMEG 95% DESIGN QC
5/16/25
02 07/29/2025 IMEG 95% DESIGN
03 02/19/2026 IMEG 95% DESIGN_RESUBMITTAL
05 03/17/2026 IMEG FINAL DESIGN QC
06 03/20/2026 IMEG FINAL DESIGN
DESIGNER:
IMEG
JGP
SDS
/2
/2
:3
:0
P
M GENERAL NOTES
S000
12755 HIGHWAY 55
SUITE 100
MINNEAPOLIS, MN 55441
P: 763-545-9196 F: 763-541-0056 www.imegcorp.com
IMEG RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO
THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG AND SHALL NOT
BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF IMEG.
©2025 IMEG CONSULTANTS CORP.
REF. SCALE IN INCHES
0 1 2 3
PROJECT #25002949.00
STRUCTURAL SHEET INDEX - B400
SHEET NUMBER SHEET NAME
S000 GENERAL NOTES
S001 GENERAL NOTES
S002 SPECIAL INSPECTIONS
S200 FOUNDATION PLAN
S201 FRAMING PLAN
GRAND TOTAL: 5
DESIGN CRITERIA
STRUCTURE HAS BEEN DESIGNED TO COMPLY WITH 2020 MINNESOTA STATE BUIDLING
CODE AND SUBSEQUENT REFERENCE STANDARDS.
1.
RISK CATEGORY: II 2.
MECHANICAL UNITS: THE CONTRACTOR SHALL CONFIRM THE ACTUAL MECHANICAL UNITS
PURCHASED ARE OF WEIGHT AND SIZE SUCH THAT:
3.
a. THE UNIT WEIGHT IS LESS THAN OR EQUAL TO WEIGHT LISTED ON PLAN.
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION ON
THE LOCATION OF ANY MECHANICAL UNITS WHERE THE SUPERIMPOSED LOAD UNDER
THE UNIT EXCEEDS THE INDICATED DESIGN SIZE AND LOAD AS INDICATED ON THE PLAN.
WIND:[ENGR NOTE: KEEP IF PROVIDING A DIAGRAM FOR C&C WIND VALUES.]4.
BASIC WIND SPEED
VULT = 115 MPH
EXPOSURE CLASS B
GENERAL
DURING THE CONSTRUCTION PERIOD, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
THE SAFETY OF PERSONNEL AND PROPERTY ON AND AROUND THE JOBSITE. THE
CONTRACTOR SHALL PROVIDE ADEQUATE SHORING, BRACING, GUYS, ETC. IN
ACCORDANCE WITH ALL NATIONAL, STATE, AND LOCAL SAFETY ORDINANCES.
TEMPORARY BRACING, SHORING, GUYING, ETC. SHALL AVOID EXCESSIVE STRESSES AND
HOLD STRUCTURAL ELEMENTS IN PLACE DURING CONSTRUCTION. THE STRUCTURE
SHOULD NOT BE CONSIDERED STABLE UNTIL ALL STRUCTURAL ELEMENTS HAVE BEEN
CONSTRUCTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
1.
ALL DRAWINGS AND SPECIFICATIONS ARE CONSIDERED TO BE A PART OF THE CONTRACT
DOCUMENTS. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE REVIEW AND
COORDINATION OF ALL DRAWINGS PRIOR TO THE START OF CONSTRUCTION. ANY
DISCREPANCIES OR OMISSIONS SHALL BE BROUGHT TO THE ATTENTION OF THE
CONTRACTING OFFICER PRIOR TO THE START OF CONSTRUCTION SO A CLARIFICATION
CAN BE ISSUED. ANY WORK THAT DEVIATES FROM OR IS PERFORMED IN CONFLICT WITH
THE CONTRACT DOCUMENTS OR ANY CODE REQUIREMENTS SHALL BE CORRECTED BY
THE CONTRACTOR AT THEIR OWN EXPENSE AND AT NO EXPENSE TO THE OWNER OR THE
DESIGN PROFESSIONALS.
2.
THE CONTRACT DOCUMENTS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT
INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR
DETERMINING ALLOWABLE CONSTRUCTION LOADS AND FOR DETERMINING SEQUENCES
OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO
PROTECT THE STRUCTURE AND SAFETY OF WORKERS DURING CONSTRUCTION. SUCH
MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO: FALSEWORK, FORMWORK, STAGING,
BRACING, AND SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC.
OBSERVATION VISITS TO THE SITE BY THE CONTRACTING OFFICER SHALL NOT INCLUDE
INSPECTION OR APPROVAL OF THE ABOVE ITEMS AND DO NOT IN ANY WAY RELIEVE THE
CONTRACTOR OF THEIR RESPONSIBILITIES FOR THE ABOVE. THE CONTRACTOR SHALL
TAKE ALL NECESSARY PRECAUTIONS TO MAINTAIN AND ENSURE THE INTEGRITY OF THE
STRUCTURE AT ALL STAGES OF CONSTRUCTION.
3.
ALL DIMENSIONS AND SITE CONDITIONS SHALL BE VERIFIED BY THE CONTRACTOR AT THE
JOBSITE PRIOR TO BID SUBMITTAL, START OF SHOP DRAWINGS, START OF
CONSTRUCTION, AND/OR FABRICATION OF MATERIALS. IF DISCREPANCIES ARE
ENCOUNTERED, OR CONDITIONS DEVELOP THAT ARE NOT COVERED BY THE CONTRACT
DOCUMENTS, THE CONTRACTING OFFICER SHALL BE NOTIFIED FOR CLARIFICATION.
4.
STRUCTURAL SUBSTITUTIONS MAY BE ALLOWED WITH THE APPROVAL OF THE
CONTRACTING OFFICER. SUPPLIER SHALL PROVIDE SIGNED AND SEALED DESIGN
CALCULATIONS OR SUITABLE PRODUCT LITERATURE FOR THE COMPONENTS. ALL
PRODUCT SUBSTITUTIONS SHALL INCLUDE A CODE EVALUATION REPORT SPECIFIC TO
THE BUILDING CODE LISTED IN THE DESIGN CRITERIA.
5.
STRUCTURAL DRAWINGS INCLUDE DESIGN REQUIREMENTS AND DIMENSIONS FOR
STRUCTURAL INTEGRITY BUT DO NOT SHOW ALL DETAIL DIMENSIONS TO FIT INTRICATE
ARCHITECTURAL AND MECHANICAL DETAILS. CONTRACTOR SHALL CONSTRUCT THE
WORK SO IT WILL CONFORM TO THE CLEARANCES REQUIRED BY ARCHITECTURAL,
MECHANICAL, AND ELECTRICAL DESIGN.
6.
ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED TO BE
CONSTRUCTION STANDARDS. IF CLARIFICATION IS REQUIRED, THE CONTRACTOR SHALL
NOTIFY THE CONTRACTING OFFICER PRIOR TO PROCEEDING WITH THE WORK.
7.
DO NOT SCALE DRAWINGS. PRINTED DIMENSIONS HAVE PRECEDENCE OVER SCALED
DRAWINGS AND LARGE-SCALE OVER SMALL-SCALE DRAWINGS. CONTRACTOR TO
DETERMINE FINAL DIMENSION WITH CONTRACTING OFFICER.
8.
TYPICAL DETAILS SHALL APPLY TO SITUATIONS OCCURRING ON THE PROJECT THAT ARE
THE SAME OR SIMILAR TO THOSE SPECIFICALLY REFERENCED. WHERE NO DETAILS ARE
GIVEN, CONSTRUCTION SHALL BE AS SHOWN FOR SIMILAR WORK.
9.
SEE ARCHITECTURAL, ELECTRICAL, AND MECHANICAL DRAWINGS FOR DETAILS,
CONDITIONS, PITS, TRENCHES, PADS, DEPRESSIONS, ROOF / FLOOR OPENINGS, TOP OF
WALL ELEVATIONS, STAIRS, SLEEVES, ITEMS TO BE EMBEDDED OR ATTACHED TO
STRUCTURAL ELEMENTS, ETC., NOT SHOWN ON THE STRUCTURAL DRAWINGS. FOR THESE
NON-STRUCTURAL ELEMENTS SHOWN ON STRUCTURAL DRAWINGS, THEY ARE FOR
GENERAL INFORMATION ONLY.
10.
COORDINATE FLOOR FINISH INCLUDING, BUT NOT LIMITED TO THE "FLATNESS" AND
"LEVELNESS" REQUIREMENTS, WITH THE FLOOR FINISH CONTRACTOR. PROVIDE
UNDERLAYMENT / TOPPING WHERE REQUIRED TO PROVIDE A SURFACE ACCEPTABLE FOR
INSTALLATION OF FLOOR FINISHES. SEE ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
11.
ESTABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR MECHANICAL, ELECTRICAL, AND
PLUMBING WITH APPROPRIATE TRADE CONTRACTORS. OPENING SIZES AND LOCATIONS
SHOWN FOR DUCTS, PIPE, INSERTS, AND OTHER PENETRATIONS WHEN SHOWN ARE FOR
GENERAL INFORMATION ONLY AND SHALL BE VERIFIED PRIOR TO FORMING.
12.
THE EXACT WEIGHTS, DIMENSIONS, AND LOCATIONS OF ALL MECHANICAL UNITS AND
ELECTRICAL GEAR SUPPORTED ON STRUCTURAL FRAMING SHALL BE DETERMINED AND
COORDINATED BY THE CONTRACTOR PRIOR TO DETAILING THE STRUCTURAL FRAMING
SUPPORTING THOSE UNITS. IF THE UNIT WEIGHTS ARE GREATER THAN THE WEIGHTS
SHOWN ON THE STRUCTURAL DRAWINGS, THE CONTRACTING OFFICER SHALL BE
NOTIFIED PRIOR TO DETAILING THE STRUCTURE. UNIT WEIGHTS, DIMENSIONS, AND
LOCATIONS SHOWN ON THE STRUCTURAL DRAWINGS ARE APPROXIMATE ONLY AND
SHALL NOT BE USED FOR DETAILING THE STRUCTURE.
13.
PROVIDE TEMPORARY BLOCKOUTS AND TEMPORARY OPENINGS IN THE STRUCTURE AS
REQUIRED TO PERMIT INSTALLATION OF ALL WORK. BLOCKOUTS AND TEMPORARY
OPENINGS SHALL BE LOCATED, CONFIGURED, DETAILED, AND INFILLED IN A MANNER THAT
ALTERS NEITHER THE STRENGTH OF THE STRUCTURAL FRAMING NOR THE STRENGTH OF
CONNECTIONS. INFILL ALL BLOCKOUTS AND TEMPORARY OPENINGS USING THE
MATERIALS SPECIFIED FOR THE FRAMING AT THE LOCATIONS WHERE THE BLOCKOUTS
AND OPENINGS OCCUR. SUBMIT DRAWINGS INDICATING THE LOCATIONS, DIMENSIONS,
AND DETAILS OF ALL PROPOSED BLOCKOUTS AND OPENINGS AND DETAILS INDICATING
THE MANNER IN WHICH THE BLOCKOUTS AND OPENINGS WILL BE INFILLED.
14.
NO HOLES, NOTCHES, BLOCK-OUTS, ETC. ARE ALLOWED IN STRUCTURAL ELEMENTS
UNLESS SPECIFICALLY DETAILED ON THE STRUCTURAL DRAWINGS OR APPROVED BY THE
CONTRACTING OFFICER.
15.
PENETRATIONS IN CONCRETE SHALL BE CAST-IN-PLACE AND SHALL NOT BE PERMITTED
EXCEPT AS SHOWN IN THE STRUCTURAL DRAWINGS.
16.
BEFORE SUBMITTING A PROPOSAL FOR THIS WORK, CONTRACTOR SHALL VISIT THE
PREMISES AND BECOME FULLY ACQUAINTED WITH FIELD CONDITIONS, TEMPORARY
CONSTRUCTION REQUIRED, QUANTITIES AND TYPE OF EQUIPMENT, ETC. THE PROPOSAL
SHALL INCLUDE ALL SUMS REQUIRED TO DO THE WORK.
17.
ELEMENTS SUCH AS NON-BEARING PARTITIONS, ETC. ATTACHED TO AND/OR SUPPORTED
BY THE STRUCTURE SHALL TAKE INTO ACCOUNT DEFLECTIONS AND OTHER STRUCTURAL
MOVEMENTS. THE STRUCTURAL FRAMING WAS DESIGNED TO LIMIT DRIFT AND
DEFLECTION OF THE STRUCTURAL SYSTEM TO LESS THAN THE MAXIMUM PERMITTED
DEFLECTIONS LISTED IN THE BUILDING CODE. THE CONTRACTOR SHALL COORDINATE THE
WORK OF OTHER TRADES TO ACCOMMODATE THESE DEFLECTIONS AND TO
ACCOMMODATE CONSTRUCTION TOLERANCES.
18.
FIRE PROTECTION FOR ALL STRUCTURAL PARTS SHALL BE PROVIDED AS SPECIFIED BY
THE ARCHITECTURAL DRAWINGS. UL FIRE RESISTANCE RATING RESTRAINT
CLASSIFICATION AS FOLLOWS:
19.
SUBMITTALS
SUBMITTALS ARE:1.
a. CONCRETE MIX DESIGNS
b. MATERIAL PRODUCT DATA FOR STRUCTURAL MATERIALS
c. CONCRETE REINFORCING
d. STEEL FABRICATION AND MISCELLANEOUS METALS
SUBMITTALS SHALL BE REVIEWED AND COORDINATED PRIOR TO SUBMITTING TO THE
CONTRACTING OFFICER. EACH SHOP DRAWING SUBMITTED SHALL BE STAMPED
INDICATING REVIEW BY THE CONSTRUCTION MANAGER/GENERAL CONTRACTOR AND
REVIEW BY THE CONTRACTING OFFICER SHALL NOT BEGIN UNTIL THIS IS COMPLETE.
WORK SHALL NOT BEGIN WITHOUT REVIEW BY THE DESIGN PROFESSIONALS.
2.
SUBMITTALS SHALL BE REVIEWED BY THE DESIGN PROFESSIONALS FOR GENERAL
CONFORMANCE WITH DESIGN CONCEPT ONLY. NOTATIONS MADE BY THE DESIGN
PROFESSIONALS ON THE SHOP DRAWINGS DO NOT RELIEVE THE CONTRACTOR FROM
COMPLYING WITH THE REQUIREMENTS OF THE DRAWINGS.
3.
FOR ADDITIONAL INFORMATION ON REQUIRED SUBMITTALS, SEE INDIVIDUAL MATERIAL
SECTIONS.
4.
EARTHWORK
FOUNDATION DESIGN IS IS BASED ON ASSUMED ALLOWABLE BEARING PRESSURES OF
1500 PSF. NO NEW GEOTECHNICAL REPORT HAS BEEN PROVIDED BY THE OWNER FOR
THIS PROJECT.
1.
A GEOTECHNICAL ENGINEER SHALL BE EMPLOYED TO VERIFY THAT THE PRESUMED
ALLOWABLE BEARING PRESSURE WILL BE ACHIEVED PRIOR TO CONSTRUCTION. THAT
ENGINEER SHALL DEVELOP AND ENSURE IMPLEMENTATION OF A SITE SUBGRADE
PREPARATION PROGRAM AS REQUIRED TO ACHIEVE THE PRESUMED SOIL BEARING
PRESSURE. FOOTING AND SLAB-ON-GRADE SUBGRADE PREPARATION SHALL BE IN
COMPLIANCE WITH THE APPLICABLE REQUIREMENTS OF THE AUTHORITIES HAVING
JURISDICTION.
2.
ANY TESTS, INSPECTIONS, FIELD OBSERVATIONS, OR APPROVAL FROM THE
GEOTECHNICAL ENGINEER SHALL BE PERFORMED PRIOR TO PLACEMENT OF CONCRETE.
ALTERATIONS TO SITE PREPARATION OR GRADING SHALL BE REPORTED TO THE
GEOTECHNICAL ENGINEER PRIOR TO CONSTRUCTION.
3.
PROPERTY LINE LOCATIONS INDICATED ON FOUNDATION PLANS ARE APPROXIMATE. SEE
ARCHITECTURAL AND/OR SITE DRAWINGS FOR LOCATION OF THE STRUCTURE ON THE
SITE.
4.
ALL EXCAVATIONS SHALL BE PROPERLY AND SAFELY BACKFILLED. DO NOT PLACE
BACKFILL BEHIND RETAINING / BASEMENT WALLS BEFORE CONCRETE HAS ATTAINED
SPECIFIED COMPRESSIVE STRENGTH. CONTRACTOR SHALL BRACE OR PROTECT ALL
WALLS BELOW GRADE FROM LATERAL LOADS UNTIL SUPPORTING FLOORS ARE
COMPLETELY IN PLACE AND HAVE ATTAINED 7-DAY STRENGTH MINIMUM. BACKFILLING IS
NOT PERMITTED FOR FOUNDATION WALLS UNTIL SUPPORTED SLAB TOP AND BOTTOM
ARE IN PLACE OR THE WALL IS ADEQUATELY BRACED TO RESIST LATERAL LOADS.
5.
CONTRACTOR SHALL PROVIDE DE-WATERING OF EXCAVATIONS FROM SURFACE WATER,
GROUNDWATER, OR SEEPAGE. DETAILS OF GROUNDWATER INFORMATION SHALL BE
OBTAINED FROM THE GEOTECHNICAL REPORT. IF GROUNDWATER IS ENCOUNTERED
DURING EXCAVATION, PROCEDURES SHALL BE IMPLEMENTED AS RECOMMENDED BY THE
GEOTECHNICAL ENGINEER.
6.
PROVIDE SHORING WHERE THERE IS INSUFFICIENT SPACE FOR STABLE-SLOPED
EMBANKMENTS.
7.
CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN AND INSTALLATION OF ALL
CRIBBING, SHEETING, SHORING, ETC. REQUIRED FOR CONSTRUCTION OF THE PROJECT
AND SHALL BE SOLELY RESPONSIBLE FOR ALL EXCAVATION PROCEDURES INCLUDING
LAGGING, SHORING, AND PROTECTION OF ADJACENT PROPERTY, STRUCTURES, STREETS,
AND UTILITIES. CONTRACTOR SHALL SUBMIT DESIGN CALCULATIONS AND SHOP
DRAWINGS SIGNED AND SEALED BY AN ENGINEER LICENSED IN THE PROJECT'S
JURISDICTION.
8.
CONTRACTOR SHALL INVESTIGATE SITE DURING CLEARING AND EARTHWORK
OPERATIONS FOR FILL MATERIAL OR BURIED STRUCTURES SUCH AS CESSPOOLS,
CISTERNS, AND FOUNDATIONS. IF ANY SUCH MATERIAL OR STRUCTURES ARE FOUND,
CONTRACTING OFFICER SHALL BE NOTIFIED IMMEDIATELY.
9.
ANY REQUIRED IMPORT FILL SHALL HAVE A LOW POTENTIAL FOR EXPANSION AND SHALL
BE APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO IMPORTING.
10.
UTILITY LINES SHALL NOT BE PLACED THROUGH OR BELOW FOUNDATIONS WITHOUT THE
CONTRACTING OFFICER'S APPROVAL. BELOW GRADE UTILITY OR PIPE ELEVATIONS,
WHERE SHOWN, ARE INDICATED FOR REFERENCE ONLY. REQUIRED ELEVATIONS SHALL
BE DETERMINED BY OTHERS AND COORDINATED WITH THE FOUNDATIONS.
11.
WHERE GRADE ELEVATIONS ARE APPROXIMATELY EQUAL ON BOTH SIDES OF WALLS,
BACKFILL SHALL BE PLACED SO THAT IT IS NOT UNBALANCED BY MORE THAN 2 FEET ON
EITHER SIDE.
12.
ALL REQUIRED BACKFILL AND UTILITY TRENCH BACKFILL WITHIN THE PROJECT AREA
SHALL BE REVIEWED BY A GEOTECHNICAL ENIGINEER.
13.
DRILLED CONCRETE PIERS
DRILLED PIERS HAVE BEEN DESIGNED FOR THE FOLLOWING NET ALLOWABLE SERVICE
LOADS:
1.
END BEARING 1500 PSF
MINIMUM EMBEDMENT 4 FT BELOW FINISHED GRADE
ACTUAL BEARING CAPACITY SHALL BE VERIFIED BY AN EXPERIENCED, QUALIFIED
GEOTECHNICAL ENGINEER PRIOR TO PLACING CONCRETE.
2.
DRILLED PIERS SHALL BE ACCURATELY CENTERED AT THE PROPER LOCATIONS AND
INSTALLED PLUMB. INSTALL TO THE FOLLOWING TOLERANCES:
3.
TOP ELEVATION +1" AND -3"
PLUMB WITHIN 1%
PIER CENTERLINE
WITHIN 1" FOR 18"Ø OR LESS
WITHIN 3" FOR GREATER THAN 18"Ø
THE ELEVATION IDENTIFYING THE BOTTOM OF SHAFT IS AN APPROXIMATE ELEVATION TO
BE USED FOR ESTIMATING PURPOSES ONLY. THE ACTUAL BOTTOM OF SHAFT ELEVATIONS
WILL BE DETERMINED IN THE FIELD BY THE GEOTECHNICAL ENGINEER AND TESTING AND
INSPECTION AGENCY.
4.
PIERS SHALL BE DRILLED IN PLACE AND FILLED WITH CONCRETE AFTER DATA IS
RECORDED, AND APPROVAL OF BEARING SURFACE IS OBTAINED. THE BED AND SHAFT
SHALL BE LEVELED AND CLEARED OF LOOSE MATERIAL BEFORE THE CONCRETE IS
PLACED. THE SHAFT SHALL BE KEPT FREE OF WATER. EXCAVATIONS SHALL NOT BE LEFT
OPEN OVERNIGHT.
5.
PLACE CONCRETE CONTINUOUSLY WITHOUT INTERRUPTION, VIBRATING NO LESS THAN
THE TOP 5 FEET OF EACH SHAFT.
6.
BEARING AND SKIN FRICTION CAPACITIES SHALL BE VERIFIED BY THE GEOTECHNICAL
ENGINEER AND TESTING AND INSPECTION AGENCY.
7.
THE TESTING AND INSPECTION AGENCY AND CONTRACTOR SHALL MAINTAIN A RECORD
OR LOG OF EACH DRILLED PIER AS INSTALLED SHOWING LOCATION, TOP AND BOTTOM
ELEVATIONS, SHAFT AND BELL DIAMETERS, DATE CONCRETE IS POURED, AND ANY OTHER
PERTINENT INFORMATION.
8.
NOTIFY THE CONTRACTING OFFICER IMMEDIATELY IF OBSTRUCTIONS ARE ENCOUNTERED.9.
SPOIL MATERIAL FROM DRILLED PIER INSTALLATION SHALL NOT BE USED AS FILL
MATERIAL AND SHALL BE REMOVED FROM WITHIN THE PROJECT PROPERTY LINES AND
PROPERLY DISPOSED OF OFFSITE.
10.
DRILLED PIER CONTRACTOR TO SUBMIT A DRILLED PIER LOCATION PLAN AND
REINFORCING STEEL PLACING DRAWINGS FOR REVIEW PRIOR TO CONSTRUCTION.
11.
CAST-IN-PLACE CONCRETE
ALL CONCRETE WORK SHALL CONFORM TO THE REQUIREMENTS OF ACI 318, BUILDING
CODE REQUIREMENTS FOR STRUCTURAL CONCRETE, AND ACI 301, SPECIFICATIONS FOR
STRUCTURAL CONCRETE UON.
1.
CONCRETE MATERIALS SHALL CONFORM TO:2.
PORTLAND LIMESTONE CEMENT
ASTM C595, TYPE IL
FLY ASH ASTM C618, TYPE C OR F
SLAG CEMENT ASTM C989
FINE AND COARSE AGGREGATE ASTM C33
LIGHTWEIGHT AGGREGATE ASTM C330
WATER POTABLE
AIR-ENTRAINING ADMIXTURE ASTM C260
WATER REDUCING ADMIXTURE ASTM C494
CONCRETE STRENGTHS SHALL CONFORM TO:3.
COMPONENT f'c AT 28 DAYS1 (PSI)
MAX PERMITTED
W/C
EXPOSURE CLASS
INTERIOR SLAB-ON-
GRADE
4000 0.50 F0, S0, W0, C0
EXTERIOR/PARKING
SLAB-ON-GRADE
3500 0.55 F1, S0, W0, C2
IF ALTERNATE VALUES ARE INDICATED ON PLANS OR DETAILS FOR SPECIFIC CONDITIONS.
THEY SHALL BE USED IN LIEU OF THOSE LISTED IN THE TABLE.
LIGHTWEIGHT CONCRETE SHALL HAVE A 115 PCF DRY UNIT WEIGHT (±3PCF).
LIGHTWEIGHT AGGREGATES SHALL BE PRESOAKED AS REQUIRED IN ACCORDANCE WITH
ACI 301.
AIR ENTRAINMENT:4.
NOMINAL MAXIMUM
AGGREGATE SIZE
REQUIRED AIR CONTENT PER EXPOSURE CATEGORY
F1 F2
3/8" 6% 7.5%
1/2" 5.5% 7%
3/4" 5% 6%
1" 4.5% 6%
a. CONCRETE IN EXTERIOR LOCATIONS SHALL BE AIR ENTRAINED WITH THE
APPROPRIATE PERCENTAGE AIR CONTENT LISTED IN THE TABLE ABOVE AS
APPLICABLE FOR THE INDICATED EXPOSURE CLASS AND NOMINAL MAXIMUM
AGGREGATE SIZE IN THE CONCRETE MIX. THE REQUIRED AIR CONTENT VALUE MAY
BE REDUCED BY 1% FOR ALL CONCRETE WITH COMPRESSIVE STRENGTH
GREATER THAN 5000 PSI. THE PERMITTED TOLERANCE ON THE REQUIRED AIR
CONTENT IS ±1.5%.
b. ALL LIGHTWEIGHT CONCRETE SHALL HAVE 4-7% AIR ENTRAINMENT.
c. AIR ENTRAINMENT SHALL CONFORM TO UL RATING REQUIREMENTS FOR FIRE
RESISTANCE.
ALL FOUNDATION ELEMENTS SHALL BE CENTERED UNDER WALLS, PIERS, OR COLUMNS
UON.
5.
"ROUGH JOINTS" ARE JOINTS ROUGHENED TO AN AMPLITUDE OF 1/4" AND FREE AND
CLEAN OF LAITANCE. PROVIDE ROUGH JOINTS AT ALL CONSTRUCTION JOINTS UON.
6.
CONTRACTOR SHALL SUBMIT PROPOSED LOCATIONS OF ALL CONSTRUCTION JOINTS
WHERE JOINTS ARE NOT INDICATED ON THE DRAWINGS.
7.
JOINTS ABUTTING EXISTING CONCRETE CONSTRUCTION SHALL BE ROUGH JOINTS UON.8.
INSTALLATION OF ELECTRICAL CABLE, CONDUIT, AND PIPING IN OR THROUGH CONCRETE
COLUMNS AND WALLS IS PROHIBITED UNLESS APPROVED BY THE CONTRACTING OFFICER
PRIOR TO INSTALLATION. INSTALLATION OF PIPING IN CAST-IN-PLACE CONCRETE IS
PROHIBITED UNLESS APPROVED BY CONTRACTING OFFICER PRIOR TO INSTALLATION.
DRAWINGS SHALL BE SUBMITTED FOR REVIEW SHOWING PROPOSED PLACEMENT OF
ELECTRICAL CABLE AND CONDUIT IN SLABS. THOSE DRAWINGS SHALL SHOW SIZES AND
DIMENSIONED LOCATIONS OF ALL CABLE AND CONDUIT.
9.
SLOPE SLABS TO DRAINS. SEE ARCHITECTURAL AND MEP DRAWINGS FOR DRAIN
LOCATIONS AND SLOPE REQUIREMENTS. SLAB THICKNESSES SHOWN ON DRAWINGS ARE
MINIMUMS.
10.
NOTIFY THE CONTRACTING OFFICER 48 HOURS MINIMUM PRIOR TO ALL POURS.11.
CONTRACTOR SHALL SURVEY ALL CONCRETE WORK WITHIN 48 HOURS OF PLACING
CONCRETE TO ENSURE PLACEMENT IS IN ACCORDANCE WITH PROJECT REQUIREMENTS.
12.
ALL FORMWORK, SHORING, AND RESHORING SHALL BE DESIGNED BY THE CONTRACTOR'S
ENGINEER LICENSED IN THE PROJECT'S JURISDICTION. ALL SUBMISSIONS SHALL BE
SIGNED AND SEALED.
13.
CORING OF CONCRETE IS NOT PERMITTED UNLESS APPROVED BY THE CONTRACTING
OFFICER. SUBMIT LOCATIONS OF PROPOSED CONCRETE CORES.
14.
REINFORCING STEEL SHALL NOT BE DAMAGED WHEN DRILLING CONCRETE.15.
ADHERE TO ACI 305R AND ACI 306R FOR HOT AND COLD WEATHER CONCRETE
CONSTRUCTION.
16.
SEE ARCHITECTURAL DRAWINGS FOR DIMENSIONS, LOCATIONS, AND DETAILS OF ALL
ARCHITECTURAL FEATURES IN THE CONCRETE. SEE ARCHITECTURAL DRAWINGS AND
PROJECT SPECIFICATIONS FOR REQUIREMENTS FOR ALL CONCRETE FINISHES.
17.
STEEL
STRUCTURAL STEEL SHALL BE DETAILED IN ACCORDANCE WITH THE AMERICAN INSTITUTE
OF STEEL CONSTRUCTION (AISC) "DETAILING FOR STEEL CONSTRUCTION" AND
FABRICATED AND ERECTED IN ACCORDANCE WITH THE "SPECIFICATION FOR STRUCTURAL
STEEL BUILDINGS".
1.
STRUCTURAL STEEL SHALL CONFORM TO ASTM STANDARDS AS NOTED BELOW:2.
WIDE FLANGE AND WT
SHAPES
ASTM A992 Fy=50 KSI
CHANNEL SHAPES ASTM A992 Fy=50 KSI
ANGLE SHAPES ASTM A572 Fy=50 KSI
PLATES ASTM A572 Fy=50 KSI
ANCHOR RODS ASTM F1554, GR 36 Fy=36 KSI
HIGH STRENGTH BOLTS ASTM F3125, GR A325 Fu=120 KSI
HIGH STRENGTH TWIST-OFF
BOLTS
ASTM F3125, GR F1852 Fu=120 KSI
HEAVY HEX NUTS ASTM A563
WASHERS FOR HIGH
STRENGTH BOLTS
ASTM F436
WELDING
AWS D1.1, 70KSI FILLER
METAL
HIGH STRENGTH BOLTS SHALL BE INSTALLED IN ACCORDANCE WITH AISC
"SPECIFICATIONS FOR STRUCTURAL JOINTS USING HIGH-STRENGTH BOLTS". SEE DETAILS
FOR BOLT SIZE AND MATERIAL ASTM DESIGNATION.
3.
ALL BOLTED CONNECTIONS SHALL BE GRADE A325N BEARING TYPE BOLTS UON. ALL
BOLTS SHALL BE INSTALLED TO A MINIMUM SNUG TIGHT CONDITION UON.
4.
FULLY TENSIONED HIGH STRENGTH BOLTS AND SLIP CRITICAL HIGH STRENGTH BOLTS
SHALL USE TENSION-CONTROL "TWIST-OFF" BOLTS OR BE INSTALLED USING THE TURN OF
THE NUT METHOD.
5.
STRUCTURAL ABBREVIATION KEY
ABBR: DESCRIPTION:
EXISTING
ADDITIONAL
BOTTOM OF
BRACED FRAME
BOUNDARY NAILING
BOTTOM
BETWEEN
COLD FORM STEEL
CENTER OF GRAVITY OF THE TENDON
COMPLETE JOINT PENETRATION WELD
CLEAR
CENTERLINE
CONNECTION
CONSTRUCTION
DBA
DEAD LOAD
EACH
EACH FACE
ELEVATION
EDGE NAILING
EDGE OF DECK
EDGE OF SLAB
EACH WAY
EXTERIOR
FIELD NAILING
GAGE OR GAUGE
GLULAM
GIRDER TRUSS
HORIZONTAL
HEADED STUD ANCHOR
LIVE LOAD
LONG LEG HORIZONTAL
LONG LEG VERTICAL
LONGITUDINAL
LONG SIDE HORIZONTAL
LONG SIDE VERTICAL
NOT TO SCALE
OPPOSITE, OPPOSITE HAND
POWDER ACTUATED FASTENER
PARTIAL JOINT PENETRATION WELD
PLATE
REQUIRED
SLIP CRITICAL
SEISMIC FORCE-RESISTING SYSTEM
SIMILAR
SNOW LOAD
SPACE(S)
SQUARE
TOP AND BOTTOM
TOP OF
PRE-TENSIONED BOLT
TRANSVERSE
UNLESS OTHERWISE NOTED
VERTICAL
VERIFY IN FIELD
WITH
WORK POINT
WELDED WIRE REINFORCING
(E)
ADDL
B.O.
BF
BN
BOT
BTWN
CFS
CGS
CJP
CLR
CL
CONN
CONST
DBA
DL
EA
EF
EL
E.N.
EOD
EOS
EW
EXT
FN
GA
GL
GT
HORIZ
HSA
LL
LLH
LLV
LONG.
LSH
LSV
NTS
OPP
PAF
PJP
PL
REQD
SC
SFRS
SIM
SL
SP
SQ
T&B T.O.
TC
TRANS
UON
VERT
VIF
w/
WP
WWR
Seth Spychala, P.E.
March 20, 2026
42432
35 East Wacker Dr Suite 2800 Chicago, IL
U S
COPYRIGHT BAILEY EDWARD DESIGN 2025 - BED# 25054
Agricultural Research Service
DDG
ORDER DATE:
TASK ORDER NO.:
DESCRIPTIONBYDATENO.
EPM:
AOE:
BED PROJECT NO.:
CHECKED BY:
PROJECT MANAGER:
REAL PROPERTY:
SAFETY & HEALTH:
USDA
DWG. NO.
ST. PAUL, MN 55108
1551 LINDIG ST.
ST. PAUL CDL
GREENHOUSE B400
25054 t 312.440.2300 f 312.440.2303 www.baileyedward.com
35 East Wacker Dr
Suite 2800
Chicago, IL
60601-2308
©2024 Bailey Edward Design
Design Firm License No. 184-001962
KURT DUGGINS
KURT DUGGINS
01 07/22/2025 IMEG 95% DESIGN QC
5/16/25
02 07/29/2025 IMEG 95% DESIGN
03 02/19/2026 IMEG 95% DESIGN_RESUBMITTAL
05 03/17/2026 IMEG FINAL DESIGN QC
06 03/20/2026 IMEG FINAL DESIGN
DESIGNER:
IMEG
JGP
SDS
/2
/2
:3
:0
P
M GENERAL NOTES
S001
12755 HIGHWAY 55
SUITE 100
MINNEAPOLIS, MN 55441
P: 763-545-9196 F: 763-541-0056 www.imegcorp.com
IMEG RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO
THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING
AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG AND SHALL NOT
BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF IMEG.
©2025 IMEG CONSULTANTS CORP.
REF. SCALE IN INCHES
0 1 2 3
PROJECT #25002949.00
DELEGATED STRUCTURAL STEEL CONNECTIONS:6.
a. CONNECTIONS AND MEMBER REINFORCEMENT AT THE CONNECTIONS SHALL BE
DESIGNED TO SUPPORT THE REACTIONS SPECIFIED OR INDICATED ON THE
DRAWINGS.
b. WHERE SPECIFIC CONNECTION TYPES, DETAILS, CONFIGURATIONS, OR
CONNECTION DESIGN LIMITATIONS ARE INDICATED, THE CONNECTIONS SHALL BE
DESIGNED AND DETAILED IN ACCORDANCE WITH THOSE REQUIREMENTS. WHERE
SPECIFIC SIZES, QUANTITIES AND DIMENSIONS OF BOLTS, WELDS, AND PLATES
ARE INDICATED, THOSE ARE MINIMUM PERMITTED SIZES, QUANTITIES, AND
DIMENSIONS. THE CONNECTION STRENGTH OF ALL CONNECTIONS SHALL BE
DETERMINED BY THE FABRICATOR'S CONNECTION DESIGN ENGINEER, AND THE
CONNECTION DETAIL SHALL BE MODIFIED IF REQUIRED TO PROVIDE THE
REQUIRED STRENGTH.
c. CONNECTION DESIGN RESPONSIBILITY SHALL INCLUDE CALCULATION OF MEMBER
STRENGTH AT CONNECTIONS CONSIDERING THE EFFECTS OF COPES, BOLT
HOLES, CONNECTION ECCENTRICITY, AND CONNECTION GEOMETRY AND SHALL
CONSIDER ALL LIMIT STATES INCLUDING BUT NOT LIMITED TO REVIEW OF GROSS
SHEAR, NET SHEAR, BLOCK SHEAR, WEB TEAR-OUT, BEARING, FLEXURAL
STRENGTH, LOCAL BUCKLING, TENSILE STRENGTH THROUGH BOTH THE NET AND
GROSS SECTIONS, COMPRESSIVE STRENGTH, AND DUCTILITY. DESIGN OF
CONNECTIONS SHALL BE IN ACCORDANCE WITH RECOGNIZED PUBLISHED
METHODS SUCH AS THOSE PUBLISHED IN THE AISC "ENGINEERING JOURNAL", THE
AISC 15TH EDITION STEEL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .