Attachment 3 - B2141 Tank Installation SOW.pdf

PDF 118 KB Posted

Attached to
Above Ground Tank, B2141
Solicitation number
FA302024Q0085
Issued by

About this file

This document is an attachment to a federal contract opportunity, specifically a Statement of Work (SOW) for the installation of a 500-gallon Waste Evac Used Oil Storage System at Sheppard AFB, TX. The project requires a contractor to test, deliver, and install the new storage tank to replace the existing tank. The SOW outlines detailed instructions for tank testing, placement, air line connection, suction line connection, and working vent installation. The related federal contract opportunity is a Request for Quotes (RFQ) to provide and install the 500-gallon tank. The solicitation number is FA302024Q0085, and the contract will be a single Firm Fixed Price award with a 120-calendar day period of performance. The requirement is a total set-aside for small businesses under NAICS code 238220. The RFQ includes additional attachments with specifications, provisions, and clauses, and requires quotes to be valid through September 30, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B2141 Tank Installation SOW

General: This project is to purchase and install a new storage tank for used oil to replace the tank at 1328 Heritage Way, B2141, Sheppard AFB, TX, 76311.

Scope: This project requires a contractor to test and install a 500 gallon Waste Evac Used Oil Storage System (model/manufacturer part number: H500) (BRAND NAME OR EQUAL). This will require providing the tank and delivery. The Oil Storage Tank must comply with Attachment 1 – Oil Storage Tank – Specifications. Delivery includes placing the tank inside of the facility, near the northwest corner. Connect the air compressor line to the 500 gallon or equal tank. Testing of the tank is required following installation to ensure equipment works as intended.

Specific Actions Required:

1. Tank Testing:

1.1. Handle tank carefully. Use cables or chains of adequate length (not more than 90 degrees between the chains) attached to lifting lugs provided. Oversize hooks will tear the lift lugs—use shackles, if necessary.

1.2. For compliance with model fire and building codes, the tank must be tested in the field before filling or use. The inner tank should be pressurized with air to a maximum of 3 psig. If the tank is a double-wall tank, the inner tank should be pressurized to a maximum of 3 psig, then the outer tank should be pressurized to a maximum of 2psig.

The test pressure should be held for 1 hour. Use a gauge with a 0 to15 psig dial span. Set pressure relief valve in test air supply line at 3 psig. While the tank is holding pressure, brush a water and soap solution on the weld seams.

1.3. Do not leave pressurized tank unattended.

1.4. Do not stand in front of tank heads or fittings when pressurizing tank.

1.5. Be sure all drain plugs are secure by applying suitable thread sealant or pipe dope around plugs.

1.6. Model fire codes require the installation of emergency and normal vents on the top of the tank. Consult with the local Authority Having Jurisdiction (AHJ) and the fire codes for the proper installation.

2. Tank Placement and Testing:

2.1. The tank is designed for lifting and positioning with the use of a fork lift or crane. If a crane is used, the straps must be positioned underneath the bottom of the system’s cabinet.

2.2. Ground the tank according to local code and National electrical code requirements.

2.3. The tank is designed to be anchored to a concrete foundation with ¾” concrete anchor bolts. If the tank will be installed in a seismic zone, consult the factory for the specific design of the concrete pad and anchoring system.

3. Air Line Connection:

3.1. Use ½” galvanized steel air lines to connect the system to the nearest compressed air source.

3.2. An ½” in-line condensate separator must be installed between the air source and the ball valve to prevent water from clogging the diaphragm pump and shut-off valve.

3.3. Install the air operated high level shutoff valve.

3.4. Check and adjust the air/filter regulator (included with the system) to 50 psig. This pressure setting is the optimum setting for the system. Maximum pressure limit is 100 psig.

4. Suction Line Connection:

4.1. The system comes with a ¾” x 8’ UL listed hardwall suction hose and a dry-break quick connect coupler. The female coupler remains attached to the suction hose.

4.2. A (Y) Screen Filter (supplied with the system) shall be attached in line before the hose.

5. Working Vent Installation:

5.1. Install the working vent(s) mushroom cap (provided) and emergency vent(s).

6. Product Testing

6.1. Test the functionality and proper installation of equipment by utilizing the double diaphragm pump to move used oil from the drum into the tank.