ATTACHMENT 3 AF 66 MBMV222300 - Repair West Perimeter Fence.pdf

PDF 16 KB Posted

Attached to
MBMV212300 - Repair West Perimeter Fence
Solicitation number
W50S84-22-B-0006
Issued by

About this file

This solicitation and related documents outline requirements for a fence repair project at Battle Creek, Michigan. The solicitation seeks bids to repair the west perimeter fence at a National Guard facility under project number MBMV212300, with a period of performance of 120 calendar days. The project magnitude is estimated between $250,000 to $500,000. Interested parties are encouraged to attend an in-person pre-bid conference on August 18, 2022. The opportunity is set aside for small businesses with a size standard of $16.5 million. The NAICS code for the work is 238990. Award will be made to the responsive bidder offering the lowest price. Bids are due by the date specified in the solicitation. Funding is not presently available but is expected to be in place by September 30, 2022, and the project has been identified as a priority for the National Guard if funds become available.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

MBMV222300

APPROVED DISAPPROVED

1 Submittal Schedule - AF Form 66 1 x

Transfer and Acceptance of DOD Real

Property - DD Form 1354 1 x

3 Contractor Hazardous Material Identification 1 x

Solid Waste Recycling and Disposal Reporting

Form 1 x

5 Affirmative Procurement Reporting Form 1 x

6 Construction Schedule 1 x

Construction Photos

8 Safety Documentation as stated 1 x

9 Permits, Licenses and Certificates 1 x

10 Quality Control Plan 1 x

11 Fence 1 1 1

12 Gates 1 1 1

13 Concrete Mix 1 1

14 Bridge Detail 1

SOLICITATION/CONTRACT NO.PROJECT TITLE

Repair West Perimeter Fence

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66 Modified)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

C A

T A

L O

G D

A T

A

L

IN

E N

U M

B E

R

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

O T

H E

R M

A T

E R

IA

L O

R D

A T

A

S H

O P

D R

A W

IN

G

S

C O

L O

R S

E L E

C T

IO

N

M A

N U

F A

C T

U R

E R

'S

R E

C O

M M

E N

D A

T

IO

N S

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

A N

D C

L O

S E

O U

T

REMARKS

FINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

RETURN

SUSPENSION

DATE

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

FOLLOW-UP

SUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

DATE CONTRACTOR NOTIFIED

AF66

File details come from the government source that posted it. Updated .