Attachment 2 - USCGA Fire Sprinkler Schedule.xlsx
XLSX spreadsheet 65 KB Posted
- Solicitation number
- 70Z08424QAA150500
About this file
This document is a solicitation for maintenance, inspection, and testing services for installed fire sprinkler systems at the United States Coast Guard Academy in New London, Connecticut. The services are required under a base period from April 7, 2024 through April 6, 2025 with four optional 12-month periods that would extend the contract through April 6, 2029. Pricing is required in the Schedule of Prices attachment for the base period and each optional period. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses with a NAICS code of 561621 and size standard of $25 million. Questions are due by January 31, 2024 and offers must be submitted by February 19, 2024 to the Coast Guard contract specialist. A site visit to the Academy is recommended for January 25, 2024. The scope of work, device list, site map, wage determination, and solicitation provisions are provided in attachments to the document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Period Instructions:
Fill in the boxes only for Unit Price, Total, Total Base Period, and Total Value (Base Period Plus Four (4) Option Periods).
Use the tabs at the bottom to provide pricing for the Base Period through Option Period Four.
| BASE PERIOD: 04/07/2024 - 04/06/2025 | |||||
| CLIN | Description | QTY | UNIT | Unit Price | Total |
| 0001 | Hamilton Hall | ||||
| 0001A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0001B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0001C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0002 | Chase Hall Alpha | ||||
| 0002A | Weekly Inspection, Testing All Systems | 1 | LO | ||
| 0002B | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0002C | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0002D | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0003 | Chase Hall Bravo | ||||
| 0003A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0003B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0003C | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 0004 | Chase Hall Charlie | ||||
| 0004A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0004B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0005 | Chase Hall Delta | ||||
| 0005A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0005B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0005C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0006 | Chase Hall Echo | ||||
| 0006A | Weekly Inspection, Testing All Systems | 1 | LO | ||
| 0006B | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0006C | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0006D | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0007 | Chiller Plant | ||||
| 0007A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0007B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0007C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0008 | Eagle Pier | ||||
| 0008A | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0009 | Michel Hall (Medical) | ||||
| 0009A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0009B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0009C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0010 | Leamy Hall | ||||
| 0010A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0010B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0010C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0011 | Johnson Hall | ||||
| 0011A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0011B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0011C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0012 | Ida Lewis Hall (Child Development Center) | ||||
| 0012A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0012B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0012C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0012D | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 0013 | Maintenance Shop | ||||
| 0013A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0013B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0013C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0014 | Paint Shop | ||||
| 0014A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0014B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0014C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0015 | MCOE Hall (Formerly Pine Hall) | ||||
| 0015A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0015B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0015C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0015D | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 0016 | Yeaton Hall | ||||
| 0016A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0016B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0016C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0017 | Roland Hall (Gym) | ||||
| 0017A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0017B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0017C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0017D | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 0018 | Munro Hall | ||||
| 0018A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0018B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0018C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0019 | Satterlee Hall | ||||
| 0019A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0019B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0019C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0020 | Waesche Hall | ||||
| 0020A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0020B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0020C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0021 | Smith/Dimick Hall | ||||
| 0021A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0021B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0021C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0022 | Alumni Center | ||||
| 0022A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0022B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0023C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0023 | Boiler Plant | ||||
| 0023A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 0023B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 0023C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 0024 | Fire Hydrants | ||||
| 0024A | Annual Inspection, Testing | 34 | LO | ||
| Total Base Period |
Total Value (Base Period Plus Four (4) Option Periods)
Attachment 2 - Schedule of Prices
Option Period One Instructions:
Fill in the boxes only for Unit Price and Total.
Use the tabs at the bottom to provide pricing for the Base Period through Option Period Four
| OPTION PERIOD ONE: 04/07/2025 - 04/06/2026 | |||||
| CLIN | Description | QTY | UNIT | Unit Price | Total |
| 1001 | Hamilton Hall | ||||
| 1001A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1001B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1001C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1002 | Chase Hall Alpha | ||||
| 1002A | Weekly Inspection, Testing All Systems | 1 | LO | ||
| 1002B | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1002C | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1002D | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1003 | Chase Hall Bravo | ||||
| 1003A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1003B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1003C | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 1004 | Chase Hall Charlie | ||||
| 1004A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1004B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1005 | Chase Hall Delta | ||||
| 1005A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1005B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1005C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1006 | Chase Hall Echo | ||||
| 1006A | Weekly Inspection, Testing All Systems | 1 | LO | ||
| 1006B | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1006C | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1006D | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1007 | Chiller Plant | ||||
| 1007A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1007B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1007C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1008 | Eagle Pier | ||||
| 1008A | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1009 | Michel Hall (Medical) | ||||
| 1009A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1009B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1009C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1010 | Leamy Hall | ||||
| 1010A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1010B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1010C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1011 | Johnson Hall | ||||
| 1011A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1011B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1011C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1012 | Ida Lewis Hall (Child Development Center) | ||||
| 1012A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1012B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1012C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1012D | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 1013 | Maintenance Shop | ||||
| 1013A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1013B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1013C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1014 | Paint Shop | ||||
| 1014A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1014B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1014C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1015 | MCOE Hall (Formerly Pine Hall) | ||||
| 1015A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1015B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1015C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1015D | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 1016 | Yeaton Hall | ||||
| 1016A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1016B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1016C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1017 | Roland Hall (Gym) | ||||
| 1017A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1017B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1017C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1017D | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 1018 | Munro Hall | ||||
| 1018A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1018B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1018C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1019 | Satterlee Hall | ||||
| 1019A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1019B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1019C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1020 | Waesche Hall | ||||
| 1020A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1020B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1020C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1021 | Smith/Dimick Hall | ||||
| 1021A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1021B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1021C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1022 | Alumni Center | ||||
| 1022A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1022B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1022C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1023 | Boiler Plant | ||||
| 1023A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 1023B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 1023C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 1024 | Fire Hydrants | ||||
| 1024A | Annual Inspection, Testing | 34 | LO | ||
| Total Option Period One |
Option Period Two Instructions:
Fill in the boxes only for Unit Price, Total, and Total Option Period Two.
Use the tabs at the bottom to provide pricing for the Base Period through Option Period Four.
| OPTION PERIOD TWO: 04/07/2026 - 04/06/2027 | |||||
| CLIN | Description | QTY | UNIT | Unit Price | Total |
| 2001 | Hamilton Hall | ||||
| 2001A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2001B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2001C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2002 | Chase Hall Alpha | ||||
| 2002A | Weekly Inspection, Testing All Systems | 1 | LO | ||
| 2002B | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2002C | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2002D | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2003 | Chase Hall Bravo | ||||
| 2003A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2003B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2003C | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 2004 | Chase Hall Charlie | ||||
| 2004A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2004B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2005 | Chase Hall Delta | ||||
| 2005A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2005B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2005C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2006 | Chase Hall Echo | ||||
| 2006A | Weekly Inspection, Testing All Systems | 1 | LO | ||
| 2006B | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2006C | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2006D | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2007 | Chiller Plant | ||||
| 2007A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2007B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2007C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2008 | Eagle Pier | ||||
| 2008A | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2009 | Michel Hall (Medical) | ||||
| 2009A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2009B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2009C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2010 | Leamy Hall | ||||
| 2010A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2010B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2010C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2011 | Johnson Hall | ||||
| 2011A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2011B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2011C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2012 | Ida Lewis Hall (Child Development Center) | ||||
| 2012A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2012B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2012C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2012D | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 2013 | Maintenance Shop | ||||
| 2013A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2013B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2013C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2014 | Paint Shop | ||||
| 2014A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2014B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2014C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2015 | MCOE Hall (Formerly Pine Hall) | ||||
| 2015A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2015B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2015C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2015D | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 2016 | Yeaton Hall | ||||
| 2016A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2016B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2016C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2017 | Roland Hall (Gym) | ||||
| 2017A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2017B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2017C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2017D | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 2018 | Munro Hall | ||||
| 2018A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2018B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2018C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2019 | Satterlee Hall | ||||
| 2019A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2019B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2019C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2020 | Waesche Hall | ||||
| 2020A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2020B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2020C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2021 | Smith/Dimick Hall | ||||
| 2021A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2021B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2021C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2022 | Alumni Center | ||||
| 2022A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2022B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2022C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2023 | Boiler Plant | ||||
| 2023A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 2023B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 2023C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 2024 | Fire Hydrants | ||||
| 2024A | Annual Inspection, Testing | 34 | LO | ||
| Total Option Period Two |
Attachment 2 - Schedule of Prices
Option Period Three Instructions:
Fill in the boxes only for Unit Price, Total, and Total Option Period Three.
Use the tabs at the bottom to provide pricing for the Base Period through Option Period Four.
| OPTION PERIOD THREE: 04/07/2027 - 04/06/2028 | |||||
| CLIN | Description | QTY | UNIT | Unit Price | Total |
| 3001 | Hamilton Hall | $100.00 | |||
| 3001A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3001B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3001C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3002 | Chase Hall Alpha | ||||
| 3002A | Weekly Inspection, Testing All Systems | 1 | LO | ||
| 3002B | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3002C | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3002D | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3003 | Chase Hall Bravo | ||||
| 3003A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3003B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3003C | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 3004 | Chase Hall Charlie | ||||
| 3004A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3004B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3005 | Chase Hall Delta | ||||
| 3005A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3005B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3005C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3006 | Chase Hall Echo | ||||
| 3006A | Weekly Inspection, Testing All Systems | 1 | LO | ||
| 3006B | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3006C | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3006D | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3007 | Chiller Plant | ||||
| 3007A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3007B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3007C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3008 | Eagle Pier | ||||
| 3008A | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3009 | Michel Hall (Medical) | ||||
| 3009A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3009B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3009C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3010 | Leamy Hall | ||||
| 3010A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3010B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3010C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3011 | Johnson Hall | ||||
| 3011A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3011B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3011C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3012 | Ida Lewis Hall (Child Development Center) | ||||
| 3012A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3012B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3012C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3012D | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 3013 | Maintenance Shop | ||||
| 3013A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3013B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3013C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3014 | Paint Shop | ||||
| 3014A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3014B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3014C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3015 | MCOE Hall (Formerly Pine Hall) | ||||
| 3015A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3015B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3015C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3015D | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 3016 | Yeaton Hall | ||||
| 3016A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3016B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3016C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3017 | Roland Hall (Gym) | ||||
| 3017A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3017B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3017C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3017D | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 3018 | Munro Hall | ||||
| 3018A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3018B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3018C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3019 | Satterlee Hall | ||||
| 3019A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3019B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3019C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3020 | Waesche Hall | ||||
| 3020A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3020B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3020C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3021 | Smith/Dimick Hall | ||||
| 3021A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3021B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3021C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3022 | Alumni Center | ||||
| 3022A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3022B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3022C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3023 | Boiler Plant | ||||
| 3023A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 3023B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 3023C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 3024 | Fire Hydrants | ||||
| 3024A | Annual Inspection, Testing | 34 | LO | ||
| 0025 | Five Year Internal Inspection | ||||
| Takes Place in Option Period Three | 1 | LO | |||
| 0026 | Stand Alone Inspection, Test for buildings w/Standpipe systems | ||||
| Takes Place in Option Period Three | 1 | LO | |||
| Total Option Period Three |
Attachment 2 - Schedule of Prices
Option Period Four Instructions:
Fill in the boxes only for Unit Price, Total, and Option Period Four Total.
Use the tabs at the bottom to provide pricing for the Base Period through Option Period Four.
| OPTION PERIOD FOUR: 04/07/2028 - 04/06/2029 | |||||
| CLIN | Description | QTY | Unit | Unit Price | Total |
| 4001 | Hamilton Hall | ||||
| 4001A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4001B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4001C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4002 | Chase Hall Alpha | ||||
| 4002A | Weekly Inspection, Testing All Systems | 1 | LO | ||
| 4002B | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4002C | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4002D | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4003 | Chase Hall Bravo | ||||
| 4003A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4003B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4003C | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 4004 | Chase Hall Charlie | ||||
| 4004A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4004B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4005 | Chase Hall Delta | ||||
| 4005A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4005B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4005C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4006 | Chase Hall Echo | ||||
| 4006A | Weekly Inspection, Testing All Systems | 1 | LO | ||
| 4006B | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4006C | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4006D | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4007 | Chiller Plant | ||||
| 4007A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4007B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4007C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4008 | Eagle Pier | ||||
| 4008A | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4009 | Michel Hall (Medical) | ||||
| 4009A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4009B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4009C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4010 | Leamy Hall | ||||
| 4010A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4010B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4010C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4011 | Johnson Hall | ||||
| 4011A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4011B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4011C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4012 | Ida Lewis Hall (Child Development Center) | ||||
| 4012A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4012B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4012C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4012D | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 4013 | Maintenance Shop | ||||
| 4013A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4013B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4013C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4014 | Paint Shop | ||||
| 4014A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4014B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4014B | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4015 | MCOE Hall (Formerly Pine Hall) | ||||
| 4015A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4015B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4015C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4015D | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 4016 | Yeaton Hall | ||||
| 4016A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4016B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4016C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4017 | Roland Hall (Gym) | ||||
| 4017A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4017B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4017C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4017D | Semi-Annual Inspection, Testing All Systems | 1 | LO | ||
| 4018 | Munro Hall | ||||
| 4018A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4018B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4018C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4019 | Satterlee Hall | ||||
| 4019A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4019B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4019C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4020 | Waesche Hall | ||||
| 4020A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4020B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4020C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4021 | Smith/Dimick Hall | ||||
| 4021A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4021B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4021C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4022 | Alumni Center | ||||
| 4022A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4022B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4022C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4023 | Boiler Plant | ||||
| 4023A | Monthly Inspection, Testing All Systems | 1 | LO | ||
| 4023B | Quarterly Inspection, Testing All Systems | 1 | LO | ||
| 4023C | Annual Inspection, Testing All Systems | 1 | LO | ||
| 4024 | Fire Hydrants | ||||
| 4024A | Annual Inspection, Testing | 34 | LO | ||
| 4025 | FDC Testing | ||||
| Testing of all FDC's - Takes Place in Option Period Four | 1 | LO | |||
| Total Option Period Four |