Attachment 3 AF 3052.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
M500 Water Main Replacement, Maxwell AFB
Solicitation number
PNQS260340
Issued by

About this file

This file is a Submittal Register template (AF Form 3052) that establishes the documentation and approval requirements for the M500 Water Main Replacement project at Maxwell Air Force Base. The register outlines eight mandatory submittals that the contractor must prepare and submit according to specified deadlines and approval processes. Required submittals include: a HazMat Questionnaire and corresponding Material Safety Data Sheets (MSDS) due five days prior to the start date; Hazmat Reporting Entry Forms for both project initiation and project completion; a Recycling and Landfill Report due at contract end; As-Built drawings due at project completion; Warranty documentation due at project completion; and a Project Schedule due within ten days of the Notice to Proceed. Each submittal requires three copies and designates Civil Engineering as the approval authority, with provisions for contractor resubmittal if items are initially disapproved.

The register serves as an administrative control mechanism to ensure environmental compliance, project documentation, and contractor accountability throughout the contract execution. The form includes columns for tracking submission dates, approval dates, suspension dates, contractor notifications, and final approval status with remarks. This template does not address the underlying scope of work for the water main replacement but rather establishes the procedural requirements contractors must follow to maintain contract compliance and project documentation standards.

View the file

Other files

File Type Posted
Attachment 1 Specifications.pdf PDF
Attachment 2 Wage Determination.pdf PDF
Solicitation - FA330026R0012.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF 66 Sheet 1-16

SUBMITTAL REGISTER PROJECT NUMBER PROJECT TITLE

TO BE COMPLETED BY PROJECT MANAGERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
ITEM NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATEDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
CERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSDATADOCUMENT \ REPORT

APPROVED DIS-APPROVED

1HazMat Questionnaire335 Days Prior to Start Date
2HazMat MSDS35 Days Prior to Start DateMust be filled out if contractor answers YES to the Hazmat Questionnaire
3Hazmat Reporting Entry Form335 Days Prior to Start DateSubmit Final Quantities
4Hazmat Reporting Entry Form (end of project)33End of Contract
5Recycling and Landfill Report33End of Contract
6As Builts33End of Contract
7Warranty33End of Contract
8Project Schedule3NTP +10 days