This file is a comprehensive set of design and construction drawings for the Tyler Dam Rehabilitation Project in Middlesex County, Massachusetts, prepared by GFT Infrastructure, Inc. for the Natural Resources Conservation Service (NRCS) in cooperation with the Massachusetts Department of Conservation and Recreation.
The project involves rehabilitation of a 38.5-foot-high floodwater retarding dam with a drainage area of 24,704 acres and flood storage capacity of 1,463 acre-feet. Key construction activities include excavation and modification of the auxiliary spillway approach channel, installation of geosynthetic clay liner (GCL) along the spillway, placement of approved earthfill (approximately 980 cubic yards) and random earthfill (approximately 1,720 cubic yards), construction of a concrete crest wall with waterstops and reinforcement, installation of chain-link fencing, and site restoration. The design incorporates temporary erosion and sediment control measures including compost filter sock, rock construction entrances, filtered sump pits, and pumped water filter bags. Material specifications address approved earthfill compaction requirements (95 percent maximum dry density), structure backfill placement, concrete specifications per CS 31, and geotextile requirements. The project includes detailed foundation exploration with boring logs and test pit data, temporary water diversion options (rock fill cofferdam, sandbag cofferdam, or manufactured portable dam), and comprehensive erosion control planning with four construction stages spanning approximately four months. Construction is anticipated to begin in 2026 with cost-reimbursable pricing terms under NRCS administration.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O
VE
R
S H
EE
T
NATURAL RESOURCES CONSERVATION SERVICE of the
U.S. DEPARTMENT OF AGRICULTURE
in Cooperation with Project Local Sponsor
COMMONWEALTH of MASSACHUSETTS DEPARTMENT OF CONSERVATION and RECREATION
DIVISION of DESIGN and ENGINEERING OFFICE of DAM SAFETY
LOCATION MAP
APPROX. SCALE IN FEET
-0- 200200 400
NRCS JOB CLASS VII
INDEX OF DRAWINGS
SHEET NO. SHEET TITLE
1 COVER SHEET
GENERAL NOTES - SHEET 2 OF 2
TYLER DAM REHABILITATION PROJECT
FLOODWATER RETARDING DAM
MIDDLESEX COUNTY, MASSACHUSETTS
DRAINAGE AREA 24,704 ACRES
FLOOD STORAGE 1,463 ACRE FT.
AT AUXILIARY SPILLWAY CREST
WATER SURFACE AREA N/A ACRES
AT NORMAL POOL
HEIGHT OF DAM 38.5 FEET
VICINITY MAP
APPROX. SCALE IN MILES
-0- 1010 20
MASSACHUSETTS STATE MAP
NOT TO SCALE
SOURCE: milebymile.com©
MIDDLESEX COUNTY
BOUNDARY LINE
SHEET TITLE
COVER SHEET
MASSACHUSETTS
ROBIN HILL STREET
5 PLAN OF EXISTING DAM - SHEET 1 OF 2
MIDDLESEX COUNTY
TYLER DAM
TYLER DAM
EXISTING SITE PLAN
D at e
C he ck ed
Ap pr ov ed
D ra w n
D es ig ne d
Sheet of
File No.
Drawing No.
Ap pr ov ed
Q :\E ar th
S ci en ce s C
BG
\D iv -4
-W \G
D H
-T yl er D am \C
AD
D
\D es ig n
Se t\C
O
VE
R S
H
EE
T.
dw g Pl ot te d By
: B ria n M ille r, Pl ot
D at e:
/1 6/
:1
PM
TY
LE
R D
AM
FL
O O
D W
AT
ER
R
ET
AR
D
IN
G
D
AM
TY
LE
R D
AM
R
EH
AB
IL
IT
AT
IO
N P
R O
JE
C
T M
ID
D
LE
SE
X C
O U
N
TY
, M
AS
SA
C
H U
SE
TT
S
1 25
EJ
B
/0
3/
EK
M
/0
3/
EE
F
/3
1/
/3
1/
D
M S
PRIOR TO EXCAVATION THE CONTRACTOR SHALL CALL THE DIG SAFE SYSTEM INC.
ONE-CALL NUMBER 888-DIG-SAFE. WRITTEN DOCUMENTATION SHALL BE PRESENTED
TO THE CONTRACTING OFFICER REPRESENTATIVE BY THE CONTRACTOR CERTIFYING
THAT THE ONE-CALL NUMBER HAS BEEN CALLED AND ALL UTILITIES LOCATED WITHIN
THE WORK AREA HAVE BEEN MARKED. ONLY AFTER THE CONTRACTING OFFICER
REPRESENTATIVE HAS THIS DOCUMENT IN HAND MAY EXCAVATION PROCEED.
PLAN OF DAM - SHEET 1 OF 2
SOURCE: © BING 2016
PLAN OF EXISTING DAM - SHEET 2 OF 2
DAM EMBANKMENT SECTION
AUXILIARY SPILLWAY APPROACH CHANNEL MODIFICATIONS
PLAN OF DAM - SHEET 2 OF 2
E&S NARRATIVE AND DETAILS - SHEET 1 OF 3
E&S NARRATIVE AND DETAILS - SHEET 2 OF 3
E&S NARRATIVE AND DETAILS - SHEET 3 OF 3
18 E&S AND SITE ACCESS PLAN - SHEET 1 OF 2
19 E&S AND SITE ACCESS PLAN - SHEET 2 OF 2
CHAIN-LINK FENCE DETAILS
FOUNDATION EXPLORATION PLAN
13 CONCRETE CREST WALL PLAN
14 CONCRETE CREST WALL DETAILS
16 MISCELLANEOUS DETAILS
GENERAL NOTES AND LEGEND - SHEET 1 OF 22
BORING AND TEST PIT LOGS - SHEET 1 OF 3
BORING AND TEST PIT LOGS - SHEET 2 OF 3
BORING AND TEST PIT LOGS - SHEET 3 OF 3
SURVEY CONTROL AND SITE LAYOUT PLAN
AUXILIARY SPILLWAY GCL LINER DETAILS12
GFT INFRASTRUCTURE, INC.
PROJECT DESIGNER
A
AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY AND
TRANSPORTATION OFFICIALS
ACI AMERICAN CONCRETE INSTITUTE
AC-FT ACRE-FOOT (FEET)
ADDL ADDITIONAL
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AL ALUMINUM
ALLOW. ALLOWABLE
ALT ALTERNATE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
APPROX APPROXIMATE(LY)
ASW AUXILIARY SPILLWAY
AVG AVERAGE
AWWA AMERICAN WATER WORKS ASSOCIATION
@ AT
B
BF BLIND FLANGE OR BACK FACE
BFF BELOW FINISHED FLOOR
BFG BELOW FINISHED GRADE
BFV BUTTERFLY VALVE
BASELINE
BM BENCHMARK
BOT BOTTOM
B.P. BEGINNING POINT
C
C/C, C.C., C TO C CENTER TO CENTER
CF CUBIC FOOT (FEET)
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CI CAST IRON
CIP CAST IN PLACE OR CAST IRON PIPE
CJ CONSTRUCTION JOINT
CENTERLINE
CLR CLEARANCE, CLEAR, CLEAR DISTANCE
CMP CORRUGATED METAL PIPE
CONC CONCRETE
CONST, CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTION
COR CONTRACTING OFFICER'S REPRESENTATIVE
CORR CORRUGATED
CY CUBIC YARD(S)
D
DEPT DEPARTMENT
DI DUCTILE IRON
DIP DUCTILE IRON PIPE
DIA, Ø DIAMETER
DWG DRAWING
E
E EAST/EASTING COORDINATE
EA EACH
EF EACH FACE
EL, EL. ELEVATION
EXP EXPANSION
EXP JT EXPANSION JOINT
EXT EXTERIOR
E&SC EROSION AND SEDIMENT CONTROL
EQ EQUAL
EW EACH WAY
F
FF FRONT FACE
FM FORCE MAIN
FTG FOOTING
FT, FT/FT FOOT/FEET, FEET PER FOOT
G
GALV. GALVANIZED
GCL GEOSYNTHETIC CLAY LINER
GIS GEOGRAPHICAL INFORMATION SYSTEM
GPD GALLONS PER DAY
GPM GALLONS PER MINUTE
H
HEX HEXAGONAL
HDPE HIGH DENSITY POLYETHYLENE
HH HAND HOLE
HORIZ HORIZONTAL
I
ID INSIDE DIAMETER
IN INCH(ES)
INTR INTERIOR
INV INVERT
J
JT JOINT
JB JUNCTION BOX
L
LB POUND
LBS POUNDS
LF, LINEAR FEET
M
MAX MAXIMUM
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MJ MECHANICAL JOINT
MSE MECHANICALLY STABILIZED EMBANKMENT
N
N NORTH/NORTHING COORDINATE
N/A NOT APPLICABLE
NAD NORTH AMERICAN DATUM
NAVD NORTH AMERICAN VERTICAL DATUM
NGVD NATIONAL GEODETIC VERTICAL DATUM
NTS NOT TO SCALE
No., # NUMBER
O
OC ON CENTER
OD OUTSIDE DIAMETER
OE OVERHEAD ELECTRIC
OPNG OPENING
OZ OUNCE
P
P.C. POINT OF CURVATURE
PCCP PRESTRESSED CONCRETE CYLINDER PIPE
PCF POUNDS PER CUBIC FOOT
PE PLAIN END
P.I. POINT OF INFLECTION
PL PLATE
POB POINT OF BEGINNING
POI POINT OF INTERSECTION
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSW PRINCIPAL SPILLWAY
P.T. POINT OF TANGENCY
PVC POLYVINYL CHLORIDE OR POINT VERTICAL CURVATURE
PVI POINT VERTICAL INTERSECTION
PVT POINT VERTICAL TANGENCY
Q
QTY QUANTITY
R
R RADIUS
RCC ROLLER COMPACTED CONCRETE
RCP REINFORCED CONCRETE PIPE
REIN REINFORCED
REQ'D REQUIRED
RGS RIGID GALVANIZED STEEL
RJ RESTRAINED JOINT
ROW RIGHT OF WAY
S
SECT SECTION
SF SQUARE FOOT (FEET)
SHT SHEET
SPA SPACING
SQ SQUARE
SS STAINLESS STEEL
STA STATION
STD STANDARD
SY SQUARE YARD
T
TEMP TEMPORARY
TOPO TOPOGRAPHY
TYP, TYP., (TYP) TYPICAL
U
UNO UNLESS OTHERWISE NOTED
USGS U.S. GEOLOGICAL SURVEY
U/S UPSTREAM
V
VC VERTICAL CURVE
VERT VERTICAL
VOL VOLUME
W
WM WATERMAIN
W/ WITH
W/O WITHOUT
WT WEIGHT
Y
YD YARD
ABBREVIATIONS
ABBREVIATIONS NOTE:
1. THIS IS A STANDARD LIST OF ABBREVIATIONS AND ALL THE
ABBREVIATIONS SHOWN MAY NOT BE USED IN THIS SET OF DRAWINGS.
A
A
SECTION A
SECTION SYMBOLS:
EXISTING LEGEND
SECTION OR DETAIL IDENTIFIER
SHEET NO. WHERE SHOWN
OR WHERE CALLED-OUT
MAJOR CONTOUR
MINOR CONTOUR
UNDERGROUND ELECTRIC
OVERHEAD ELECTRIC
GAS
UNDERGROUND TELECOMMUNICATIONS
OVERHEAD TELECOMMUNICATIONS
UNDERGROUND CABLE TV
OVERHEAD CABLE TV
WATERMAIN
FIBER OPTIC
FORCE MAIN
SANITARY SEWER
STORM SEWER
AIR LINE
RIPRAP
SWALE / DITCH
LIMIT OF DETAILED FIELD SURVEY
PROPERTY LINE
RIGHT OF WAY
EASEMENT LINE
CENTERLINE / BASELINE
EDGE OF WATER
VEGETATION
BRUSH
HEDGE ROW
FENCE
GUIDE RAIL
HANDRAIL
RAILROAD
BORDERING VEGETATED WETLAND
ROCK OUTCROP
GRAVEL ROAD
PAVED ROAD
100' BUFFER ZONE
BANK/ORDINARY HIGH WATER (BANK/OHW)
BORDERING LAND SUBJECT TO FLOODING (BLSF)
200' RIVERFRONT AREA
30' WETLAND SET BACK (LOCAL)
TREE - DECIDUOUS
TREE - CONIFEROUS
SHRUB
BORING
TEST PIT
IRON PIN
CONTROL POINT
BENCHMARK
MARKER POST
RAILROAD SPIKE
SURVEY MONUMENT
PK NAIL
BOLLARD
WELL
WATER VALVE
WATER METER
FIRE HYDRANT
CLEANOUT
SPIGOT
DOWNSPOUT
STORM MANHOLE
STORM INLET
SANITARY MANHOLE
VENT
GAS VALVE
GAS METER
CABLE TV UTILITY BOX
TELECOMMUNICATIONS UTILITY BOX
TELECOMMUNICATIONS MANHOLE
ELECTRICAL MANHOLE
LIGHT POST
UTILITY POLE
GUY WIRE
MANHOLE - UNKNOWN UTILITY
JUNCTION BOX
MAILBOX
SIGN
MAJOR CONTOUR
MINOR CONTOUR
GEOMEMBRANE
LIMIT OF WORK
SLOPE (SLOPING ↓)
CONCRETE SURFACE SLOPE (SLOPING ↓)
TOP OF ROCK
EARTH SUBGRADE
WATER LEVEL (FOR SECTIONS AND PROFILES)
FLOW ARROW
SHEETPILE
ROCK CONSTRUCTION ENTRANCE
PROPOSED AND MISCELLANEOUS LEGEND
G
EN
ER
AL
N O
TE
S
AN
D
L
EG
EN
D
SH
EE
T
O
F
GENERAL DRAFTING NOTES:
1. GREY OR LIGHT LINEWORK GENERALLY REPRESENT EXISTING FEATURES,
WHEREAS DARKER BLACK LINEWORK IS GENERALLY INTENDED TO DEPICT
NEW CONSTRUCTION.
2. DIMENSION AND TEXT CALLOUTS
PROJECT NOTES
GENERAL NOTES:
1. ALL ELEVATIONS ARE IN UNITS OF FEET, UNLESS NOTED OTHERWISE.
2. NUMERICAL DIMENSIONS OR VALUES WILL TAKE PRECEDENCE OVER ANY SCALED DIMENSIONS OR
VALUES. ALL ELEVATIONS ARE IN UNITS OF FEET, UNLESS NOTED OTHERWISE.
3. THE CONTRACTOR SHALL CONFINE ALL WORK TO THE LIMIT OF WORK AS SHOWN ON THE DRAWINGS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXISTING FEATURES TO REMAIN INCLUDING TREES, ROADS, UTILITIES, PAVING AND SIMILAR ITEMS BOTH INSIDE AND OUTSIDE OF THE LIMIT OF WORK, WHICH IF DAMAGED BY THE CONTRACTOR SHALL BE REPLACED IN KIND AT NO COST
TO THE NRCS. PRIOR TO COMMENCING CONSTRUCTION, COR AND CONTRACTOR WILL PERFORM A
SITE INSPECTION AND DOCUMENT (WITH PHOTOGRAPHS AND DESCRIPTIONS) THE CONDITION OF EXISTING FEATURES TO BE PROTECTED. CONTRACTOR WILL SUBMIT DOCUMENTATION TO COR FOR
APPROVAL.
5. RESTORE ALL DISTURBED AREAS TO THE ORIGINAL CONDITIONS OR AS SHOWN ON THE DRAWINGS.
SURVEY NOTES:
1. MAPPING SOURCES AND DATUM: THE FOLLOWING NOTES PERTAIN TO ALL MAPPING PRESENTED IN
THESE DRAWINGS.
a. SITE SURVEY PERFORMED BY GANNETT FLEMING IN JULY, 2016.
b. LIDAR GENERATED FROM MASSGIS DATA, DECEMBER 2010.
c. VERTICAL DATUM IS NAVD 88 COMPUTED USING GEOID12B.
d. GRID IS MASSACHUSETTS STATE PLANE COORDINATE SYSTEM MAINLAND ZONE, NAD 83 (2011).
e. ELEVATIONS SHOWN ARE IN FEET.
f. CONTOURS WITHIN LIMIT OF SURVEY WERE GENERATED FROM DETAILED SURVEY PERFORMED BY
GANNETT FLEMING. ALL CONTOURS AND FEATURES SHOWN OUTSIDE LIMIT OF SURVEY WERE
GENERATED FORM LIDAR DATA AND AERIAL IMAGERY.
g. DRAWING UNITS ARE IN US SURVEY FEET.
2. PROPERTY BOUNDARIES ARE BASED ON COUNTY TAX MAP INFORMATION AND ARE INTENDED FOR
PLANNING PURPOSES ONLY.
3. INFORMATION SHOWN OUTSIDE THE INDICATED DETAILED FIELD SURVEY LIMITS IS FOR REFERENCE
ONLY AND HAS NOT BEEN SURVEYED OR VERIFIED. THESE FEATURES HAVE BEEN GENERALLY
LOCATED BASED ON AERIAL IMAGERY AND AS-BUILT DRAWINGS. THE CONTRACTOR SHALL FIELD
VERIFY ALL FEATURES AND CONDITIONS THAT MAY AFFECT WORK.
4. SURVEY AND MAPPING OF EXISTING GROUND FEATURES PROVIDED, AND STRUCTURAL DETAILS
THAT WERE DERIVED FROM PRIOR AS-BUILT DRAWINGS, MAY NOT REFLECT LATEST SITE
CONDITIONS. CONTRACTOR SHALL FIELD-VERIFY CONDITIONS AND RELEVANT DIMENSIONS PRIOR TO START OF CONSTRUCTION. DISCREPANCIES SHALL BE BROUGHT TO THE COR'S ATTENTION FOR
RESOLUTION PRIOR TO THE START OF WORK.
UTILITIES:
1. CARE SHALL BE TAKEN NOT TO DAMAGE EXISTING UTILITIES OR STRUCTURES TO REMAIN. ANY DAMAGE CAUSED BY THE CONTRACTOR'S OPERATION SHALL BE REPAIRED BY THE CONTRACTOR IN A TIMELY MANNER, TO THE SATISFACTION OF THE COR, AND AT NO EXTRA COST. PERFORM UTILITY
COORDINATION AND TEMPORARY RELOCATION AS NECESSARY, AND AS REQUIRED BY THE
CONTRACT DOCUMENTS.
2. OVERHEAD ELECTRIC LINES ARE PRESENT ALONG ROBIN HILL STREET. TAKE CAUTION NOT TO
DAMAGE OVERHEAD ELECTRIC LINES DURING CONSTRUCTION, ESPECIALLY WHEN USING
CONSTRUCTION ENTRANCES.
3. PROTECT ALL EXISTING UNDERGROUND UTILITIES AND FACILITIES TO REMAIN AGAINST DAMAGE FROM HAULING AND CONSTRUCTION OPERATIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO IDENTIFY SUCH UTILITIES AND FACILITIES. IN NO CASE SHALL THE CONTRACTOR PLACE VEHICLE LOADS EXCEEDING THE LEGAL LOAD LIMIT WITHIN 10 FEET OF THESE UTILITIES AND FACILITIES. IF
THE CONTRACTOR ELECTS TO PLACE LOADS EXCEEDING THE LEGAL LIMIT ON THESE OR OTHER
UNDERGROUND FACILITIES OR UTILITIES, IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE AND ADVISE THE COR OF THE TYPE, SIZE AND WEIGHT OF ALL VEHICLES HE INTENDS TO USE OVER THESE FACILITIES DURING CONSTRUCTION, AND PROTECT THE FACILITIES FROM DAMAGE, TAKING INTO ACCOUNT THE CONDITIONS OF EXISTING FACILITIES. THIS DETERMINATION SHALL BE
MADE BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF MASSACHUSETTS, EMPLOYED
AND PAID BY THE CONTRACTOR, AND IS TO BE MADE PRIOR TO THE LOADING OF ANY FACILITIES
WITH ALL RESTRICTIONS ENUMERATED BY THE PROFESSIONAL ENGINEER BEING STRICTLY
OBSERVED. IN THE EVENT THE CONTRACTOR FAILS TO COMPLY WITH FINDINGS OF THE
PROFESSIONAL ENGINEER, THE WORK SHALL IMMEDIATELY CEASE UNTIL CORRECTIVE
PROCEDURES, SATISFACTORY TO THE PROFESSIONAL ENGINEER AND COR ARE EMPLOYED. ALL
DAMAGE, DIRECT OR INDIRECT, OF WHATEVER NATURE RESULTING FROM THE PERFORMANCE OF
THE WORK OR RESULTING TO THE WORK DURING ITS PROGRESS, FROM WHATEVER CAUSE, SHALL
BE BORNE AND SUSTAINED BY THE CONTRACTOR.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING AND PROVIDING TEMPORARY
UTILITY AND POWER AS NECESSARY FOR ALL WORK.
5. UTILITIES ARE SHOWN AT APPROXIMATE ELEVATIONS AND LOCATIONS. EXACT LOCATIONS AND SIZES OF EXISTING UTILITIES IN THE AREA OF CONSTRUCTION SHALL BE VERIFIED IN THE FIELD BY
THE CONTRACTOR.
D at e
C he ck ed
Ap pr ov ed
D ra w n
D es ig ne d
Sheet of
File No.
Drawing No.
Ap pr ov ed
Q :\E ar th
S ci en ce s C
BG
\D iv -4
-W \G
D H
\0
0-
Ty le r D am
\C
AD
D \D es ig n Se t\G en er al
N ot es a nd L eg en d.
dw g Pl ot te d By
: M ille r, Br ia n
S.
, P lo t D at e:
0/
/2
1:
P M
TY
LE
R D
AM
FL
O O
D W
AT
ER
R
ET
AR
D
IN
G
D
AM
TY
LE
R D
AM
R
EH
AB
IL
IT
AT
IO
N P
R O
JE
C
T M
ID
D
LE
SE
X C
O U
N
TY
, M
AS
SA
C
H U
SE
TT
S
2 25
EJ
B
/0
3/
EK
M
/0
3/
EE
F
/3
1/
/3
1/
D
M S
LEGEND NOTES:
1. THIS IS A STANDARD LIST OF SYMBOLS AND ALL THE SYMBOLS SHOWN
MAY NOT BE USED IN THIS SET OF DRAWINGS.
2. ADDITIONAL SITE SPECIFIC LEGENDS MAY BE SHOWN ELSEWHERE ON THE
DRAWINGS WHICH WOULD TAKE PRECEDENCE OVER THE LEGENDS
SHOWN ON THIS SHEET.
G
EN
ER
AL
N O
TE
S
- S H
EE
T
O
F
D at e
C he ck ed
Ap pr ov ed
D ra w n
D es ig ne d
Sheet of
File No.
Drawing No.
Ap pr ov ed
Q :\E ar th
S ci en ce s C
BG
\D iv -4
-W \G
D H
-T yl er D am \C
AD
D
\D es ig n
Se t\G en er al N ot es a nd
L eg en d.
dw g
Pl ot te d
By : B ria n
M ille r, Pl ot D at e:
/1
8/
0:
A M
TY
LE
R D
AM
FL
O O
D W
AT
ER
R
ET
AR
D
IN
G
D
AM
TY
LE
R D
AM
R
EH
AB
IL
IT
AT
IO
N P
R O
JE
C
T M
ID
D
LE
SE
X C
O U
N
TY
, M
AS
SA
C
H U
SE
TT
S
3 25
EJ
B
/0
3/
EK
M
/0
3/
EE
F
/3
1/
/3
1/
D
M S
EARTHFILL
1. APPROVED EARTHFILL, APPROXIMATELY 980 C.Y.
A. PLACE APPROVED EARTHFILL ON THE CREST OF THE DAM AND ON THE DAM EMBANKMENT TO RESTORE THE TEMPORARY
ACCESS ROAD. LOCATIONS ARE SHOWN ON THE DRAWINGS.
B. MATERIAL IN APPROVED EARTHFILL SHALL HAVE USCS CLASSIFICATION OF ML OR SM AND SHALL BE OBTAINED FROM
THE AUXILIARY SPILLWAY APPROACH EXCAVATION.
C. COMPACTION OF APPROVED EARTHFILL SHALL BE CLASS A IN ACCORDANCE WITH CS 23. A PADFOOT (OR SHEEPSFOOT) TAMPING ROLLER SHALL BE USED, AND EQUIPMENT USED FOR SPREADING AND COMPACTING ABOVE GEOSYNTHETIC CLAY LINER SHALL MEET THE REQUIREMENTS OF CS 98. FILL MATERIAL SHALL BE COMPACTED TO AT LEAST 95 PERCENT OF THE MAXIMUM DRY DENSITY. MOISTURE CONTENT AT THE TIME OF COMPACTION SHALL BE WITHIN A RANGE FROM 2 PERCENT BELOW OPTIMUM TO 2 PERCENT ABOVE OPTIMUM. THE MAXIMUM DENSITY AND OPTIMUM MOISTURE
CONTENT SHALL BE DETERMINED BY ASTM D-698.
D. THE MAXIMUM LAYER THICKNESS, BEFORE COMPACTION, SHALL BE 9 INCHES. THE MAXIMUM ROCK PARTICLE SIZE INCORPORATED INTO APPROVED EARTHFILL PRIOR TO COMPACTION SHALL BE 3 INCHES. ALL ROCK PARTICLES LARGER
THAN 3 INCHES SHALL BE REMOVED.
2. RANDOM EARTHFILL, APPROXIMATELY 1,720 C.Y.
A. RANDOM EARTHFILL WILL BE USED IN THE SPOIL AREA, AS SHOWN ON THE DRAWINGS.
B. MATERIAL IN RANDOM EARTHFILL SHALL CONSIST OF FILL OR OVERBURDEN SOILS OBTAINED FROM THE AUXILIARY SPILLWAY APPROACH EXCAVATION AND OTHER REQUIRED EXCAVATIONS WHICH ARE UNSUITABLE FOR USE AS
APPROVED EARTHFILL.
C. COMPACTION OF RANDOM EARTHFILL SHALL BE CLASS C IN ACCORDANCE WITH CS 23. A PADFOOT (OR SHEEPSFOOT ) TAMPING ROLLER SHALL BE USED. THE ROLLER SHALL EXERT A MINIMUM PRESSURE OF 450 PSI (BASED ON THE HORIZONTAL PROJECTION OF THE FACE TO THE ROLLER TOOTH) AND SHALL HAVE A MINIMUM DRUM DIAMETER OF 60 INCHES. A MINIMUM OF 6 PASSES, OVER THE ENTIRE SURFACE OF EACH LIFT, SHALL BE REQUIRED AT A TOWING SPEED OF NOT LESS THAN 3 FEET PER SECOND NOR NOT MORE THAN 6 FEET PER SECOND (2-4 MPH).
D. THE MOISTURE CONTENT OF RANDOM EARTHFILL SHALL BE MAINTAINED WITHIN THE LIMITS REQUIRED TO : (A) PREVENT WEAVING, RUTTING , BULKING OR DILATANCE OF THE MATERIAL UNDER THE ACTION OF THE HAULING OR COMPACTING EQUIPMENT, (B) PREVENT THE ADHERENCE OF THE EARTHFILL MATERIAL TO THE ROLLER PADS/FEET, TREADS OR TRACKS OF THE PLACEMENT AND COMPACTION EQUIPMENT, (C) PREVENT MATERIAL FROM GENERATING DUST DURING PLACING AND COMPACTION, AND (D) ENSURE THE CRUSHING AND BLENDING OF THE SOIL CLODS AND AGGREGATIONS
INTO A REASONABLY HOMOGENOUS MASS.
E. THE MAXIMUM LAYER THICKNESS, BEFORE COMPACTION, SHALL BE 12 INCHES. THE MAXIMUM SIZE ROCK PARTICLE SIZE INCORPORATED IN RANDOM EARTHFILL PRIOR TO COMPACTION SHALL BE 10 INCHES. ALL ROCK PARTICLES LARGER
THAN 10 INCHES SHALL BE REMOVED.
F. RANDOM EARTHFILL SHALL BE GRADED TO PROVIDE POSITIVE DRAINAGE.
3. STRUCTURE BACKFILL, QUANITY IS INCLUDED AS PART OF APPROVED FILL
A. STRUCTURE BACKFILL WILL BE PLACED ADJACENT TO THE CONCRETE CREST WALL AND ABOVE THE GCL ADJACENT TO
THE HEADWALL.
B. PARAGRAPH 1-B ABOVE SHALL APPLY.
C. STRUCTURE BACKFILL ADJACENT TO CONCRETE AS DEFINED IN SPECIFICATION CS 23 SHALL BE COMPACTED BY HAND TAMPING OR MANUALLY DIRECTED POWER TAMPERS, PLATE VIBRATORS, WALK-BEHIND, MINIATURE OR SELF-PROPELLED ROLLERS. STRUCTURE BACKFILL MATERIAL SHALL BE COMPACTED TO AT LEAST 95 PERCENT OF MAXIMUM DRY DENSITY.
MOISTURE CONTENT AT THE TIME OF COMPACTION SHALL BE WITHIN A RANGE FROM 2 PERCENT BELOW OPTIMUM TO 2 PERCENT ABOVE OPTIMUM. THE MAXIMUM DENSITY AND OPTIMUM MOISTURE CONTENT SHALL BE DETERMINED BY ASTM D-698.
D. THE MAXIMUM LAYER THICKNESS, BEFORE COMPACTION, SHALL BE 4 INCHES. THE MAXIMUM SIZE ROCK PARTICLE SIZE INCORPORATED IN STRUCTUE BACKFILL PRIOR TO COMPACTION SHALL BE 2 INCHES. ALL ROCK PARTICLES LARGER
THAN 2 INCHES SHALL BE REMOVED.
REMOVAL OF WATER NOTES:
1. DIVERSION OF WATER WILL BE NEEDED TO FACILITATE DEWATERING THE PRINCIPAL SPILLWAY CONDUIT TO REPAIR THE DETERIORATED JOINT SEALER ALONG THE INTERIOR OF THE PRINCIPAL SPILLWAY CONDUIT AND INTERIOR OF THE RISER STRUCTURE. REFER TO SPECIFICATION CS 11 FOR DETAILS AND SUBMISSION
REQUIREMENTS. JOINT REPAIR DETAILS ARE SHOWN ON SHEET 16.
2. IN ORDER TO FACILITATE DEWATERING OF THE PRINCIPAL SPILLWAY CONDUIT, DIVERSION OF WATER FEATURES WILL BE NEEDED AT THE UPSTREAM SIDE TO DIVERT RESERVOIR INFLOW, AND AT THE DOWNSTREAM SIDE TO
DIVERT TAILWATER.
3. COFFERDAM AND BULKHEAD OPTIONS SHOWN ON THE DRAWINGS ARE FOR ILLUSTRATIVE PURPOSES ONLY, AND DO NOT SUGGEST, GUARANTEE, OR OTHERWISE INDICATE ANY LEVEL OF PROTECTION. REFER TO SPECIFICATION
CS 11 FOR DETAILED REQUIREMENTS.
4. REFER TO SPECIFICATION CS 11 FOR DETAILS AND SUBMISSION REQUIREMENTS FOR DEWATERING OF THE
PRINCIPAL SPILLWAY CONDUIT AND EXCAVATION AREA FOR THE CONCRETE CREST WALL.
5. TEMPORARY DIVERSION SYSTEM SHALL DISCHARGE WITHIN THE DOWNSTREAM SIDE OF THE EXISTING SPILLWAY STRUCTURE. SEE SHEET 22 FOR SUGGESTED SUMP INLET AND DISCHARGE OUTLET CONFIGURATIONS.
FILLED BURLAP
EARTH OR SAND
FLOWWORK AREA
FLEXIBLE MEMBRANE TO
PREVENT WATER SEEPAGE
INTO WORK AREA
TOP ELEVATION
ROCK FILL COFFERDAM OPTION
SECTION VIEW
STEEL SUPPORT
FRAME FABRIC
MEMBRANE
SECTION VIEW
MANUFACTURED PORTABLE DAM OPTION
FLOW
WORK AREA
DEPTH VARIESCLEAN ROCK FILL
TOP WIDTH
IMPERMEABLE LINER TO PREVENT
WATER SEEPAGE INTO WORK AREA
(ANCHOR AT TOP AND BOTTOM
WITH SANDBAGS NOT SHOWN)
RESERVOIR BOTTOM
(ELEVATION VARIES)
WORK AREA
DEPTH
VARIES
(CONTRACTOR TO ESTABLISH)
SANDBAG COFFERDAM OPTION
SECTION VIEW
TOP ELEVATION
(CONTRACTOR TO ESTABLISH)
TOP ELEVATION
(CONTRACTOR TO ESTABLISH)
NOT TO SCALE
TEMPORARY DIVERSION OF WATER
SACKS (TYP.)
(SEE NOTE 3)
TWO BAG MINIMUM HEIGHT
ABOVE NORMAL BASE FLOW
AGGREGATE GRADATIONS
SIEVE SIZE
PERCENT PASSING
COARSE
DRAINFILL FINE DRAINFILL CRUSHER RUN
GRAVEL
NO. 57
AGGREGATE
76 MM (3") 100
38 mm (1-1/2") 70 TO 100 100
25 mm (1") 95 TO 100
19 mm (3/4") 50 TO 85
12.5 mm (1/2") 100 25 TO 60
9.5 mm (3/8") 85 TO 100 100
4.75 mm (No. 4) 10 TO 30 95 TO 100 30 TO 60 0 TO 10
2.36 mm (No. 8) 0 TO 10 0 TO 5
1.18 mm (No. 16) 45 TO 80
600 μm (No. 30)
300 μm (No. 50) 10 TO 30
150 μm (No. 100) 0 TO 10
74 μm (No. 200) 0 TO 3 0 TO 10
NOTES:
1. COARSE DRAINFILL AND FINE DRAINFILL SHALL MEET THE QUALITY REQUIREMENTS OF
MATERIAL SPECIFICATION 521.
2. CRUSHER RUN GRAVEL SHALL MEET THE QUALITY REQUIREMENTS OF COMMONWEALTH
OF MASSACHUSETTS DOT CONSTRUCTION SPECIFICATIONS SECTION M1.03.1
3. NO. 57 AGGREGATE SHALL MEET THE QUALITY REQUIREMENTS OF MATERIAL
SPECIFICATION 521.
CONSTRUCTION SEQUENCE NOTES:
THE CONSTRUCTION SEQUENCE SHOWN BELOW IS INTENDED TO GUIDE DEVELOPMENT OF THE CONTRACTOR'S CONSTRUCTION SCHEDULE. TASKS 1 THRU 4 ARE INDEPENDENT OF ONE ANOTHER AND CAN BE PERFORMED IN ANY SEQUENCE AS LONG AS REQUIRED EROSION AND SEDIMENT CONTROL FACILITIES ARE IN PLACE AND
MAINTAINED. ALSO REFER TO SEQUENCE OF OPERATIONS ON SHEET 21.
TASK 1 - PRINCIPAL SPILLWAY CONDUIT JOINT REPAIR.
A. INSTALL DEWATERING AND DIVERSION FACILITIES.
B. REPAIR JOINTS ALONG THE INTERIOR OF THE PRINCIPAL SPILLWAY CONDUIT AND RISER STRUCTURE
INTERIOR.
C. REMOVE DEWATERING AND DIVERSION FACILITIES.
TASK 2 - EARTHWORK
A. EXCAVATE AUXILIARY SPILLWAY APPROACH CHANNEL.
B. INSTALL GEOSYNTHETIC CLAY LINER AND OVERLYING FILL.
C. CONSTRUCT CREST WALL.
D. CLEARING AND GRUBBING AT LEFT ABUTMENT CREST.
E. REGRADE TOP OF DAM
TASK 3 - WORK AT RIGHT ABUTMENT
A. CLEARING AND CUTTING STUMPS ALONG UPSTREAM SLOPE.
B. REPAIR AND PERMANENTLY STABILIZE EROSION AT DOWNSTREAM SLOPE.
REMAINING TASKS:
A. REMAINING TASKS TO BE COMPLETED AFTER TASKS 1 THRU 3 ARE COMPLETED.
B. PLACE TOPSOIL AND PERMANENTLY STABILIZE.
C. INSTALL CHAIN-LINK FENCE.
D. REINSTALL GATES AND BOLLARDS.
E. REMOVE EROSION AND SEDIMENT CONTROLS.
GEOTEXTILE NOTES:
1. TYPE 1 GEOTEXTILE SHALL BE WOVEN OR NONWOVEN AND SHALL MEET THE
REQUIREMENTS OF MATERIAL SPECIFICATION 592 - GEOTEXTILE, TABLE 1 OR TABLE 2 FOR
CLASS I GEOTEXTILES. THE APPARENT OPENING SIZE (AOS) OF THE GEOTEXTILE SHALL BE
WITHIN A RANGE OF A MAXIMUM OF #40 TO A MINIMUM OF #70 (U.S. STANDARD SIEVE SIZE.
GEOTEXTILE
FLOW
TEMPORARY BULKHEAD OPTION
TEMPORARY BULKHEAD OPTION
SECTION VIEW
RISER DETAIL COPIED FROM HISTORIC DRAWINGS AND
SHOWN FOR SCHEMATIC PURPOSES ONLY. ELEVATIONS
INDICATED ON THE DETAIL MAY NOT MATCH PROJECT
DATUM AND SHALL BE CONFIRMED BY THE CONTRACTOR
PRIOR TO BULKHEAD INSTALLATION.
TR3
0+00 D 1+00 D
2+00 D 3+00 D
4+00 D 5+00 D
6+00 D 7+00 D
8+00 D 9+00 D
10+00 D 11+00 D 12+00 D 13+00 D 14+00 D 15+00 D 16+00 D 17+00 D17+00 D
BM1TR2 TR1
TR4
2+
A
SW
0+
A
SW
1+
A
SW
2+
A
SW
SCALE IN FEET
-0- 160
LIMIT OF DETAILED SURVEY
EX
IS
TI
N
G S
IT
E
PL
AN
D at e
C he ck ed
Ap pr ov ed
D ra w n
D es ig ne d
Sheet of
File No.
Drawing No.
Ap pr ov ed
Q :\E ar th
S ci en ce s C
BG
\D iv -4
-W \G
D H
\0
0-
Ty le r D am
\C
AD
D \D es ig n Se t\E xi st in g Si te P la n.
dw g
Pl ot te d
By : M ille r, Br ia n S.
, P lo t D at e:
0/
/2
1:
P
M
TY
LE
R D
AM
FL
O O
D W
AT
ER
R
ET
AR
D
IN
G
D
AM
TY
LE
R D
AM
R
EH
AB
IL
IT
AT
IO
N P
R O
JE
C
T M
ID
D
LE
SE
X C
O U
N
TY
, M
AS
SA
C
H U
SE
TT
S
4 25
EJ
B
/0
3/
EK
M
/0
3/
EE
F
/3
1/
/3
1/
D
M S
NOTE:
1. SEE SHEETS 5 AND 6 FOR ADDITIONAL EXISTING
FEATURES NOT SHOWN ON THIS SHEET.
2. UPLAND AREAS WITHIN THE PROJECT LIMIT OF WORK ARE
WITHIN THE 100-FOOT BUFFER ZONE TO BORDERING
VEGETATED WETLANDS.
3. SEE SHEET 7 FOR LIMIT OF WORK AND ASSOCIATED LAYOUT
INFORMATION.
SEE SHEET 5 AND 8.
SEE SHEET 6 AND 9.WETLAND EXTENDS
BEYOND STUDY AREA
WETLAND EXTENDS
BEYOND STUDY AREA
WETLAND EXTENDS
BEYOND STUDY AREA
WETLAND EXTENDS
BEYOND STUDY AREA
WETLAND EXTENDS
BEYOND STUDY AREA
WETLAND EXTENDS
BEYOND STUDY AREA
WETLAND EXTENDS
BEYOND STUDY AREA
BORDERING AREA
SUBJECT TO FLOODING
EL. 217.2'
BORDERING LAND
SUBJECT TO FLOODING
200' RIVERFRONT AREA
200' RIVERFRONT AREA
100' BUFFER ZONE
100' BUFFER ZONE
100' BUFFER ZONE
30' WETLAND SETBACK (LOCAL)
TR4
0+00 D
1+00 D
2+00 D
3+00 D
4+00 D
5+00 D
6+00 D
7+00 D
8+00 D
SCALE IN FEET
-0- 4040 80
LIMIT OF DETAILED SURVEY
SEE REQUIRED FILL
SHEETS 8 AND 9
PL
AN
O F
EX
IS
TI
N
G D
AM
SH
EE
T
O F
D at e
C he ck ed
Ap pr ov ed
D ra w n
D es ig ne d
Sheet of
File No.
Drawing No.
Ap pr ov ed
Q :\E ar th
S ci en ce s C
BG
\D iv -4
-W \G
D H
\0
0-
Ty le r D am
\C
AD
D \D es ig n Se t\P la n of
E xi st in g D am .d w g
Pl ot te d
By : M ille r, Br ia n S.
, P lo t D at e:
0/
/2
1:
P
M
TY
LE
R D
AM
FL
O O
D W
AT
ER
R
ET
AR
D
IN
G
D
AM
TY
LE
R D
AM
R
EH
AB
IL
IT
AT
IO
N P
R O
JE
C
T M
ID
D
LE
SE
X C
O U
N
TY
, M
AS
SA
C
H U
SE
TT
S
5 25
EJ
B
/0
3/
EK
M
/0
3/
EE
F
/3
1/
/3
1/
D
M S
M
AT
C H
LI
N
E, S
EE
S
H
EE
T
BM1TR2 TR1
9+00 D
10+00 D 11+00 D 12+00 D 13+00 D 14+00 D 15+00 D 16+00 D 17+00 D17+00 D
SCALE IN FEET
-0- 4040 80
LIMIT OF DETAILED SURVEY
PL
AN
O F
EX
IS
TI
N
G D
AM
SH
EE
T
O F
D at e
C he ck ed
Ap pr ov ed
D ra w n
D es ig ne d
Sheet of
File No.
Drawing No.
Ap pr ov ed
Q :\E ar th
S ci en ce s C
BG
\D iv -4
-W \G
D H
\0
0-
Ty le r D am
\C
AD
D \D es ig n Se t\P la n of
E xi st in g D am .d w g
Pl ot te d
By : M ille r, Br ia n S.
, P lo t D at e:
0/
/2
1:
P
M
TY
LE
R D
AM
FL
O O
D W
AT
ER
R
ET
AR
D
IN
G
D
AM
TY
LE
R D
AM
R
EH
AB
IL
IT
AT
IO
N P
R O
JE
C
T M
ID
D
LE
SE
X C
O U
N
TY
, M
AS
SA
C
H U
SE
TT
S
6 25
EJ
B
/0
3/
EK
M
/0
3/
EE
F
/3
1/
/3
1/
D
M S
M
AT
C H
LI
N
E, S
EE
S
H
EE
T
SEE REQUIRED FILL
SHEET 8 AND 9
FL
O
W
LC
LC
LC
LC
1+26 CW
0+00 CW
1+00 CW
0+
A
SW
1+
A
SW
2+
A
SW
2+
A
SW
TR3
TR2
TR1
TR4
0+00 D 1+00 D
2+00 D 3+00 D
4+00 D 5+00 D
6+00 D 7+00 D
8+00 D 9+00 D
10+00 D 11+00 D 12+00 D 13+00 D 14+00 D 15+00 D 16+00 D 17+00 D17+00 D
BM1
2+
A
SW
0+
A
SW
1+
A
SW
2+
A
SW
17+00 D
0+00 D 1+00 D
2+00 D 3+00 D
4+00 D 5+00 D
6+00 D 7+00 D
8+00 D 9+00 D
10+00 D 11+00 D 12+00 D 13+00 D 14+00 D 15+00 D 16+00 D 17+00 D
L1
L2
L3 L4
L5L6
L7
L8
L9 L10
L11 L12
L13
L14
L15 L16
L17 L18
L19
L20
L21 L22
L23 L24
L25
L26
L27
L29
L30
L31 L32
L28
SCALE IN FEET
-0- 160
HORIZONTAL AND VERTICAL SURVEY CONTROL POINTS
POINT ID NORTHING (FT.) EASTING (FT.) ELEVATION (FT.) DESCRIPTION
TR-1 2,951,199.76 625,559.01 243.72 IRON PIN W/CAP
TR-2 2,951,030.46 625,241.41 243.73 IRON PIN W/CAP
TR-3 2,950,850.58 624,807.16 241.22 IRON PIN W/CAP
TR-4 2,950,682.05 624,310.43 240.84 IRON PIN W/CAP
BM1* 2,951,054 625,287 242.03 SQ CUT ON UPPER LEFT
SPILLWAY WALL
REFERENCE TIE FOR SURVEY CONTROL
NOT TO SCALE
TR-4
DAM BASELINE
BOLLARDSTOP OF DAM
7+00D
TR-3
ROBIN HILL STREET
8.10'
8.15'
DAM BASELINE
GUIDE RAIL
TOP OF DAM
EXISTING BOLLARDS GUIDE RAIL
12.12'2.72'
TR-1
7.92'
10.13'
DAM BASELINE
GATE POST
FENCE
TR-2
SIDEWALL OF
SPILLWAY SIDEWALL OF
SPILLWAY
GATE POST
DAM BASELINE
13.47'
12.47'
BM-1
FENCE
* FOR LOCATION PURPOSES ONLY. NOT FOR HORIZONTAL CONTROL.
LIMIT OF DETAILED SURVEY
SU
R
VE
Y
C O
N
TR
O L
AN
D
S
IT
E
LA
YO
U
T
PL
AN
D at e
C he ck ed
Ap pr ov ed
D ra w n
D es ig ne d
Sheet of
File No.
Drawing No.
Ap pr ov ed
Q :\E ar th
S ci en ce s C
BG
\D iv -4
-W \G
D H
\0
0-
Ty le r D am
\C
AD
D \D es ig n Se t\L ay ou t P la n of D am
S pi llw ay
.d w g Pl ot te d By
: M ille r, Br ia n
S.
, P lo t D at e:
/1
0/
1:
A M
TY
LE
R D
AM
FL
O O
D W
AT
ER
R
ET
AR
D
IN
G
D
AM
TY
LE
R D
AM
R
EH
AB
IL
IT
AT
IO
N P
R O
JE
C
T M
ID
D
LE
SE
X C
O U
N
TY
, M
AS
SA
C
H U
SE
TT
S
7 25
EJ
B
/0
3/
EK
M
/0
3/
EE
F
/3
1/
/3
1/
D
M S
DAM
AUXILIARY SPILLWAY
CREST WALL
ROBIN HILL ST
PO
N
D
VIEW
D R
IVE
LIMIT OF WORK
L1
L9
L2
L3
L4
L5
L6
L7
L8
L10
L11
L12
L13
L14
L15
L16
L17
L18
L19
L20
L21
L22
L23
L24
L25
L26
L27
L28
L29
L30
L31
L32
LIMIT OF WORK POINT TABLE CONT.
POINT # NORTHING EASTING
LIMIT OF WORK POINT TABLE
POINT # NORTHING EASTING
2950611.25
2950668.13
624204.15
624191.55
2950847.23 2951077.70
2950843.07
2950811.47
2950754.09
2950445.15
2950790.01
2950865.55
2950897.34
2951019.03
2951047.38
2951131.33
2951148.87
2951130.32
624712.77 625598.98
624740.92
624719.32
624622.55
624445.89
624737.00
624791.15
624834.24
625180.72
625235.77
625192.53
625199.15
625252.01
2951252.79
2951305.24
2951302.66
2951266.89
2951181.75
2951126.79
2951097.65
2951079.79
2950995.59
2950970.04
2950930.70
2950961.62
2950930.53
2950815.78
2950772.35
2950923.68
625481.67
625499.94
625508.00
625575.56
625631.90
625603.00
625593.80
625548.97
625411.71
625442.86
625431.26
625347.12
625119.40
624798.46
624762.41
625392.88
0+00 D
1+00 D
2+00 D
3+00 D
4+00 D
5+00 D
6+00 D
7+00 D
8+00 D
SCALE IN FEET
-0- 4040 80
LIMIT OF DETAILED SURVEY
REMOVE AND REINSTALL EXISTING VEHICULAR GATES
REMOVE AND REINSTALL EXISTING METAL BOLLARDS,
SEE BOLLARD AND VEHICULAR GATE NOTES,
THIS SHEET
DAM CREST
SEE DETAIL SHEET 10
(TYP)
PL
AN
O F
D
AM
SH
EE
T
O
F
D at e
C he ck ed
Ap pr ov ed
D ra w n
D es ig ne d
Sheet of
File No.
Drawing No.
Ap pr ov ed
Q :\E ar th
S ci en ce s C
BG
\D iv -4
-W \G
D H
\0
0-
Ty le r D am
\C
AD
D \D es ig n Se t\P ro po se d Pl an .d w g
Pl ot te d
By : M ille r, Br ia n S.
, P lo t D at e:
/2 9/
2:
P
M
TY
LE
R D
AM
FL
O O
D W
AT
ER
R
ET
AR
D
IN
G
D
AM
TY
LE
R D
AM
R
EH
AB
IL
IT
AT
IO
N P
R O
JE
C
T M
ID
D
LE
SE
X C
O U
N
TY
, M
AS
SA
C
H U
SE
TT
S
8 25
EJ
B
/0
3/
EK
M
/0
3/
EE
F
/3
1/
/3
1/
D
M S
M
AT
C H
LI
N
E, S
EE
S
H
EE
T
LEFT ABUTMENT
DAM EMBANKMENT
SLOPE 2H:1V
SLOPE 2H:1V
CONCRETE CREST WALL
SEE SHEETS 13 AND 14 FOR
DETAILS
DAM EMBANKMENT
STAGING AREA
SEE DETAIL SHEET 21
LIMIT OF WORK
LIMIT OF WORK
SPOIL PILE
TOP EL. 243.0'
SLOPE
3H:1V
SLOPE DAM CREST FILL
TO MEET EXISTING GRADE
TYP, SEE SHEET 13
PERMANENT ROCK
CONSTRUCTION ENTRANCE
SEE DETAIL SHEET 21
PERMANENT ROCK
CONSTRUCTION ENTRANCE
SEE DETAIL SHEET 21
APPROVED EARTHFILL AND TOPSOIL AND SEED - SEE TYPICAL DETAIL
SHEET 10
WETLANDS
REPLACE W / NEW WOODEN BOLLARDS,
SEE BOLLARD AND VEHICULAR GATE NOTES,
THIS SHEET
BOLLARD AND VEHICULAR GATE NOTES:
1. BEFORE REMOVAL OF BOLLARDS (METAL AND WOODEN) AND VEHICULAR GATES,
THE CONTRACTOR SHALL FIELD SURVEY AND DOCUMENT THE NORTHING AND
EASTING COORDINATE LOCATION OF EACH BOLLARD REFERENCED TO PROJECT
HORIZONTAL CONTROL AND REINSTALL IN THE SAME LOCATION.
2. TAKE CARE IN REMOVING METAL BOLLARDS AND VEHICULAR GATES TO AVOID
DAMAGE. METAL BOLLARDS AND VEHICULAR GATES WILL BE REMOVED AND
NEATLY STORED ONSITE FOR REINSTALLATION. STORE METAL BOLLARDS AND
VEHICULAR GATES OFF THE GROUND AND IN A MANNER TO AVOID DAMAGE,
DETERIORATION, AND ENVIRONMENTAL EXPOSURE. REPAIRS TO DAMAGE
CAUSED TO BOLLARDS AND VEHICULAR GATES DURING REMOVAL WILL BE THE
RESPONSIBILITY OF THE CONTRACTOR AT NO ADDITIONAL TIME OR
COMPENSATION TO THE CONTRACTOR. ALL REPAIRS SHALL BE APPROVED BY
THE COR PRIOR TO COMMENCEMENT.
3. IF METAL BOLLARDS AND VEHICULAR GATES (STRUCTURES) ARE DETERMINED BY
THE CONTRACTOR TO HAVE BEEN INSTALLED WITH CONCRETE FOOTINGS AND
THE CONCRETE IS BONDED TO THE STRUCTURES, THEN CAREFULLY REMOVE
THE CONCRETE FOOTINGS FROM THE STRUCTURES TO AVOID DAMAGING THE
STRUCTURES. REINSTALL METAL BOLLARDS AND VEHICULAR GATES WITH NEW
CONCRETE FOOTINGS TO THE DIMENSIONS OF THE EXISTING FOOTINGS. USE
BACKFILL CONCRETE TO REINSTALL METAL BOLLARDS AND VEHICULAR GATES.
4. AFTER METAL BOLLARDS AND VEHICULAR GATES ARE REINSTALLED, PAINT THEM
WITH AN EXTERIOR WATERPROOFING PAINT. LOXON XP BY SHERWIN WILLIAMS
OR AN APPROVED EQUAL. PAINT COLOR TO MATCH EXISTING COLOR. SUBMIT
PAINT TO COR FOR APPROVAL.
5. REMOVE AND DISPOSE OFF-SITE THE EXISTING WOODEN BOLLARDS. REPLACE
REMOVED WOODEN BOLLARDS WITH NEW WOODEN BOLLARDS AT THE SAME
LOCATION. NEW WOODEN BOLLARDS TO MATCH THE DIMENSIONS OF EXISTING
BOLLARDS. WOODEN BOLLARDS WILL BE MADE OF PRESSURE TREATED LUMBER.
SUBMIT WOODEN BOLLARDS TO COR FOR APPROVAL.
25' CLEARING
AND GRUBBING LIMIT
SEE SHEET 13 FOR ENLARGED VIEW
TR3
TR4
WETLAND EXTENDS
BEYOND STUDY AREA
WETLAND EXTENDS
BEYOND STUDY AREA
WETLAND EXTENDS
BEYOND STUDY AREA
21021021
BM1
WOODS
WOODS
WOODS
225225
230 23
230 23 0 23
2+
A
SW
0+
A
SW
1+
A
SW
2+
A
SW
17+00 D
9+00 D
10+00 D 11+00 D 12+00 D 13+00 D 14+00 D 15+00 D 16+00 D 17+00 D
SCALE IN FEET
-0- 4040 80
ROBIN HILL ST.
LIMIT OF DETAILED SURVEY
BUILDING (TYP)
PO
N
D
VIEW
D R
RISER STRUCTURE
SPILLWAY
STRUCTURE
STORM DRAIN HEADWALL
12" RCP DRAIN PIPE
INLET INVERT EL. 216.42
OUTLET INVERT EL. 216.16
12" RCP DRAIN PIPE
INLET INVERT EL. 216.10
12" CMP DRAIN PIPE
INLET INVERT EL. 226.74
OUTLET INVERT EL. 216.10
12" CMP DRAIN PIPE
INLET INVERT EL. 227.73
OUTLET INVERT EL. 227.01
PL
AN
O F
D
AM
SH
EE
T
O
F
D at e
C he ck ed
Ap pr ov ed
D ra w n
D es ig ne d
Sheet of
File No.
Drawing No.
Ap pr ov ed
Q :\E ar th
S ci en ce s C
BG
\D iv -4
-W \G
D H
\0
0-
Ty le r D am
\C
AD
D \D es ig n Se t\P ro po se d Pl an .d w g
Pl ot te d
By : M ille r, Br ia n S.
, P lo t D at e:
/1 4/
:2
PM
TY
LE
R D
AM
FL
O O
D W
AT
ER
R
ET
AR
D
IN
G
D
AM
TY
LE
R D
AM
R
EH
AB
IL
IT
AT
IO
N P
R O
JE
C
T M
ID
D
LE
SE
X C
O U
N
TY
, M
AS
SA
C
H U
SE
TT
S
9 25
EJ
B
/0
3/
EK
M
/0
3/
EE
F
/3
1/
/3
1/
D
M S
M
AT
C H
LI
N
E, S
EE
S
H
EE
T
SLOPE 2H:1V
SLOPE 2H:1V
EL. 227.97'
LIMIT OF WORK
SLOPE
3H:1V
SLOPE
3H:1V
DAM
AUXILIARY
SPILLWAY
PRINCIPAL SPILLWAY CONDUIT
9' WIDE BY 7' HIGH
A
A
ERODED AREAS UPSTREAM OF DAM
BASELINE. PLACE TOPSOIL AND GRADE
TO MATCH ADJOINING EXISTING GRADE
SURFACE AND SEED.
SL
O
PE
2%
CLEAR TREES WITHIN 20' OF
THE DAM EMBANKMENT -
ABUTMENT CONTACT
FOUNDATION DRAIN ℄
FL
O
W
B
B
EXISTING CHAIN-LINK FENCE
TO BE REMOVED
CHAIN LINK FENCE
SEE SHEET 15
SEE SHEET 11 FOR
SPILLWAY APPROACH
CHANNEL MODIFICATIONS
APPROVED EARTHFILL AND TOPSOIL AND SEED - SEE TYPICAL DETAIL
SHEET 10
WETLANDS
CONCRETE, RIPRAP AND
BEDDING NOT SHOWN.
TO BE REMOVED.
WETLAND EXTENDS
BEYOND STUDY AREA
WETLAND EXTENDS
BEYOND STUDY AREA
WETLAND EXTENDS
BEYOND STUDY AREA
WETLAND EXTENDS
BEYOND STUDY AREA
LIMIT OF GCL LINER
EL
EV
AT
IO
N
(F
EE
T)
0102030405060708090100110120130140 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140
3.5
14'
CREST EL. 241.8 FT.
SEE TYPICAL DAM CREST DETAIL THIS SHEET
TEMPORARY ACCESS ROAD, SEE
DETAIL AND NOTES THIS SHEET
UPSTREAM DOWNSTREAM
FINISHED GRADE
4.29% 4.29%
EL. 241.8 FT
EL. 241.5 FTEL. 241.5 FT
6"
6" TOPSOIL & SEED
3.5
14'
7'
APPROVED EARTHFILL
STRIP TOPSOIL 6"
12.7'
4' MAX
SCALE IN FEET
-0- 1010 20
D at e
C he ck ed
Ap pr ov ed
D ra w n
D es ig ne d
Sheet of
File No.
Drawing No.
Ap pr ov ed
Q :\E ar th
S ci en ce s C
BG
\D iv -4
-W \G
D H
\0
0-
Ty le r D am
\C
AD
D \D es ig n Se t\T yp
E m ba nk m en t S ec tio n.
dw g
Pl ot te d
By : M ille r, Br ia n S.
, P lo t D at e:
0/
/2
1:
P
M
TY
LE
R D
AM
FL
O O
D W
AT
ER
R
ET
AR
D
IN
G
D
AM
TY
LE
R D
AM
R
EH
AB
IL
IT
AT
IO
N P
R O
JE
C
T M
ID
D
LE
SE
X C
O U
N
TY
, M
AS
SA
C
H U
SE
TT
S
10 25
EJ
B
/0
3/
EK
M
/0
3/
EE
F
/3
1/
/3
1/
D
M S
D
AM
E M
BA
N
KM
EN
T
SE
C
TI
O N
TYPICAL PROPOSED DAM CREST DETAIL
TYPICAL DAM EMBANKMENT SECTION
APPROVED EARTHFILL
DAM
DAM
TEMPORARY ACCESS ROAD DETAIL
N.T.S.
TEMPORARY ACCESS ROAD NOTES:
1. STRIP TOPSOIL BEFORE EXCAVATING FOR TEMPORARY ACCESS ROAD.
2. UTILIZE EXISTING APPROVED FILL (I.E. DAM EMBANKMENT MATERIAL) TO
CONSTRUCTION TEMPORARY ACCESS ROAD.
3. AVOID CONTAMINATION OF APPROVED FILL USED FOR TEMPORARY ACCESS
ROAD. RESTORE DAM EMBANKMENT TO EXISTING LINES, GRADES, AND
VEGETATION CONDITION USING SAME APPROVED FILL MATERIAL. APPROVED FILL
MATERIAL WILL BE APPROVED BY COR FOR REUSE TO RESTORE DAM EMBANKMENT.
TEMPORARY
ACCESS ROAD
4% (TYP) 4% (TYP)
LEGEND
APPROVED EARTHFILL
AT
IO
N (F
EE
T)
0102030405060708090100110120130140 0 -10 -20 -30 -40 -50 -60 -70 -80 -90 -100 -110 -120 -130 -140
1.5
FLOW
EL. 227.97'
2% SLOPE
1:1 TYP
40'
1'
EL. 230.47
GCL, SEE DETAIL SHEET 12
CONCRETE SLAB AND KEY
TO BE REMOVED
FL
O
W
TO BE REMOVED
SCALE IN FEET
-0- 1010 20
SPILLWAY SECTION
D at e
C he ck ed
Ap pr ov ed
D ra w n
D es ig ne d
Sheet of
File No.
Drawing No.
Ap pr ov ed
Q :\E ar th
S ci en ce s C
BG
\D iv -4
-W \G
D H
\0
0-
Ty le r D am
\C
AD
D \D es ig n Se t\S pi llw ay
S ec tio n.
dw g
Pl ot te d
By : M ille r, Br ia n S.
, P lo t D at e:
0/
/2
2:
P
M
TY
LE
R D
AM
FL
O O
D W
AT
ER
R
ET
AR
D
IN
G
D
AM
TY
LE
R D
AM
R
EH
AB
IL
IT
AT
IO
N P
R O
JE
C
T M
ID
D
LE
SE
X C
O U
N
TY
, M
AS
SA
C
H U
SE
TT
S
11 25
EJ
B
/0
3/
EK
M
/0
3/
EE
F
/3
1/
/3
1/
D
M S
AU
XI
LI
AR
Y
SP
IL
LW
AY
A
PP
R
O
AC
H C
H
AN
N
EL
M O
D
IF
IC
AT
IO
N
S
DAM
A
PLAN VIEW
ASBESTOS CEMENT DRAIN PIPE AND
CONCRETE SLAB REMOVAL LIMITS
N.T.S.
DEMOLITION NOTES:
1. PRIOR TO COMMENCING DEMOLITION ACTIVITIES, CONTRACTOR AND COR WILL VISUALLY INSPECT AND
IDENTIFY FOR PAYMENT EXISTING DAMAGED LOCATIONS ALONG THE SPILLWAY HEADWALL.
2. DAMAGE TO SPILLWAY HEADWALL CAUSED BY CONTRACTOR DURING DEMOLITION ACTIVITIES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AND WILL BE REPAIRED TO THE SATISFACTION OF THE COR AT NO
ADDITIONAL EXPENSE TO THE NRCS.
3. SAW CUT EXISTING REINFORCING STEEL AND EXISTING WATERSTOP CONNECTING THE SPILLWAY HEADWALL TO THE CONCRETE SLAB FLUSH WITH THE BACK FACE OF THE SPILLWAY HEADWALL. REMOVE REMAINING WATERSTOP IN THE HEADWALL TO A MINIMUM DISTANCE OF 1/2- INCH FROM THE FACE OF THE WALL.
4. DEMOLISH CONCRETE SLAB. CONTRACTOR MAY SPOIL DEMOLISHED CONCRETE SLABS ON-SITE IF REINFORCING AND WATERSTOP MATERIALS ARE REMOVED FROM DEMOLISHED CONCRETE SLABS. IF CONTRACTOR ELECTS NOT TO REMOVE REINFORCING AND WATERSTOP MATERIAL FROM DEMOLISHED CONCRETE SLABS, DEMOLISHED CONCRETE SLABS SHALL BE REMOVED AND DISPOSED OF OFF-SITE BY THE
CONTRACTOR IN A LAWFUL MANNER.
5. APPLY A MINIMUM OF TWO COATS OF SIKAGARD 62, OR APPROVED EQUAL, TO EXPOSED REINFORCING
ALONG THE BACK SIDE OF THE SPILLWAY HEADWALL IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS TO PROTECT THE REINFORCING FROM AIR AND WATER. PREPARE STEEL AND
CONCRETE SURFACE IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS. APPLY PRODUCT BEYOND REINFORCING EXTENTS AND ONTO CONCRETE TO ENSURE EXPOSED REINFORCING IS FULLY COATED.
6. EXCAVATE BEDDING MATERIAL AND SPOIL ON-SITE AT DESIGNATED SPOIL AREA.
7. EXCAVATE, CLEAN, AND PLACE RIPRAP NEATLY AND EVENLY BEHIND THE LEFT AND RIGHT SPILLWAY TRAINING WALLS NEAR THE NORMAL TAILWATER SURFACE ELEVATION WHERE EXISTING RIPRAP IS SPARSE.
8. REMOVE AND DISPOSE OF OFF-SITE IN A LAWFUL MANNER THE 4-INCH ASBESTOS CEMENT DRAIN PIPE LOCATED BEHIND THE SPILLWAY HEADWALL IN ACCORDANCE WITH MASS DEP AND LOCAL RULES AND REGULATIONS. SEVER THE 4-INCH ASBESTOS CEMENT DRAIN PIPE A MINIMUM DISTANCE OF 1-INCH INSIDE THE WALL PENETRATION AS MEASURED FROM THE UPSTREAM SIDE OF THE SPILLWAY HEADWALL AND FILL THE INTERIOR OF THE PIPE WITH MORTAR PER CS35. ENSURE THE ABANDONED ASBESTOS CEMENT DRAIN PIPE LEFT BEHIND IN THE SPILLWAY HEADWALL IS COMPLETELY FILLED AND ENCAPSULATED WITH MORTAR.
FINISH MORTAR SURFACES IN ACCORDANCE WITH CS31. COMPLETELY FILL THE WALL PENETRATION WITH MORTAR AND FINISH THE MORTAR SURFACE FLUSH WITH UPSTREAM AND DOWNSTREAM FACE OF THE
HEADWALL.
SEE APPROACH CHANNEL
DETAIL THIS SHEET
TO BE REMOVED
TO BE REMOVED
TO BE REMOVED
17"
EL. 227.8
WATERSTOP
GCL, SEE DETAIL
SHEET 12
APPROACH CHANNEL DETAIL
FINISHED GRADE
REMOVE RIPRAP BELOW GCL,
BACKFILL BELOW GCL WITH
STRUCTURE BACKFILL
TYPICAL SECTION
REMOVE DRAIN PIPE,
1" MIN. INTO HEADWALL
DRAIN PIPE TO REMAIN,
ABANDON DRAIN PIPE WALL
PENETRATION, SEE DEMOLITION
NOTE 8
SCALE IN FEET
-0- 22 4
B
B
C
C
C
FLOW
SAWCUT, SEE DEMOLITION NOTES,
THIS SHEET
2% SLOPE
STRIP TOPSOIL 6"
EL. 230.47
B
DAM
FINISHED GRADE
EL. 227.97
1.5'
AT
IO
N (F
EE
T)
EL
EV
AT
IO
N (F
EE
T)
PROFILE OF ASW
ST
A.
2+
D
12+00D 12+50D 13+00D 13+50D 14+00D 14+50D 15+00D 15+50D
3H:1V
TYP
TO BE REMOVED
TYP
BOTTOM OF
EXCAVATION TYP FINISHED GRADEGCL, SEE GCL DETAIL THIS SHEET
APPROVED EARTHFILL
AND STRUCTURE BACKFILL,
LIMITS DEFINED BY CS 23
1H:1V
TYP
ST
A.
5+
D
4"
6"
12"
4"
2% SLOPE
6" TOPSOIL
AND SEED
1H:1V
FLOW
BOTTOM OF
EXCAVATION
GRANULAR BENTONITE,
SEE GCL INSTALLATION
NOTES THIS SHEET
GCL
TYPE 304 S.S. 3 12" CONCRETE
ANCHORS @ 12" C.C. STARTING
1" FROM END OF BATTEN BAR
BENTONITE SEALING COMPOUND,
SEE GCL INSTALLATION
NOTES THIS SHEET
APPROVED EARTHFILL
AND STRUCTURE BACKFILL,
LIMITS DEFINED BY CS 23
3"X1" (NOMINAL) BATTEN BAR (PLASTIC)
EL. 227.97FINISHED GRADE
D at e
C he ck ed
Ap pr ov ed
D ra w n
D es ig ne d
Sheet of
File No.
Drawing No.
Ap pr ov ed
Q :\E ar th
S ci en ce s C
BG
\D iv -4
-W \G
D H
\0
0-
Ty le r D am
\C
AD
D \D es ig n Se t\S pi llw ay
S ec tio n.
dw g
Pl ot te d
By : M ille r, Br ia n S.
, P lo t D at e:
0/
/2
2:
P
M
TY
LE
R D
AM
FL
O O
D W
AT
ER
R
ET
AR
D
IN
G
D
AM
TY
LE
R D
AM
R
EH
AB
IL
IT
AT
IO
N P
R O
JE
C
T M
ID
D
LE
SE
X C
O U
N
TY
, M
AS
SA
C
H U
SE
TT
S
12 25
EJ
B
/0
3/
EK
M
/0
3/
EE
F
/3
1/
/3
1/
D
M S
AU
XI
LI
AR
Y
SP
IL
LW
AY
G
C L
LI
N
ER
D
ET
AI
LS
SCALE IN FEET
-0- 2020 40
GEOSYNTHETIC CLAY LINER (GCL) DETAIL
N.T.S.
GCL INSTALLATION NOTES:
1. CAUTION - SEE CS 98 FOR PROVISIONS REGARDING MINIMUM REQUIRED LIMITS OF EARTHFILL BETWEEN EQUIPMENT AND GCL. ALSO COMPLY WITH
MANUFACTURER'S RECOMMENDATIONS.
2. DAMAGE TO THE SPILLWAY HEADWALL CAUSED BY THE CONTRACTOR DURING INSTALLATION OF THE GCL WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE NRCS AND WILL BE REPAIRED TO THE SATISFACTION OF THE COR.
3. EXTEND GCL JUST ABOVE THE BATTEN BAR AND PROVIDE A CONTINUOUS SEAL USING A BENTONITE SEALING COMPOUND ALONG EXTERIOR EDGES OF GCL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATION. ENSURE BENTONITE SEALING COMPOUND IS INSTALLED WHERE GCL IS IN CONTACT WITH CONCRETE
SURFACES AND AT LOCATIONS WHERE CONCRETE ANCHORS WILL BE INSTALLED.
4. GRANULAR BENTONITE APPLICATION RATE AS SPECIFIED IN CS98.
5. SEE SHEET 11 FOR ADDITIONAL DETAILS
ELEVATION VIEW
B
STRIP TOPSOIL 6"
ASW SECTION
WOODS
40' 60'
6+00 D
7+00 D
8+00 D
C O
N C
R
ET
E C
R
ES
T W
AL
L
PL
AN
D at e
C he ck ed
Ap pr ov ed
D ra w n
D es ig ne d
Sheet of
File No.
Drawing No.
Ap pr ov ed
Q :\E ar th
S ci en ce s C
BG
\D iv -4
-W \G
D H
\0
0-
Ty le r D am
\C
AD
D \D es ig n Se t\P ro po se d Pl an .d w g
Pl ot te d
By : M ille r, Br ia n S.
, P lo t D at e:
/1 4/
:2
AM
TY
LE
R D
AM
FL
O O
D W
AT
ER
R
ET
AR
D
IN
G
D
AM
TY
LE
R D
AM
R
EH
AB
IL
IT
AT
IO
N P
R O
JE
C
T M
ID
D
LE
SE
X C
O U
N
TY
, M
AS
SA
C
H U
SE
TT
S
13 25
EJ
B
/0
3/
EK
M
/0
3/
EE
F
/3
1/
/3
1/
D
M S
SCALE IN FEET
-0- 1010 20
A
A
DAM CREST
SEE DETAIL SHEET 10
(TYP)
DAM
ROBIN HILL STREET
12" CMP DRAIN PIPE
INLET INVERT EL. 241.77
OUTLET INVERT EL. 214.56
CONCRETE CREST WALL
TOP EL. 241.8
SEE SHEET 14
STORM DRAIN HEADWALL
REMOVE AND REINSTALL EXISTING GATES
REMOVE AND REPLACE EXISTING BOLLARDS
(TYP) SEE NOTES SHEET 8
SLOPE 2H:1V
ROBIN HILL ST.
RIGHT-OF-WAY
LIMIT OF WORK
SLOPE DAM CREST FILL
TO MEET EXISTING GRADE
SLOPE 2H:1V
PERMANENT ROCK CONSTRUCTION
ENTRANCE, SEE ROCK CONSTRUCTION
ENTRANCE NOTES SHEET 21
PERMANENT ROCK
CONSTRUCTION ENTRANCE
SEE DETAIL SHEET 21
LIMIT OF WORK
SLOPE 2H:1V
SLOPE 2H:1V
14'
TOE DRAIN PIPE
EL. 241.8'
WARP
SLOPE
REMOVE ROCK CONSTRUCTION ENTRANCE
TO PERMIT PLACEMENT OF APPROVED FILL,
SEE ROCK CONSTRUCTION NOTES, SHEET 21
REMOVE ROCK CONSTRUCTION ENTRANCE
TO PERMIT PLACEMENT OF APPROVED FILL,
SEE DETAIL SHEET 21
APPROVED EARTHFILL AND TOPSOIL AND SEED - SEE TYPICAL DETAIL
SHEET 10
1+13.77 CW
0+13.77 CW
7+53.63 D7+43.72 D
LEGEND
AT
IO
N (F
EE
T)
EL
EV
AT
IO
N (F
EE
T)
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+26
10' 30' 30' 30'
ST
A.
+1
3.
ST
A.
+7
3.
ST
A.
+1
3.
EL. 236.5'
EL. 236.5'
" S
PL
IC
E (T
YP
3" CLR (TYP)
3" CLR (TYP)
#5 @ 12(TYP)
3/4" x 3/4" CHAMFERS
AT EXPOSED EDGES (TYP)
1'
EL. 241.8'
#5 @ 6(TYP)
#5 @ 12(TYP)
STRUCTURE BACKFILL
(TYP)
UNDISTURBED SUBRADE
CONSTRUCTION JOINT
10" HOOK (TYP)
DOWNSTREAM SIDE
UPSTREAM SIDE
6" PVC WATERSTOP
14"
3'
DOWELED CONTRACTION JOINT IN WALL
NOT TO SCALE
ONE HALF OF BAR RIGIDLY
ENCASED IN CONCRETE
UPSTREAM FACE9" PVC WATERSTOP
1' -2
PLASTIC SLEEVE
1" DIA. SMOOTH DOWEL BAR
BAR X 24" LG. @ 24" C/C
DOWNSTREAM FACE
5" 3"
1'-0"
REINFORCEMENT AS REQUIRED (TYP.)
6"
C O
N C
R
ET
E C
R
ES
T W
AL
L
D
ET
AI
LS
D at e
C he ck ed
Ap pr ov ed
D ra w n
D es ig ne d
Sheet of
File No.
Drawing No.
Ap pr ov ed
Q :\E ar th
S ci en ce s C
BG
\D iv -4
-W \G
D H
\0
0-
Ty le r D am
\C
AD
D \D es ig n Se t\P ro po se d Pl an .d w g
Pl ot te d
By : M ille r, Br ia n S.
, P lo t D at e:
0/
/2
1:
P
M
TY
LE
R D
AM
FL
O O
D W
AT
ER
R
ET
AR
D
IN
G
D
AM
TY
LE
R D
AM
R
EH
AB
IL
IT
AT
IO
N P
R O
JE
C
T M
ID
D
LE
SE
X C
O U
N
TY
, M
AS
SA
C
H U
SE
TT
S
14 25
EJ
B
/0
3/
EK
M
/0
3/
EE
F
/3
1/
/3
1/
D
M S
SCALE IN FEET
-0- 55 10
PROFILE ALONG NORTH (DOWNSTREAM) FACE OF CONCRETE CREST WALL
(LOOKING UPSTREAM)
CONCRETE CREST WALL NOTES:
1. EXCAVATION REQUIREMENTS ARE PROVIDED IN SPECIFICATION CS21.
2. BACKFILL CONCRETE CREST WALL EQUALLY, NOT EXCEEDING A MAXIMUM DIFFERENTIAL OF 1-FOOT ON EITHER
SIDE OF THE WALL.
3. PROVIDE CONSTRUCTION AND CONTRACTION JOINTS AT THE LOCATIONS SHOWN. CHANGES TO JOINTS AND
JOINT LOCATIONS MUST BE APPROVED IN WRITING BY THE COR.
4. ALL JOINTS REQUIRE WATERSTOPS.
5. CONSTRUCTION JOINTS ARE COLD JOINTS WITH REINFORCING CONTINUOUS THROUGH THE JOINT.
6. CONTRACTION JOINTS ARE DOWELED COLD JOINTS AND DO NOT HAVE CONTINUOUS REINFORCING THROUGH
THE JOINT.
7. CLASS OF CONCRETE AND OTHER DESIGN DETAILS ARE PROVIDED IN SPECIFICATION CS31.
TYPICAL CONCRETE CREST WALL SECTION
NOT TO SCALE
APPROXIMATE 31.03°
HORIZONTAL BEND
WATERSTOP NOTES:
1. WELD ALL PVC JOINTS PER MANUFACTURER'S INSTRUCTIONS. INSTALL ON CLEAN EXISTING CONCRETE
SURFACE.
2. APPLY A LAYER OF EPOXY GEL BETWEEN WATERSTOP AND CONCRETE SURFACE IN ACCORDANCE WITH
MANUFACTURER'S INSTRUCTIONS. APPLY NEOPRENE PAD OR CAULK PER MANUFACTURER'S
RECOMMENDATION WHERE CLEAN CONCRETE SURFACE IS UNEVEN. RECORD ALL VARIATION ON
AS-BUILT DRAWINGS.
3. FOR ALL WATERSTOP JUNCTIONS OR ABRUPT CHANGES IN DIRECTION PROVIDE MANUFACTURER'S PREFABRICATED TEE, Ls, CROSSES, ETC. AS APPLICABLE
TOP OF WALL EL. 241.8'
CONTRACTION JOINT (TYP)
GRADE TO EL. 241.8'
(TOP OF DAM)
EXTEND TO EL. 242'
DOWNSTREAM FINISHED
GRADE EL. 241.8'
(TOP OF DAM)
3 8"
8"
8"
Ø 78" ID & Ø 11
2" OD
9"
3 16
9" WATERSTOP DETAIL
NOT TO SCALE
9" PVC, RIBBER WATERSOP
WITH CENTER BULB,
GREENSTREAK 696, OR EQUAL
AND
FINISHED GRADE
FLOW
A
AND FINISHED GRADE
FINISHED GRADE EL. 240.5 (MIN.),
SEE PROFILE THIS SHEET
AND
FINISHED GRADE
UPSTREAM FINISHED
GRADE
EL. 240.5 (MIN.)
NOTE: SEE TYPICAL CONCRETE CREST WALL SECTION, THIS SHEET
ST
A.
+4
1.
ST
A.
+0
1.
TYPICAL FINISHED GRADING
STA. 0+27.77 TO 1+13.77
TYPICAL FINISHED GRADING
STA. 0+13.77 TO 0+27.77 CW.
SEE PLAN VIEW ON SHEET 13
SEE PROFILE
CHAIN-LINK FENCE DETAIL
NOT TO SCALE
1/
2" 8'-0"
VARIES 10'-0" MAX
VEE TYPE STEEL EXTENSION
ARMS @ 45° ANGLE
1 5/8" OD
PIPE
3/8" ROUND
ROD
3" OD CORNER
POST
2 1/2" OD
LINE POST
TOP OF CONCRETE
TENSION WIRE
7 GAUGE
DOUBLE LEAF SWING GATE DETAIL
NOT TO SCALE
10'-0"
BARBED WIRE (TYP)
1" MESH #9
GAUGE FENCING
FABRIC
LATCH ASSEMBLY
w/ KEEPER
5/8" DIA PLUNGER BAR
4" OD GATE
POST
8'-0" GATE FRAME
2" OD
BARBED WIRE (TYP)
THREE STRANDS EACH ARM
INSIDE AND OUTSIDE
1" MESH #9 GAUGE
FENCING FABRIC
CONCRETE CATCH FOR
PLUNGER BAR
CONCRETE
8"X8"X3/8" GALVANIZED
STEEL BRACKET
1/2" S.S. ADHESIVE ANCHORS
WITH 4" EMBEDMENT (TYP),
SEE CS 91
SURFACE MOUNTED FENCE POST DETAIL
NOT TO SCALE
1'-0"
1'-0"
CHAIN-LINK FENCE PLAN
SURFACE MOUNTED
FENCE POST (TYP.)
SEE DETAIL, THIS SHEET
4'-0"
CONCRETE WALL
DOUBLE FENCE BARRIER DETAIL
NOT TO SCALE
8'-0"
4'-0"
1'-0" DIA.
1/
2"
4" 3'
-0
NOTE: SET POST CENTERED IN FOOTING
FOOTING DOMED
TO SHED WATER
FINISHED GRADE
POST
FENCE POST IN SOIL DETAIL
NOT TO SCALE
SEE FENCE POST IN SOIL
DETAIL THIS SHEET (TYP.)
CONCRETE FOOTING
1" MESH #9 GAUGE
FENCING FABRIC
1 5 8" OD PIPE
3" OD CORNER POST
VERTICAL MOUNTED FENCE POST DETAIL
NOT TO SCALE
ADHESIVE MATERIAL (TYP),
SEE CS 91
ADHESIVE MATERIAL (TYP),
SEE CS 91
PIPE STRAP WELDED TO POST (TYP)
1/2" S.S. ADHESIVE ANCHORS
WITH 4" EMBEDMENT (TYP),
SEE CS 91
BM1TR2
TR1
12+00 D 13+00 D 14+00 D 15+00 D 16+00
2+
A
SW
1+
A
SW
2+
A
SW
F1
F2
F3 F4
F5 F6
F7 F8
F9 F10
C H
AI
N
-L
IN
K
FE
N C
E D
ET
AI
LS
D at e
C he ck ed
Ap pr ov ed
D ra w n
D es ig ne d
Sheet of
File No.
Drawing No.
Ap pr ov ed
Q :\E ar th
S ci en ce s C
BG
\D iv -4
-W \G
D H
\0
0-
Ty le r D am
\C
AD
D \D es ig n Se t\M is ce lla ne ou s D et ai ls .d w g
Pl ot te d
By : M ille r, Br ia n S.
, P lo t D at e:
0/
/2
2:
P
M
TY
LE
R D
AM
FL
O O
D W
AT
ER
R
ET
AR
D
IN
G
D
AM
TY
LE
R D
AM
R
EH
AB
IL
IT
AT
IO
N P
R O
JE
C
T M
ID
D
LE
SE
X C
O U
N
TY
, M
AS
SA
C
H U
SE
TT
S
15 25
EJ
B
/0
3/
EK
M
/0
3/
EE
F
/3
1/
/3
1/
D
M S
END OF
FENCE (TYP)
DOUBLE FENCE BARRIER,
6 FT ABOVE GROUND (TYP),
SEE DETAIL THIS SHEET
DOUBLE LEAF SWING GATE
SEE DETAIL THIS SHEET
LIMIT OF WORK
TO BE REMOVED
DOUBLE LEAF
SWING GATE,
SEE DETAIL
THIS SHEET
CHAIN-LINK FENCE NOTES:
1. REMOVE EXISTING CHAIN-LINK FENCING ALONG THE CONCRETE TRAINING WALLS
AND ALONG THE EARTHEN DAM EMBANKMENT. DISPOSE OF CHAIN-LINK FENCE
OFF-SITE. INCLUDING CONCRETE FOOTINGS LOCATED IN GROUND.
2. DAMAGE TO CONCRETE CAUSE BY CONTRACTOR DURING CHAIN-LINK FENCE
REMOVAL WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AT NO
ADDITIONAL EXPENSE TO THE NRCS AND WILL BE REPAIRED TO THE
SATISFACTION OF THE COR.
3. PRIOR TO INSTALLATION OF NEW CHAIN-LINK FENCE, VOIDS IN CONCRETE LEFT
BEHIND FROM REMOVAL OF EXISTING CHAIN-LINK FENCE WILL BE CLEANED TO
REMOVE DEBRIS AND LOOSE MATERIAL AND WILL BE FILLED IN WITH MORTAR
PER CS 35. TOP OF MORTAR SURFACE WILL BE DOMED A MINIMUM OF 1/4-INCH
HIGH.
4. CHAIN-LINK FENCE POSTS, FRAMEWORK, FABRIC, AND FITTINGS WILL BE COATED
WITH A POLYMER TOP COATING PER CS 91. COLOR TO RESEMBLE FOREST
GREEN AND MATCH METAL BOLLARDS AND VEHICULAR GATES.
SCALE IN FEET
-0- 3030 60
5'
28'
FL
O
W
5' 5'
CHAIN LINK FENCE
SEE DETAILS
THIS SHEET
5'
5'
CHAIN LINK FENCE
MOUNTED ON
EMBANKMENT SIDE
VERTICAL FACE (TYP)
CHAIN LINK FENCE
MOUNTED ON
UPSTREAM SIDE
VERTICAL FACE (TYP)
37.08'
.1
.0
8'
POINT #
F9
F1
F2
F3
F4
F5
F6
F7
F8
F10
NORTHING
2951201.99
2951044.57
2951022.03
2950968.95
2950986.40
2951005.01
2951027.05
2951008.47
2951102.78
2951207.24
EASTING
625577.34
625268.45
625252.38
625323.85
625356.57
625346.64
625387.97
625397.90
625574.42
625574.05
FENCE CONTROL POINTS
TO BE REMOVED
TO BE REMOVED
TO BE REMOVED
TO BE REMOVED
POLYMER-MODIFIED MORTAR,
SEE CS 35
TO BE CLEANED AND COATED
WITH ANTI-CORROSION COMPOUND,
SEE CS 35
SAW CUT 1" MIN. DEEP.
SAW CUT ALL EDGES 1" MIN.
OUTSIDE DETERIORATED AREA
3" MIN.
1" MIN.
SEE JOINT REPAIR DETAILS,
THIS SHEET
3" MIN.
POLYMER-MODIFIED MORTAR,
SEE CS 35
TO BE CLEANED AND COATED
WITH ANTI-CORROSION COMPOUND,
SEE CS 35
SAW CUT 1" MIN. DEEP AND
PERPENDICULAR TO SURFACE.
SAW CUT ALL EDGES 1" MIN.
OUTSIDE DETERIORATED AREA
CONCRETE REMOVAL LIMIT,
SEE NOTES
1" MIN.
2" MIN.
PREFORMED EXPANSION JOINT FILLER,
SEE CS 35
M
IS
C
EL
LA
N
EO
U
S D
ET
AI
LS
D at e
C he ck ed
Ap pr ov ed
D ra w n
D es ig ne d
Sheet of
File No.
Drawing No.
Ap pr ov ed
Q :\E ar th
S ci en ce s C
BG
\D iv -4
-W \G
D H
\0
0-
Ty le r D am
\C
AD
D \D es ig n Se t\M is ce lla ne ou s D et ai ls .d w g
Pl ot te d
By : M ille r, Br ia n S.
, P lo t D at e:
0/
/2
2:
P
M
TY
LE
R D
AM
FL
O O
D W
AT
ER
R
ET
AR
D
IN
G
D
AM
TY
LE
R D
AM
R
EH
AB
IL
IT
AT
IO
N P
R O
JE
C
T M
ID
D
LE
SE
X C
O U
N
TY
, M
AS
SA
C
H U
SE
TT
S
16 25
EJ
B
/0
3/
EK
M
/0
3/
EE
F
/3
1/
/3
1/
D
M S
GRAFFITI REMOVAL
N.T.S.
GRAFFITI REMOVAL NOTES:
1. REMOVE GRAFFITI FROM EXTERIOR AND INTERIOR UNSUBMERGED CONCRETE SURFACES.
2. USE TAGINATOR GRAFFITI REMOVER FOR MASONRY AND CONCRETE SURFACES OR APPROVED EQUAL.
SUBMIT PRODUCT AND PROCEDURE TO COR FOR APPROVAL.
3. SPRAY ON PRODUCT ONTO GRAFFITI PER MANUFACTURER'S RECOMMENDATIONS AND USE A PRESSURE WASHER TO REMOVE GRAFFITI FROM CONCRETE SURFACES OR OTHERWISE EXECUTE GRAFFITI REMOVAL AS RECOMMENDED BY MANUFACTURER. PRESSURE WASHING SHALL NOT REMOVE EXISTING CEMENT MATRIX SURFACE MATERIAL. PERFORM GRAFFITI REMOVAL IN A SAMPLE AREA TO BE DESIGNATED BY COR AND DEMONSTRATE REMOVAL PROCEDURE TO THE SATISFACTION OF THE COR BEFORE BEGINNING
PRODUCTION CLEANING.
4. IF PROPOSING AN ALTERNATIVE PRODUCT, THE ALTERNATIVE PRODUCT AND PROCEDURE SHALL BE FREE OF AIR AND WATER POLLUTANTS, DOES NOT CONTAIN OTHER TOXIC SUBSTANCES, AND DOES NOT
REQUIRE DISCHARGE COLLECTION AND DISPOSAL.
5. PHOTOGRAPHS REPRESENT TYPICAL AREAS OF GRAFFITI AND NOT ALL GRAFFITI IS SHOWN.
SPILLWAY HEADWALL JOINT (TYPICAL) PRINCIPAL SPILLWAY CONDUIT JOINT (TYPICAL)
TRAINING WALL JOINT 1 OF 2 (TYPICAL) TRAINING WALL JOINT 2 OF 2 (TYPICAL) BUTTRESS WALL JOINT (TYPICAL)
SHALLOW JOINT REPAIR DETAIL
N.T.S.
DEEP JOINT REPAIR DETAIL
N.T.S.
JOINT REPAIR DETAILS
N.T.S.
CONCRETE SPALL REPAIR DETAIL
N.T.S.
CONCRETE SPALL REPAIR NOTES:
1. PRIOR TO DEMOLISHING THE SPILLWAY CONCRETE SLAB, THE CONTRACTOR AND COR SHALL DETERMINE CONCRETE
SPALL LOCATIONS AND THE EXTENTS TO BE REPAIRED.
2. REMOVE ALL DETERIORATED CONCRETE. REMOVE WATERSTOP. PREPARED EXISTING CONCRETE SURFACE TO BE
ROUGH-CLEAN SURFACE.
3. REMOVE CONCRETE TO SOUND SUBSTRATE, BUT NOT LESS THAN 3-INCHES BELOW EXISTING CONCRETE SURFACE.
4. FORMING MATERIALS, INSTALLATION, AND REMOVAL IN ACCORDANCE WITH SPECIFICATION CS 35.
5. FINISH REPAIRED SURFACE TEXTURE AND FINISH TO MATCH EXISTING, ADJACENT SURFACES.
CONCRETE SPALL AT JOINT REPAIR DETAIL
N.T.S.
PRIMER
JOINT SEALER
SHALLOW JOINT DEPTH
BOND
BREAKER TAPE
EXISTING EXPANSION
JOINT MATERIAL
OR
PREFORMED
EXPANSION
JOINT FILLER
3/4"
1/2" MAX.
JOINT SEALER
PRIMER
BOND
BREAKER TAPEEXISTING EXPANSION
JOINT MATERIAL
OR
PREFORMED
EXPANSION
JOINT FILLER
3/4"
DEEP JOINT
DEPTH
1/2" MAX.
JOINT REPAIR NOTES:
1. USE OF SHALLOW JOINT REPAIR DETAIL VERSUS DEEP JOINT REPAIR DETAIL IS DICTATED BY THE DEPTH OF JOINT SEALER AS RECOMMENDED BY MANUFACTURER, EXCEPT AS STATED IN NOTE 3.
2. REMOVE AND REPLACE DETERIORATED JOINT SEALER ALONG UNSUBMERGED JOINTS ALONG THE SPILLWAY TRAINING WALLS, BUTTRESS WALLS, AND SPILLWAY
HEADWALL.
3. REMOVE AND REPLACE DETERIORATED JOINT SEALER ALONG THE INTERIOR OF THE PRINCIPAL SPILLWAY CONDUIT AND RISER STRUCTURE. THE PRINCIPAL SPILLWAY CONDUIT AND RISER STRUCTURE SHALL BE DEWATERED BY THE CONTRACTOR CONTINUOUSLY DURING PERFORMANCE OF THE WORK. USE DEEP JOINT REPAIR DETAIL
FOR FLOOR JOINTS.
4. PRIOR TO COMMENCING WORK, THE CONTRACTOR AND COR WILL CONFIRM JOINTS AND EXTENTS WHERE DETERIORATED JOINT SEALER WILL BE REPLACED.
5. SUBMIT FOR THE COR'S APPROVAL A FALL PROTECTION PLAN. THE FALL PROTECTION PLAN SHALL IDENTIFY FALL PROTECTION MEASURES AND PROCEDURES THE CONTRACTOR SHALL IMPLEMENT WHEN WORKING ALONG THE TRAINING WALLS, BUTTRESS WALLS, AND SPILLWAY HEADWALL. THE FALL PROTECTION PLAN AT MINIMUM SHALL MEET THE REQUIREMENTS OF OSHA 29 CFR 1926 SUBPART M - FALL PROTECTION.
6. SUBMIT FOR THE COR'S APPROVAL A SURFACE WATER DIVERSION PLAN AS SPECIFIED IN CS11.
7. THE CONTRACTOR IS MADE AWARE THE INTERIORS OF THE…