Attachment 3 Appendix A Inspection Checklist.pdf

PDF 78 KB Posted

Attached to
USDA Forest Service Region 1 Regional Office HVAC Quarterly Maintenance
Solicitation number
1284LM26Q0012
Issued by

About this file

These are HVAC Inspection Checklists for Building 24 and Building 26, serving as maintenance and compliance documentation tools rather than procurement solicitations. The checklists establish quarterly inspection schedules for heating, ventilation, and air conditioning equipment across multiple floors and rooms within each facility.

Building 24's checklist covers 48 line items organized by floor and room location, including boiler room equipment (gas-fired boilers, circulation pumps, motorized shut-off valves), air handlers with specified capacities (AAON models ranging from 2,135 to 9,985 cfm), filter sections, chiller units, AC mini-split condensers, fin tube radiators, thermostats, and exhaust fans distributed throughout the basement, first floor, second floor, and attic. Building 26's checklist encompasses 25 line items including gas-fired boilers (Knight Model WH 55-399), hydronic pumps (Grundfos PACO), water-cooled heat pumps (Daikin RWEYQ model), cooling tower controls and chemicals, domestic hot water heaters (Bradford White 80-gallon capacity), water softener, environmental control systems (Liebert DS), heat recovery ventilators (Venmar CES), and exhaust fans across basement, central IT room, first floor, second floor, attic, and external locations. Both checklists require quarterly verification across four quarters (April-June, July-September, October-December, January-March) with spaces for completion dates and initials from the service mechanic, supervisor, and Contracting Officer Representative (COR).

View the file

Other files

File Type Posted
Attachment 1 Solicitation Terms and Conditions.docx DOCX document
Attachment 4 Wage Determination.pdf PDF
Attachment 2 Performance Work Statement.doc DOC document
Attachment 5 Experience Questionnaire.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LINE

No.

FLR ROOM ITEM Quantity DESCRIPTION DUE DATE

COMPLETED

DUE DATE

COMPLETED

DUE DATE

COMPLETED

DUE INITIALS

1. Basement Boiler room Gas Fired Boiler 2ea Peerless Model 211-11-5 X X

2. Hot Water Circ pumps & motors 2ea TACO- 7.5 HP X X

3. Boiler Draft Fans 2ea X X

4. Condensate Drain

Sump 1ea X X X X

5. Sump Pump 1ea X X X X

6. Motorized Gas Shut

Off Valves 2ea X X X X

7. Motorized Hot Water Supply Line

1ea X X X X

8. Domestic Type Water

Heater 1ea 40 gallon X X X X

9. Radon Systems 4ea X

10. Chiller Room Hot Water Circ pumps & motors 2ea TACO- 7.5 HP X X

11. Chiller controls 1ea X X X X

12. Commercial Water

Heater 1ea 100 gallon X X X X

13. Hallways and Offices

Fin Tube Radiators various locations X

14. Wall Mounted

Thermostats various locations X

15. Bathrooms Exhaust Fans 2ea X X X X

16. Computer

Room (Cooling) coil, fan, and thermostat

1ea X X

17. Computer

Room (Cooling) coil, fan, and thermostat

1ea X X

18. First Floor Hallways and

Offices Fin Tube Radiators various locations X

19. Wall Mounted Thermostats various locations X

20. Bathrooms Exhaust Fans 2ea X X X X

21. First

Floor Overhead Space

Air Handler #1 1ea AAON, 5780 cfm, 5hp X X X X

22. Filter Section #1 10ea 16 x 20 x 2 Filter X X X X

23. Air Handler #1 Blower

Assembly 1ea Inspect entire blower assembly once per year X

24. Air Handler #2 1ea AAON, 2985 cfm, 2hp X X X X

25. Filter Section #2 4ea 16 x 20 x 2 Filter X X X X

26. Air Handler #2 Blower

Assembly 1ea Inspect entire blower assembly once per year X

27. Air Handler #4 1ea AAON, 2135 cfm, 2hp X X X X

23.

26.

27.

24.

21.

20.

17.

18.

15.

14.

12.

11.

8.

9.

6.

5.

3.

2.

INITIALS INITIALS INITIALS DATE

COMPLETED

LINE

No.

1st QUARTER April - June

2nd QUARTER July - September

3rd QUARTER October - December

4th QUARTER January - March

Building 24 HVAC Inspection Checklist

FLR ROOM ITEM Quantity DESCRIPTION DUE DATE

COMPLETED

DUE DATE

COMPLETED

DUE DATE

COMPLETED

DUE INITIALS

28. Filter Section #4 2ea 16 x 20 x 2 Filter X X X X

29. Air Handler #4 Blower

Assembly 1ea Inspect entire blower assembly once per year X

30. Air Handler #5 1ea AAON, 5780 cfm, 5hp X X X X

31. Filter Section #5 10ea 16 x 20 x 2 Filter X X X X

32. Air Handler #5 Blower

Assembly 1ea Inspect entire blower assembly once per year X

33. Bathroom Exhaust

Fans 2ea X X X X

34. Exterior Ground Mounted

AC mini split condenser #1

1ea EMI 7.5A, computer room, courtyard X X X X

35. AC mini split condenser #2

1ea EMI 7.5A, telephone/comm room, front of building X X X X

36. Chiller #1 1ea McQuay AGZ-085B, 75 ton, north side X X

37. Second Floor

Hallways and Offices

Fin Tube Radiators various locations X

38. Wall Mounted

Thermostats various locations X

39. Bathrooms Exhaust Fan Timer 1ea X X X X

40. Exhaust Fans 2ea X X X X

41. Attic Attic Air Handler #3 1ea AAON, 9985 cfm, 7.5hp X X X X

42. Filter Section #3 10ea 16 x 20 x 2 Filter X X X X

43. Air Handler #3 Blower

Assembly 1ea Inspect entire blower assembly once per year X

44. Air Handler #6 1ea AAON, 9395 cfm, 7.5hp X X X X

45. Filter Section #6 10ea 16 x 20 x 2 Filter X X X X

46. Air Handler #6 Blower

Assembly 1ea Inspect entire blower assembly once per year X

47. Fresh Air Blower 2ea X X X X

48. Bathroom Exhast Fan 1ea X X X X

Verification of Completion

Service Mechanic (sign & date)

Supervisor (sign & date)

COR (sign & date)

43.

46.

29.

32.

47.

48.

44.

45.

41.

42.

39.

40.

37.

38.

35.

36.

33.

34.

INITIALS INITIALS INITIALS DATE

COMPLETED

LINE

No.

28.

30.

31.

1st QUARTER April - June

2nd QUARTER July - September

3rd QUARTER October - December

4th QUARTER

Building 24 HVAC Inspection Checklist (cont.)

FLR ROOM ITEM Quantity DESCRIPTION DUE DATE

COMPLETED

DUE DATE

COMPLETED

DUE DATE

COMPLETED

DUE INITIALS

1. Basement Boiler room South

Gas Fired Boiler & Accessories

4ea Knight Model WH 55 - 399 X

2. Hydronic Pumps 5ea Grundfos PACO X X

3. Cooling Tower

Controls 1ea X X

4. Glycol Cooling Tower 1ea X X

5. Domestic Hot Water

Heater 1ea 80 gal Bradford White X

6. Circulation Pump 1ea X

7. Water Softener 1ea North Star X

8. Water Cooled Heat

Pumps 8ea Daikin (Model #: RWEYQ) X X

9. Boiler Room North

Water Cooled Heat Pumps

8ea Daikin (Model #: RWEYQ) X X

10. HRV 3 1ea Venmar CES X X X X

11. Central IT

Room Environmental Control System

1ea Liebert DS X X X X

12. Sump Pump 2ea Zoeller X X X X

13. Cooling

Tower Control Cooling Tower Controls

1ea Advantage Controls X

14. Cooling Tower

Chemicals 1ea 100 gallon X

15. Bathrooms Exhaust Fans 2ea X X X X

16. Offices &

Hallways Branch Selectors 9ea Various Locations X

17. External External Radon Systems 3ea X X

18. Cooling Tower 1ea X X

19. Condensing Unit 1ea Liebert X

20. Condensing Unit 1ea Daikin X

21. First Floor Bathrooms Exhaust Fans 2ea X X X X

22. Second

Floor Bathrooms Exhaust Fans 2ea X X X X

23. IT Room Mini Split 1ea Daikin X X

24. Attic Attic HRV 1 1ea Venmar CES X X X X

Building 26 HVAC Inspection Checklist

23.

24.

21.

20.

17.

18.

15.

14.

11.

12.

9.

8.

5.

6.

3.

2.

INITIALS INITIALS INITIALS DATE

COMPLETED

LINE

No.

1st QUARTER April - June

2nd QUARTER July - September

3rd QUARTER October - December

4th QUARTER

FLR ROOM ITEM Quantity DESCRIPTION DUE DATE

COMPLETED

DUE DATE

COMPLETED

DUE DATE

COMPLETED

DATE

COMPLETED

LINE

No.

25. HRV 2 1ea Venmar CES X X X 25.

Verification of Completion

Service Mechanic (sign & date)

Supervisor (sign & date)

COR (sign & date)

Building 26 HVAC Inspection Checklist (cont.)

INITIALS INITIALS INITIALS DUE INITIALS

X

1st QUARTER April - June

2nd QUARTER July - September

3rd QUARTER October - December

4th QUARTER