Attachment 20 - 4278 Pressure Results.pdf

PDF 146 KB Posted

Attached to
Repair Hangar Deficiencies
Solicitation number
Not on record
Issued by

View the file

Other files

File Type Posted
Attachment 13 - Past Performance Reference List.pdf PDF
Attachment 3 - B. UFC 4-211-01 Aircraft Maintenance Hangers.pdf PDF
Attachment 14 - SF 1444.pdf PDF
Solicitation Amendment FA301022R00300002 SF 30.pdf PDF
Attachment 7 - F. Sundown Policy Foam Fire Suppression Systems.pdf PDF
Attachment 19 - 4254 Pressure Results.pdf PDF
Attachment 11 - MSS.pdf PDF
Attachment 10 - I. As-Built Plans B4278.pdf PDF
Solicitation Amendment FA301022R00300001 SF 30.pdf PDF
Attachment 17 - Wage Determination.pdf PDF
Attachment 9 - H. As-Built Plans B4254.pdf PDF
Attachment 18 - Questions and Answers 29 August 2022.pdf PDF
Attachment 2 - A. UFC 3-600-01 Fire Protection for Facilities.pdf PDF
Attachment 15 - Notice of Compliance.pdf PDF
Solicitation Amendment FA301022R00300003 SF 30.pdf PDF
Attachment 1 - SOW 20220624.pdf PDF
Solicitation Amendment - FA301022R00300003.pdf PDF
Attachment 8 - G. As-Built Plans B4247.pdf PDF
Attachment 4 - C. Evaluation AF Fire Protection Features Hangers B4247.pdf PDF
Attachment 16 - Submittal Procedures.pdf PDF
Attachment 6 - E. Evaluation AF Fire Protection Features Hangers B4278.pdf PDF
Attachment 12 - Past Performance Questionnaire.pdf PDF
Attachment 5 - D. Evaluation AF Fire Protection Features Hangers B4254.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Water Flow Test Record Input information in non‐shaded areas only.

Hydrant # Location Date 2‐May‐19 6‐May‐20 7‐May‐21 10‐May‐22 3‐May‐18

Purpose of Test 65 65 68 65 70 Manufacturer 55 56 62 55 62

Date 2005 Size 5 1/4" 2.5 2.5 2.5 2.5 2.5

0.9 0.9 0.9 0.9 0.9

Comments 50 51 58 55 50 Min of Test 5 15 5 5 5

Outlet Size 2.5 1186 1198 1278 1244 1186 Cooefficient 0.9 2673 2858 3928 2803 3192

2979 3185 4351 3124 3522 Flow Hydrant #1 5932 17974 6389 6222 5932 Flow Hydrant #2 J.BROWN J. BROWN D.NECAISE D.NECAISE K STURGILL Flow Hydrant #3

GPM PSI GPM PSI GPM PSI GPM PSI GPM PSI

0 65 0 65 0 68 0 65 0 70

1186 55 1198 56 1278 62 1244 55 1186 62 2673 20 2858 20 3928 20 2803 20 3192 20 2979 10 3185 10 4351 10 3124 10 3522 10 3260 0 3485 0 4741 0 3419 0 3828 0

Column heading color correlates to line color on the chart

Outlet Size (inches) Coefficient

17 TURNS Pitot Pressure

Test Flow (gpm) Flow (gpm) available @ 20 psi Flow (gpm) available @ 10 psi (gpm) Consumed During Test

Tested By:

MUELLER Residual Pressure (psig)

Test Data Information 5‐47

PHANTOM ST S.E. OF 4278

FLUSH & FLOW Static Pressure (psig)

0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000

Pr es su re (p si g)

Water Flow (gpm)

Water Flow Test Chart

AF Form 1027, Water Flow Test Record, Computer‐Generated (Nov 2010) Produced By:

Robert Manter

Utilities Supervisor

508 L St Keesler AFB, MS 39540 Work: (228) 377‐4390

File details come from the government source that posted it. Updated .