This document outlines work requirements for a federal contract opportunity to supply, install, and maintain mosquito screens in Rome, Italy. The contract calls for mosquito nets made from aluminum screen and die cast aluminum frames painted white or brown, with Teflon and stainless steel hardware. Installation must be performed within 10 days of order, with initial surveys completed within 48 hours and cost estimates provided within 48 hours of surveys. Pricing must include ZTL permits for downtown access and removal/disposal of old screens. Interested vendors must be able to service areas of Rome including Parioli, Centro Storico, Vigna Stelluti and Prati. The solicitation was issued by the Department of State under number 191T7024Q0003 to supply and install mosquito screens in Rome.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2 – Work Requirements.

Supply, installation, and maintenance of mosquito screens

Material to be used to make mosquito nets.

Roll boxes, slides bars, and tracks are realized in all models in die cast aluminum 12/10 pre painted in RAL standard colors (white 9010 and 1013, brown 8017 and green 5001).

The screen itself must be made in aluminum, while all the non-metallic components are made by high strength Teflon anti-putrescent and resistant to atmospheric agents.

The handling with springs occurs through high resistance hardened steel Siemens springs.

Registers, bolts, and screws are made of brass or stainless steel.

All the side scrolling locks are made by stainless permanent magnets.

The participating companies shall assure the following services:

For the first survey, the intervention shall be within 48 hours.

They shall be able to submit written cost estimate within 48 hours from the survey.

They shall be able to perform the work within 10 days from the order.

They shall be able to have the access to downtown (ZTL access).

Removal and disposal service of the old mosquito nets shall be included in each unit price.

ZTL permit shall be included in the BPA rates (to allow entrance in the city limited traffic area).

Note that areas within the city of Rome where the service can be requested are: Parioli, Centro Storico, Vigna Stelluti and Prati.