Attachment 11 - MSS.pdf
PDF 56 KB Posted
- Attached to
- Repair Hangar Deficiencies
- Solicitation number
- Not on record
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).
Approved Disapproved
HazMat Questionnaire 1 5 Days Prior to Start Date
HazMat MSDS 1 5 Days Prior to Start Date
Hazmat Reporting Entry Form 1 5 Days Prior to Start Date
4 Hazmat Reporting Entry Form 1 End of Contract
5 Recycling and Landfill Report 1 End of Contract
6 Warranty (Manufacturer's) 1 End of Contract
7 1-Year Warranty (Contractor) 1 End of
Contract 8 Miscellanous Material conduit/wire 1 10 Days after
NTP
9 24x36" Shop Drawings 3 30 Days after
NTP
10 All Fire Protection Eq. Pumps, motors, etc.
1 10 days after Shop Drawing
Approval
Re tu rn
S us pe ns e D at e
Te ch ni ca l D at a
Te st
R ep or ts
D at e to
C iv il En gi ne er in g
Sa m pl es
Co lo r S el ec tio n
M an uf ac tu re r's R ec om m en da tio n
W ar ra nt y- M an uf ac tu re r a nd /o r W or km an sh ip
Ca ta lo g
D at a
Project Number:
MAHG21-1003
Repair Hanger Deficencies from AFCEC Report B4247, B4254, B4278 Solicitation / Contract Number:
WO# 83097
Remarks
(To be completed by Project Engineer)
Li ne
N um be r
Re qu ire d
Su bm is si on D at e
Item or Description of Item, Contract Reference, Type of Submittal
Ce rt ifi ca te o f C om pl ia nc e
Sh op
D ra w in gs
Date Contractor Notified
(To be completed by Contract Administrator)
Su bm itt al
N um be rs
Co nt ra ct or R es ub m itt al
Fi na l A pp ro va l
Number of Copies Required (if not electronically submitted)
D at e Re ce iv ed in
C on tr ac tin g
Fi el d Re po rt s
O pe ra tin g In st ru ct io ns
Sc he du le s, Li st in gs , R ep or ts , P la ns
File details come from the government source that posted it. Updated .