This file contains 40 detailed construction drawings issued for the renovation of rooms C208G/F for IR/RF at the Mann-Grandstaff VA Medical Center in Spokane, WA (Project #668-CSI-009). The drawings include architectural, structural, mechanical, electrical, plumbing, and telecom plans for converting an existing restroom and adjacent room into an IR/RF imaging suite with a control room.
Key technical specifications include installation of lead-lined walls and observation windows, scanner support rails, new terminal units and HVAC modifications, electrical power requirements for Siemens Multitom RAX imaging equipment (480V 80A service), plumbing modifications including new sink with eyewash station, and telecom/nurse call system updates. The drawings provide detailed demolition plans, new construction details, equipment layouts, and building system modifications required to accommodate the medical imaging equipment. Notable elements include radiation shielding requirements, mechanical system modifications to maintain proper environmental conditions, and coordination details for integrating the imaging system infrastructure. The drawings are dated May 2024 and marked as "Issued for Construction."
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 668-CSI-009 SOW.pdf | ||
| Attachment 2 668-CSI-009 Specifications.pdf | ||
| 36C26025R0031_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MANN-GRANSTAFF
VA MEDICAL CENTER
W. FRANCIS AVE.
W
. INDIAN TRAIL RD.
N. 5 MILES RD. N.
C
O
UN
TR
Y
HO
M
ES
B
LV
D.
N. DRISCOLL BLVD.
N .A
SH
S
T.
N .M
AP
LE
S T.
H W
Y
N .M
O N
R O
E
ST
N .W
AL
L
ST
N .A
S T.
E. WELLESLEY AVE.WELLESLEY AVE.
W. GARLAND AVE.
E. EMPIRE AVE.
E. FRANCIS AVE.
N .A
SS
EM
BL
Y
ST
W. NORTHWEST BLVD.
SPOKANE RIVER
PROJECT
SITE
H W
Y
H W
Y
Xref ..\Support\668CSI009_G-BSVCTY.dwg
RESERVE RD.
MEMORIAL CIR.
INDEPENDENCE DR.
IN
D
EP
EN
D
EN
C E
D R
N .A
SS
EM
BL
Y
ST
WELLESLEY AVE.
W. BROAD AVE.
W. OLYMPIC AVE.
W. QUEEN AVE.
R
ES
ER
VE
R D
FR
EE
D O
N W
AY
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
RENOVATE C208G/F FOR IR/RF
SPOKANE, WA
MAY 2024
668-CSI-009
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
COVER SHEET
GI001
1WBRWBR
N
RENOVATE C208G/F FOR IR/RF
DEPARTMENT OF VETERANS AFFAIRS
PROJECT NO. 668-CSI-009
MANN-GRANDSTAFF VA MEDICAL CENTER
4815 N ASSEMBLY ST
SPOKANE, WA 99205
VICINITY MAP
CAMPUS MAP
ARCHITECTURAL /
LIFE SAFETY STRUCTURAL
MECHANICAL /
PLUMBING ELECTRICAL
05/03/2024
5/ 3/ jlandrith PE Seal Colorado
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
RENOVATE C208G/F FOR IR/RF
SPOKANE, WA
MAY 2024
668-CSI-009
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SHEET INDEX
GI002
2WBRWBR
SHEET INDEX
Sheet Number Sheet Title
GENERAL
GI001 COVER SHEET
GI002 SHEET INDEX
STRUCTURAL
SE101 STRUCTURAL GENERAL NOTES AND PLAN
ARCHITECTURAL
AE001 ARCHITECTURAL ABBREVIATIONS AND LEGENDS
AL001 LIFE SAFETY PLAN
AD101 DEMOLITION FLOOR AND REFLECTED CEILING PLANS
AE101 FLOOR PLAN AND REFLECTED CEILING PLAN
AE102 EQUIPMENT AND FURNITURE PLAN
AE301 WALL TYPES, DOOR AND WINDOW SCHEDULE DETAILS
AE601 DOOR AND WINDOW SCHEDULES AND DETAILS
AI101 INTERIOR FINISHES PLAN, AND ROOM FINISH SCHEDULES
MECHANICAL
MI001 MECHANICAL ABBREVIATIONS
MI002 MECHANICAL GENERAL NOTES AND SYMBOLS
MD101 MECHANICAL HVAC DEMO PLAN
MD102 MECHANICAL PIPING DEMO PLAN
MH101 MECHANICAL HVAC PLAN
MP101 MECHANICAL PIPING PLAN
MH501 MECHANICAL DETAILS
MH502 MECHANICAL DETAILS
MH503 MECHANICAL DETAILS
MH601 MECHANICAL SCHEDULES
PLUMBING
PI001 PLUMBING ABBREVIATIONS AND GENERAL NOTES
PI002 PLUMBING SYMBOLS
PD101 PLUMBING DEMO PLAN UNDERFLOOR
PD102 PLUMBING DEMO PLAN
PL101 PLUMBING PLAN UNDERFLOOR
PL102 PLUMBING PLAN
PL601 PLUMBING SCHEDULES
ELECTRICAL
EI001 ELECTRICAL GENERAL NOTES
EI002 ELECTRICAL SYMBOLS AND ABBREVIATIONS
ED101 ELECTRICAL POWER DEMO PLAN
ED102 ELECTRICAL DEMO REFLECTED CEILING PLAN
EL101 ELECTRICAL LIGHTING PLAN
EP101 ELECTRICAL POWER PLAN
EP102 ELECTRICAL CONDUIT PLAN
EP601 PANEL SCHEDULES
EP701 PARTIAL ONE-LINE DIAGRAM
TELECOM
TI100 TELECOM ABBREVIATIONS AND SYMBOLS
TD101 TELECOM DEMO FLOOR PLAN AND REFLECTED CEILING
TN101 TELECOM FLOOR PLAN AND REFLECTED CEILING
05/03/2024
DESIGN CRITERIA
A. VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. DO NOT SCALE DRAWINGS.
B. DO NOT REPRODUCE CONTRACT DOCUMENTS OR COPY STANDARD PRINTED INFORMATION AS BASIS OF SHOP DRAWINGS C. CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION PRACTICES INCLUDING TECHNIQUES, PROCEDURES, AND THE
SEQUENCE OF CONSTRUCTION. CONTRACTOR SHALL NOTIFY COR IF A CONFLICT ARISES DUE TO VARIATIONS OR OTHER
PROBLEMS WITH THE CONSTRUCTION DOCUMENTS
D. OBSERVATIONS OF JOBSITE OTHER THAN REQUIRED INSPECTIONS BY ENGINEER ARE NOT CONSTRUCTION APPROVALS E. STRUCTURAL ENGINEER MUST BE NOTIFIED AT LEAST 72 HOURS PRIOR TO ANY REQUIRED CONSTRUCTION OBSERVATION.
GENERAL NOTES
A. SCOPE: THE FOLLOWING DRAWING SHEETS OUTLINE THE STRUCTURAL DESIGN FOR THE INSTALL OF NEW EQUIPMENT FOR THE RENOVATION OF ROOMS C208G-F FOR THE SPOKANE VAMC. WHEN A DIFFERENCE EXISTS BETWEEN THESE DRAWINGS AND ANY OTHER GOVERNING CODE, THE MORE STRINGENT SHALL CONTROL. ANY OTHER ITEMS NOT COVERED THEREIN SHALL BE COMMENSURATE WITH GOOD ENGINEERING PRACTICE. SEISMIC DESIGN DATA WAS ASSUMED USING INFORMATION FROM OTHER PROJECTS LOCATED ELSEWHERE ON SPOKANE VAMC CAMPUS.
B. APPLICABLE CODES AND STANDARDS:
1. INTERNATIONAL BUILDING CODE (IBC) - 2021 EDITION
2. AMERICAN SOCIETY OF CIVIL ENGINEERS - ASCE 7-22 (WITH SUPPLEMENTS)
3. SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS - AISC360-22
4. BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE - ACI318-19
C. BUILDING RISK CATEGORY: III
D. DESIGN LOADS:
1. LOADS RECEIVED FROM MANUFACTURER'S DESIGN DRAWINGS
a. WEIGHT OF HANGING PARTS 805 lb & 783 lb
b. WEIGHT OF RAILS 3 x 59 lb
c. PATIENT TABLE 738 lb
d. MAX. LOAD ON PATIENT TABLE 529 lb
2. SEISMIC DESIGN CRITERIA:
a. SEISMIC DESIGN CATEGORY C
b. RISK CATEGORY III
c. SOIL CLASSIFICATION D - STIFF SOIL
d. COMPONENT IMPORTANCE FACTOR Ip = 1.5
e. COMPONENT RESONANCE DUCTILITY FACTOR CAR = 1.0
f. COMPONENT RESPONSE MODIFICATION FACTOR RP0 = 1.5
g. COMPONENT OVER-STRENGTH FACTOR Ω0 = 2.0
h. MAPPED SEISMIC RESPONSE ACCELERATIONS SS = 0.32
S1 = 0.094
i. SPECTRAL RESPONSE COEFFICIENTS SDS = 0.31
SD1 = 0.17
j. COMPONENT OPERATING WEIGHT Wp = 1105 lb
k. SEISMIC DESIGN FORCE Fp = 369 lb
l. VERTICAL SEISMIC FORCE Fv = 69 lb
3. LOAD COMBINATIONS:
a. 1.2 DL + 1.6 LL
b. 1.2DL + LL + EV + Ω0 Fp
STRUCTURAL STEEL REQUIREMENTS
1. DETAIL, FABRICATE AND ERECT STRUCTURAL STEEL IN ACCORDANCE WITH THE LATEST PROVISIONS OF AISC MANUAL OF
STEEL CONSTRUCTION, CODE OF STANDARD PRACTICE AND CHAPTER 22 OF THE IBC PER THE REQUIREMENTS OF THE
AUTHORITY HAVING JURISDICTION.
2. MATERIALS SHALL BE AS FOLLOWS UNO:
• PLATES ASTM A36
• UNISTRUT TELESPAR ASTM A1011
• HIGH−STRENGTH BOLTS ASTM A325, U.N.O.
• PLAIN WASHERS ANSI B18.22.1−65 (R2008)
• WELDING ELECTRODES SHALL BE E60XX RODS CONFORMING TO AWS A5.20 (FCAW PROCESS), AWS A5.18 (GMAW
PROCESS) OR AWS A5.1 (SMAW PROCESS)
3. WELDING SHALL BE PERFORMED BY AN AWS CERTIFIED WELDER.
4. WELDING PROCEDURES ARE THE RESPONSIBILITY OF THE STRUCTURAL STEEL CONTRACTOR.
5. ALL WELDS SHALL BE CONTINUOUS WHERE NO LENGTH IS PROVIDED.
6. ALL GROOVE AND BUTT WELDS SHALL BE FULL PENETRATION WELDS AND SHALL DEVELOP THE FULL STRENGTH OF THE
WEAKER MEMBER.
7. ALL WELDS EXPOSED TO VIEW SHALL BE CLEANED, GROUND SMOOTH AND PAINTED. PAINTING DONE ON STEEL MEMBERS
SHOULD BE AT LEAST 3" FROM FIELD WELDS UNLESS WELDS ARE COMPLETED. SHOP PRIME AND PAINT STEEL PER THE
OWNER'S SPECIFICATIONS.
8. CONNECTIONS MADE WITH HIGH STRENGTH STEEL BOLTS SHALL CONFORM IN ALL RESPECTS TO THE CURRENT
SPECIFICATIONS FOR STRUCTURAL JOINTS AS ENDORSED BY AISC.
9. FOR BEARING TYPE CONNECTIONS, BOLTS SHALL BE INSTALLED TO A SNUG TIGHT CONDITION. THE SNUG TIGHT CONDITION IS DEFINED AS THE TIGHTNESS THAT EXISTS WHEN ALL PLIES OF A JOINT ARE IN FIRM CONTACT. THIS CONDITION MAY NORMALLY BE ATTAINED BY A FEW IMPACTS OF AN IMPACT WRENCH OR THE FULL EFFORT OF A PERSON USING AN
ORDINARY SPUD WRENCH.
*FOR EASE OF ILLUSTRATION, CONCRETE SLABS, AND LATERAL BRACING ARE NOT SHOWN.
DET. LB1
Rail
Lateral Bracing
Refer to DET. TB1
TABLE TO FLOOR ANCHORAGE
25'-8"
2'-2"
4"
2'-2" 2'-2" 2'-2" 2'-2" 2'-2"
1' -0
3 4"
83 4"
Refer to DET. LB1 Lateral Bracing
Concrete Slab f'c = 3000 psi
Rail
Refer to DET. S1
Refer to DET. H1
Rail
Rail
* Lateral bracings are not shown in the view.
- Lateral bracing shall be provided as specified in the framing plan.
- CJP groove weld can be substituted instead of fillet welds.
- Use (2) 1 4" φ Titen HD, hnom=2.5" (1.94" embedment depth) for connecting the patient table to the concrete floor.
* Note 1
83 4" 6"
(8) 12" φ CS Strong-Bolt 2 hnom. = 2.75" hemb. = 2.25"
PL 8"x8"x3 8"
UNISTRUT TELESPAR
Tube Box 2 12"x 2 12" (10 GA.)
8"
Rail
Min. Edge Distances: 1"
Rail
UNISTRUT TELESPAR
Tube Box 2 12"x 2 12" (10 GA.)
Min. Edge Distances: 1"
(4) 3 4" Titen HD hnom = 6" hemb. = 4.64"
PL 10"x6"x1 2"
8"
M in
L w
1 2"
8" 2"
3"
5"
L/2 L/2
(2) 3 8" SET-3G F1554 Gr.36 hemb. = 2.375"
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
RENOVATE C208G/F FOR IR/RF
SPOKANE, WA
MAY 2024
668-CSI-009
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
STRUCTURAL GENERAL
NOTES AND PLAN
SE101
3MKMA
SCALE: 3/16" = 1'-0"
0' 10'5'N
SCALE: 3/8" = 1'-0"
0' 6'3'0' 2'1'
SCALE:1 STRUCTURAL FRAMING PLAN
3/16" = 1'-0" SCALE:2 CEILINGS - 3D VIEW
NTS
SCALE:3 CEILINGS CONNECTIONS
3/8" = 1'-0" SCALE:4 DET. H1
NTS SCALE:5 DET. S1
NTS SCALE:6 DET. LB1
3/4" = 1'-0"
SCALE: 3/4" = 1'-0"
0' 2'1'
SCALE:7 3D VIEW
NTS
SCALE:8 DET. TB1
NTS
5/ 3/
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
RENOVATE C208G/F FOR IR/RF
SPOKANE, WA
MAY 2024
668-CSI-009
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
ARCHITECTURAL ABBREVIATIONS
AND LEGENDS
AE001
4BAJBAJ/JE
ABBREVIATIONS
ABV ABOVE
ACI AMERICAN CONCRETE INSTITUTE
ACT ACOUSTICAL CEILING TILE
AFF ABOVE FINISHED FLOOR
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON & STEEL INSTITUTE
ALUM ALUMINUM
ALM ALARM
ALT ALTERNATE
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECT(URAL)
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATING &
AIR CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AWG AMERICAN WIRE GAGE
AWS AMERICAN WELDING SOCIETY
AWWA AMERICAN WATER WORKS ASSOCIATION
BL BUILDING LINE
BLDG BUILDING
B.O. BOTTOM OF
BRK BRICK
BUR BUILT UP ROOFING
CAB CABINET
CF CUBIC FOOT
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CJ CONTROL JOINT
CKT CIRCUIT
CL CENTERLINE
CLOS CLOSET
CLG CEILING
CLR CLEAR(ANCE)
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CND CONDUIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
COR CONTRACTING OFFICER'S REPRESENTATIVE
CORR CORRIDOR
CRS COURSE(S)
CTR CENTER
CNTR COUNTER
CU IN CUBIC INCH
CU YD CUBIC YARD
d PENNY (NAILS, ETC.)
DEMO DEMOLITION
DET DETAIL
DIAM,Ø DIAMETER
DP DAMP PROOFING
DPR DAMPER
DR DOOR
DS DOWNSPOUT
DSP DRY STANDPIPE
DWG DRAWING
E EAST
EA EACH
ELEV ELEVATION
EJ EXPANSION JOINT
ELEC ELECTRIC(AL)
EMER EMERGENCY
EP ELECTRICAL PANEL
EPDM ETHYLENE-PROPYLENE-DIENE-MONOMER
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXH EXHAUST
EXP EXPOSED
EXT EXTERIOR
FA FIRE ALARM
FB FACE BRICK
FC FOOT-CANDLE
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FFE FURNITURE, FIXTURES, AND EQUIPMENT
FG FIXED GLASS
FIN FL FINISHED FLOOR
FIN FL EL FINISHED FLOOR ELEVATION
FIX FIXTURE
FL FLOOR
FH FIRE HYDRANT
FLUOR FLUORESCENT
FMS FACILITY MANAGEMENT SERVICES
FND FOUNDATION
FOC FACE OF CONCRETE / CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUDS
FT FOOT / FEET
FTG FOOTING
FURR FURRED(ING)
GA GAGE, GAUGE
GALV GALVANIZE(D)
GFCI GOVERNMENT FURNISHED, CONTRACTOR INSTALLED
GFGI GOVERNMENT FURNISHED, GOVERNMENT INSTALLED
GFI GROUND FAULT CIRCUIT INTERRUPTER
GL GLASS, GLAZING
GWB GYPSUM WALL BOARD
GRND GROUND
GRT GROUT
HB HOSE BIB
HNDCP HANDICAP
HDW HARDWARE
HJT HEAD JOINT
HM HOLLOW METAL
HORZ HORIZONTAL
HP HORSE POWER / HIGH PRESSURE
HSKP HOUSEKEEPING
HT HEIGHT
HVAC HEATING, VENTILATION, AIR CONDITIONING
ID INSIDE DIAMETER
IES ILLUMINATING ENGINEERING SOCIETY
IGU INSULATED GLASS UNIT
IN INCH (“
INC INCORPORATED
INFO INFORMATION
INSUL INSULATION/INSULATE(D)(ING)
INT INTERIOR
INV INVERT
IRCA INFECTION CONTROL RISK ASSESSMENT
JAN JANITOR
JC JANITOR CLOSET
JT JOINT
K KIP (1,000 LB.)
LAB LABORATORY
LDR LADDER
LAM LAMINATE
LAV LAVATORY
LB POUND
LAG LAG SCREW
LG LENGTH / LONG
LTG LIGHTING
LVL LAMINATED VENEER LUMBER
LW CONC LIGHTWEIGHT CONCRETE
M METER(S)
MAX MAXIMUM
MECH MECHANIC(AL)
MED MEDIUM
MET METAL
MFR MANUFACTURE(R)
MH MANHOLE
MIN MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MM MILLIMETER
MO MASONRY OPENING
N NORTH
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFF OFFICE
OFD OVERFLOW DRAIN
OH OVERHEAD
OPNG OPENING
OPOI OWNER PROVIDED, OWNER INSTALLED
OPP OPPOSITE
ORIG ORIGINAL
OVHD OVERHEAD
PA PUBLIC ADDRESS
PCF POUNDS PER CUBIC FOOT
PLF POUNDS PER LINEAL FOOT
PFN PRE-FINISHED
PH PHASE
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
POC POINT OF CURVE/CONTACT
POI POINT OF INTERSECTION
POT POINT OF TANGENT
PR PAIR
PSF POUNDS PER SQUARE FEET
PSI POUNDS PER SQUARE INCH
PT CONC POST-TENSIONED CONCRETE
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
RAD RADIUS
RB RUBBER BASE
RCP REINFORCED CONCRETE PIPE,
REFLECTED CEILING PLAN
RD ROOF DRAIN
RE REFER TO, REFERENCE
REIN REINFORCE(D)(ING)
RECP RECEPTACLE
REF REFERENCE
REFR REFRIGERATOR
RO ROUGH OPENING
ROW RIGHT OF WAY
S SOUTH
SAFB SOUND ATTENUATION FIRE BATTS
SAN SANITARY
SB SPLASH BLOCK
SC SOLID CORE
SCH SCHEDULE
SD STORM DRAIN
SECT SECTION
SEW SEWER
SHT SHEET
SIM SIMILAR
SPF SPRAY APPLIED POLYURETHANE FOAM INSULATION
SPEC SPECIFICATION
SQ SQUARE
SS SERVICE SINK, STORM SEWER, STAINLESS STEEL
STM STORM
STD STANDARD
STL STEEL
STRUCT STRUCTURAL
SWBD SWITCHBOARD
T&G TONGUE AND GROOVE
TEL TELEPHONE
THK THICK(NESS)
THRU THROUGH
TJI TRUSJOIST INCORPORATED
T.O. TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL/TOP OF SLAB
TOW TOP OF WALL
TYP TYPICAL
UC UNDERCUT
UG UNDERGROUND
UL UNDERWRITERS' LABORATORIES, INC.
UNO UNLESS NOTED OTHERWISE
V VOLT
VB VINYL BASE
VBR VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VENT VENTILATE
VERT VERTICAL
VIF VERIFY IN FIELD
VIT VITREOUS
VS VERSUS
VC VERTICAL CURVE
VOL VOLUME
VPT VERTICAL POINT OF TANGENT
VPI VERTICAL POINT OF INTERSECTION
VPC VERTICAL POINT OF CURVATURE
W WEST / WIDTH / WIDE / WATT
W/ WITH
WC WATER CLOSET
WD WOOD
WG WIRE GLASS
WH WATER HEATER
WDW WINDOW
W/O WITHOUT
WT WEIGHT
WTR WATER
WWF WELDED WIRE FABRIC
XFMR TRANSFORMER
XPAN CROSS PAN
XSECT CROSS SECTION
XSTR EXTRA STRONG
YD YARD
YR YEAR
SYMBOLS LEGEND AND NOTES:
DETAIL MARKERS
DETAIL NUMBER
SHEET NUMBER OF DWG. WHERE
DETAIL IS SHOWN
WALL SECTION MARKERS
SECTION NUMBER
SHEET NUMBER OF DWG. WHERE
SECTION IS SHOWN
INTERIOR ELEVATION MARKERS
ELEVATION MARKERS
DRAWING TITLE
FINISH FLOOR
0'-0"
TITLE
VIEW NUMBER
ELEVATION NUMBER
SHEET NUMBER
A
COLUMN GRID LINES AND
IDENTIFICATION MARKERS
X
LAB EXPANSION ROOM NAME
ROOM NUMBER
DOOR NUMBER
X WINDOW OPENING
WALL PARTITION TYPE
X KEY NOTES
NORTH ARROW
X REVISION NUMBER
REVISION CLOUD
A6
A104
X
XX-XX
XX.X
SCALE:1 XXXXX
XX N
NORTH
X
XXX
05/03/2024
AutoCAD SHX Text
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
RENOVATE C208G/F FOR IR/RF
SPOKANE, WA
MAY 2024
668-CSI-009
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
LIFE SAFETY PLAN
AL001
5MEBAJ
CODE REVIEW:
0'
SCALE: 1/4" = 1'-0"
8'4'2' N
EXIT PATH WITH TRAVEL DISTANCE
COMMON PATH OF TRAVEL
TRAVEL DISTANCE = 124'-6" TRAVEL DISTANCE = 187-0"
COMMON PATH OF TRAVEL = 97'-7"
LEGEND:
PROJECT SUMMARY:
THE PROJECT CONSISTS OF RENOVATING TWO ADJOINING ROOMS
TO CREATE AN IR/RF IMAGING SUITE.
ONE OF THE ROOMS IS AN EXISTING RESTROOM WHICH WILL
DEMOLISHED INCLUDING WALLS. FLOOR FINISHES, ACOUSTICAL
CEILINGS, PIPING, DUCTWORK, ELECTRICAL CONDUIT, WIRING AND
FIXTURES AND MADE INTO A CONTROL ROOM FOR THE IMAGING.
THE OTHER ROOM WILL BE PREPARED TO RECEIVE IR/RF
EQUIPMENT AND BOTH ROOMS WILL HAVE LEAD SHIELDED WALLS
AND IN THE CONTROL ROOM A LEAD GLASS OBSERVATION
WINDOW.
CODE REFERENCE: 2021 NFPA 101 LIFE SAFETY CODE
EXISTING FIRE PROTECTION: FULLY SPRINKLERED TO REMAIN
ALLOWABLE MAXIMUM OCCUPANCY PER ROOM
CONTROL ROOM 1 OCCUPANT
IMAGING ROOM 2 OCCUPANTS
ALLOWABLE TRAVEL DISTANNCE.................200 FEET
ALLOWABLE COMMON PATH OF TRAVEL.....100 FEET
CONSTRUCTION AREA (LIMITATION OF WORK)
NEITHER EXISTING SMOKE BARRIERS, SUITES,
NOR EGRESS SYSTEMS ARE BEING MODIFIED BY
THIS PROJECT
05/03/2024
AutoCAD SHX Text
RESPIRATORY THERAPY
AutoCAD SHX Text C214
AutoCAD SHX Text
CONFERENCE ROOM
AutoCAD SHX Text C215
AutoCAD SHX Text
CLEANING
AutoCAD SHX Text C215A
AutoCAD SHX Text C212
AutoCAD SHX Text
RT
AutoCAD SHX Text C210
AutoCAD SHX Text
ULTRASOUND
AutoCAD SHX Text C208
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text C204A
AutoCAD SHX Text R.R
AutoCAD SHX Text C206
AutoCAD SHX Text
CAT SCAN
AutoCAD SHX Text C202
AutoCAD SHX Text X-Ray overflow
AutoCAD SHX Text C221
AutoCAD SHX Text
WAITING
AutoCAD SHX Text C220
AutoCAD SHX Text
COORDINATOR DIAG. SERVICES
AutoCAD SHX Text C211
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C2-C1
AutoCAD SHX Text
CENTRAL RECEPTION
AutoCAD SHX Text C207
AutoCAD SHX Text
CONFERENCE RM.
AutoCAD SHX Text C201
AutoCAD SHX Text
X-RAY WAITING RM.
AutoCAD SHX Text C205
AutoCAD SHX Text
ECHO
AutoCAD SHX Text
VASCULAR
AutoCAD SHX Text C213
AutoCAD SHX Text
FIRE HOSE CLOS.
AutoCAD SHX Text
EXTERIOR ROOF AREA
AutoCAD SHX Text
EXG HVAC CONDENSING UNITS ON STEEL BEAM SUPPORTS.
AutoCAD SHX Text c200
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text S2-c1
AutoCAD SHX Text
STAIRWAY
AutoCAD SHX Text C202c
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text
COMPUTER RM.
AutoCAD SHX Text C202A
AutoCAD SHX Text
OFFICE RADIOLOGY TECHNICIAN
AutoCAD SHX Text
AUTOCLAVE
AutoCAD SHX Text C240A
AutoCAD SHX Text
RT
AutoCAD SHX Text
(TEMP. RECEPTION)
AutoCAD SHX Text
TEMP. WAITING
AutoCAD SHX Text
FIRE HOSE CLOSET
AutoCAD SHX Text C200A
AutoCAD SHX Text
HALL
AutoCAD SHX Text S2-C2
AutoCAD SHX Text
STAIRWAY
AutoCAD SHX Text remote digital r & f X ray
AutoCAD SHX Text
GENERAL X-RAY
AutoCAD SHX Text
DAYLIGHT PROCESSOR
AutoCAD SHX Text C230A
AutoCAD SHX Text
TOILET RM.
AutoCAD SHX Text
1:4 PANEL SURF MTD VIEW BOX.
AutoCAD SHX Text
COMPUTER RM.
AutoCAD SHX Text
EXG DUCT SHAFT
AutoCAD SHX Text C219A
AutoCAD SHX Text imation (3m) laser printer
AutoCAD SHX Text lumysis #150 film digitizer
AutoCAD SHX Text C226
AutoCAD SHX Text
DESK
AutoCAD SHX Text
4 PC STATIONS
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
CRASH CART
AutoCAD SHX Text 42"
AutoCAD SHX Text 26"
AutoCAD SHX Text C227
AutoCAD SHX Text
STAFF RADIOLOGIST
AutoCAD SHX Text
FILM FILES STORAGE (1 HR FIRE RTD)
AutoCAD SHX Text C224
AutoCAD SHX Text
STAFF RADIOLOGIST
AutoCAD SHX Text
SECRETARY
AutoCAD SHX Text C225
AutoCAD SHX Text C223
AutoCAD SHX Text
RT STORAGE
AutoCAD SHX Text 202-27
AutoCAD SHX Text C240
AutoCAD SHX Text
LAB OFFICE
AutoCAD SHX Text
PLATE READER
AutoCAD SHX Text
FRESH AIR INTAKE
AutoCAD SHX Text changing rooms
AutoCAD SHX Text C229A,B,C
AutoCAD SHX Text
X-RAY EQUIP ALCOVE
AutoCAD SHX Text C230B
AutoCAD SHX Text
X-RAY EQUIP ALCOVE
AutoCAD SHX Text C231B
AutoCAD SHX Text
CS CONTROL
AutoCAD SHX Text C204
AutoCAD SHX Text C222
AutoCAD SHX Text C232
AutoCAD SHX Text C230
AutoCAD SHX Text
ESTABLISHED SMOKE BARRIER
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C2-C1
AutoCAD SHX Text
ESTCODE
IMAGE
C208G
RESTROOM
C208F
IMAGE
C208G
RESTROOM
C208F
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
RENOVATE C208G/F FOR IR/RF
SPOKANE, WA
MAY 2024
668-CSI-009
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
DEMOLITION FLOOR AND
REFLECTED CEILING PLANS
AD101
6BAJ/JMEBAJ
KEY NOTES:
1. REMOVE THE PARTIAL HEIGHT CONTROL ROOM WALL
INCLUDING WINDOWS, ELECTRICAL CONDUIT AND DEVICES.
2. REMOVE THE CONTROL ROOM WORK SURFACES AS REQUIRED
TO ALLOW FOR THE NEW DIVIDING WALL. CONFIRM WITH COR
IF THESE ARE TO BE RELOCATED OR RECONFIGURED.
3. REMOVE THE RESTROOM INCLUDING THE NORTH, EAST AND
WEST WALLS, FIXTURES, PIPING, CAP FLOOR DRAIN,
ELECTRICAL CONDUIT AND DEVICES, CEILING AND FLOOR
FINISHES INCLUDING SHEET FLOORING, INTEGRAL BASE AND
ADHESIVE TO BARE SUBSTRATE THROUGHOUT.
4. REMOVE THE TOILET AND HANDICAP RAILING, SINK AND
CASEWORK, THE BASE AND UPPER CABINETS AND
COUNTERTOP.
5. REMOVE THE CEILINGS INCLUDING GRID AND ACOUSTICAL
PANELS, LIGHT FIXTURES, SPRINKLER HEADS AND DROPS AND
FIRE ALARM DEVICES.
6. REMOVE SOFFIT, REFER TO MECHANICAL MD101.
7. DOOR TO REMAIN. REMOVE AND SAVE FOR REINSTALLATION.
8. WALL TO REMAIN.
9. LEAD-LINED DOOR AND FRAME TO BE REMOVED AND SAVED
FOR DETERMINATION OF SALVAGE BY COR.
10. EXISTING COLUMN TO REMAIN.
11. REMOVE GYPSUM BOARD CEILING FOR DEMOLITION OF
MECHANICAL AND THE RELOCATION OF CEILING DIFFUSER.
LIGHT FIXTURES TO BE REMOVED.
12. RETURN AIR GRILLE TO BE RELOCATED.
0'
SCALE: 1/4" = 1'-0"
8'4'2' N
SCALE:1 DEMOLITION FLOOR PLAN
1/4" = 1'-0" SCALE:2 DEMOLITION REFLECTED CEILING PLAN
1/4" = 1'-0"
SHEET NOTES:
1. PROTECT ALL EXISTING WALLS AND STRUCTURE NOT
SHOWN FOR DEMOLITION.
2. EXAMINE AND VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS BOTH IN PLAN AND IN THE FIELD PRIOR TO
CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE
FOR ANY ADJUSTMENTS AND / OR CORRECTIONS.
3. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION AND COORDINATION WITH NEW
CONSTRUCTION.
4. REFER TO KEY NOTES FOR DEMOLITION OF GYPSUM
BOARD CEILINGS, SUSPENSION SYSTEMS, LIGHT
FIXTURES AND DIFFUSERS.
5. DEMOLISH ALL LIGHTING FIXTURES WITHIN THE GRID
CEILING.
LIMITS OF
CONSTRUCTION
LIMITS OF
CONSTRUCTION
LIMITS OF CONSTRUCTION
EXISTING WALL TO REMAIN
PARTITION/WALL TO BE REMOVED
ACOUSTICAL TILE GRID TO BE REMOVED
2X4 LIGHT FIXTURE TO BE REMOVED
SUPPLY DIFFUSER TO BE REMOVED
LEGEND:
CONTROL ROOM
C208F
A
B
2'-6" V.I.F.
A
A208
B
AE301
B
AE301
IMAGE
C208G
CONTROL ROOM
C208F
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
RENOVATE C208G/F FOR IR/RF
SPOKANE, WA
MAY 2024
668-CSI-009
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
KEY NOTES:
1. NEW LEAD-LINED WALLS: REFER TO WALL TYPES, SHEET 1/AE301.
2. 3'-5" X 4'-0" LEAD SAFETY GLASS OBSERVATION WINDOW WITH LEAD-LINED
HOLLOW METAL FRAME.
3. 3'-0" X 7'-0" NEW LEAD-LINED DOOR - SEE DOOR SCHEDULE ON SHEET
AE601.
4. SEAMLESS SHEET VINYL FLOORING WITH RUBBER BASE, SEE AI101.
5. EXISTING LEAD-LINED DOOR AND FRAME AND DOOR HARDWARE TO
REMAIN. CONFIRM WITH VA PHYSICIST THAT IT MEETS SHIELDING
REQUIREMENTS FOR THIS APPLICATION.
6. EXISTING WINDOW TO BE INFILLED. CONFIRM THAT THE WINDOW IS SHUT
TIGHT AND REMOVE THE WINDOW BLIND, SEE DETAIL 1/AE601.
7. SOFFIT , REFER TO DRAWING 2/AE301 AND MECHANICAL 1/MH101.
8. SCANNER SUPPORT RAILS.
9. STAINLESS STEEL SINK, SOLID SURFACE COUNTERTOP, AND LAMINATED
CASEWORK.
10. 2' X 2' ACOUSTICAL GRID CEILING. SEE CEILING EQUIPMENT PLAN BY
VENDOR FOR LOCATION OF EQUIPMENT RAILS AND UNISTRUT SUPPORT.
11. 2' X 2' ACOUSTICAL GRID CEILING.
12. WINDOWS WERE PREVIOUSLY INFILLED AND COVERED WITH GYPSUM
BOARD AND ARE TO REMAIN AS IS.
13. EXISTING COLUMN.
14. EXISTING DOOR AND DOOR HARDWARE TO BE REINSTALLED IN-PLACE.
15. RELOCATED RETURN AIR GRILLE, REFER TO MECHANICAL.
16. SHADED AREAS TO REMAIN FREE OF OBSTRUCTIONS FOR MOUNTED
CEILING EQUIPMENT MOVEMENT DURING USE. REFER TO VENDOR
INSTALLATION REQUIREMENTS.
0'
SCALE: 1/4" = 1'-0"
8'4'2' N
SCALE:1 FLOOR PLAN
1/4" = 1'-0" SCALE:2 REFLECTED CEILING PLAN
1/4" = 1'-0"
SHEET NOTES:
1. ALL WORK SHALL BE COMPLETED IN COMPLIANCE WITH APPLICABLE CODES
AND TO THE SATISFACTION OF THE COR.
2. PROTECT ALL EXISTING WALLS AND STRUCTURE TO REMAIN FROM
DEMOLITION ACTIVITIES.
3. DIMENSIONS TAKE PRECEDENCE OVER DRAWINGS, DO NOT SCALE.
4. CONTRACTOR SHALL EXAMINE AND VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS BOTH ON PLAN AND IN THE FIELD PRIOR TO CONSTRUCTION AND
SHALL BE RESPONSIBLE FOR ANY ADJUSTMENTS AND/OR CORRECTIONS.
5. PATCH, REPAIR, REPLACE AND REPAINT ALL AREAS OF EXISTING
CONSTRUCTION AFFECTED BY DEMOLITION AND REMOVAL OF HAZARDOUS
MATERIALS TO NEW CONDITION. MATERIALS AND FINISHES IN EXISTING
CONSTRUCTION SHALL MATCH EXISTING ADJACENT MATERIALS TO GREATEST
EXTENT POSSIBLE, INCLUDING, BUT NOT LIMITED TO: FLOORS, WALLS AND
CEILINGS. COORDINATE REMOVAL AND/OR RELOCATION OF FIXTURES AND
EQUIPMENT WITH COR.
6. CONTRACTOR TO CENTER ALL CEILING GRIDS WITHIN THE ROOM, UNLESS
OTHERWISE INDICATED ON PLAN.
7. ANY MECHANICAL DEVICES SHOWN ARE FOR INFORMATION ONLY. SEE
MECHANICAL SHEETS FOR SPECIFICATIONS AND FURTHER DETAILS.
8. PROVIDE LEAD GLASS, LEAD-LINED DOOR, LEAD-LINED FRAMES AND
LEAD-LINED WALLS WHERE INDICATED IN DRAWINGS. RADIATION SHIELDING
REQUIREMENTS ARE TO BE PROVIDED BY THE CLIENT.
FLOOR PLAN AND
REFLECTED CEILING PLAN
AE101
7BAJ/JMEBAJ/JME
LIMITS OF CONSTRUCTION
EXISTING WALL TO REMAIN
NEW PARTITION / CONSTRUCTION
NEW ACOUSTICAL TILE GRID
WINDOW SCHEDULE, SEE AE601
DOOR TYPE, REFER TO DOOR
SCHEDULE, SEE AE601
A
A208
4" RECESSED LED DOWNLIGHT, SEE EL101
2'X2' RECESSED LED TROFFER, SEE EL101
2'X2' RECESSED LED TROFFER WITH
EMERGENCY BATTERY PACK, SEE EL101
AE102
LEGEND:
RETURN AIR, REFER TO
MECHANICAL
SUPPLY AIR, REFER TO
MECHANICAL
AE102
66 12
SHADED AREAS TO REMAIN
OBSTRUCTION FREE.
A DOOR SCHEDULE, SEE AE301
2'-6" V.I.F.
2' -1
0"
6'-0"
9'-0"
CONTROL ROOM
C208F
3'-0"6'-6"
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
RENOVATE C208G/F FOR IR/RF
SPOKANE, WA
MAY 2024
668-CSI-009
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
EQUIPMENT AND
FURNITURE PLAN
AE102
8LMFJME
0'
SCALE: 1/2" = 1'-0"
4'2'1' N
SCALE:1 ENLARGED C208G IMAGE ROOM EQUIPMENT PLAN
1/2" = 1'-0"
SHEET NOTES:
1. ALL WORK SHALL BE COMPLETED IN COMPLIANCE WITH APPLICABLE CODES
AND TO THE SATISFACTION OF THE COR.
2. PROTECT ALL EXISTING WALLS AND STRUCTURE TO REMAIN FROM
DEMOLITION ACTIVITIES.
3. DIMENSIONS TAKE PRECEDENCE OVER DRAWINGS, DO NOT SCALE.
4. CONTRACTOR SHALL EXAMINE AND VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS BOTH ON PLAN AND IN THE FIELD PRIOR TO CONSTRUCTION AND
SHALL BE RESPONSIBLE FOR ANY ADJUSTMENTS AND/OR CORRECTIONS.
5. PATCH, REPAIR, REPLACE AND REPAINT ALL AREAS OF EXISTING
CONSTRUCTION AFFECTED BY DEMOLITION AND REMOVAL OF HAZARDOUS
MATERIALS TO NEW CONDITION. MATERIALS AND FINISHES IN EXISTING
CONSTRUCTION SHALL MATCH EXISTING ADJACENT MATERIALS TO GREATEST
EXTENT POSSIBLE, INCLUDING, BUT NOT LIMITED TO: FLOORS, WALLS AND
CEILINGS. COORDINATE REMOVAL AND/OR RELOCATION OF FIXTURES AND
EQUIPMENT WITH COR.
6. CONTRACTOR TO CENTER ALL CEILING GRIDS WITHIN THE ROOM, UNLESS
OTHERWISE INDICATED ON PLAN.
7. ANY MECHANICAL DEVICES SHOWN FOR INFORMATION ONLY. SEE
MECHANICAL SHEETS FOR SPECIFICATIONS AND FURTHER DETAILS.
8. PROVIDE LEAD GLASS, LEAD-LINED DOOR, LEAD-LINED FRAMES AND
LEAD-LINED WALLS WHERE INDICATED IN DRAWINGS. RADIATION SHIELDING
REQUIREMENTS ARE TO BE PROVIDED BY THE CLIENT.
EQUIPMENT KEY NOTES:
1. FLUORO CONTROL CONSOLE.
2. FLUORO CONTROL CONSOLE CART.
3. IMAGING SYSTEM - KEYBOARD AND MOUSE.
4. FLUOROSPOT - COMPACT CONTAINER W/CD-DVD
RECORDER.
5. POLYDOROS F80 (80kW) GENERATOR CABINET.
6. MULTITOM RAX PATIENT TABLE.
7. FLUORO LIVE / REFERENCE DISPLAY CART WITH 2
MONITORS.
8. TRANSVERSE BRIDGE AND DETECTOR STAND (FIXED
DETECTOR).
9. TRANSVERSE BRIDGE AND X-RAY TUBE STAND.
10. LONGITUDINAL RAILS.
11. EMERGENCY MECHANICAL STOP SWITCH (TWO
PROVIDED).
12. GRID HOLDER (WALL MOUNTED).
13. MULTIPURPOSE STAND - FOR RAX ORTHO.
14. MOBILE DETECTOR HOLDER ON WHEELS.
15. ACCESS POINT (TOP OF GENERATOR).
16. CHARGING STATION FOR MAX DETECTORS.
17. TIMS DESKTOP STATION W / MONITOR, MIC, KEYBOARD
AND MOUSE.
18. SYNGO WORKSTATION.
19. INTERCOM CONSOLE WITH SPEAKER/MICROPHONE.
20. INTERCOM CENTRAL UNIT AND RJ45 CONNECTOR
SOCKET.
21. INTERCOM EXAM ROOM SPEAKER.
22. INTERCOM EXAM ROOM MICROPHONE.
23. EATON UPS 5P 850G FOR IMAGING SYSTEM ONLY.
24. WALL CHARGING UNIT FOR MAX DETECTORS
25. IDI 100RTL MOBILE IMAGING TABLE.
26. DVI INTERFACE FOR SP WORKSTATION.
1 4 3
SCALE:2 ENLARGED CONTROL ROOM EQUIPMENT PLAN
1/2" = 1'-0"
21 22
#** THIS EQUIPMENT DRAWING AND KEY NOTES ARE FOR ILLUSTRATION ONLY
AND ARE NOT MEANT TO BE USED FOR BIDDING, LAYOUT OR CONSTRUCTION.
KEYNOTES INDICATE EQUIPMENT SUPPLIED BY SIEMENS, UNDER SEPARATE
CONTRACT. REFER TO THE VA AND THE VENDOR FOR ALL EQUIPMENT
REQUIREMENTS, WARRANTIES, AND INSTALLATION.
LEAD LINED 5/8" TYPE X GYPSUM
BOARDS ON BOTH SIDES TO A HEIGHT
ABOVE THE FINISHED FLOOR AS
DETERMINED BY THE VA PHYSICIST
CEILING AS SCHEDULED
TYPE PART
WIDTH
STUD
SIZE
STUD
SPACE
FIRE
RATE UL STC NOTE
A 4 7/8" 3 5/8" 16" NA - 45 MIN. 1,2
TYPE PART
WIDTH
STUD
SIZE
STUD
SPACE
FIRE
RATE UL STC NOTE
B 4 7/8" 3 5/8" 16" NA - 45 MIN. 1,2
EXISTING STRUCTURE
CONTINUOUS STEELTRACK
WITH STEEL STUDS AS
NOTED BELOW
WALL BASE AS SCHEDULED
CONTINUOUS ACOUSTICAL
SELANT
FLOOR FINISH AS SCHEDULED
IMAGING ROOM CONTROL ROOM
EXISTING STRUCTURE
CONTINUOUS FIRE RATED
SEALANT AND BACKERROD
1" DEFLECTION TRACK
CEILING AS SCHEDULED
CONTINUOUS STEELTRACK
WITH STEEL STUDS AS NOTED
BELOW
WALL BASE AS SCHEDULED
CONTINUOUS ACOUSTICAL
SELANT
FLOOR FINISH AS SCHEDULED
INSULATED WITH ACOUSTICAL
SOUND BATTS
INSULATED WITH ACOUSTICAL
SOUND BATTS
IMAGING ROOMEXISTING ROOM
CONTINUOUS FIRE RATED
SEALANT AND BACKERROD
1" DEFLECTION TRACK
LEAD LINED 5/8" TYPE X GYPSUM
BOARDS ON IMAGING ROOM SIDE
TO A HEIGHT ABOVE THE FINISHED
FLOOR AS DETERMINED BY THE VA
PHYSICIST.
NON-LEAD LINED 5/8" TYPE X
GYPSUM BOARD ON CONTROL
ROOM SIDE 8'
-0 " C
LE
AR
B.O. STRUCTURE
'-6
/4
' 3
/4
SCANNER SUPPORT RAILS,
SEE STRUCTURAL 1/SE101
ACOUSTICAL TILE CEILING
MECHANICAL SOFFIT,
FRAME WITH 5/8" TYPE X
LEAD LINED GWB
ON METAL STUDS
WALL TYPE "A", SEE
SHEET 1/AE301
EXISTING
COLUMN SUPPLY GRILL, SEE
MECHANICAL MH601
LEADED SAFETY
GLASS OBSERVATION
WINDOW, SEE AE601
DOOR A208 - SEE SHEET
AE601EXISTING LEAD-
LINED DOOR
0'-0"
FLOOR LEVEL
BASE CABINET WITH SINK,
SEE INTERIORS 2/AI101
9' -6
" M
IN
.2'-6"
EXISTING THICKENED
FLOOR SLAB
10'-6 3/4"
DUCT AND PIPING
SEE MECHANICAL
AI101
AI101
3'-0" 3'-0"
IMAGE
C208G
AE301
AE301
B.O. STRUCTURE
0'-0"
FLOOR LEVEL
B.O. SOFFIT
8'-0"
10'-3/4"
EXISTING COLUMN
EXISTING DOOR
SCANNER SUPPORT
RAIL
ACOUSTICAL LAY-IN
CEILING
B.O. STRUCTURE
10'-6 3/4"
3'-0" 3'-0"
LINE OF SOFFIT WITH
DUCT, SEE 2/AE301
TRANSVERSE
BRIDGE
LONGITUDINAL
RAIL
ACOUSTICAL
LAY-IN CEILING
B.O. STRUCTURE
0'-0"
FLOOR LEVEL
RAILING SUPPORT,
SEE STRUCTURAL.
TRIM OPENING
WITH 2" ID WHITE
TILE GROMMET
5/8" THICK
10'-6 3/4"
B.O. ACOUSTICAL
TILE CEILING
9'-6"
B.O. STRUCTURE
0'-0"
FLOOR LEVEL
B.O. SOFFIT
8'-0"
10'-3/4"
TUBE UNIT
STAND
PATIENT TABLE B.O. STRUCTURE
10'-6 3/4"
6'-6"
AI101
EQEQ
CONTROL ROOM
C208F
0'-0"
FLOOR LEVEL
8' -0
LEADED SAFETY
GLASS OBSERVATION
WINDOW
STAINLESS STEEL
COUNTERTOP
2'-8"
5/8" GYPSUM BOARD
2 12" METAL STUD
FRAMING
MECHANICAL SOFFIT
WITH DUCTWORK AND
PIPING (NOT SHOWN)
EDGE OF WALL
B.O. SOFFIT
B.O. STRUCTURE
SET AT SAME LEVEL AS
PREVIOUS SOFFIT HEIGHT
DUCTWORK SHOWN
FOR ILLUSTRATION
ONLY
CONTROL ROOM
C208F
2' -6
0'-0"
FLOOR LEVEL
B.O. CEILING
8'-0"
STAINLESS STEEL
COUNTERTOP
2'-6"
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
RENOVATE C208G/F FOR IR/RF
SPOKANE, WA
MAY 2024
668-CSI-009
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SCALE:1 WALL TYPES
1" = 1'-0"
SCALE:2 INTERIOR SECTION
1/4" = 1'-0"
0'
SCALE: 1/4" = 1'-0"
8'4'2'
0'
SCALE: 1" = 1'-0"
2'1'
WALL TYPES, DOOR AND
WINDOW SCHEDULE DETAILS
AE301
9JEBAJ
SCALE:3 INTERIOR ELEVATION
1/4" = 1'-0"
SHEET NOTES:
1. RADIATION SHIELDING REQUIREMENTS FOR THE
BUILDING COMPONENTS - WALLS, DOORS, OBSERVATION
WINDOW AND EQUIPMENT ARE TO BE PROVIDED BY THE
VA PHYSICIST.
2. DETAILS 4,6/AE301 ARE FOR ILLUSTRATION ONLY. REFER
TO THE MANUFACTURER FOR THE ROBOTIC IMAGING
X-RAY SYSTEM AND SETUP REQUIREMENTS INCLUDING
THE PLACEMENT OF EQUIPMENT NOT SHOWN.
3. VERIFY ALL DIMENSIONS IN THE FIELD.
SCALE:6 INTERIOR ELEVATION
1/4" = 1'-0"
SCALE:4 INTERIOR ELEVATION
1/4" = 1'-0"
SCALE:5 INTERIOR SECTION
1/4" = 1'-0"
SCALE:7 SECTION AT SOFFIT
1" = 1'-0" SCALE:8
CONTROL ROOM
INTERIOR ELEVATION
1/4" = 1'-0"
NOTES:
1. THE HEIGHT AND SHIELDING PROPERTIES OF THE LEAD LINED
WALL PANELS (1/AE301) ARE TO BE DETERMINED BY THE VA
PHYSICIST.
2. ANOTHER ACCEPTABLE METHOD OF SHIELDING THE WALLS IS
TO FASTEN LEAD SHEETS DIRECTLY TO THE METAL WALL STUDS
AND THEN COVER THEM WITH 5/8" TYPE X GYPSUM BOARD
PANELS.
FIXED LEADED
SAFETY GLASS
WINDOW
A
3' -7
3'
-5
FLOOR LINE
4'-0"
2"
2"
2" HOLLOW METAL FRAME
WITH LEAD SHIELDING
LEADED SAFETY GLASS
CONTROL
ROOM
IMAGING ROOM
BOX HEADER
LEAD-LINED 5/8" TYPE
X GYPSUM BOARD PANELS -
EXTEND LEAD INTO FRAME
DOUBLE STUDS WELDED
ON EACH SIDE OFJAMB
OPENING
REMOVABLE GLAZING
STOP
CONTROL ROOM
IMAGING ROOM
STUD RUNNER - ATTACH
TO DOUBLE STUDS EACH
SIDE OF OPENING
LEAD LINED GYPSUM
BOARD PANELS
LEAD LINED HOLLOW
METAL FRAME ON FIRE
RETARDANT TREATED
WOOD BLOCKING
LEADED SAFETY GLASS
WITH GLAZING BLOCKS
AND TAPE
CONTROL ROOM IMAGING ROOM
STAINLESS
STEEL
COUNTERTOP
3 5/8" METAL STUD FRAMED
OPENING WITH FULL BATT
INSULATION
1/2" FIRE RETARDANT
TREATED PLYWOOD
18 GAUGE ANODIZED
ALUMINUM SHEET
EXISTING WINDOW
5/8" TYPE X GYPSUM
BOARD
EXISTING WALL LINE
IMAGING ROOMBUILDING
EXTERIOR
ALIGN WITH WALL
AND FINISH TO
MATCH
LEAD-LINED 5/8"
TYPE X GYPSUM
BOARD OVER 3 5/8"
METAL STUDS AT
16" O.C.
HOLLOW METAL
DOOR FRAME
WITH LEAD
SHIELDING
SEALANT
WOOD DOOR
WITH LEAD CORE,
REFER TO DOOR
SCHEDULE
BOX
HEADER
LEAD-LINED 5/8" TYPE
X GYPSUM BOARD PANELS -
EXTEND LEAD INTO FRAME
2" HOLLOW METAL
WITH LEAD SHIELDING
WOOD DOOR WITH LEAD CORE
DOOR SILENCER
3 PER JAMB
DOUBLE STUDS
EACH SIDE OF
JAMB OPENING
LEAD-LINED
WOOD DOOR
FINISHED FLOOR
95% RESUBMITTAL - DESIGN DEVELOPMENT
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
RENOVATE C208G/F FOR IR/RF
SPOKANE, WA
FEB 2024
668-CSI-009
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SCALE: 3" = 1'-0"
1'6"0'
WINDOW SCHEDULE
WINDOW GLAZING DETAILS REMARKS
SIZE
MATERIAL FINISH STYLE FIRE
RATING TYPE
THICKNESS
AND
SHIELDING
TINT HEAD JAMB SILL
THE LEVEL OF LEAD
PROTECTIVE
SHIELDING IS TO BE
DETERMINED BY
THE VA PHYSICIST
NO WIDTH HEIGHT DEPTH
A 4'-0" 3'-5" 0'-5"
LEAD
SHIELDED
WINDOW WITH
HM FRAME
PAINT, SEE
INTERIORS
SHEET AI101
FIXED NA
LEADED
SAFETY
GLASS
SEE
REMARKS NONE 2/AE601 3/AE601 4/AE601
SCALE:2 WINDOW HEAD DETAIL
3" = 1'-0"
SCALE:3 WINDOW JAMB DETAIL
3" = 1'-0"
SCALE:4 WINDOW SILL DETAIL
3" = 1'-0"SCALE:1 WINDOW INFILL DETAIL
3" = 1'-0"
SCALE:5 DOOR HEAD DETAIL
3" = 1'-0"
SCALE:7 DOOR SILL DETAIL
3" = 1'-0"
SCALE:6 DOOR JAMB DETAIL
3" = 1'-0"
DOOR SCHEDULE
ROOM NAME
DOOR FRAME DETAIL
REMARKSSIZE
TYPE MATERI
AL FINISH HARDWARE
SET
FIRE
LABEL TYPE MATERIAL FINISH GLAZING HEAD
DETAIL
JAMB
DETAIL
SILL
DETAIL
NO WIDT
H HEIGHT THICKNESS
CT SCANNER
EQUIPMENT
ROOM
CONTROL
A208 3'-0" 7'-0" 1 3/4" A WOOD STAIN HW-4V NA - HOLLOW
METAL PAINT - 5/AE601 6/AE601 7/AE601
LEVEL OF
LEAD
PROTECTIVE
SHIELDING IS
TO BE
DETERMINED
BY VA THE
PHYSICIST
DOOR AND WINDOW
SCHEDULES AND DETAILS
AE601
10JEBAJ
CONTROL ROOM
C208F
1' -0
4'-0"
6' -0
4'-0"
N.I.C
FLOOR TRANSITION
HOMOGENEOUS SHEET
VINYL FLOORING (SVF)
(FIELD COLOR)
HOMOGENEOUS SHEET
VINYL FLOORING (SVF)
(ACCENT COLOR)
STAINLESS STEEL
CORNER GUARD
2'-1"
4"
SOLID SURFACE
COUNTERTOP
BULLNOSE EDGE
AND BACKSPLASH
6"
DRAWER GLIDE,
WITH SOFT-CLOSE
BASE CABINET WITH
PLASTIC LAMINATE ON
EXTERIOR EXPOSED
SURFACES VISIBLE
INTERIOR SURFACES TO
BE WHITE MELAMINE
ADJUSTABLE SHELF
EUROPEAN CONCEALED
HINGES WITH
SOFT-CLOSE3"
2' -1
0"
4" WIRE PULLS, TYP.
RUBBER WALL BASE
1/
2"
TOE KICK
3/4" PLYWOOD
2' -1
0"
2'-1"
4" 2'
-1 0"
8"
6 " MAX
1' - 5"
5" 2'
-5
SOLID SURFACE
COUNTERTOP,
BULLNOSE EDGE
AND BACKSPLASH
MEDIUM DENSITY
PARTICLE BOARD CORE
CONSTRUCTION FACED
WITH LOW PRESSURE
VERTICAL GRADE
PLASTIC LAMINATE
9"
3/4" PLYWOOD
RUBBER
WALL BASE
EXTEND FLOORING
MATERIAL (SVF-1)
AS SCHEDULED
FOR ROOMS C208G
STAINLESS
STEEL
SINK, SEE
MECHANICAL
PLASTIC LAMINATED
EXISTING VCT
FLOORING (NIC)
2' -6
2'-0"
STAINLESS STEEL
COUNTERTOP
3/4" PLYWOOD
EXTEND FLOORING
MATERIAL (SVF-1)
AS SCHEDULED
FOR ROOMS C208G
SURFACE -
MOUNTED HEAVY
DUTY ALUMINUM
(CLEAR ANODIZED)
BRACKET WITH
ROUNDED ENDS
RUBBER
WALL BASE
2"
1/
WALL ASSEMBLY, AS
SPECIFIED
STAINLESS STEEL CORNER
GUARD, 3 1/2" WINGS. 5'-0" AFF
TO TOP OF GUARD. SEE
SCHEDULE OF FINISHES FOR
MORE INFORMATION
3 1/2 "
HOMOGENEOUS
SHEET VINYL
FLOORING (0.080")
1 5/8" RUBBER
REDUCER STRIP
EXISTING VCT
FLOORING (NIC)
ISSUED FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
RENOVATE C208G/F FOR IR/RF
SPOKANE, WA
MAY 2024
668-CSI-009
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
KEY NOTES:
1. FLOOR TRANSITION BETWEEN NEW
SHEET FLOORING AND EXISTING
VINYL TILE. IF THE FLOOR IS
SLOPED OR DEPRESSED PROVIDE
A SELF-LEVELING UNDERLAYMENT
EVEN WITH ADJACENT FLOOR
SURFACES.
2. SOLID SURFACE COUNTERTOP
3. STAINLESS STEEL CORNER GUARD
FOR OPEN CORNERS IN BOTH
ROOMS.
4. STAINLESS STEEL SINK.
5. SANITARY TRANSITION (WELDED)
BETWEEN THE WALL BASE AND THE
SHEET FLOORING.
6. EXISTING INTERIOR SIGNAGE TO
REUSE, COORDINATE WITH VA COR.
7. STAINLESS STEEL COUNTERTOP.
0'
SCALE: 1/4" = 1'-0"
8'4'2'N
SCALE:1 FLOOR PLAN
1/4" = 1'-0"
SCHEDULE FOR INTERIOR FINISHES
MARK MANUFACTURER SIZE PATTERN / FINISH / STYLE COLOR REMARKS / LOCATION USED
ACT ARMSTRONG 24" X 24" X 7/8" 1758 FINE FISSURED HIGH
NRC, BEVELED TEGULAR
MEDIUM TEXTURE
WHITE WH CONTROL AND IMAGE ROOMS
SVF-1 MANNINGTON 6'-6", 30-73 SQ PER ROLL BIOSPEC MD (HOMOGENEOUS
SHEET VINYL)
BRIGHT WHITE 15246 IMAGE ROOM FLOORING
(FIELD COLOR)
SVF-2 MANNINGTON 6'-6", 30-73 SQ PER ROLL BIOSPEC MD (HOMOGENEOUS
SHEET VINYL)
BLUE RIDGE 15376 IMAGE ROOM FLOORING
(ACCENT COLOR)
P-1 SHERWIN WILLIAMS - - SW 7008 ALABASTER FIELD COLOR
P-2 SHERWIN WILLIAMS - - SW 7033 BRAINSTORM
BRONZE
HOLLOW METAL DOOR FRAME
P-3 SHERWIN WILLIAMS - - SW 7660 EARL GREY ACCENT COLOR
FT-1 MANNINGTON 1-5/8" - 1/8" REDUCER (RUBBER) GRAY 204 FLOOR TRANSITION
RB-1 MANNINGTON 6.25" EXTEND 2" ONTO FLOOR IDEALBASE (RUBBER) GRAY 204 ALL AROUND THE CONTROL
AND IMAGE ROOMS
SS-1 CORIAN 1/2" - GLACIER WHITE COUNTERTOP
PLAM-1 FORMICA - - 8828 EARTHEN TWILL BASE AND TOP CABINETS
WD-1 - - - MATCH EXISTING COLOR
CG-1 CONSTRUCTION SPECIALTIES 4' HEIGHT, 3 1/2" WINGS CO-8 STAINLESS STEEL PLACE AT ANY EXPOSED
CORNER WITHIN PROJECT
LIMITS
* (OR APPROVED EQUAL) FINAL APPROVAL MUST BE MADE BY THE SPOKANE VA COR AND THE VA INTERIOR DESIGNER.
SHEET NOTES:
1. REFER TO SPECIFICATIONS
FOR MATERIAL AND
INSTALLATION
REQUIREMENTS.
2. ADHESIVES AND PAINT TO
BE LOW VOC / ODOR.
3. COLOR IS AN IMPORTANT
PART OF THE PROJECT,
ANY SUBSTITUTIONS MUST
BE APPROVED BY THE COR.
LEGEND
ACT - ACOUSTICAL CEILING TILE
GWB - GYPSUM WAL BOARD
GRT - GROUT
FT- FLOOR TRANSITION
P - PAINT
PLAM - PLASTIC LAMINATE
SVF - SHEET VINYL FLOORING
SS - SOLID SURFACE
RB - WALL BASE
WD - WOOD DOOR
INTERIOR FINISHES PLAN, AND
ROOM FINISH SCHEDULES
AI101
11LMFALK
ROOM FINISH SCHEDULE
ROOM # ROOM NAME FLOOR FINISH WALL BASE WALL (NORTH) WALL (EAST) WALL (WEST) WALL (SOUTH) CEILINGS FINISH CEILING HEIGHT REMARKS
C208F CONTROL ROOM SVF-1 RB-1 P-1 P-1 P-2 P-1 ACT-1 8'-0"
C208G IMAGE SVF-1, SVF-2 RB-1 P-1 P-1 P-1 P-2 ACT-1 9'-6"
FLOOR LEGEND:
SCALE:2 BASE CABINET
1-1/2" = 1'-0" SCALE:3 BASE CABINET WITH SINK
1-1/2" = 1'-0"
SCALE: 1 1/2" = 1'-0"
0' 2'1'
SCALE:5 CORNER GUARD DETAIL
3" = 1'-0"
SCALE:6 FLOOR TRANSITION DETAIL
1-1/2" = 1'-0"
SCALE: 3" = 1'-0"
1'6"0'
SCALE:4
STAINLESS STEEL COUNTERTOP -
CONTROL ROOM
1-1/2" = 1'-0"
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
E on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANT:
Kyle Wagner - COR
PHONE: 509-769-8026
EMAIL: Kyle.Wagner2@va.gov
RENOVATE C208G/F FOR IR/RF
SPOKANE, WA
MAY 2024
668-CSI-009
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
D
C
B
A
E
D
C
B
A
2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
MECHANICAL ABBREVIATIONS:
A/E ARCHITECT / ENGINEER
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,
TWO POSITION
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
AQST AQUASTAT
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEAT
REFRIGERATION AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER
BG BOTTOM GRILLE
BSC BIOLOGICAL SAFETY CABINETS
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER
HOUR
C CENTIGRADE (CELSIUS)
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE
DRAIN
CD CEILING DIFFUSER
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CG CEILING GRILLE
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON DIOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO CARBON MONOXIDE
CO2 CARBON DIOXIDE
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO
COOLING TOWER)
CWS CONDENSER WATER SUPPLY
(FROM COOLING TOWER)
D DAMPER - AUTOMATIC
Db DECIBELS
DB DRY-BULB TEMPERATURE
DCW DOMESTIC COLD WATER
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE
ASSEMBLY
DPS DIFFERENTIAL PRESSURE
SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING
COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMP
EH EXHAUST HOOD
EJ EXPANSION JOINT
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
EWT ENTERING WATER
TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT
EXCHANGER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSD COMBINATION FIRE SMOKE
DAMPER
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFIER
HAC HOUSEKEEPING AID CLOSET
HC HEATING COIL
HD HEAD
HHW HEATING HOT WATER
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HSTAT HUMIDISTAT
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH POUND
IPLV INTEGRATED PART LOAD VALUE
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/h LITERS PER HOUR L/m LITERS PER MINUTE L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METER PER SECOND
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT
AMPACITY
MCDB MEAN COINCIDENT DRY
BULB
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE
DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
Nm NEWTON METER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC &
ATMOSTPHERIC ADMINISTRATION
NOM NOMINAL
NPVL NON-STANDARD PART LOAD
VALUE
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OR OPERATING ROOM
P PUMP
Pa PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER
(SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE)
STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH –
GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR
CONDITIONER
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD REFRIGERANT AIR DRYER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RELAD RELIEF AIR DAMPER
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION LINE
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER
MINUTE
SCI SPINAL CODE INJURY
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SI SQUARE INCHES
SMACNA SHEET METAL AND AIR
CONDITIONING CONTRACTORS'
NATIONAL ASSOCIATION
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND
DISTRIBUTION
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT
EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SW SOFTWATER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
U UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH
ADMINISTRATION
VI VIBRATION ISOLATOR
VIF VERIFY IN FIELD
VIV VARIABLE INLET VANES
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
WAG WASTE ANETHESIA GAS
WB WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING
UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN