Attachment 3-8 Plans.pdf
PDF 378 KB Posted
- Attached to
- Fitness Center Renovation
- Solicitation number
- W50S8D21Q0002
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 1.pdf | ||
| Solicitation Amendment W50S8D21Q0002_0001.pdf | ||
| Pre-Proposal Conference Attendance Sheet.pdf | ||
| Performance Work Statement.pdf | ||
| W50S8D21Q0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STORAGE ROOM
H
A L
L W
A Y
MECHANICAL
ROOM
REMOVE
EXIST. WALL
EXIST. FENCE & GATES
TO BE REMOVED &
RELOCATED.
DEMO
EXIST. OFFICE
EXISTING JACK
STAND TO BE RELOCATED
BY OTHERS.
EXIST. WALL TO REMAIN
REMOVE
EXIST. HEATING UNIT
DESCRIPTION:
TITLE:
NEWBURGH, NEW YORKSTEWART AIRPORT
AIR NATIONAL GUARD FACILITIES
DWG. NO:
BASE CIVIL ENGINEER:
DATE:
ENG:
CHK:
DR:
BY:DESCRIPTION:DATE:REV.:
OF:SHEET:SCALE:
61NTS
ATTACHMENT 3 - DEMO PLAN
FITNESS MODERNIZATION PLAN
BUILDING 107
DEMO PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 112-1
AutoCAD SHX Text
AutoCAD SHX Text 114-1
AutoCAD SHX Text
2021 JAN 15
AutoCAD SHX Text Capt. M. NOTEBOOM
AutoCAD SHX Text Capt. M. NOTEBOOM
AutoCAD SHX Text F.P.
AutoCAD SHX Text (Gov. Use Only)
AutoCAD SHX Text 2d Lt. M. LYNCH
L
L W
A Y
MULTIUSE COURT
HALF-COURT BASKETBALL
MECHANICAL
ROOM
FITNESS CENTER PHASE I
FITNESS CENTER PHASE II
EXTEND
EXIST. WALL
TO COLUMN
NEW WALL 10' HIGH.
REFER TO PWS FOR
SPECIFICATIONS
NEW WALL
20' WIDE X 16FT HEIGHT.
REFER TO PWS FOR
SPECIFICATIONS.
MULTIUSE WALL.
REFER TO PWS FOR
SPECIFICATIONS.
NEW PADDED WALL
8' HIGH OR FLUSH TO
LOWEST HORIZONTAL
BEAM.
NEW YOGA/SPIN
STUDIO.
INSTALL
NEW FINISH WALL TO
MATCH EXISTING. (V.I.F)
± 33'
± 34'
20'
DESCRIPTION:
TITLE:
NEWBURGH, NEW YORKSTEWART AIRPORT
AIR NATIONAL GUARD FACILITIES
DWG. NO:
BASE CIVIL ENGINEER:
DATE:
ENG:
CHK:
DR:
BY:DESCRIPTION:DATE:REV.:
OF:SHEET:SCALE:
62NTS
ATTACHMENT 4 - PROPOSED PLAN
FITNESS CENTER
BUILDING 107
ABBREVIATION:
V.I.F. VERIFY IN FIELD
PROPOSED PLAN
GENERAL PLAN NOTES:
THESE PLANS ARE A GRAPHICAL REPRESENTATION OF THE
PERFORMANCE WORK STATEMENT AND THE INTEND OF THE FINAL
PRODUCT. GOVERNING CODES FOR EACH TRADE MUST PREVAIL OVER
THE DESIRE LAYOUT. CONTRACTOR TO COORDINATE ALL WORK.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 112-1
AutoCAD SHX Text
AutoCAD SHX Text 114-1
AutoCAD SHX Text
AutoCAD SHX Text
2021 JAN 15
AutoCAD SHX Text Capt. M. NOTEBOOM
AutoCAD SHX Text Capt. M. NOTEBOOM
AutoCAD SHX Text F.P.
AutoCAD SHX Text (Gov. Use Only)
L
L W
A Y
L O
W
W
A L
L
MULTIUSE
COURT
HALF-COURT
BASKETBALL
MECHANICAL
ROOM
FITNESS CENTER PHASE I
FITNESS CENTER PHASE II
3' DISTANCE
ACRYLIC
FLOORING
± 2,820 SQF
TURF
± 1,480SQF
RUBBER
TILE
± 1,270 SQF
WOOD-GRAIN
VINYL
± 620 SQF
PROVIDE CAUTION
MARKINGS AROUND
ELECTRICAL
PANEL
AS PER OSHA
REQUIREMENTS .
EXIST. ELECTRICAL
PANEL
NEW
YOGA/SPIN
STUDIO
NEW PADDED WALL
8' HIGH OR FLUSH TO
LOWEST HORIZONTAL
BEAM.
DESCRIPTION:
TITLE:
NEWBURGH, NEW YORKSTEWART AIRPORT
AIR NATIONAL GUARD FACILITIES
DWG. NO:
BASE CIVIL ENGINEER:
DATE:
ENG:
CHK:
DR:
BY:DESCRIPTION:DATE:REV.:
OF:SHEET:SCALE:
63NTS
ATTACHMENT 5 - FLOORING PLAN
FITNESS MODERNIZATION PLAN
BUILDING 107
REFERENCE NOTES :
1. FLOOR TRANSITION STRIPS.
2. DOORWAY TRANSITION PIECE.
GENERAL PLAN NOTES:
THESE PLANS ARE A GRAPHICAL REPRESENTATION OF THE
PERFORMANCE WORK STATEMENT AND THE INTEND OF THE FINAL
PRODUCT. GOVERNING CODES FOR EACH TRADE MUST PREVAIL OVER
THE DESIRE LAYOUT. CONTRACTOR TO COORDINATE ALL WORK.
FLOORING PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 112-1
AutoCAD SHX Text
AutoCAD SHX Text 114-1
AutoCAD SHX Text
AutoCAD SHX Text
2021 JAN 15
AutoCAD SHX Text Capt. M. NOTEBOOM
AutoCAD SHX Text Capt. M. NOTEBOOM
AutoCAD SHX Text F.P.
AutoCAD SHX Text (Gov. Use Only)
L
L W
A Y
L O
W
W
A L
L
MULTIUSE COURT
HALF-COURT
BASKETBALL
MECHANICAL
ROOM
FITNESS CENTER PHASE II
NEW PADDED WALL
8' HIGH OR FLUSH TO
LOWEST HORIZONTAL
BEAM.
3 3 3 3 3
DESCRIPTION:
TITLE:
NEWBURGH, NEW YORKSTEWART AIRPORT
AIR NATIONAL GUARD FACILITIES
DWG. NO:
BASE CIVIL ENGINEER:
DATE:
ENG:
CHK:
DR:
BY:DESCRIPTION:DATE:REV.:
OF:SHEET:SCALE:
64NTS
ATTACHMENT 6 - PANELING & MIRRORS
FITNESS MODERNIZATION PLAN
BUILDING 107
LEGEND
BASE COVE
MIRROR ONLY (5' MIRROR)
PANELING & 3' MIRROR ( REFER TO PWS
FOR DETAILS.)
REFERENCE NOTES : GENERAL PLAN NOTES:
THESE PLANS ARE A GRAPHICAL REPRESENTATION OF THE
PERFORMANCE WORK STATEMENT AND THE INTEND OF THE FINAL
PRODUC`T. GOVERNING CODES FOR EACH TRADE MUST PREVAIL OVER
THE DESIRE LAYOUT. CONTRACTOR TO COORDINATE ALL WORK.
3. EXIST. COLUMNS TO BE PAINTED. COLORS TO
BE SELECTED AND APPROVED BY THE
CONTRACTING OFFICER.
PANELING & MIRRORS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 112-1
AutoCAD SHX Text
AutoCAD SHX Text 114-1
AutoCAD SHX Text
AutoCAD SHX Text
2021 JAN 15
AutoCAD SHX Text Capt. M. NOTEBOOM
AutoCAD SHX Text Capt. M. NOTEBOOM
AutoCAD SHX Text F.P.
AutoCAD SHX Text (Gov. Use Only)
L
L W
A Y
L O
W
W
A L
L
4 4 4
4 4 4
4 4
6 66
5 5
5 5
DESCRIPTION:
TITLE:
NEWBURGH, NEW YORKSTEWART AIRPORT
AIR NATIONAL GUARD FACILITIES
DWG. NO:
BASE CIVIL ENGINEER:
DATE:
ENG:
CHK:
DR:
BY:DESCRIPTION:DATE:REV.:
OF:SHEET:SCALE:
65NTC
ATTACHMENT 7 - DEMO & EXIST. LIGHTING
FITNESS MODERNIZATION PLAN
BUILDING 107
DEMO & EXISTING LIGHTING PLAN
REFERENCE NOTES :
4. 11 LIGHT FIXTURES TO BE REMOVED, RELINQUISHED TO C.E AND REPLACED WITH NEW LIGHT FIXTURES
AT THE SAME LOCATION .
5. EXISTING LIGHT FIXTURES TO BE REMOVED.
6. EXISTING LIGHT FIXTURES MOUNTED ON WALLS TO BE REMOVED.
7. EXISTING LIGHT FIXTURES TO REMAIN.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 112-1
AutoCAD SHX Text
AutoCAD SHX Text 114-1
AutoCAD SHX Text
AutoCAD SHX Text
2021 JAN 15
AutoCAD SHX Text Capt. M. NOTEBOOM
AutoCAD SHX Text Capt. M. NOTEBOOM
AutoCAD SHX Text F.P.
AutoCAD SHX Text (Gov. Use Only)
L
L W
A Y
L O
W
W
A L
L
8 8 8
8 8 8
8 8
8 8 8
8 8 8
7 7
NEW YOGA/SPIN STUDIO
EXISTING
ELECTRICAL
PANELS
S Z1
ZONE 1
ZONE 2
S Z2
ON
OFF
ON
OFF
ON
OFF
O N
O F
F
ON
OFF
E X
I T
E X
I T
DESCRIPTION:
TITLE:
NEWBURGH, NEW YORKSTEWART AIRPORT
AIR NATIONAL GUARD FACILITIES
DWG. NO:
BASE CIVIL ENGINEER:
DATE:
ENG:
CHK:
DR:
BY:DESCRIPTION:DATE:REV.:
OF:SHEET:SCALE:
66NTS
ATTACHMENT 8 - PROPOSED POWER AND LIGHTING
FITNESS MODERNIZATION PLAN
BUILDING 107
PROPOSED POWER & LIGHTING LAYOUT
7. EXISTING LIGHT FIXTURES TO REMAIN.
8. NEW LIGHT FIXTURES.
9. REPLACE EXISTING LIGHT SWITCH WITH A NEW MOTION SENSOR SWITCH.
10. NEW CEILING MOUNTED OCCUPANCY MOTION SENSOR SET BY ZONES.
11. INSTALL A NEW MOTION SENSOR SWITCH.
12. REPLACE EXISTING LIGHT SWITCH WITH A NEW MOTION SENSOR DIMMER
SWITCH SERVING YOGA/SPIN STUDIO.
13. EXISTING RECEPTACLE TO REMAIN .
14. NEW RECEPTACLES.
SYMBOL LIST
S
ON
OFF
OCCUPANCY MOTION SENSOR
MOTION SENSOR SWITCH.
DUPLEX RECEPTACLE.
EXIT. SIGN
GENERAL PLAN NOTES:
THESE PLANS ARE A GRAPHICAL REPRESENTATION OF THE
PERFORMANCE WORK STATEMENT AND THE INTEND OF THE FINAL
PRODUCT. GOVERNING CODES FOR EACH TRADE MUST PREVAIL OVER
THE DESIRE LAYOUT. CONTRACTOR TO COORDINATE ALL WORK.
EXIT
REFERENCE NOTES :
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 112-1
AutoCAD SHX Text
AutoCAD SHX Text 114-1
AutoCAD SHX Text
AutoCAD SHX Text
2021 JAN 15
AutoCAD SHX Text Capt. M. NOTEBOOM
AutoCAD SHX Text Capt. M. NOTEBOOM
AutoCAD SHX Text F.P.
AutoCAD SHX Text (Gov. Use Only)
| Sheets and Views |
| 107 Fitness Center Phase II - Revised-DEMO PLAN |
| 107 Fitness Center Phase II - Revised-PROPOSED PLAN |
| 107 Fitness Center Phase II - Revised-FLOORING PLAN |
| 107 Fitness Center Phase II - Revised-PANELING - MIRROR |
| 107 Fitness Center Phase II - Revised-DEMO & EXIST. LIGHTING |
| 107 Fitness Center Phase II - Revised-POWER & LIGHTING |
File details come from the government source that posted it. Updated .