ATTACHMENT 3 AF 66 MBMV212809 RPR High Bay LED Lighting Basewide.pdf

PDF 89 KB Posted

Attached to
MBMV212809 Repair High Bay Lighting
Solicitation number
W50S84-22-B-0007
Issued by

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

MBMV212809

APPROVED DISAPPROVED

1 Conduit, Fittinges Lighting Anchorages x x x x x x x 2 LED Fixtures x x x x x x x 3 Dimmer Controls/Switches x x x x x x x

4 Lighting Wiring Conductor, Mounting Hardware x x x x x x x

5 Lightin Fixture Wire Conduit MSD Sheets x x x x x x x

6 Construction Materials x x x x x x x

7 Installation Drawings (shop drawings) x x x x x x x 8 Light Fixture Performance Data x x x x x x x

9 Submittal Schedule - AF Form 66 1 x

10 Transfer and Acceptance of DOD Real Property - DD Form 1354 1 x

11 Contractor Hazardous Material Identification 1 x

12 Solid Waste Recycling and Disposal Reporting Form 1 x

13 Affirmative Procurement Reporting Form 1 x

14 DD Form 1354 1 x

15 Construction Schedule 1 x

16 Construction Photos 1

17 Safety Documentation as stated 1 x

18 Permits, Licenses and Certificates 1 x

19 Quality Control Plan 1 x

20 Lighting Installation Plan and Procedures 1 x

SOLICITATION/CONTRACT NO.PROJECT TITLE

Repair High Bay LED Lighting Basewide

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66 Modified)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

M

AT

ER

IA

L

O R

D

AT

A

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D

AT

IO

N

S

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

D

C

LO

SE

O

U

T REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

RETURN

SUSPENSION

DATE

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

FOLLOW-UP

SUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

DATE CONTRACTOR NOTIFIED

ATTACHMENT 3 AF 66 MBMV212809 RPR High Bay LED Lighting Basewide

File details come from the government source that posted it. Updated .