Attachment 3 47PC5326R0013 Solicitation_ Price Proposal Breakdown.xlsx

XLSX spreadsheet 39 KB Posted

Attached to
Amendment 1 SOLICITATION NOTICE - FY26 Alexandria Bay Detainee Shower
Solicitation number
47PC5326R0013
Issued by
Not on record

About this file

This is a Price Proposal Breakdown template for task order submissions under an Indefinite Delivery/Indefinite Quantity (IDIQ) contract (47PC5326R0013) for construction services at the Alexandria Bay Land Port of Entry in Alexandria Bay, New York. The template is designed for general contractors to submit pricing for the Private Shower project, which involves providing all labor, materials, tools, and equipment necessary for facility improvements at the federal installation located at 46735 U.S. Interstate 81.

The pricing sheet requires contractors to break down costs by CSI MasterFormat divisions, including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Woods/Plastics/Composites, Thermal & Moisture Protection, Openings, Finishes, Fire Suppression, Plumbing, HVAC, Electrical, and Communications. For each line item, contractors must provide unit quantities, unit measurements (per RS Means abbreviations), material costs per unit, labor costs per unit, and subtotals for both in-house general contractor work and subcontractor costs. The template includes sections for calculating general contractor overhead and profit percentages, bonds and insurance costs, and arrives at a total proposal price. The instructions specify that contractors must utilize unit pricing established at the IDIQ level when preparing task order proposals, with any requirements not covered by listed unit prices to be negotiated at the task order RFP level.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

INSTRUCTIONS: HOW TO COMPLETE PRICING SHEETS
1For each line item, provide labor, material, and line item subtotal costs.
2For units of measurement, refer to RS Means abbreviations.
3The Contractor shall be required to utilize the unit pricing accepted at the IDIQ level, when preparing Task Order price proposals. Task Order requirements which are not covered by unit price line items listed here, including Division 01 and 02 requirements, will be negotiated by the Task Order Contracting Officer at the Task Order RFP level.

TO Price Breakdown

Exhibit 13
Task Order Price Sheet

PRICE PROPOSAL CONTRACTOR NAME DATE SUBMITTED PROJECT NO. CONTRACT NO.

PROJECT AND CITYPURPOSE
Project NamePROPOSAL XXXX
Building Name & AddressITEM
City, State & Zip Code
DATE:SHEET NO.OF
XX
CSI MASTERFORMAT NUMBERDESCRIPTION OF WORKQUANTITYMATERIALLABORGC ORGANIC SUBTOTALSSUBCONTRACTOR SUBTOTALS
NO. UNITSUNIT MEAS.PER UNITSUBTOTALSPER UNITSUBTOTALS
1General Requirements
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 1 SUBTOTAL =$ - 0$ - 0
2Existing Conditions
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 2 SUBTOTAL =$ - 0$ - 0
3Concrete
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 3 SUBTOTAL =$ - 0$ - 0
4Masonry
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 4 SUBTOTAL =$ - 0$ - 0
5Metals
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 5 SUBTOTAL =$ - 0$ - 0
6Woods, Plastics, Composites
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 6 SUBTOTAL =$ - 0$ - 0
7Thermal & Moisture Protection
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 7 SUBTOTAL =$ - 0$ - 0
8Openings
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 8 SUBTOTAL =$ - 0$ - 0
9Finishes
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 9 SUBTOTAL =$ - 0$ - 0
21Fire Supression
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 21 SUBTOTAL =$ - 0$ - 0
22Plumbing
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 22 SUBTOTAL =$ - 0$ - 0
23Heating, Ventilating, and Air Conditioning
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 23 SUBTOTAL =$ - 0$ - 0
26Electrical
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 26 SUBTOTAL =$ - 0$ - 0
27Communications
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 27 SUBTOTAL =$ - 0$ - 0
TOTAL DIVISION SUBTOTAL =$ - 0$ - 0
GC Overhead (In House)XX%PCTTOTAL OH =#VALUE!
GC Profit (In House)XX%PCTTOTAL Profit =#VALUE!
SUBTOTAL WITH OH&P =#VALUE!
Bonds/InsuranceXX%PCTTOTAL B&I =#VALUE!
TOTAL PROPOSAL=#VALUE!