Attachment 28 A025 Hazardous Materials Management Plan and Reports_2 Apr 2021.pdf

PDF 120 KB Posted

Attached to
DRAFT RFP Fort Benning Aviation Maintenance Services Contract Federal contract opportunity
Solicitation number
W911SF22R0024
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis

About this file

This document contains a Contract Data Requirements List (CDRL) and related Draft Request for Proposal (RFP) for aviation maintenance services at Fort Benning, Georgia. The CDRL requires the submission of a Hazardous Materials Management Program Plan and quarterly reports detailing expired hazardous materials against a 12-month baseline. The contractor must submit the initial plan within 30 days of award and annual updates by January 31st, with quarterly reports due 15 days after the end of each quarter. The Draft RFP from the Mission and Installation Contracting Command at Fort Eustis, Virginia seeks industry feedback on requirements for aviation maintenance and logistics support at Fort Benning prior to release of a formal solicitation. Interested parties must submit any questions, comments or suggestions on the Draft RFP by the unspecified response due date.

View the file

Other files for this federal contract opportunity

Other files attached to DRAFT RFP Fort Benning Aviation Maintenance Services Contract, newest first.
File Type Posted
SITE VISIT SCHEDULE.xlsx XLSX spreadsheet
Attachment 5 A002 Key Personnel Listing.pdf PDF
Attachment 17 A014 Forecast Reports Demand Analysis.pdf PDF
Attachment 18 A015 Review and Analysis Materials.pdf PDF
Attachment 20 A017 Flight and Ground Operations (FOPGOP).pdf PDF
Attachment 21 A018 GFRC Reporting.pdf PDF
Attachment 25 A022 Environmental Management System Procedure Reports_2 Apr 2021.pdf PDF
Attachment 30 A027 Waste Minimization Plan and Reports_2 Apr 2021.pdf PDF
Attachment 32 A029 Automation Life Cycle and Management Report.pdf PDF
Attachment 35 A032 Training Completion Report.pdf PDF
Attachment 41 A038 Appointment of Contractor Property Manager.pdf PDF
Attachment 43 A040 Reporting CAP.pdf PDF
Attachment 49 A046 Estimated Cost of Damage (ECOD) Actual Cost of Damage (ACOD) Report.pdf PDF
Attachment 7 A004 Non Mission Capable Maintenance (NMCM) Corrective Action Plan.pdf PDF
Attachment 12 A009 CSI Report.pdf PDF
Attachment 14 A011 Back Shops Report.pdf PDF
Attachment 31 A028 Energy and Utilities Conservation Plan and Reports_2 Apr 2021.pdf PDF
Attachment 36 A033 Personnel Roster.pdf PDF
Attachment 37 A034 Phase-Out Plan.pdf PDF
Attachment 39 A036 Training Plan.pdf PDF
Attachment 40 A037 Industrial Hygiene Survey Test Evaluation Assessments.pdf PDF
Attachment 48 A045 Accident-Incident Notification and Reporting.pdf PDF
RFP Attachment 2 - Past Performance Cover Letter and Questionnaire.pdf PDF
Attachment 8 A005 Phase Time and Direct Man-hour Analysis Report.pdf PDF
Attachment 15 A012 CER CFTL.pdf PDF
Attachment 19 A016 Performance and Cost Report.pdf PDF
Attachment 23 A020 Facilities Engineering Work Request Log for Work Orders.pdf PDF
Attachment 24 A021 Local Purchase.pdf PDF
Attachment 27 A024 Air Compliance Reports_2 Apr 2021.pdf PDF
Attachment 29 A026 Site Specific Spill Plan and Reports_2 Apr 2021.pdf PDF
Attachment 33 A030 Troubleshooting and Repair Report.pdf PDF
Attachment 34 A031 Security Program Plan.pdf PDF
Attachment 42 A039 Periodic Inventory of GFP.pdf PDF
Attachment 51 A048 Contractor Accident Incident Report.pdf PDF
Attachment 1_Pricing Worksheet_FINAL.xlsx XLSX spreadsheet
Attachment 3 Wage Determination.pdf PDF
Attachment 4 A001 DATA ACCESSION LIST (DAL).pdf PDF
Attachment 6 A003 Documentation Signature Authorization Report V1.pdf PDF
Attachment 9 A006 Daily Status Report.pdf PDF
Attachment 11 A008 PQDR Status Report.pdf PDF
Attachment 13 A010 Aircraft Inventory-Status and Flying Time Report.pdf PDF
Attachment 16 A013 Bench Stock Shop Stock.pdf PDF
Attachment 22 A019 Environmental Appointments_2 Apr 2021.pdf PDF
Attachment 26 A023 Environmental Compliance Reports_2 Apr 2021.pdf PDF
Attachment 38 A035 Continuity of Operations Plan (COOP).pdf PDF
Attachment 44 A041 Facilities Survey.pdf PDF
Attachment 46 A043 Safety and IH Program Plan.pdf PDF
Attachment 47 A044 Aviation Accident Prevention Survey (AAPS).pdf PDF
W911SF22R0024 V1.2.1 DRAFT.pdf PDF
Attachment 50 A047 OPSEC Plan.pdf PDF
Show all 50

DRAFT RFP Fort Benning Aviation Maintenance Services Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A025
title: Technical Report-Study/Services
sub: Hazardous Materials Management Program Plan and Reports
auth: DI-MISC-80508B
ref: 4.4.1, 4.4.2.2
req_ofc: ACLC
dd250: LT
appcode: A
dist: E
freq: SEE BLK 16
asof: N/A
firstsub: 30DAC
subsub: SEE BLK 16
addressee1: ACLC Environmental
draft1: 1
reg1: 1
repro1: 0
addressee2: COR
draft2: 0
reg2: 1
repro2: 0
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 1
total_reg: 2
total_repro: 0
remarks: Block 8: Contractor shall submit draft documents to the requiring office for Government approval prior to submitting final copy.

Block 9: Distribution Statement E: Distribution authorized to the Department of Defense Components only (Administrative or Operational Use), (10 October 2013), EOC; other requests shall be referred to:

Aviation Center Logistics Command

AMAM-FAM

Contracting Officer Representative Fort Benning, GA

Block 10-13: Within 30 days from contract award date, the Contractor shall submit a Hazardous Materials Management Program (HMMP) Plan IAW DA Pam 710-7, NAS 411 and AR 200-1. The HMMP Plan shall include appointment of Hazardous Materials Manager (primary and alternate), procedures for hazardous materials life cycle management, planned reduction targets from a baseline of expired hazardous materials, methods for detailed tracking and description of performance metrics. The baseline shall be provided by ACLC using the previous 12 months of expired hazardous materials prior to start of contract. The sustained HMMP Plan shall be submitted annually to ACLC ENV for concurrence NLT 31 January to include annual performance compared to planned reduction targets from baseline of expired hazardous materials, identified deficiencies and plans for continuous improvement. The Contractor shall submit quarterly (based upon contract year) reports to include detailed tracking of expired hazardous materials against baseline. Quarterly reports shall be submitted NLT 15 calendar days after each contractual quarter ends.

Block 14: The preferred method of delivery shall be electronically in Microsoft Office (2013 or later) format via email; Integrated Data Environment, or an FTP site with email notification.

COR: charles.g.duncan.civ@mail.mil COR will provide ACLC Environmental contact information upon contract award.

group: IV
total_price: 0.00
prep_name: Charles Duncan
line_item:
exhibit: A
xtdp: Off
xtm: Off
othercat: MISC
system: AMCOM Avn Maint Fort Benning, GA
ctr_no:
contr:
remarksb:
Page2: 2
Reset:
2021-05-20T13:11:05-0400
DUNCAN.CHARLES.GLENN.1007753388
prep_date: 07 April 21
app_by:
app_date:
Page: 1
of_pages: 2
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .